![]() |
STANDARD PLANSU. S. CUSTOMARY UNITSMAY 2006 EDITION |
![]() |
GENERAL (Pavement Delineation, Excavation and Backfill, Portable Concrete Barrier,
Concrete Barrier, Metal Beam Guard Railing, Thrie Beam Barrier, Crash Cushions,
Fences, Curbs, Driveway, Dikes, Curb Ramps, Accssible Parking, Etc.) (A Sheets)
PLANTING AND IRRIGATION (H Sheets)
TEMPORARY FACILITIES (T Sheets)
SIGNALS, LIGHTING and ELECTRICAL SYSTEMS (ES Sheets)
The California DOT (CALTRANS) "Standard Plans" digital files on this page
are in DWG and DGN and PDF
formats.
The DWG and DGN files have
been compressed (zipped) to facilitate faster download times from the site.
Information on decompressing files can be found on our page of
Decompression Utilities
ACRONYMS, ABBREVIATIONS AND SYMBOLS
PAVEMENT MARKERS, TRAFFIC LINES, AND PAVEMENT MARKINGS
Pavement
Markings - Words and Crosswalks, Plan No. A24E (.dwg)
(.dgn)
(click to view)
RUMBLE STRIP
EXCAVATION AND BACKFILL
PORTABLE CONCRETE BARRIER
OBJECT MARKERS, DELINEATORS, CHANNELIZERS AND BARRICADES
SURVEY MONUMENTS
CONCRETE BARRIER TYPE 60 SERIES
CONCRETE BARRIER WILDLIFE PASSAGEWAY
METAL BEAM GUARD RAILING - STANDARD RAILING SECTIONS
METAL BEAM GUARD RAILING - TYPICAL LAYOUTS FOR EMBANKMENTS
METAL BEAM GUARD RAILING - TYPICAL LAYOUTS FOR STRUCTURES
METAL BEAM GUARD RAILING - TYPICAL LAYOUTS FOR FIXED OBJECTS
METAL BEAM GUARD RAILING - END ANCHORAGE AND RAIL TENSIONING ASSEMBLY
METAL BEAM GUARD RAILING - CONNECTION DETAILS AND TRANSITION RAILING TO BRIDGE RAILINGS, ABUTMENTS AND WALLS
METAL BEAM GUARD RAILING - TERMINAL SYSTEM END TREATMENT
THRIE BEAM BARRIER - STANDARD BARRIER SECTIONS
THRIE BEAM BARRIER AT FIXED OBJECTS AND ON BRIDGE
THRIE BEAM BARRIER - END ANCHORAGE, END TREATMENT AND EMERGENCY PASSAGEWAY
THRIE BEAM BARRIER - CONNECTION TO BRIDGE RAILINGS, ABUTMENTS, WALL AND BARRIER
THRIE BEAM BARRIER TRANSITION RAILING
CRASH CUSHIONS
FENCES
CURBS, DRIVEWAY, DIKES, CURB RAMPS AND ACCESSIBLE PARKING
DRAINAGE INLETS, PIPE INLETS AND GRATES
GUTTER AND INLET DEPRESSIONS
CONCRETE PIPE - DIRECT DESIGN METHOD
BOX CULVERTS
PIPE AND ARCH CULVERT - ENDWALLS AND WARPED WINGWALLS
PIPE DOWNDRAINS, ANCHORAGE SYSTEMS AND OVERSIDE DRAINS
CONSTRUCTION LOADS ON CULVERTS AND STRUT DETAILS
PIPE HEADWALLS, ENDWALLS AND WINGWALLS
PIPE RISER AND DRAINAGE INLET RISER CONNECTIONS
FLARED END SECTIONS
PIPE COUPLING AND JOINT DETAILS
SLOTTED AND GRATED LINE DRAINS
STRUCTURAL SECTION DRAINS
GABIONS AND UNDERDRAINS
EROSION CONTROL
TEMPORARY CRASH CUSHIONS, RAILING AND TRAFFIC SCREEN
PROJECT FUNDING SIGNS
TEMPORARY TRAFFIC CONTROL SYSTEMS