This is a Highway Maintenance (HM) Pavement Preservation Project in El Dorado County located along U.S. Highway 50 from post mile 15.4 to pos mile 18.8 (in and near Placerville from Weber Creek Bridge to Carson Road Overcrossing).

The work includes cold plane AC pavement followed by placing rubberized hot mix asphalt-gap graded (RHMA-G), placement of new shoulder backing, removing and replacing existing traffic loops, removing and replacing traffic stripes, removing and replacing metal beam guardrail and adjusting guardrail.


PROJECT BENEFITS

Purpose: The purpose of the project is to preserve the drivability and serviceability of this section of Highway 50.

Need: This portion of Highway 50 contains alligator cracking, rutting, delaminating and is degrading such that a HM program is needed to preserve the existing roadway.


FUNDING BREAKDOWN

The Project Approval and Environmental Document (PA&ED) work and the Design support components are being funded from the State Highway’s Major Maintenance Program. The Construction Support and Capital expenses are funded from the SB 1 Program.

COST ESTIMATE:
Support Cost: $370,000
Capital Cost: $2,145,515
Total Project Cost: $2,515,515


PROJECT SCHEDULE

Project Approval & Environmental Document -- 02/17/2016
Design Completed -- 01/31/2017
Advertise Project -- 02/21/2017
Begin Construction -- 05/27/2017
Expected Completion -- 11/01/2018


PROJECT CONTACT

Sameh Hegazi, Project Manager
Phone: (530) 740-5138
Email: sameh.hegazi@dot.ca.gov

Steve Nelson, Public Information Officer
Phone: (530) 741-4566
Email: steve.nelson@dot.ca.gov

NO DOCUMENTS AVAILABLE

NO NEWS AVAILABLE

NO ADDITIONAL PHOTOS OR VIDEOS AVAILABLE


News

Contact Information

General Information:

Phone: (530) 741-4572
Fax: (530) 741-4111

Physical Address:

California Department of Transportation
District 3
703 B Street
Marysville, CA 95901

Caltrans Logo

Translate.