Listing for all primes seeking assistance with project 03-1F1904. 2 results found.
Contractor: Martin Brothers Construction Contact: Connie Dennis
Address: 8801 Folsom Blvd Suite 260 Sacramento CA 95826
Phone: 916-381-0911 Fax: 916-381-1447 Email: cdennis@martinbrothers.net
Services needed: Martin Brothers Construction is requesting quotes from all qualified subcontractors and suppliers including certified SBE / DBE firms for the following items of work, including but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMPORARY TRAFFIC STRIPE (PAINT), PLASTIC TRAFFIC DRUMS, PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY RAILING (TYPE K), ALTERNATIVE TEMPORARY CRASH CUSHION, TEMPORARY TRAFFIC SCREEN, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMPORARY COVER, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, TEMPORARY SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, ADL BURIAL LOCATION REPORT, TREATED WOOD WASTE, REMOVE CONCRETE, REMOVE CONCRETE (MISCELLANEOUS), TEMPORARY HIGH-VISIBILITY FENCE, ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD), ROADWAY EXCAVATION, GEOSYNTHETIC REINFORCEMENT, ROADSIDE CLEARING, SOIL AMENDMENT, PACKET FERTILIZER, SLOW-RELEASE FERTILIZER, PLANT (GROUP B), PLANT (GROUP U), MAINTAIN EXISTING PLANTED AREAS, PLANT ESTABLISHMENT WORK, WOOD MULCH, CHECK AND TEST EXISTING IRRIGATION FACILITIES, OPERATE EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY, CONTROL AND NEUTRAL CONDUCTORS, 1" REMOTE CONTROL VALVE, RISER SPRINKLER ASSEMBLY, 2" GATE VALVE, 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), 8" CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT, 6" CORRUGATED STEEL PIPE CONDUIT (.064" THICK), MOVE-IN/MOVE-OUT (EROSION CONTROL), BONDED FIBER MATRIX, FIBER ROLLS, CLASS 2 AGGREGATE BASE, HOT MIX ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE F), TACK COAT, 60" CAST-IN-DRILLED-HOLE CONCRETE PILE (SIGN FOUNDATION), STRUCTURAL CONCRETE, DRAINAGE INLET, FURNISH SIGN STRUCTURE (TRUSS), INSTALL SIGN STRUCTURE (TRUSS), REMOVE SIGN STRUCTURE, 24" REINFORCED CONCRETE PIPE, 12" CORRUGATED STEEL PIPE, DRAINAGE INLET MARKER, 24" CONCRETE FLARED END SECTION, REMOVE CULVERT, REMOVE INLET, REMOVE FLARED END SECTION, ROCK SLOPE PROTECTION (NO. 2, METHOD B), ROCK SLOPE PROTECTION FABRIC (CLASS 8), MINOR CONCRETE (GUTTER), MINOR CONCRETE (TEXTURED PAVING), REMOVE CONCRETE (CURB AND GUTTER), MISCELLANEOUS IRON AND STEEL, 4' CHAIN LINK GATE (TYPE CL-3), DELINEATOR (CLASS 1), PAVEMENT MARKER (RETROREFLECTIVE), REMOVE ROADSIDE SIGN, FURNISH LAMINATED PANEL SIGN (1" TYPE A) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED) FOR RETROREFLECTIVE SHEETING(TYPE XI), RETROREFLECTIVE SHEETING (TYPE XI), ROADSIDE SIGN - ONE POST, INSTALL SIGN PANEL ON EXISTING FRAME, MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), TRANSITION RAILING (TYPE WB-31) END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE IN-LINE TERMINAL SYSTEM, REMOVE GUARDRAIL, REMOVE CONCRETE BARRIER, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 6-1), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC TRAFFIC STRIPE (WATER BLASTING), MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION MODIFYING EXISTING ELECTRICAL SYSTEM,TRUCKING AND SUPPLIER QUOTES on all Required Materials per Project Plans & Specifications. Quotations will be broken down into comparable packages as reasonably necessary. Martin Brothers will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: Martin Brothers Construction is signatory to Operating Engineers, Cement Masons and Laborers. 100% performance and payment bonds may be required for the full amount of subcontract price. Martin Brothers Construction will pay for bond premium up to 1.5%. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Martin Brother?s requirements and will be required to sign the standard Martin Brothers Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. Plans and specifications are available for viewing at our office located at 8801 Folsom Blvd Suite 260, Sacramento, CA and on the CDOT website. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. Martin Brothers Construction intends to work cooperatively with all qualified firms seeking work on this project. Martin Brothers Construction is an equal opportunity employer
Date posted: 11/26/2018
Contractor: DeSilva Gates Construction Contact: Eric Allred
Address: 11555 Dublin Blvd., Dublin, CA 94568
Phone: 925-829-9220 Fax: 925-803-4263 Email: dgcestimating@desilvagates.com
Services needed: DeSilva Gates Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE/SBE firms for the following types of work, including but not limited to: Cold Plane, Construction Area Signs, Electrical, Erosion Control, Guardrailing, HMA Dike, Landscaping, Minor Concrete, Minor Concrete Structures, Roadside Signs, Sign Structures, Striping and Pavement Markers, SWPPP Prep, Underground Work, Vegetation Control Concrete, Trucking, Sweeping, Water Trucks, Erosion Control Materials, Imported Borrow Material, Shoulder Backing Material, Aggregate Subbase Material, Aggregate Base Material, HMA Material, RHMA Material and Tack Coat Material.
Requirements: DeSilva Gates is signatory to Operating Engineers and Laborers unions. 100% performance and payment bonds may be required for the full amount of subcontract price. DeSilva Gates will pay for bond premium up to 2%. Subcontractors must possess current insurance and worker?s compensation coverage meeting DeSilva Gates Construction?s requirements. Subcontractor will be required to sign the standard DeSilva Gates Construction Subcontract Agreement. A copy of the agreement can be obtained from our estimator. Quotations must be valid for the same duration as specified by the Owner for Contract Award. Plans and specifications are available for viewing at our Dublin office. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. DeSilva Gates intends to work cooperatively with all qualified firms seeking work on this project. DeSilva Gates is an equal opportunity employer.
Date posted: 12/17/2018