Listing for all primes seeking assistance with project 02-4F8604. 6 results found.
Contractor: Myers and Sons Construction, LLC Contact: Mike Lewis
Address: 4600 Northgate Blvd., Suite 100 Sacramento, CA 95834
Phone: 916-283-9950 Fax: 916-614-9520 Email: mlewis@myers-sons.com
Services needed: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PCMS, SWPPP, TEMP EROSION CONTROL, STREET SWEEPING, TEMPORARY CREEK DIVERSION SYSTEM, ASBESTOS COMPLIANCE PLAN, NOA BURIAL LOCATION REPORT, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST, NATURAL RESOURCE PROTECTION PLAN, INVASIVE SPECIES PREVENTION PLAN, DUST CONTROL PLAN (NATURALLY OCCURRING ASBESTOS), TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), DUST PALLIATIVE, ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS), SHOULDER BACKING, DITCH EXCAVATION, GEOSYNTHETIC REINFORCEMENT EMBANKMENT, CRUSHED ROCK, ROLLED EROSION CONTROL PRODUCT (JUTE MESH), HYDROMULCH, HYDROSEED, IMPORTED BIOFILTRATION SOIL, COMPOST (CY), INCORPORATE MATERIALS, FINISHING ROADWAY, CLASS 2 AGGREGATE BASE, HMA, HMA DIKE, TACK COAT COLD PLANE AC PAVEMENT, RAIL ELEMENT WALL, 24? CIDH PILING, FURNISH READY MIX, JOINT SEAL, REBAR, 24" CORRUGATED STEEL PIPE (.079" THICK), 24" STEEL FLARED END SECTION, RSP, MISC IRON AND STEEL, DELINEATOR, MILEPOST MARKER, MARKER (CULVERT), OBJECT MARKER, SIGNS, MIDWEST GUARDRAIL SYSTEM, TRANSITION RAILING (TYPE WB 31), ALT IN LINE TERMINAL SYSTEM, CALIFORNIA ST 20S BRIDGE RAIL, THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE), ETC.***All items are open for bid, including items for work normally performed by Myers and Sons Construction. Quotations will be broken down into comparable packages as reasonably necessary. Myers and Sons Construction will work with interested DBE subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: 100% performance and payment bonds may be required for the full amount of the subcontract price. Subcontractors must possess a valid contractor's license, DIR registration number, current insurance meeting Myers and Sons Construction's requirements. Subcontractors will be required to sign the standard Myers and Sons Construction, LP Subcontract Agreement. Quotations must be valid for one hundred and twenty (120) days after the specified Contract Award Date by the Owner. Plans and Specifications are available for viewing at http://www.dot.ca.gov/des/oe/NDA-test.php?id=02-4F8604/plans/02-4f8604_plans.pdf http://www.dot.ca.gov/des/oe/weekly-ads/specs-ntb.php?c=02-4F8604 or at our Sacramento office, please contact (916) 283-9950 or estimating@myers-sons.com. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies or visit our website at www.myers-sons.com for more information. Myers and Sons Construction, LP will work cooperatively with all qualified firms seeking work on this project. Myers and Sons Construction is signatory to the Laborers, Carpenters, Cement Masons and Operating Engineers. Myers and Sons Construction, LP is an equal opportunity employer.
Date posted: 06/27/2018
Contractor: Mercer-Fraser Company Contact: Verity Penland
Address: PO Box 1006 Eureka, CA 95502
Phone: 707-443-6371 Fax: 707-443-0277 Email: vpenland@mercerfraser.com
Services needed: Mercer-Fraser is currently requesting quotes from all qualified DBE subcontractors and/or suppliers for the following items of work: 1 LEAD COMPLIANCE PLAN 2 PROGRESS SCHEDULE (CRITICAL PATH METHOD) 3 TIME-RELATED OVERHEAD (LS) 4 DEVELOP WATER SUPPLY 5 CONSTRUCTION AREA SIGNS 6 TRAFFIC CONTROL SYSTEM 7 PORTABLE CHANGEABLE MESSAGE SIGN (LS) 8 JOB SITE MANAGEMENT 9 PREPARE STORM WATER POLLUTION PREVENTION PLAN 10 RAIN EVENT ACTION PLAN 11 STORM WATER SAMPLING AND ANALYSIS DAY 12 STORM WATER ANNUAL REPORT 13 MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) 14 TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX) 15 TEMPORARY TACKED STRAW 16 TEMPORARY CHECK DAM 17 TEMPORARY DRAINAGE INLET PROTECTION 18 TEMPORARY FIBER ROLL 19 TEMPORARY SILT FENCE 20 TEMPORARY STRAW BALE BARRIER 21 TEMPORARY CONSTRUCTION ENTRANCE 22 STREET SWEEPING 23 TEMPORARY CONCRETE WASHOUT 24 WATER QUALITY SAMPLING AND ANALYSIS DAY 25 WATER QUALITY MONITORING REPORT 26 WATER QUALITY ANNUAL REPORT 27 TEMPORARY CREEK DIVERSION SYSTEM 28 ASBESTOS COMPLIANCE PLAN 29 NOA BURIAL LOCATION REPORT 30 TREATED WOOD WASTE 31 CONTRACTOR-SUPPLIED BIOLOGIST (DAY) 32 NATURAL RESOURCE PROTECTION PLAN 33 INVASIVE SPECIES PREVENTION PLAN 34 DUST CONTROL PLAN (NATURALLY OCCURRING ASBESTOS) 35 TEMPORARY HIGH-VISIBILITY FENCE 36 CLEARING AND GRUBBING (LS) 37 DUST PALLIATIVE 38 ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) 39 SHOULDER BACKING 40(F) STRUCTURE EXCAVATION (BRIDGE) 41(F) STRUCTURE EXCAVATION (BRIDGE) (NATURALLY OCCURRING ASBESTOS) 42(F) STRUCTURE BACKFILL (BRIDGE) 43 DITCH EXCAVATION 44 GEOSYNTHETIC REINFORCEMENT EMBANKMENT 45 CRUSHED ROCK 46 ROLLED EROSION CONTROL PRODUCT (JUTE MESH) 47 HYDROMULCH 48 HYDROSEED (HBGM)(SWALE) 49 HYDROSEED (HBGM)(UPLAND) 50 HYDROMULCH (FRM A) 51 HYDROMULCH (FRM B) 52 HYDROSEED 53 IMPORTED BIOFILTRATION SOIL 54 COMPOST (CY) 55 INCORPORATE MATERIALS 56 FINISHING ROADWAY 57 CLASS 2 AGGREGATE BASE (CY) 58 HOT MIX ASPHALT (TYPE A) 59 PLACE HOT MIX ASPHALT DIKE (TYPE C) 60 PLACE HOT MIX ASPHALT DIKE (TYPE D) 61 PLACE HOT MIX ASPHALT DIKE (TYPE F) 62 TACK COAT 63 COLD PLANE ASPHALT CONCRETE PAVEMENT 64 RAIL ELEMENT WALL 65 24" CAST-IN-DRILLED-HOLE CONCRETE PILING 66(F) STRUCTURAL CONCRETE, BRIDGE FOOTING 67(F) STRUCTURAL CONCRETE, BRIDGE 68(F) STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER) 69 STRUCTURAL CONCRETE, HEADWALL 70 STRUCTURAL CONCRETE, DRAINAGE INLET 71 JOINT SEAL (MR 2") 72(F) BAR REINFORCING STEEL (BRIDGE) 73(F) BAR REINFORCING STEEL (EPOXY COATED) (BRIDGE) 74 PREPARE CONCRETE BRIDGE DECK SURFACE 75 FURNISH POLYESTER CONCRETE OVERLAY 76(F) PLACE POLYESTER CONCRETE OVERLAY 77 24" CORRUGATED STEEL PIPE (.079" THICK) 78 24" STEEL FLARED END SECTION 79 ABANDON CULVERT (LF) 80 REMOVE CULVERT (LF) 81 REMOVE DOWNDRAIN (EA) 82 ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY) 83 ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) 84 ROCK SLOPE PROTECTION (STREAMBED MATERIAL)(CY) 85 ROCK SLOPE PROTECTION FABRIC (CLASS 8) 86(F) MISCELLANEOUS IRON AND STEEL 87 DELINEATOR (CLASS 2) 88 MILEPOST MARKER 89 MARKER (CULVERT) 90 OBJECT MARKER (TYPE L-1) 91 REMOVE ROADSIDE SIGN 92 ROADSIDE SIGN - TWO POST 93 MIDWEST GUARDRAIL SYSTEM (STEEL POST) 94 TRANSITION RAILING (TYPE WB-31) 95 ALTERNATIVE IN-LINE TERMINAL SYSTEM 96(F) CALIFORNIA ST-20S BRIDGE RAIL (MODIFIED) 97 THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE) 98 MOBILIZATION
Requirements: Mercer Fraser Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Mercer-Fraser Company is a union signatory contractor. Subcontractors must possess a current contractor?s license, worker?s compensation and insurance coverage during the entire length of the prime contract. 100% Performance and Payment Bonds may be required. Conditions or exceptions in Subcontractor?s quote are expressly rejected unless accepted in writing. All Subcontractors will be required to sign our standard Subcontract Agreement. Plans and specifications are available for viewing at our office or you may call Mercer-Fraser Company for further assistance. Please call if assistance is needed in obtaining bonding, insurance, equipment, materials and supplies. Mercer-Fraser Company intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will consider all bids that may be submitted.
Date posted: 06/28/2018
Contractor: Steelhead Constructors, Inc. Contact: Kelly Knight
Address: 2940 Innsbruck Drive, Redding, CA 96003
Phone: 530-226-6400 Fax: 530-226-6401 Email: kelly@steelheadconstructors.com
Services needed:
Requirements:
Date posted: 06/29/2018
Contractor: Steelhead Constructors, Inc Contact: Kelly Knight
Address: 2940 Innsbruck Drive Redding, CA 96003
Phone: 5302266400 Fax: 5302266401 Email: kelly@steelheadconstructors.com
Services needed: We are requesting quotes from all qualified subcontractors and suppliers, including all certified DVBE/DBE/MBE/WBE/MB subcontractors. We are soliciting quotes for (including but not limited to): Hot Mix Asphalt (Type A), 24?Cast-In-Drilled-Hole Concrete Piling, Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel ( Epoxy Coated) (Bridge), Prepare Concrete Deck Surface, Furnish Polyester Concrete Overlay, Place Polyester Concrete Overlay, Midwest Guardrail System (Steel Post), Transition Railing (Type WB-31), Alternative In-Line Terminal System, California ST-20S Bridge Rail (Modified), The quotations may be broken down into comparable units as reasonably necessary. Steelhead will work with suppliers and subcontractors to identify opportunities and break down items into economically feasible units.
Requirements: Steelhead Constructors, Inc. (Steelhead) will be bidding the referenced project as a prime contractor. Plans and specifications for this project may be viewed on the Caltrans Website, at your local builder?s exchange and are available for review in our office. If you require additional information regarding the requirements of the contract, please don?t hesitate to call our office. In order that we may give your bid maximum consideration, please supply us with a FAX letter prior to the bid describing the scope of your work. Steelhead is an Equal Employment Opportunity Employer. We encourage and actively solicit proposals from DVBE, DBE, MBE, WBE, DBE and MB subcontractors and suppliers on all our projects. All qualified DVBE, DBE, MBE, WBE, and MB subcontractors must be registered and certified by the California Department of Transportation. Steelhead is signatory to Operating Engineers, Laborers, Carpenters and Cement Masons Unions. All subcontractors must possess a current contractor?s license, insurance, and workers? compensation coverage meeting Steelhead?s requirements and will be required to sign Steelhead?s Subcontract Agreement. Performance and payment bonds up to 100% may be required for the full amount of the subcontract price. Prior to the bid, upon request, you can contact our office if you require assistance in bonding, lines of credit, insurance, obtaining necessary equipment, supplies, materials or services, establishing delivery schedules, etc., which may be required by the Owner. Please contact our office and advise us if you are interested in this project. When submitting any bid on a public works project, please prominently include, on your quote, your California Contractors License Number and Department of Industrial Relations Number. More information regarding California Contractors License and DIR Numbers can be found at http://www.cslb.ca.gov/ and http://www.dir.ca.gov/Public-Works/PublicWorks.html Sincerely, STEELHEAD ONSTRUCTORS, INC. Kelly Knight The Estimating Department 530-226-6400 ask for Kelly Knight
Date posted: 07/05/2018
Contractor: Stimpel-Wiebelhaus Associates, Inc Contact: Marshall Harmon
Address: 1168 Industrial St. Redding, CA, 96002
Phone: 530-356-4454 Fax: 530-223-3879 Email: marshall@stimpel.net
Services needed: We are seeking quotes from all qualified DBE subcontractors and suppliers for the following items: LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE, TIMERELATED OVERHEAD, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, JOB SITE MANAGEMENT, PREPARE SWPPP, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL, TEMPORARY HYDRAULIC MULCH, TEMPORARY TACKED STRAW, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY SILT FENCE, TEMPORARY STRAW BALE BARRIER, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, WATER QUALITY ANNUAL REPORT, TEMPORARY CREEK DIVERSION SYSTEM, ASBESTOS COMPLIANCE PLAN, NOA BURIAL LOCATION REPORT, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST, NATURAL RESOURCE PROTECTION PLAN, INVASIVE SPECIES PREVENTION PLAN, DUST CONTROL PLAN (NATURALLY OCCURRING ASBESTOS), TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING, DUST PALLIATIVE, ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS), SHOULDER BACKING, STRUCTURE EXCAVATION (BRIDGE), STRUCTURE EXCAVATION (BRIDGE) (NATURALLY OCCURRING ASBESTOS), STRUCTURE BACKFILL (BRIDGE), DITCH EXCAVATION, GEOSYNTHETIC REINFORCEMENT EMBANKMENT, CRUSHED ROCK, ROLLED EROSION CONTROL PRODUCT (JUTE MESH), HYDROMULCH, HYDROSEED (HBGM)(SWALE), HYDROSEED (HBGM)(UPLAND), HYDROMULCH (FRM A), HYDROMULCH (FRM B), HYDROSEED, IMPORTED BIOFILTRATION SOIL, COMPOST, INCORPORATE MATERIALS, FINISHING ROADWAY, CLASS 2 AGGREGATE BASE, HOT MIX ASPHALT (TYPE A), PLACE HMA DIKE (TYPE C), PLACE HMA DIKE (TYPE D), PLACE HMA DIKE (TYPE F), TACK COAT, COLD PLANE AC PAVEMENT, RAIL ELEMENT WALL, 24" CAST-IN-DRILLEDHOLE CONCRETE PILING, STRUCTURAL CONCRETE BRIDGE FOOTING, STRUCTURAL CONCRETE BRIDGE, STRUCTURAL CONCRETE BRIDGE (POLYMER FIBER), STRUCTURAL CONCRETE HEADWALL, STRUCTURAL CONCRETE DRAINAGE INLET, JOINT SEAL (MR 2"), BAR REINFORCING STEEL (BRIDGE), BAR REINFORCING STEEL (EPOXY COATED) (BRIDGE), PREPARE CONCRETE BRIDGEDECK SURFACE, FURNISH POLYESTER CONCRETE OVERLAY, PLACE POLYESTER CONCRETE OVERLAY, 24" CORRUGATED STEEL PIPE (.079" THICK), ABANDON CULVERT, REMOVE CULVERT, REMOVE DOWNDRAIN, ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B), ROCK SLOPE PROTECTION (STREAMBED MATERIAL), ROCK SLOPE PROTECTION FABRIC (CLASS 8), MISCELLANEOUS IRON AND STEEL, DELINEATOR, MILEPOST MARKER, MARKER, OBJECT MARKER (TYPE L-1), REMOVE ROADSIDE SIGN, ROADSIDE SIGN-TWO POST, MIDWEST GUARDRAIL SYSTEM (STEEL POST), TRANSITION RAILING (TYPE WB-31), ALTERNATIVE IN-LINE TERMINAL SYSTEM, CALIFRONIA ST20S BRIDGE RAIL (MODIFIED), THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE), MOBILIZATION
Requirements: STIMPEL-WIEBELHAUS ASSOCIATES, INC. (SWA) WILL WORK WITH INTERESTED SUBCONTRACTORS TO IDENTIFY OPPORTUNITIES TO BREAK DOWN ITEMS INTO ECONOMICALLY FEASIBLE PACKAGES TO ENCOURAGE MINORITY CONTRACTOR PARTICIPATION. SWA IS A UNION SIGNATORY CONTRACTOR AND SUBS SHALL BE REQUIRED TO BE OR TO SIGN AN APPROVED ONE TIME TERMS/CONDITIONS AGREEMENT PLANS AND SPECIFICATIONS ARE AVAILABLE FOR VIEWING AT OUR OFFICE OR CAN BE DOWNLOADED FROM THE OWNERS WEBSITE. PLEASE CONTACT SWA FOR ANY FUTHER ASSISTANCE AND IF ANY HELP IS NEEDDED IN OBTAINING BONDING, INSURANCE, EQUIPMENT, MATERIALS, OR SUPPLIES SWA INTENDS TO WORK COOPERATIVELY WITH ALL QUALIFIED FIRMS SEEKING TO WORK ON THIS PROJECT. WE ARE AN EQUAL OPPORTUNITY EMPLOYER AND WILL CONSIDER ANY AND ALL BIDS THAT MAY BE SUBMITTED
Date posted: 07/05/2018
Contractor: Golden State Bridge, Inc. Contact: David Riccitiello
Address: 3701 Mallard Drive Benicia, CA 94510
Phone: 925-372-8000 Fax: 925-372-8001 Email: dave@gsbridge.com
Services needed: Lead Compliance Plan, Develop Water Supply, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Prepare SWPPP, Rain Event Action Plan, Storm Water Sampling and Analysis Day, Strom Water Annual Report, Move-In/Move-Out (Temp Erosion Control), Temp. Hydraulic Mulch (Bonded Fiber Matrix), Temp. Tacked Straw, Temp Check Dam, Temp. Drainage Inlet Protection, Temp. Fiber Roll, Temp Silt Fence, Temp. Straw Bale Barrier, Temp. Construction Entrance, Street Sweeping, Temp. Concrete Washout, Water Quality Sampling and Analysis Day, Water Quality Monitoring Report, Water Quality Annual Report, Temp. Creek Diversion System, Asbestos Compliance Plan, NOA Burial Location Report, Treated Wood Waste, Contractor-Supplied Biologist (Day), Natural Resource Protection Plan, Invasive Species Prevention Plan, Dust Control Plan (Naturally Occurring Asbestos), Temp. High-Visibility Fence, Clearing and Grubbing, Dust Palliative, Roadway Excavation (Naturally Occurring Asbestos), Shoulder Backing, Structure Excavation (Bridge), Structure Backfill (Bridge), Ditch Excavation, Geosynthetic Reinforcement Embankment, Crushed Rock, Rolled Erosion Control Product (Jute Mesh), Hydromulch, Hydroseed, Imported Biofiltration Soil, Compost, Incorporate Materials, Finishing Roadway, Class 2 Aggregate Base, Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type C, D and F), Tack Coat, Cold Plane Asphalt Concrete Pavement, Rail Element Wall, 24? CIDH Concrete Piling, Structural Concrete, Joint Seal, Bar Reinforcing Steel, Prepare Concrete Bridge Deck Surface, Furnish and Place Polyester Concrete Overlay, 24? Corrugated Steel Pipe, 24? Steel Flared End Section, Abandon Culvert, Remove Culvert, Remove Downdrain, Rock Slope Protection, Misc. Iron and Steel, Delineator (Class 2), Milepost Marker, Marker, Object Marker, Remove Roadside Sign, Roadside Sign ? Two Post, Midwest Guardrail System (Steel Post), Transition Railing (Type WB-31), Alternative In-Line Terminal System, CA St-20S Bridge Rail (Modified), Thermoplastic Traffic Stripe.
Requirements: Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000 or dave@gsbridge.com. Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $400 and covers the fiscal year (July 1 to June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html. We are an Equal Opportunity Employer
Date posted: 07/09/2018