Listing for all primes seeking assistance with project 08-0R7804. 6 results found.
Contractor: Ferreira Construction Company inc., dba Ferreira Coastal Construction Company Contact: Kevin Raleigh
Address: 15188 Vista Del Rio Ave Chino, CA 91710
Phone: 909-606-5900 Fax: 909-606-7711 Email: kraleigh@ferreiraconstruction.com
Services needed: Lead Compliance, Construction Area Signs, Traffic Control, PCMS, Temporary Alternative Crash Cushion, Job Site Management, Prepare WPCP, Clearing and Grubbing, Roadway Excavation, Weed Control Mat, HMA Type A, Remove AC Dike,
Requirements: Union Signatory
Date posted: 07/24/2017
Contractor: Coral Construction Company Contact: Marc Roberts
Address: 10780 SW Clutter Road Sherwood, OR 97140
Phone: 503-682-2252 Fax: 503-682-0110 Email: marcroberts@coralconstruction.com
Services needed: LEAD COMPLIANCE PLAN, CONST. AREA SIGNS, TRAFFIC CONTROL SYSTEM, CLEARING AND GRUBBING, ROADWAY EXCAVATION, WEED CONTROL, ASPHALT, HOT MIX, REMOVE CONCRETE DIKE, STAINING METAL GUARDRAIL SURFACES.
Requirements: Coral Construction Company is seeking qualified DBE/DVBE/SBE Subcontractors and Suppliers for this project. We are an equal opportunity employer and intend to seriously negotiate with qualified DBE/DVBE/SBE Subcontractors and Suppliers for project participation. All Subcontractors must possess a current California Contractors License, insurance and workers compensation coverage meeting Coral?s requirements and will be required to sign the standard Coral Construction Company Subcontract Agreement. A copy of the insurance requirements and subcontract agreement can be obtained by contacting the project estimator. 100% Performance and Payment bonds will be required for all Subcontractors. Please call Coral Construction Company if you need assistance obtaining insurance, bonds or lines of credit. Coral is Union Signatory. Subcontractor, Supplier and Trucking quotes must be valid for the award period stated in the contract documents. Conditions or exceptions in Subcontractors quotes are expressly rejected unless accepted in writing prior to bid. Plans and specifications can be viewed on line at http://www.dot.ca.gov/hq/esc/oe/project_ads_addenda/08/08-0R7804//
Date posted: 07/25/2017
Contractor: Alcorn Fence Company Contact: Tom Stack
Address: 9901 Glenoaks Blvd. Sun Valley, CA 91352
Phone: 323-875-1342 Fax: 818-768-9719 Email: tom@alcorn-fence.com
Services needed: Alcorn Fence Company is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY ALTERNATIVE CRASH CUSHION, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TREATED WOOD WASTE, CLEARING AND GRUBBING, ROADWAY EXCAVATION, WEED CONTROL MAT (RUBBER), HOT MIX ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE C), REMOVE ASPHALT CONCRETE DIKE, STAINING GALVANIZED METAL GUARD RAILING SURFACES, GUARD RAILING DELINEATOR, OBJECT MARKER, MIDWEST GUARDRAIL SYSTEM (STEEL POST), MIDWEST GUARDRAIL SYSTEM (9' STEEL POST), ALTERNATIVE IN-LINE TERMINAL SYSTEM, ALTERNATIVE FLARED TERMINAL SYSTEM, & REMOVE GUARDRAIL. Alcorn will work with interested subcontractors/suppliers to identify opportunities to break down items into economically feasible packages.
Requirements: Alcorn Fence Company is signatory to Operating Engineers, Laborers, and Cement Masons unions. 100% Payment and Performance Bonds from an accepted surety may be required. Subcontractors must possess a current contractor?s license, be registered with the Department of Industrial Relations (DIR) pursuant to the Labor Code section 1725.5, provide insurance and worker?s compensation coverage meeting Alcorn?s requirements and will be required to sign the standard Alcorn?s Subcontract Agreement. Assistance in bonding, insurance, lines of credit or obtaining equipment, supplies, materials, or related assistance or services is available upon request. Alcorn intends to work cooperatively with all qualified firms seeking work on this project. Plans and specifications are available for viewing at our office located at 9911 Glenoaks Blvd., Sun Valley, CA. Alcorn Fence Company is Equal Opportunity Employer and Women/Minority Employees are encouraged to apply.
Date posted: 07/31/2017
Contractor: ACE FENCE COMPANY Contact: BEN LAYOS
Address: 727 NORTH GLENDORA AVE. LAPUENTE, CA 91744
Phone: 626-333-0727 Fax: 626-333-7843 Email: blayos@acefencecompany.com
Services needed: We are seeking a certified and qualified subcontractors and suppliers including DBE Firms for the following Item of works, Lead Compliance Plan, Construction Area signs, Traffic Control System, PCMS, Temporary Alternative Crash Cushion, Job Site Management, PWPCP, Disposal of Treated Wood Waste, Clearing & Grabbing, Roadway Excavation, Weed Control Mat (Rubber),Hot Mix Asphalt (type A), Place Hot mix Asphalt Dike (Type A & C), Removal of asphalt dike, Staining Galvanized Metal Guardrail Surfaces, Guardrailing Delineator, Object marker, Midwest Guardrail System, Alternative Terminal Systems& Remove Guardrail.
Requirements: Union Signatory
Date posted: 08/03/2017
Contractor: Future DB International Inc. Contact: Future DB International Inc.
Address: 8707 Research Dr Irvine, CA 92618
Phone: 949-390-2110 Fax: 949-732-4355 Email: estimating@futuredbi.com
Services needed: Lead compliance plan, Traffic control, Construction area signs, PCMS, SWPPP, Treated wood waste, Weed control, HMA, HMA Dike, AC Dike removal, Galvanized Metal Guard rail, Guard rail delineator, Midwest guard rail, Inline terminal system.
Requirements:
Date posted: 08/10/2017
Contractor: LMS Transport & LMN Concrete & Grinding Contact: Anthony Steen
Address: 2751 Avalon St Jurupa Valley
Phone: 9516163828 Fax: 951-685-1862 Email: orders@lms-transport.com
Services needed: Oil supply and haul, Cold Milling, and dump trucks all work codes DBE certified.
Requirements:
Date posted: 08/14/2017