Office of Special Funded Projects and Structures Local Assistance (OSFP/SLA)


OSFP Information and Procedures Guide

The OSFP Information and Procedures Guide contains the general policies and procedures of the Office of Special Funded Projects.

MANUAL SECTIONS
 
Date
Section Document

07/2007   Binder Cover Sheets
07/2007   Title Sheet
12/2012   Revisions
12/2012   Table of Contents
 
Section 1 - General Information
 
06/2002 1-1 Introduction
06/2002 1-2 Roles and Responsibilities
06/2002 1-3 Project Liaison and Oversight
06/2002 1-4 Published Design and Procedural documents
12/2012 1-5 Statement of Work for Structures
06/2002 1-6 Quality Control Plan
12/2012 1-7 Deliverables
06/2002 1-8 Updating Projects for Advertisement
06/2002 1-9 Project Records
 
Section 2 - Typical Project Information
 
06/2002 2-1 Bridge Names and Numbers
06/2002 2-2 Plans
12/2012 2-3 Foundation Report
06/2002 2-4 Hydraulics Report
06/2002 2-5 Field Assessments
03/2004 2-6 Miscellaneous Structures
 
Section 3 - Project Initiation and Preliminary Engineering
 
06/2002 3-1 Project Initiation
06/2002 3-2 Advance Planning Studies
06/2002 3-3 Value Analysis Studies
 
Section 4 - Design and Award
 
10/2002 4-1 Preliminary Data
06/2002 4-2 Structure Type Selection
12/2012 4-3 Unchecked Details Submittal
12/2012 4-4 PS&E Deliverables, Review, & Approval
03/2004 4-5 Structure Calculations
12/2012 4-6 Contract Special Provisions
03/2004 4-7 PS&E Estimates
12/2012 4-8 Road Plans and Special Provisions
12/2012 4-9 Resident Engineer's Pending File
09/2003 4-10 Pumping Plants
06/2002 4-12 Contract documents
03/2004 4-13 Addenda
06/2002 4-14 Bidder's Inquiries
 
Section 5 - Construction
 
09/2003 5-1 Roles and Responsibilities
03/2004 5-2 Contract Change Orders
03/2004 5-3 Cost Reduction Incentive Proposals
09/2006 5-4 Working Drawings and Submittals
10/2003 5-5 Structure As-Built Plans
 
EDITABLE ATTACHMENTS
 
Date
Section Document

03/2004 1-5.1 Statement of Work for Structures
06/2002 1-6.1 Quality Control Plan Checklist
06/2004 3-2.1 Consultant Prepared APS Checklist
03/2003 4-1.1 Bridge Site Data Submittal (Preliminary Investigations)  
06/2002 4-1.2 Bridge or Structure Field Site Investigation Checklist
06/2002 4-1.3 Railroad Separation Field Site Investigation Checklist
06/2002 4-1.4 Bridge or Structure Hydraulic Site Survey Checklist
06/2002 4-1.5 Foundation Plan Preparation Checklist
01/2011 4-6.1 Memo To Specifications Engineer/Estimator
 
Forms referenced in Section 4-7 "PS&E Estimates":
 
Quantity Summaries & Cost Estimates (Structure Office Engineer)(EXCEL)
Working Days Schedule
 

Statewide Alerts and Other Information.