CONTENTS - VOLUME I
   
        Section 1 General (Policy and Procedure)    
        Section 2 Plan Preparation    
        Section 3 Piles    
        Section 4 Footings    
        Section 5 Abutments and Retaining Walls    
        Section 6 Bents and Piers    
        Section 7 Bearing & Expansion Devices    
        Section 8 Deck Slabs    
        Section 9 Existing Bridges    
        Section 10 Reinforced Concrete Box Girders    
        Section 11 Precast and/or Prestressed    
       
CONTENTS - VOLUME II
   
        Section 12 Structural Steel    
        Section 13 Pedestrian Structures    
        Section 14 Railings and Barriers    
        Section 15 Structural Analysis    
        Section 16 Deflections    
        Section 17 Railroads    
        Section 18 Drainage and Utilities    
        Section 19 Estimating    
        Section 20 Seismic    
        Section 21 Miscellaneous    
        Section 22 Sound Walls    
        Section 23 Underground Structures    
               
               
               
       
 
     
T.O.C

Table of Contents

 
     
     
 
CONTENTS - VOLUME I
 
Section 1

General (Policy and Procedure)

 

 

1-0

Routine Screening and Updating of Memos and Manuals (Metric)

Mar 1998

 

1-0 Attachment A

Memo Responsibility (Metric)

Mar 1998

1-1

Division of Structures - Organization Chart

May 1993

1-2

Structure Design Technical Committee

Dec 1998

 

1-2 Attachment 1

Structure Design Technical Committee

Dec 1998

1-2 Attachment 2

Individual Technical Specialists

Dec 1998

 

1-2 Attachment 3

Individual Technical Committee

Sep 1993

 

1-3

Checking Procedure

Jan 1989

 

1-3 Attachment A

Checking Procedure

Jan 1989

 

1-4

Estimated Design Hours for Bridges and Related Structures

Apr 1992

 

1-4 Attachment A

Estimated Design Hours

Apr 1992

 

1-5

Distribution of Plans

Dec 1994/Apr 1996

 

1-5 Attachment A

 

Distribution of Unchecked Details for Earth Retaining Systems <<Interim Oct 2005

 

1-6

Retention of Project Records

Apr 1991

 

1-6 Attachment A

 

Computer File Archive Worksheet (Example) Apr 1991

 

1-7

Retention of Standard Sheet Backup Date

Dec 1990

 

1-7 Attachment A

Location of Backup Calculations for Standard Sheet (Form) Dec 1990

 

1-8

Advance Planning Studies

Aug 1992

 

1-8 Attachment A

Example Mar 1991

1-10

Considering Bridge Security During Design (Metric)

Aug 2004

1-11

Stage Construction Future Widenings

Jul 1989

1-11 Attachment A

Provision for future Widening Jul 1989

1-13

Disposition of Plans Specifications and Estimates (PS & E)

Mar 1989

1-13 Attachment

 

Form DPD - SD51 (Rev 5/78) Mar 1989

1-15

Telephone Calls from Contractors and Suppliers

Jan 1999

 

1-16

Release of Structure's Electronic Contract Plan Files (After Award)(Metric)<<New

Mar 2002

1-16 Attachment 1

Release of Structure's Electronic Contract PlanFiles (After Award)(Metric)<<New Mar 2002

 

1-16 Attachment 2A

Release of Structure's Electronic Contract Plan Files (After Award)(Metric)<<New Mar 2002

 

1-16 Attachment 2B

 

Release of Structure's Electronic Contract Plan Files (After Award)(Metric)<<New Mar 2002

 

1-16 Attachment 2C

Release of Structure's Electronic Contract Plan Files (After Award)(Metric)<<New Mar 2002

 

1-16 Attachment 2D

Release of Structure's Electronic Contract Plan Files (After Award)(Metric)<<New Mar 2002

 

1-16 Attachment 2E

Release of Structure's Electronic Contract Plan Files (After Award)(Metric)<<New Mar 2002

 

1-16 Attachment 3A

Release of Structure's Electronic Contract Plan Files (After Award)(Metric)<<New Mar 2002

 

1-16 Attachment 3B

Release of Structure's Electronic Contract Plan Files (After Award)(Metric)<<New Mar 2002

 

1-16 Attachment 3C

 

Release of Structure's Electronic Contract Plan Files (After Award)(Metric)<<New Mar 2002

 

1-16 Attachment 3D

Release of Structure's Electronic Contract Plan Files (After Award)(Metric)<<New Mar 2002

 

1-20

''As Built Plans'' for Bridges and Structures

Nov 1988

 

1-20 Attachment 1

Procedure on ''As Builts'' for State PS & E Bridge and Structures Nov 1988

 

1-20 Attachment 2

 

Procedure on ''As Builts'' for Local Agency PS & E Bridge and Structures Nov 1988

 

1-21

Bridge "As Built Plans" Changes<<(Coming soon)

Oct 1992

 

1-21 Attachment A

 

Form DS-D0011<<(Coming soon)  Oct 1992

 

1-22

Scheduling Graph

Apr 1989

 

1-22 Attachment

Office of Structure Design Scheduling Bridge Projects Apr 1989

 

1-23

Hydraulic and Hydrologic Data (Metric)

Oct 2003
    Lightweight Masonry Approved for Use on Structures Oct 2003
    Caltrans Bridge Design Specifications, Section 2.7.3.2.1 Sep 2003

 

1-29

Type Selection Review Meeting (Metric) <<Update

Jul 2001

 

1-29 Attachment 1

 

Structure Type Selection (Metric) <<Update Jul 2001

 

1-29 Attachment 2

 

Request for Type Selection Meeting (Metric) <<New Jul 2001

 

1-29 Attachment 3

 

Type Selection Memo (Metric) <<New Jul 2001

 

1-29 Attachment 4

 

Type Selection Recommendations (Metric) <<New Jul 2001

 

1-29 Attachment 5

 

Type Selection Review Meeting for Earth Retaining Structures (Metric) <<Interim Oct 2005

 

1-32

Use of Trade Names in Plans and Specifications (Metric)

Jan 1999

1-32 Attachment 1

 

Policy For Using Trade Names - (from PS & E Guide)(Metric) Jan 1999

 

1-35

Foundation Data (Metric)

Mar 1998

 

1-35 Attachment A

Earth Retaining Structure Foundation Review <<Interim Nov 2004

1-36

Structure Project Engineer's Responsibility for Monitoring Delivery of PS & E Packages

Mar 1991

 

1-37

Duties of Project Designer

Apr 1995

1-38

Project Administrative Records

May 1989

 

1-38 Attachment A

 

Correspondence Record May 1989

 

1-38 Attachment B

 

Telephone Memo May 1989

 

1-38 Attachment C

 

Project Engineer's Checklist May 1989

 

1-38 Attachment D

 

Print Distribution May 1989

 

1-38 Attachment E

 

Historical Cost Record May 1989

 

1-38 Attachment F

 

Check List (Final Check on Completed Sets) May 1989

 

1-38 Attachment G

 

Check List (Check on Road Plans) May 1989

 

1-39

Communication with Field Personnel

May 1989

 

1-40

Processing Standard Plans and Bridge Standard Detail Sheets

Aug 1986

 

1-45

Availability of Structure Slides

Feb 1989

 

1-46

Process for Establishing Depth of Footing to Compensate for Expected Scour

Feb 1990
  1-47 General Notes Oct 2007
  1-47 Attachment 1 Load Factor Design or Load and Resistance Factor Design Oct 2007
 
 
 
 
 
Section 2

Plan Preparation

 

 

2-1

Detailing Contract Plans in Metric

Apr 1996

 

2-1 Attachment A

 

Preferred Metric Scale Apr 1996

 

2-2

Deck Contour (Metric)

Jan 1999

 

2-2 Attachment 1

 

From DS-D134 (Rev 12/88)(Metric) Jan 1999

 

2-11

Bridge Numbering System

Feb 1993

 

2-11

Bridge Numbering System (Metric)

May 1996

2-11 Attachment A

 

Earth Retaining Structures Numbering Responsibility <<Interim May 2004

2-11 Attachment B

 

Earth Retaining Structures Bridge Number Form <<Interim May 2004

 

2-25

Review of Road Plans

May 1989

 

2-25 Attachment

 

Routing and Transmittal of Road Plans May 1989
 
 
 
 
 
Section 3

Piles

 

 

3-0

Pile Foundation Design

Mar 1989

3-1

Deep Foundations (Metric) <<Update

Jan 2001

3-1 Attachment 1

Pile Data Table (Metric) <<Update Jan 2001

3-1 Attachment 2

CIDH Inspection Piles (Metric) <<Update Jan 2001

3-1 Attachment 3

Standard Metric Sizes (Metric) <<Update Jan 2001

 

3-4

Piles Adjacent to Existing Roadway or Private Property

Oct 1988

 

3-6

Large Diameter Hollow Prestressed Driven Piles

Oct 1988
 
 
Section 4

Footings

4-1

Spread Footing (Metric) <<Update

Nov 2003

4-1 Attachment 1

Format for the Final Foundation Report (Metric) <<Update Nov 2003

 

4-2

Superimpose Footing Locations on Log of Test Borings Sheet

Oct 1988
 
 
 
 
Section 5

Abutments and Retaining Walls

 

5-1

Abutments

Oct 1992

 

5-1

Abutments (Metric)

May 1996

 

5-2

Diaphragm Abutments

Oct 1992

 

5-2

Diaphragm Abutments (Metric)

May 1996

 

5-3

Structure Approach

Dec 1992

 

5-3

Structure Approach (Metric)

May 1996

 

5-3 Attachment A

Selection Process for Structure Approach Pavement System on PCC Pavement (Metric) May 1996

 

5-3 Attachment B

 

Selection Process for Structure Approach Pavement System on AC Pavement (Metric) May 1996

5-7

Earth Retaining System Safety Railing (Metric) <<Update

Jan 2005

 

5-8

Mechanically Stabilized Embankment

Jan 1991

 

5-8 Attachment A

 

Implementaton of PS&E Jan 1991

 

5-8 Attachment B

 

Outline of Design Responsibilities Jan 1991

 

5-10

Slope Treatment Under Structures

Apr 1989

 

5-12

Earth Retaining Structures Using Tiebacks

Aug 1990

 

5-14

Review of Working Drawings for Tieback Anchors

Oct 1988

 

5-16

Review of Working Drawings for Proprietary Earth Retaining Systems

Apr 1992

 

5-17

Earth Retaining Structures (Costs)

Feb 1989

 

5-17 Attachment

 

Earth Retaining Structures (Graph) Feb 1989

 

5-18

Soil Nail Walls

Jan 1991

5-18 Attachment A

 

Soil Nail Working Drawings Review Process <<Interim Oct 2004

 

5-20

Foundation Report/Geotechnical Design Report Checklist for Earth Retaining Systems (Metric)

Aug 2004
 
 
     
Section 6

Bents and Piers

 

 

6-1

Column Analysis Considerations

Jun 1990

6-1

Column Analysis Considerations (Metric) <<Update

Oct 2001