Listing for all primes seeking assistance with project 10-0K0214. 2 results found.
Contractor: Marina Landscape, Inc. Contact: Rick Reynolds
Address: 1900 S. Lewis St. Anaheim, Ca. 92805
Phone: (714) 704-0459 Fax: (714) 935-1199 Email: rreynolds@marinaco.com
Services needed: Marina Landscape is seeking DVBE participation for all item including, lead compliance plan, construction area signs, traffic control system, portable changeable message signs, job site management, prepare water pollution control program, temporary construction entrance, temporary concrete washout, temporary fence (type ESA), Roadside Clearing, Soil Amendments, Plant Material, Irrigation Materials, Wood Mulch, 4' Chain link gates (type CL-6) Booster Pump, Maintaining existing traffic management system elements during construction, Electric Service (irrigation) Items have been broken out to facilitate participation and further breakout possible to help bidding economic feasible items upon request
Requirements: Marina is signatory with the Operating Engineers, Laborers, and Pipefitters unions. 100% performance and payment bonds may be required for the full amount of contract price. Subcontractors must possess a current california contractors licence for the trade they are quoting, must carry workmans compensation coverage and insurance meeting Caltrans requirements. Marina will pay for up to 1-1/2% of bond rate. Please call for any assistance. Marina is a equal Opportunity Employer.
Date posted: 07/14/2014
Contractor: WABO Landscape & Construction, Inc. Contact: Mark Gomes
Address: 726 Alfred Nobel Dr. Hercules, CA 94547
Phone: 510 741-9226 Fax: 510 724-2391 Email: admin@wabo.com
Services needed: WABO Landscape & Construction, Inc., requests quotes from all vendors and qualified subcontractors including Certified DBVE vendors and subcontractors for this project. Items to be subcontracted include, but are not limited to, LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY CONSTRUCTION ENTRANCE, TEMPORARY CONCRETE WASHOUT, TEMPORARY FENCE (TYPE ESA), 4' CHAIN LINK GATE (TYPE CL-6), MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, and ELECTRIC SERVICE (IRRIGATION). Materials required for this project include, but are not limited to wood mulch, soil amendments, fertilizer packets, plants, wire and irrigation materials which include pipe, sprinklers, bubblers and valves, etc.
Requirements: WABO is signatory with the operating engineers, laborers and plumbers unions. We may require bonds. Subcontractors will be required to meet our insurance requirements and sign our standard subcontract. Please contact us for more specific information, or if you wish to discuss the scope of work you are interested in participating in. We may be able to assist with obtaining bonding, insurance, or necessary equipment and supplies. Contact us for more details.
Date posted: 07/21/2014