Listing for all primes seeking assistance with project 01-0E4704. 6 results found.
Contractor: Telfer Pavement Technologies, LLC Contact: Rick Arias
Address: 4522 Parker Avenue Suite 350 McClellan, CA. 95652
Phone: 916-383-1756 Fax: 916-383-4084 Email: estimating@telferpavements.com
Services needed: Telfer Pavement Technologies, LLC is requesting quotes from all qualified subcontractors and suppliers including certified UDBE/DBE firms for the following items of work, including but not limited to; Materials supply/delivery, Trucking, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Job Site Management, PCMS, PWPCP, Type III Barricade, Temporary Pavement Marking (Paint), Channelizer (Surface Mounted), Channelizer (Surface Mounted) (Left In Place), Temporary Railing (Type K), Alternative Temporary Crash Cushion System, Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Construction Entrance, Street Sweeping, Treated Wood Waste, Temporary High-Visibility Fence, Clearing and Grubbing, Roadway Excavation, Rock Excavation, Shoulder Backing, Ditch Excavation, Imported Borrow, Subgrade Enhancement Geotextile, Cultivation, Hydromulch, Straw, Hydroseed, Compost, Class 2 Aggregate Base, Hot Mix Asphalt, Geosynthetic Pavement Interlayer (Paving Fabric), Hot Mix Asphalt Dike (Type A, E,) and Removal, Cold Plane Asphalt Concrete, Remove Base and Surfacing, Rail Element Wall, Structural Concrete, Drainage Inlet, Minor Concrete, Concrete Backfill, Corrugated Steel Pipe, Per. Plastic Pipe, Culvert, Roadside Signs, Guardrail and Removal, Thermoplastic Traffic Stripe and Removal, Thermoplastic Pavement Marking and Removal, Rumble Strip, Lighting System, ETC?Quotations will be broken down to comparable packages as reasonably necessary. Telfer Pavement Technologies, LLC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. All Supplier and Subcontractor proposals shall be in strict accordance with said project plans, specifications, and any addenda issued.
Requirements: Telfer Pavement Technologies, LLC will assist with performance and payment bonds as they may be required for the full amount of subcontract price. Telfer Pavement Technologies, LLC, will pay for bond premium up to 1.5%. Please call if you need assistance in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Telfer Pavement Technologies, LLC requirements and will be required to sign the standard Telfer Pavement Technologies, LLC Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the Telfer Pavement Technologies, LLC?s office. Endorsements or waivers required are Additional Insured End., Primary Wording End., and a Waiver of Subrogation (GL & WC). Plans and specifications are available for viewing at our office, and or available for viewing on the Caltrans website. Please call if you need any additional assistance. Telfer Pavement Technologies, LLC intends to work cooperatively with all qualified firms seeking to supply materials, services or work on this project Telfer Pavement Technologies, LLC is an equal opportunity employer.
Date posted: 03/20/2018
Contractor: Chester Bross Construction Company Contact: Estimating
Address: 318 E. Kettleman Lane Lodi, CA. 95240
Phone: 209-920-3595 Fax: 209-263-0123 Email: estimating@chesterbross.com
Services needed: Chester Bross Construction Company (CBC) is requesting quotes from all qualified subcontractors, truckers and suppliers including certified DBE/UDBE/SBE/WBE/DVBE firms for work complete or in part that may be necessary for the performance, construction, and facilitation of the items of work listed on the list of bid items. Requirements: Chester Bross Construction Company (CBC) is an Equal Opportunity Employer. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. CBC will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. CBC will assist in obtaining bonding, lines of credit, insurance, necessary equipment, supplies and materials. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by CBC. CBC will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable contractors license, insurance and workers compensation coverage meeting CBC and Caltrans minimum requirements, and will be required to sign the standard CBC Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.
Requirements:
Date posted: 03/22/2018
Contractor: Mercer-Fraser Company Contact: Verity Penland
Address: PO Box 1006 Eureka, CA 95502
Phone: 707-443-6371 Fax: 707-443-0277 Email: vpenland@mercerfraser.com
Services needed: Mercer-Fraser is currently requesting quotes from all qualified DBE subcontractors and/or suppliers for the following items of work: 1 LEAD COMPLIANCE PLAN 2 PROGRESS SCHEDULE (CRITICAL PATH METHOD) 3 DEVELOP WATER SUPPLY 4 CONSTRUCTION AREA SIGNS 5 TRAFFIC CONTROL SYSTEM 6 TYPE III BARRICADE 7 TEMPORARY PAVEMENT MARKING (PAINT) 8 TEMPORARY TRAFFIC STRIPE (PAINT) 9 CHANNELIZER (SURFACE MOUNTED) 10 CHANNELIZER (SURFACE MOUNTED) (LEFT IN PLACE) 11 PORTABLE CHANGEABLE MESSAGE SIGN (LS) 12 TEMPORARY RAILING (TYPE K) 13 RELOCATE TEMPORARY RAILING (TYPE K) 14 ALTERNATIVE TEMPORARY CRASH CUSHION SYSTEM 15 RELOCATE ALTERNATIVE TEMPORARY CRASH CUSHION SYSTEM 16 JOB SITE MANAGEMENT 17 PREPARE WATER POLLUTION CONTROL PROGRAM 18 TEMPORARY CHECK DAM 19 TEMPORARY DRAINAGE INLET PROTECTION 20 TEMPORARY FIBER ROLL 21 TEMPORARY CONSTRUCTION ENTRANCE 22 STREET SWEEPING 23 TEMPORARY CONCRETE WASHOUT 24 TREATED WOOD WASTE 25 TEMPORARY HIGH-VISIBILITY FENCE 26 CLEARING AND GRUBBING (LS) 27 ROADWAY EXCAVATION 28 ROCK EXCAVATION 29 SHOULDER BACKING 30 DITCH EXCAVATION 31 IMPORTED BORROW (CY) 32 SUBGRADE ENHANCEMENT GEOTEXTILE, CLASS B2 33 CULTIVATION 34 HYDROMULCH 35 STRAW 36 HYDROSEED 37 COMPOST (CY) 38 INCORPORATE MATERIALS 39 CLASS 2 AGGREGATE BASE (CY) 40 HOT MIX ASPHALT (TYPE A) 41 GEOSYNTHETIC PAVEMENT INTERLAYER (PAVING FABRIC) 42 PLACE HOT MIX ASPHALT DIKE (TYPE A) 43 PLACE HOT MIX ASPHALT DIKE (TYPE E) 44 PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) 45 BONDED WEARING COURSE-GAP GRADED 46 TACK COAT 47 REMOVE ASPHALT CONCRETE DIKE 48 COLD PLANE ASPHALT CONCRETE PAVEMENT 49 REMOVE BASE AND SURFACING 50 RAIL ELEMENT WALL 51(F) STRUCTURAL CONCRETE, DRAINAGE INLET 52(F) MINOR CONCRETE 53(F) CONCRETE BACKFILL (PIPE TRENCH) 54 24" CORRUGATED STEEL PIPE (.138" THICK) 55 18" CORRUGATED STEEL PIPE (.138" THICK) 56 18" SLOTTED CORRUGATED STEEL PIPE (.168" THICK) 57 6" PERFORATED PLASTIC PIPE UNDERDRAIN 58 18" STEEL FLARED END SECTION 59 ABANDON CULVERT (LF) 60 REMOVE CULVERT (LF) 61 REMOVE INLET 62 ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (TON) 63 ROCK SLOPE PROTECTION FABRIC (CLASS 8) 64(F) MISCELLANEOUS IRON AND STEEL 65 RESET MAILBOX 66 OBLITERATE SURFACING 67 RECONSTRUCT CHAIN LINK FENCE 68 REMOVE PAVEMENT MARKER 69 DELINEATOR (CLASS 1) 70 DELINEATOR (CLASS 2) 71 PAVEMENT MARKER (RETROREFLECTIVE) 72 UNDERDRAIN MARKER 73 MARKER (CULVERT) 74 OBJECT MARKER (TYPE N) 75 OBJECT MARKER (TYPE P) 76 REMOVE MARKER 77 REMOVE ROADSIDE SIGN 78 REMOVE ROADSIDE SIGN PANEL 79 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) 80 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 81 RETROREFLECTIVE SHEETING (TYPE XI) 82 ROADSIDE SIGN - ONE POST 83 ROADSIDE SIGN - TWO POST 84 INSTALL ROADSIDE SIGN PANEL ON EXISTING POST 85 INSTALL ROADSIDE SIGN (LAMINATED WOOD BOX POST) 86 LAMINATED WOOD BOX POST (TYPE L) 87 TRANSITION RAILING (TYPE WB-31) 88 ALTERNATIVE IN-LINE TERMINAL SYSTEM 89 CONCRETE BARRIER TRANSITION 90 REMOVE GUARDRAIL 91 ADJUST GUARDRAIL 92 RESET TERMINAL SYSTEM 93 RESET END ANCHOR ASSEMBLY (TYPE SFT) 94 6" THERMOPLASTIC TRAFFIC STRIPE 95 8" THERMOPLASTIC TRAFFIC STRIPE 96 "8"" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 12-3)" 97 THERMOPLASTIC PAVEMENT MARKING 98 "6"" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 6-1)" 99 "6"" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 12-3)" 100 "6"" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 36-12)" 101 REMOVE PAINTED TRAFFIC STRIPE 102 REMOVE THERMOPLASTIC TRAFFIC STRIPE 103 REMOVE THERMOPLASTIC PAVEMENT MARKING 104 6" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT) 105 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT) 106 LIGHTING SYSTEM 107 TRAFFIC MONITORING STATION SYSTEM 108 MOBILIZATION Mercer Fraser Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: Mercer-Fraser Company is a union signatory contractor. Subcontractors must possess a current contractor?s license, worker?s compensation and insurance coverage during the entire length of the prime contract. 100% Performance and Payment Bonds may be required. Conditions or exceptions in Subcontractor?s quote are expressly rejected unless accepted in writing. All Subcontractors will be required to sign our standard Subcontract Agreement. Plans and specifications are available for viewing at our office or you may call Mercer-Fraser Company for further assistance. Please call if assistance is needed in obtaining bonding, insurance, equipment, materials and supplies. Mercer-Fraser Company intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will consider all bids that may be submitted.
Date posted: 04/06/2018
Contractor: Northern Pacific Corp Contact: Cindy Orme
Address: 550 Gateway Drive, Suite 104 Napa, CA 94558
Phone: 707-939-0595 Fax: 707-940-4298 Email: cindy.orme@northern-pacific.com
Services needed: NPC is requesting quotes from the following trades including but not limited to: Trucking, lead compliance plan, CAS, traffic control, barricades, temp. pvmnt. marking/traffic striping, channelizers, portable CMS, temp. K-rail & alt. temp. crash cushion system, WPCP, temp. erosion control items, street sweeping, treated wood waste, clear & grub, AC dike, bonded wearing course, cold plane AC & HMA, rail element wall, structural concrete, minor concrete, steel pipe & plastic pipe, RSP, misc. iron and steel, chain link fencing, delineators, remove and replace roadside signs & sign panel, furnish aluminum sign, transition railing, remove & replace guardrail, concrete barrier transition, 6? & 12? rumble strip, furnish alternate pipe, alt. in-line terminal system, striping, electrical.
Requirements: Your company?s certification must be current with Caltrans. We require a copy of your CURRENT CERTIFICATION with your quote. We encourage the use of DBE (Disadvantaged Business Enterprises). Your registration must be current with the DIR. NPC IS AVAILABLE TO DISCUSS BREAKING OUT PORTIONS OF WORK TO ENCOURAGE DBE PARTICIPATION. Dan Palmer (cell 707.732.1715 or dan.palmer@northern-pacific.com) is the estimator bidding this project. He is available to answer any questions regarding scope of work, interpretation of plans, specs, bid process. NPC may also offer assistance in obtaining bonds, lines of credit, insurance, necessary equipment, materials, supplies, etc. NPC may also require payment and performance bonds. NPC will pay bond premiums up to 1-1/2% of contract cost. NPC is a NON-UNION contractor. All subcontractors performing labor on this project must pay PREVAILING WAGES and must submit CERTIFIED PAYROLL REPORTS to NPC and upload them to DIR. Plans and specs can be downloaded at http://www.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php or can be viewed at local plan rooms or our office at 550 Gateway Drive, Suite 104, Napa, California. INSURANCE: NPC requires to be named as additionally insured on all insurance certificates. Primary and non-contributing is required on certificates. NORTHERN PACIFIC CORP. IS AN EQUAL OPPORTUNITY EMPLOYER
Date posted: 04/06/2018
Contractor: Ghilotti Construction Company, Inc. Contact: Mark Mahboubi
Address: 246 Ghilotti Avenue Santa Rosa, CA 95407
Phone: 707-585-1221 Fax: 707-585-1601 Email: markm@ghilotti.com
Services needed: Ghilotti Construction Company, Inc. is seeking certified DBE subcontractors, suppliers & truckers for quotes including, but not limited to, the following scopes of work: CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL, LIGHTING, DETECTOR, CLEAR & GRUB, ASPHALT PAVING, AC DIKE, STRUCTURAL CONCRETE, MINOR CONCRETE STRUCTURE, ROADSIDE SIGNS, CONCRETE CURB & & SIDEWALK - MISC., METAL BEAM GUARD RAILING, THERMOPLASTIC STRIPING & PAVEMENT MARKINGS, EROSION CONTROL, STREET SWEEPING, MATERIAL SUPPLIER & TRUCKING. Engineer's Estimate: $2,330,000 / DBE Goal: 12% / 88 WD / $4,800 per day LD. Submit quotes by Noon on bid date. Contact our estimator for more information. GCC is available to discuss breaking out any portion of work to encourage minority participation.
Requirements: Mr. Mark Mahboubi (707/585-1221 or markm@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 1/2% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.) Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. Plans may also be viewed or purchased through local plan rooms, builder's exchanges, or Dodge Scan. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project. Req: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC's written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC's website (www.ghilotti.com/subcontractors/documents) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void. Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form CG-2010-1185 or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.
Date posted: 04/10/2018
Contractor: Granite Construction Contact: Jenni McKenzie
Address: 1324 S. State Street, Ukiah, CA 95482
Phone: 707-467-4100 Fax: 707-467-4143 Email: jenni.mckenzie@gcinc.com
Services needed: Granite Construction Company (Granite) is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: C0685 PAVEMENT MARKERS SUPPLIER; C1200 CONSTRUCTION AREA SIGNS; C1201 TRAFFIC CONTROL SYSTEM; C1211 TRAFFIC FLAGGERS; C1522 RESET, ADJUST ROADWAY ITEMS; C1531 PLANE ASPHALT CONCRETE; C2020 SOIL AMENDMENTS; C2021 HYDROSEEDING; C2030 EROSION CONTROL; C2066 TEMPORARY EROSION CONTROL; C3930 PAVEMENT REINFORCING FABRIC; C3940 AC DIKE AND MISC. PAVING; C5601 SIGN STRUCTURES; C5620 ROADSIDE SIGN; C8001 TEMPORARY FENCING; C8201 OBJECT MARKER; C8320 METAL BEAM GUARD RAILING; C8331 CONCRETE BARRIER; C8405 THERMOPLASTIC TRAFFIC STRIPE AND MARKING; C8406 PAINTED TRAFFIC STRIPE AND MARKING; C8501 PAVEMENT MARKING; C8602 SIGNAL AND LIGHTING; C8603 SIGNAL; C8604 LIGHTING; C8605 MESSAGE SIGNS, LIGHTING, AND SIGN ILLUMINATION; C8851 LEAD COMPLIANCE PLAN; C8852 SWPPP PLANNING; C9602 BOTTOM DUMP TRUCKING; C9603 TRANSFER DUMP TRUCK; C9604 SUPER 10 DUMP TRUCK; C9609 STREET SWEEPING. Additional services needed: TYPE III BARRICADE; CHANNELIZER (SURFACE MOUNTED); ALTERNATIVE TEMPORARY CRASH CUSHION; TEMPORARY CONCRETE WASHOUT; TREATED WOOD WASTE; BONDED WEARING COURSE ? GAP GRADED; TACK COAT; RAIL ELEMENT WALL; RESET MAILBOX; OBLITERATE SURFACING; RECONSTRUCT CHAIN LINK FENCE; REMOVE PAVEMENT MARKER; RETROREFLECTIVE SHEETING; TRANSITION RAILING; ALTERNATIVE IN-LINE TERMINAL SYSTEM; 6? AND 12? RUMBLE STRIP; TRAFFIC MONITORING STATION SYSTEM. Quotations will be broken down into comparable packages as reasonably necessary. Granite will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: For any bid proposal submitted on or after March 1, 2015 and any contract for public work entered into on or after April 1, 2015, the following registration requirements apply: Every Subcontractor is required to be registered to perform public work pursuant to Section 1725.5 of the Public Contract Code (?Section 1725.5?). No Contractor or Subcontractor shall be qualified to bid on, be listed in a bid proposal pursuant to Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered to perform public work pursuant to Section 1725.5. No bid shall be accepted nor any subcontract entered into without proof of the Subcontractor?s current registration to perform public work pursuant to Section 1725.5. Granite Construction Company (Granite) is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite will pay for bond premium up to 1.5%. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. Granite intends to work cooperatively with all qualified firms seeking work on this project. Portions of work can be made available upon request prior to bid date. Please call if any assistance is needed. Granite Construction Is An Equal Opportunity Employer.
Date posted: 04/18/2018