awarded.txt generated on Tuesday 30th of May 2017 12:32:51 AM
Field List: Contract No, Bid Open Date, Advertise Date, Award Date, Contractor, Phone, Amount, Road, Work type

04-4J7004,2017-05-10,2017-04-17,2017-05-24,AMERICAN CIVIL CONSTRUCTORS WEST COAST LLC,(707)746-8028,$1,626,510.00,04-CC-4,242,580,680-Var,Treat bridge decks with methacrylate resin and replace joint seals.
04-1K1004,2017-05-04,2017-04-10,2017-05-26,A. TEICHERT & SON INC. DBA TEICHERT CONSTRUCTION,(916)757-6400,$4,295,000.00,04-Sol-12-L2.1/7.9,Place RHMA-G
10-0X9104,2017-05-04,2017-04-10,2017-05-26,DREAMBUILDER CONSTRCUTION CORP,(714)646-3697,$610,061.00,10-SJ,Tuo,Sta-4,120,132-Var,Mitigating scour, placing rock slope protection,and repairing
12-0Q4104,2017-05-04,2017-04-10,2017-05-22,STURGEON ELECTRIC CALIFORNIA, LLC.,(909)536-8693,$614,650.00,12-Ora-5-3.2/44.4,Replace Meter ON signal head with new pole and flashing beacon.
03-1H3204,2017-05-03,2017-04-03,2017-05-19,KNIFE RIVER CONSTRUCTION,(530)891-6555,$1,036,979.20,03-But-99-r34.6/r34.9,Widen off-ramp, modify signals, upgrade curbs and sidewalk
07-3W2004,2017-05-03,2017-04-03,2017-05-22,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$3,681,450.20,07-LA-10, 39, 164, and 710-Var,Replace approach slabs
12-0Q0804,2017-05-02,2017-04-03,2017-05-25,ALL AMERICAN ASPHALT,(951)736-7600,$1,805,752.61,12-Ora-1, 39-21.6/23.2, 6.1/8.9,Resurface travel lanes and ADA Curb Ramp Upgrade
08-1F8704,2017-05-02,2017-04-10,2017-05-17,AMERICA PACIFIC CONSTRUCTION,(559)577-9999,$278,990.00,08-Riv-15-23.8/33.4,Install Rumble Strips
04-4J5804,2017-05-02,2017-04-03,2017-05-24,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$1,859,628.60,04-SCl-17, 25, 85, 101, 130, 152, 237 & 280-VAR,Treat bridge decks with methacrylate and replace joint seals.
04-1K0404,2017-04-27,2017-04-03,2017-05-17,GRANITE ROCK COMPANY,(408)574-1400,$1,810,427.00,04-SCl-87-6.1/7.5,Cold plane and overlay with rubberized hot mix asphalt
04-1K3604,2017-04-27,2017-04-03,2017-05-22,FBD VANGUARD CONSTRUCTION,(925)245-1300,$329,053.50,04-CC-04-R16.8/R17.8,Replace failed concrete pavement
04-0K9604,2017-04-27,2017-04-03,2017-05-17,G. BORTOLOTTO & COMPANY,(650)595-2591,$489,168.59,04-SM-35-R28.7/30.0,Replace asphalt concrete pavement
01-0F4104,2017-04-27,2017-04-03,2017-05-16,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$741,497.60,01-Lak,Men-VAR-VAR,Cold plane, replace joint seals, prepare and treat bridge decks.
09-368104,2017-04-27,2017-04-03,2017-05-24,QUALCON CONTRACTORS, INC.,(775)782-2006,$1,324,120.00,09-Mno-108-0.0/9.8,Cold plane asphalt concrete pavement and place hot mix asphalt
04-0K2804,2017-04-26,2017-04-03,2017-05-17,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$369,675.58,04-Ala-580, 880, 980 -Var,Treat bridge decks with methacrylate and replace joint seals.
04-1K0704,2017-04-26,2017-04-03,2017-05-17,DESILVA GATES COSNTRUCTION,(925)829-9220,$1,108,108.00,04-Sol-113-19.9/21.2,Cold plane AC pavement and place HMA (Type A)
05-1F0304,2017-04-26,2017-03-27,2017-05-16,GRANITE ROCK COMPANY,(408)574-1400,$3,657,013.90,05-SCr,SBt-129-1.8/9.9, 0.0/0.1,Cold plane asphalt pavement, resurface with HMA and replace guardrail.
04-2K1304,2017-04-26,2017-04-03,2017-05-24,BAY CITIES PAVING & GRADING, INC.,(925)687-6666,$2,682,147.40,04-Ala-24-R1.8/R4.4,Cold plane AC pavement and place RHMA-O.
04-0K4504,2017-04-25,2017-04-03,2017-05-18,ETIC,(925)602-4710,$336,841.23,04-Sol-37,80,680-VaR,Treat bridge decks with methacrylate and replace joint seals
03-2F0704,2017-04-25,2017-04-03,2017-05-15,STATEWIDE TRAFFIC SAFETY & SIGNS INC.,(805)929-5070,$405,158.50,03-But,Gle-5, 99, 162-VAR,Upgrade Overhead Signs
05-1H3004,2017-04-25,2017-04-03,2017-05-15,CENTRAL STRIPING SERVICE, INC.,(916)635-5175,$121,494.07,05-SLO-41-43.9/50.4,Construct centerline and edge line rumble strip.
04-4J5604,2017-04-25,2017-03-27,2017-05-17,SPECTRUM CONSTRUCTION GROUP, INC.,(949)299-1400,$1,470,210.72,04-SM-VAR-VAR,Place polyester concrete, methacrylate resin, and replace joint seals
04-3J4804,2017-04-25,2017-04-03,2017-05-17,O.C. JONES & SONS, INC.,(510)526-3424,$1,120,236.40,04-Ala-262-R0.7,Cold place AC pavement and place RHMA (Gap Graded)
06-0U2104,2017-04-20,2017-03-27,2017-05-11,SPECTRUM CONSTRUCTION GROUP, INC.,(949)299-1400,$499,592.76,06-Fre-168,180-Var,Joint seal and polyester concrete overlay.
05-1G4404,2017-04-20,2017-03-27,2017-05-10,SPECIALTY CONSTRUCTION,(805)543-1706,$223,274.00,05-SLO-101-63.2,64.6,Construct drainage system and rock slope protection.
04-0K9704,2017-04-19,2017-03-27,2017-05-16,OGRADY PAVING INC.,(650)966-1926,$1,375,074.00,04-SM-101, 380-VAR,Cold plane asphalt concrete pavement and place HMA (Type A).
08-1G6904,2017-04-19,2017-03-27,2017-05-17,SULLY-MILLER CONTRACTING COMPANY,(714)578-9600,$8,105,000.00,08-SBd-40/95-150.2/R153.3, 33.6/57.2,COLD PLANE/OVERLAY TRAVEL WAYS, SHOULDERS & RAMPS
10-1C5504,2017-04-18,2017-03-27,2017-05-05,DREAMBUILDER CONSTRUCTION CORP.,(714)646-3697,$1,799,061.00,10-Mer-152-R2.4/R6.0,Construct thrie beam median barrier.
02-2H5104,2017-04-18,2017-03-27,2017-05-03,MERCER FRASER COMPANY,(707)443-6371,$921,580.00,02-Tri-3-33.0/65.0,Excavation, HMA, shoulder backing, signs & striping.
01-0F8904,2017-04-13,2017-03-20,2017-05-02,MERCER FRASER COMPANY,(707)443-6371,$2,293,118.50,01-Men-162-25.7/29.8,Covelo Replace AC and BWC Overlay
04-2K4404,2017-04-13,2017-03-20,2017-05-03,GHILOTTI CONSTRUCTION CO. INC.,(707)585-1221,$940,304.00,04-Son-116-25.0/27.9,Cold plane asphalt concrete pavement and place hot mix asphalt.
06-0V9604,2017-04-13,2017-03-20,2017-04-26,GRIFFITH COMPANY,(661)392-6600,$1,219,882.00,06-Ker-33-54.2/R60.0,Place RHMA-G (BWC) and HMA (Type A) and cold plane AC pavement.
06-0K4604,2017-04-13,2017-01-23,2017-05-05,SEMA CONSTRUCTION, INC.,(949)470-0500,$14,319,576.65,06-Ker-46,99-57.3/57.8,43.9/44.6,Realign roadway and construct new bridge.
10-1G4904,2017-04-13,2017-03-20,2017-05-05,BRM,(406)261-5359,$418,844.90,10-Ama-88-54.0,Salt Storage Shed Building
07-3W4804,2017-04-13,2017-03-20,2017-05-08,C. A. RASMUSSEN, INC.,(661)367-9040,$2,576,437.00,07-LA-170-R14.6/R20.6,Replace PCC pavement and repair and resurface AC pavement.
10-1F5804,2017-04-12,2017-03-20,2017-05-05,GEORGE REED INC,(209)523-0730,$3,150,444.00,10-Cal-4,49-23.3/28.0, R0.2/7.0,Cold plane AC pavement, and HMA resurfacing.
02-1H8904,2017-04-12,2017-03-20,2017-05-01,J.F. SHEA CONSTRUCTION, INC.,(530)246-4292,$296,497.00,02-Tri-3, 299-VAR,Methacrylate bridge deck, repair bridge joints, striping
04-1K0604,2017-04-12,2017-03-20,2017-05-02,VINTAGE PAVING COMPANY, INC,(530)795-0132,$1,326,938.00,04-Sol-84 & 220-7.5/13.7 & 0.0/3.1,Perform slurry seal.
05-1H4004,2017-04-12,2017-03-13,2017-05-10,PAPICH CONSTRUCTION CO., INC.,(805)473-3000,$3,199,190.01,05-SLO-101-46.0/50.7,Resurface existing roadbed with RHMA-O.
06-0Q6304,2017-04-11,2017-03-06,2017-05-11,EMMETTS EXCAVATION, INC.,(559)347-9188,$2,715,603.77,06-Fre,Mad-41-Var,Construct stamped concrete and maintenance vehicle pullouts.
09-368404,2017-04-11,2017-03-20,2017-05-22,QUALCON CONTRACTORS, INC.,(775)782-2006,$2,473,800.00,09-Iny-127, 190-42.0/42.4, 126.1/140.7,Construct hot mix asphalt thin blanket overlay.
07-309904,2017-04-11,2017-03-20,2017-05-17,ALDRIDGE ELECTRIC, INC.,(847)680-5200,$3,593,041.90,07-LA-1,107,213-Var,Improve traffic signal and ITS management system.
07-3W2304,2017-04-11,2017-03-20,2017-04-26,ODONNELL CONSTRUCTION, INC.,(909)394-4510,$1,397,085.62,07-LA-5, 14, 110, 118, 710-Var,Bridge Preservation
02-2H5404,2017-04-11,2017-03-20,2017-04-27,HIGHWAY SPECIALTY COMPANY INC,(530)949-5631,$233,996.00,02-Sis-96-33.0/85.2,Reconstruct MBGR.
04-1K0304,2017-04-06,2017-03-13,2017-05-04,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$393,393.00,04-CC-4-2.9/3.4,Cold plane asphalt concrete pavement, place HMA and HFST.
07-3W1904,2017-04-06,2017-03-13,2017-04-26,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$486,405.70,07-LA-5, 10, 91, 101, 105, 710-Var,Bridge Deck Overlay and Joint Seal Replacement
08-1C1804,2017-04-06,2017-02-27,2017-04-26,ODONNELL CONSTRUCTION, INC.,(909)394-4510,$587,825.00,08-SBd-60-R0.0/R1.8,Relocate irrigation facilities and weed control.
10-1F6104,2017-04-06,2017-03-06,2017-04-21,GRANITE CONSTRUCTION COMPANY,(916)855-4400,$2,345,820.31,10-Mer-59-R0.0/12.8,Repair failed pavement areas and construct RHMA resurfacing.
09-368204,2017-04-05,2017-03-13,2017-05-03,AMERICAN PAVEMENT SYSTEMS, INC.,(209)522-2277,$1,930,795.50,09-Iny-395-11.8/20.5, 100.8/113.0,Construct asphalt-rubber and polymer modified chip seal.
02-0H3304,2017-04-05,2017-03-06,2017-04-21,J.F. SHEA CONSTRUCTION, INC.,(530)246-4292,$1,046,861.00,02-Tri-299-20.2/20.7,Grading, cold plane AC pavement, HMA, guardrail, drainage, striping
12-0Q1204,2017-04-04,2017-03-13,2017-05-03,AUTOBAHN CONSTRUCTION INC.,(714)769-7025,$526,284.00,12-Ora-91-7.0/R10.3,REMOVE AND REPLACE RUBBERIZED HOT MIX ASPHALT
07-3W1104,2017-04-04,2017-03-13,2017-04-21,JABRE CONTRACTING INC.,(310)720-0277,$348,260.00,07-LA-210-R1.6/R6.0,PLACE PIPE LINER AND REPAIR CULVERTS
06-0V3104,2017-04-04,2017-03-13,2017-04-25,JABRE CONTRACTING INC.,(310)720-0277,$463,180.00,06-Fre-198-0.0/42.7,Construct rumble strip and replace pavement delineation.
03-0G5404,2017-03-30,2017-02-21,2017-04-27,MERCER FRASER COMPANY,(707)443-6371,$2,511,199.75,03-ED-50-15.4/18.8,Cold Plane AC Pavement and RHMA-G Overlay
11-2M9404,2017-03-30,2017-03-06,2017-04-26,MANHOLE ADJUSTING INC,(323)558-8000,$2,302,528.00,11-Imp-115-R3.2/R8.5, 21.1/35.3,Apply asphalt rubber binder seal coat, slurry seal, shoulder backing.
10-0U5204,2017-03-30,2017-03-06,2017-05-01,AGEE CONSTRUCTION CORPORATION,(559)299-3290,$922,402.00,10-Mer-59-12.8/13.5,Construct Left Turn Channelization.
01-0F1904,2017-03-29,2017-02-13,2017-04-19,AMERICAN CIVIL CONSTRUCTORS WEST COAST LLC,(707)746-8028,$1,598,000.00,01-DN-199-7.5/27.5,COLD PLANE, PLACE HMA AND HIGH FRICTION SURFACE TREATMENT
06-0U1504,2017-03-29,2017-03-06,2017-04-21,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$644,268.83,06-Fre,Mad,Tul-5,41,99,216,245-Var,Treat bridge decks and replace joint seals.
03-1H6204,2017-03-28,2017-03-06,2017-04-18,LEE CONTRACTORS AND CONSULTANTS, INC.,(805)423-2505,$256,898.55,03-Yub-20, 70-VAR,Install Advanced Loop Detectors
08-1F9104,2017-03-28,2017-02-27,2017-04-18,AMERICA PACIFIC CONSTRUCTION,(559)577-9999,$168,814.00,08-SBd-38-8.5/15,Place centerline and shoulder rumble strips
10-1F1604,2017-03-28,2017-03-06,2017-05-01,VIKING CONSTRUCTION COMPANY, INC.,(916)852-5530,$1,199,456.00,10-Mer-33-R16.6,Bridge repair
07-3W5104,2017-03-23,2017-02-27,2017-04-24,AUTOBAHN CONSTRUCTION INC.,(714)769-7025,$1,897,213.00,07-LA-605-20.2/25.8,Cold Plane & Overlay Shoulders, Slurry Seal Ramps, Replace Slabs
10-1F8604,2017-03-23,2017-02-27,2017-04-17,HARRIS STEEL FENCE CO., INC,(323)751-4104,$681,410.00,10-SJ-4-R16.20,Install Wrought iron fence and gates.
05-1G5804,2017-03-23,2017-02-27,2017-04-12,PAPICH CONSTRUCTION CO., INC.,(805)473-3016,$1,387,498.00,05-SB-135-11.7/13.3,Resurface roadway with rubberized HMA and construct curb ramps.
05-1G6504,2017-03-22,2017-02-27,2017-04-13,GRANITE CONSTRUCTION COMPANY,(831)763-6100,$1,441,441.00,05-Mon,SBt-146-1.5/10.1, 10.1/10.2,Overlay roadbed with Rubberized Hot Mix Asphalt - Gap Graded
06-0V5104,2017-03-22,2017-02-27,2017-04-21,GRANITE CONSTRUCTION COMPANY,(559)441-5700,$699,879.00,06-Fre-198-22.7/26.3,Cold plane AC pavement and RHMA overlay (bonded wearing coarse).
08-1C1904,2017-03-22,2017-02-13,2017-05-03,RSB GROUP, INC.,9494541999,$956,326.00,08-SBd-60-R2.9/R3.9, Roadside safety improvements
07-3W3304,2017-03-22,2017-02-27,2017-04-17,CALMEX ENGINEERING INC,(909)546-1311,$1,515,526.59,07-LA-2-10.6/12.7,12.8/14.2,Cold plane AC pavement and place HMA (Type A).
01-0B8304,2017-03-22,2017-02-13,2017-04-19,GRANITE CONSTRUCTION COMPANY,(707)467-4100,$1,707,199.00,01-Men-101-47.1/47.6,ADA infrastructure upgrade and installation.
05-1H4204,2017-03-21,2017-02-27,2017-04-04,C.A. RASMUSSEN, INC.,(661)367-9040,$1,836,356.00,05-SB-154, 192-32.5/32.8, 2.8/7.0,Cold plane existing pavement and replace with RHMA-G.
06-0Q2604,2017-03-21,2017-01-30,2017-04-18,TEICHERT CONSTRUCTION,(916)757-6400,$7,479,318.00,06-Tul-65-R20.1/31.5,Repair failed areas, replace guardrails and overlay with RHMA-G.
12-0P7604,2017-03-21,2017-02-27,2017-04-11,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$2,297,262.90,12-Ora-55, 57, 91, 241, 405-var,Methacrylate treatment and joint seal replacement
07-252624,2017-03-21,2017-01-30,2017-04-17,GUY F. ATKINSON,(949)855-9755,$127,667,478.00,07-LA-5-R45.4/R61.2 ,Rehabilitate concrete pavement.
09-361204,2017-03-21,2017-02-27,2017-04-13,AMERICAN PAVEMENT SYSTEMS, INC.,(209)522-2277,$383,676.00,09-Mno-158-0.0/6.0,Construct scrub seal.
08-1G2404,2017-03-16,2017-02-13,2017-04-21,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$357,461.00,08-Riv-15-41.8/51.5,Bridge Deck Rehab, Joint Seal Replacement, and Shear Key Repair
12-0Q0604,2017-03-16,2017-02-21,2017-04-17,JABRE CONTRACTING INC.,(310)720-0277,$247,900.00,12-Ora-1-25.2/33.3,CULVERT CLEANING, LINING AND INLET REPAIR
07-3W3404,2017-03-16,2017-02-21,2017-04-17,R.J. NOBLE COMPANY,(714)637-1550,$1,098,750.00,07-LA-103-0.3/1.7,Cold plane AC Pvmt, place RHMA (Type G) and slurry seal.
01-0C7604,2017-03-16,2017-02-21,2017-04-19,FBD VANGUARD CONSTRUCTION,(925)245-1300,$2,023,998.50,01-Men-101-0.7/3.0,Construct Median Barrier
06-0Q0304,2017-03-16,2017-02-21,2017-04-26,ETIC,(925)602-4710,$500,583.37,06-Fre,Mad-41,99,152,168,180-Var,Treat bridge decks and replace joint seals.
06-0V5204,2017-03-16,2017-02-21,2017-04-21,TELFER PAVEMENT TECHNOLOGIES, LLC,(916)383-1756,$1,659,521.50,06-Fre-145-6.0/13.2,Cold plane AC pavement, HMA, and RHMA (bonded wearing course).
04-4G9504,2017-03-15,2017-02-13,2017-04-19,PACIFIC INFRASTRUCTURE CONSTRUCTION, LLC,(707)449-3604,$1,068,678.20,04-SCl,SF,SM-84,85,92,101,237,etc-VAR,Pump House Safety and Access improvements and Irrigation removal
06-0Q5104,2017-03-15,2017-02-21,2017-04-13,DREAMBUILDER CONSTRUCTION CORP.,(714)646-3697,$364,861.00,06-Fre-180-26.9,Construct compaction grouting, cold plane AC pavement, and place HMA.
03-3F9304,2017-03-15,2017-02-21,2017-04-17,DREAMBUILDER CONSTRUCTION CORP.,(714)646-3697,$1,152,061.00,03-Sac-50-R7.5/17.0,Install Roadside Pavement and Vegetation Control, and Replace Signs.
08-1G0904,2017-03-15,2017-02-21,2017-04-21,MATICH CORPORATION,(909)382-7400,$2,526,587.00,08-SBd-18-48.1/53.1,Rehabilitate Pavement.
10-1F5704,2017-03-15,2017-02-21,2017-04-21,TELFER PAVEMENT TECHNOLOGIES, LLC,(916)175-6000,$2,053,930.00,10-Ama-16-R0.0/9.4,Repair failed areas and rubberized hot mix asphalt overlay.
11-2M9504,2017-03-14,2017-02-21,2017-04-11,FBD VANGUARD CONSTRUCTION,(925)245-1300,$989,980.00,11-SD-52,805-0.0/2.0, 21.6/25.7,REPLACE EXISTING PCC SLABS WITH RAPID STRENGTH CONCRETE, SPALL REPAIR.
06-0Q6104,2017-03-14,2017-02-21,2017-03-30,GRANITE CONSTRUCTION COMPANY,(559)441-5700,$1,989,459.00,06-Mad-99-10.4/14.5, 26.4,Maintenance vehicle pull-outs and gore area improvements.
03-4F0504,2017-03-14,2017-02-13,2017-04-13,KNIFE RIVER CONSTRUCT,(530)891-6555,$3,299,995.10,03-But-70-22.1/28.2,Cold Plane AC Pavement and RHMA Overlay
04-0K9504,2017-03-09,2017-02-13,2017-04-04,GRANITE CONSTRUCTION COMPANY,(408)327-7013,$952,341.00,04-SCl-17-2.8/7.5,Replace asphalt concrete surfacing.
06-0V5304,2017-03-09,2017-02-13,2017-04-10,TELFER PAVEMENT TECHNOLOGIES, LLC,(916)383-1756,$2,525,525.00,06-Ker-58, 99-28.2/31.4, R43.9/48.7,Overlay with gap graded rubberized hot mix asphalt
04-1SS584,2017-03-08,2017-01-30,2017-04-18,GORDON N. BALL, INC.,(925)838-5675,$1,589,282.00,04-Mrn-1-2.2,Soldier pile retaining wall
05-1H2804,2017-03-08,2017-02-13,2017-04-13,AMERICA PACIFIC CONSTRUCTION,(559)577-9999,$180,370.00,05-SLO-46-R0.2/R21.7,Install rumble strip and place traffic striping.
11-410904,2017-03-08,2017-01-30,2017-05-10,PAL GENERAL ENGINEERING INC,(858)638-7100,$2,474,410.60,11-SD-5, 75, 905-VAR,Construct gore paving, maintenance vehicle pullout and curb ramps.
11-2M9804,2017-03-07,2017-02-06,2017-03-30,CALMEX ENGINEERING INC,(909)546-1311,$1,855,864.01,11-SD-75, 78, 805-VAR,Mill and Replace with RHMA Overlay.
08-1G3904,2017-03-07,2017-02-13,2017-03-30,J. MCLOUGHLIN ENGINEERING CO., INC.,(909)944-1037,$1,978,361.96,08-Riv-10-R20.1/R99.1,Bridge Maintenance with Methacrylate and Polyester Overlay
01-0F5204,2017-03-07,2017-02-13,2017-03-30,MERCER FRASER COMPANY,(707)443-6371,$3,468,877.00,01-Hum-101-R8.5/R22.4,RUBBERIZED HMA OVERLAY
06-0T7704,2017-03-01,2017-02-06,2017-03-23,BOWMAN ASPHALT, INC,(661)334-1356,$854,609.00,06-Ker-155-64.8/R70.9,Resurface existing pavement with Hot Mix Asphalt (Type A)
12-0C5714,2017-03-01,2017-02-06,2017-03-20,ACCU CONSTRUCTION, INC.,(714)641-4730,$1,377,808.00,12-Ora-91-0.9/5.4,Highway Planting and Irrigation Replacement
10-1F0804,2017-02-28,2017-01-09,2017-03-15,ETIC,(925)602-4710,$488,589.00,10-SJ-4,26-19.75,1.1,Heat Straightening existing steel girders.
01-0F9104,2017-02-28,2017-02-06,2017-03-21,ARGONAUT CONSTRUCTORS,(707)542-4862,$664,128.00,01-Lak-29-VAR,Replace Asphalt Concrete Surfacing, Inductive Loop Detectors, Striping
02-2H1704,2017-02-23,2017-01-30,2017-03-23,HAT CREEK CONSTRUCTION & MATERIALS, INC.,(530)335-5501,$847,748.00,02-Sis-161-1.3/2.8,Full Depth Pavement Reclamation-Cement, Cold Plane AC, HMA
08-1G2304,2017-02-23,2017-01-30,2017-03-14,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$658,475.00,08-SBd-15, 138-Var,Replace joint seals, place methacrylate on bridge deck and approachs.
04-4J5904,2017-02-23,2017-01-30,2017-03-23,CERTIFIED COATINGS COMPANY,(707)639-4414,$384,702.00,04-Ala-84-16.9,Spot blast clean and paint steel elements.
07-3W1804,2017-02-22,2017-01-30,2017-03-14,VELARDE CONCRETE CONSTRUCTION, INC.,(818)898-2300,$758,533.95,07-LA-110, 405-Var,Repair bridge deck.
08-1C6404,2017-02-22,2017-01-30,2017-03-17,SERVITEK SOLUTIONS, INC,(626)227-1650,$1,273,894.77,08-Riv-60-R0.0/R12.2,Replace wireless communication with fiber optic and connect existing
11-2M9604,2017-02-16,2017-01-23,2017-03-13,GRANITE CONSTRUCTION COMPANY,(760)775-7500,$4,636,364.00,11-Imp-78-15.6/R50.0,Apply Asphalt Rubber Seal Coat, Cold Plane and Overlay with RHMA.
08-1C5104,2017-02-16,2017-01-23,2017-03-09,HAL HAYS CONSTRUCTION INC.,(951)788-0703,$1,757,089.00,08-Riv-74-17.4/17.8, Construct Vehicle Rinse Facility
06-342534,2017-02-16,2016-12-27,2017-04-04,SECURITY PAVING COMPANY, INC.,(818)362-9200,$52,635,542.35,06-Fre-180-R74.1/R78.6,Construct 4 lanes on new alignment; Conc Pvmt, Brs & HMA local Rds.
06-0U1804,2017-02-16,2017-01-23,2017-03-13,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$277,277.00,06-Ker-Var-Var,Treat bridge decks with methacrylate, replace joint seals.
06-0T8104,2017-02-15,2017-01-23,2017-03-17,PAPICH CONSTRUCTION COMPANY, INC.,(805)473-3016,$3,143,000.00,06-Kin,Fre-33-12.0/19.0,0.0/R10.7,Cold place AC pavement, place RHMA-G (BWC).
04-3G6414,2017-02-15,2016-12-27,2017-03-17,VALENTINE CORPORATION,(415)453-3732,$5,298,084.00,04-Nap-29-37.0,Scour Replace Bridge
08-1G7004,2017-02-15,2017-01-17,2017-03-13,SEMA CONSTRUCTION, INC,(949)470-0500,$1,580,352.49,08-SBd-38-26.0/31.0,Repair fire damage, existing embankment, and drainage system.
07-3W5404,2017-02-15,2017-01-23,2017-03-14,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$1,358,546.39,07-LA-105, 110-Var,Repair bridge deck and replace joint seal assembly.
07-3W2104,2017-02-14,2017-01-23,2017-03-29,VELARDE CONCRETE CONSTRUCTION, INC.,(818)898-2300,$558,548.25,07-LA-10-R5.3/R13.8,Methacrylate deck, repair joint seals, spalls, approach slabs.
04-2A4414,2017-02-14,2017-01-17,2017-03-14,EMPIRE LANDSCAPING INC,(530)400-3943,$1,358,624.00,04-SCl-152-13.2,PLANTING AND ENVIRONMENTAL MITIGATION
04-1A9044,2017-02-14,2017-01-09,2017-03-17,PACIFIC INFRASTRUCTURE CONSTRUCTION, LLC,(707)449-3604,$1,954,701.50,04-SF-1-5.9/6.3,Construct Drainage
06-0T7604,2017-02-14,2017-01-23,2017-03-17,GRANITE CONSTRUCTION COMPANY,(559)441-5700,$1,314,131.00,06-Tul-216-11.7/19.3,Repair failed AC pavement and resurface with RHMA-gap graded (BWC).
03-0G7104,2017-02-14,2017-01-23,2017-03-29,FBD VANGUARD CONSTRUCTION,(925)245-1300,$3,168,822.90,03-Yol-50, 80-0.0/2.5, 8.9/9.5,Individual Slab Replacement (RSC) and RHMA-O Overlay
06-0V9704,2017-02-09,2017-01-09,2017-03-08,TELFER PAVEMENT TECHNOLOGIES, LLC,(916)175-6000,$648,175.00,06-Fre-5-53.0/60.0,Cold plane and rubberized hot mix asphalt (bonded wearing course).
06-0T7504,2017-02-08,2017-01-17,2017-04-21,MERCER FRASER COMPANY,(707)443-6371,$1,073,521.80,06-Ker-155-R11.0/R17.7,RHMA- Gap Graded (Bonded Wearing Course) paving.
05-1H5004,2017-02-08,2017-01-17,2017-03-07,TELFER PAVEMENT TECHNOLOGIES, LLC,(916)383-1756,$450,083.00,05-SB-246-26.3/28.6,Slurry seal and repair failed areas.
01-0B5604,2017-02-08,2017-01-03,2017-02-28,GORDON N. BALL, INC.,(925)838-5675,$3,345,304.00,01-Men-253-1.4/1.8,Construct Soldier Pile Wall
12-0N9404,2017-02-08,2017-01-17,2017-03-02,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$1,762,319.96,12-Ora-1, 5, 22, 55, 405-VAR,Methacrylate deck seal treatment and joint seal replacement.
08-1F9504,2017-02-07,2017-01-17,2017-02-27,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$197,197.00,08-Riv-10-29.6,Install high friction surface treatment.
08-368514,2017-02-07,2016-11-21,2017-05-02,GRANITE CONSTRUCTION COMPANY,(760)775-7500,$42,126,508.00,08-SBd-15-87.1/87.5 & 177.3/181.1,CONSTRUCT AIF AND DEMOLISH EXISTING AIF IN YERMO
05-1H3704,2017-02-07,2017-01-17,2017-03-14,SOUZA CONSTRUCTION, INC.,(805)546-8288,$409,409.00,05-SLO-58-0.0/0.7,Resurface existing roadbed with RHMA-G.
06-457114,2017-02-07,2016-12-05,2017-03-14,GRANITE CONSTRUCTION CO.,(831)724-1011,$21,725,953.70,06-Ker-14, 178-58.2/62.3, 88.3/88.9,Reconstruct highway from 2-lane conventional to 4-lane expressway.
04-4G2304,2017-02-02,2016-12-05,2017-04-19,BRIDGEWAY CIVIL CONSTRUCTORS, INC.,(707)455-7033,$1,559,014.50,04-Ala-80-4.6/5.7,REPLACING EXISTING MBGR AND K-RAIL WITH CONCRETE BARRIER.
12-0N9704,2017-02-02,2017-01-09,2017-02-23,SPECTRUM CONSTRUCTION GROUP, INC.,(949)299-1400,$732,963.60,12-Ora-5, 133-0.6/14.8, M4.3/8.6,Methacrylate Treatment, Joint Seal Replacement, Polyester Conc Overlay
10-1E8904,2017-02-02,2017-01-09,2017-03-02,ABHE & SVOBODA, INC.,(952)447-6025,$237,770.00,10-SJ-5-26.5/27.0,Repair bridge crossframes.
11-418524,2017-02-02,2016-11-21,2017-03-21,COFFMAN SPECIALTIES, INC.,(858)536-3100,$38,335,000.00,11-Imp-8-R83.1/R90.0,Construct CRCP overlay, HMA-A, and lighting.
11-409004,2017-02-01,2017-01-09,2017-03-14,GRANITE CONSTRUCTION COMPANY,7604441028,$930,420.00,11-SD-94-46.9, R58.9,Upgrade bridge rails and guardrails.
10-1F2404,2017-02-01,2017-01-09,2017-03-06,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$833,950.75,10-Sta-132-R2.4,Treat bridge deck and replace joint seals.
05-1H0804,2017-02-01,2017-01-03,2017-03-08,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$952,089.85,05-Mon,SLO-1, 41, 58, 101-Var,Polyester concrete overlay, deck seal, paint steel column casings
02-2H4804,2017-02-01,2017-01-09,2017-02-27,TULLIS, INC.,(530)241-5105,$3,310,836.00,02-Tri-36-R3.5/R9.2,Cold In-Place Recycle with Hot Mix Asphalt Overlay and Guardrail
06-0P2904,2017-01-31,2016-12-27,2017-03-15,GRANITE CONSTRUCTION CO.,(831)724-1011,$2,697,285.50,06-Ker-155-R1.1/R1.9,Intersection improvements
04-0K2904,2017-01-31,2017-01-09,2017-03-06,TPA CONSTRUCTION INC.,(916)919-1624,$674,116.70,04-Ala-84,680,880-VAR,Treat bridge decks with methacrylate and replace joint seal.
05-0161H4,2017-01-31,2017-01-03,2017-04-04,JJ NGUYEN, INC.,(408)259-7982,$2,372,139.50,05-Mon-101-R91.2/99.2,Replacement planting, irrigation and plant establishment
05-1H3904,2017-01-31,2017-01-09,2017-03-07,GRANITE CONSTRUCTION COMPANY,(408)327-7013,$650,134.23,05-SCl,SCr-35-R0.0/1.5,Resurface pavement with rubberized hot mix asphalt (gap graded).
06-0T7304,2017-01-25,2017-01-03,2017-02-23,VSS INTERNATIONAL, INC.,(916)373-1500,$689,065.00,06-Fre-145, 168-34.1/35.1, R9.9/18.5,Slurry Seal and Asphaltic Emulsion (Fog Seal Coat).
03-0G3204,2017-01-25,2016-12-27,2017-02-15,AMERICAN CIVIL CONSTRUCTORS WEST COAST LLC,(707)746-8028,$717,000.00,03-Nev-20, 49-VAR,METHACRYLATE, POLYESTER OVERLAY, AND HMA OVERLAY
10-1F2004,2017-01-25,2017-01-03,2017-03-17,AMERICAN CIVIL CONSTRUCTORS WEST COAST LLC,(707)746-8028,$808,000.00,10-SJ-12,99-Var,Treat bridge decks and replace joint seals.
07-3W2204,2017-01-25,2017-01-03,2017-02-15,WESTERN STRUCTURES,(951)352-4300,$2,322,018.83,07-LA-210-R0.0/R15.8,Replace bridge approach slabs and rehabilitate decks.
11-418514,2017-01-24,2016-11-14,2017-03-01,SECURITY PAVING COMPANY, INC.,(818)362-9200,$73,516,033.60,11-Imp-8-R40.4/R45.5, R55.0/65.0,Construct CRCP overlay, HMA-A, and lighting.
10-1F6004,2017-01-24,2016-12-27,2017-03-13,GEORGE REED INC,(209)523-0730,$1,363,074.00,10-SJ-88-0.0/5.2,Cold plane roadway and place rubberized hot mix asphalt.
05-1H0704,2017-01-24,2017-01-03,2017-02-15,SPECTRUM CONSTRUCTION GROUP, INC.,(949)299-1400,$1,052,398.80,05-Mon,SBt,SCr-1, 9, 25, 68, 101, 129, 156-Var,Seal bridge decks with methacrylate or polyester concrete.
03-0G5804,2017-01-24,2017-01-03,2017-03-02,KNIFE RIVER CONSTRUCTION,(530)891-6555,$1,148,744.25,03-Sut-113-R11.8/16.1,RHMA Overlay.
06-471504,2017-01-19,2016-11-14,2017-02-24,GRANITE CONSTRUCTION COMPANY,(559)441-5700,$31,665,588.30,06-Tul-99-39.6/41.3,Reconstruct interchange with new pumping plant.
07-293504,2017-01-19,2016-08-22,2017-02-22,C. A. RASMUSSEN, INC.,(661)367-9040,$8,320,236.35,07-LA-138-58.8/60.2,Widen Route 138 and construct drainage facilities.
10-0Y4504,2017-01-19,2016-12-05,2017-03-02,GEORGE REED INC,(209)523-0730,$287,598.00,10-Tuo-120-T24.6/28.8,Construct turnouts with hot mix asphalt.
09-366104,2017-01-19,2016-12-27,2017-02-14,JABRE CONTRACTING INC.,(310)720-0277,$207,315.00,09-Iny,Mno-127,190,168, 120, 270, 395, 89-Various,Construct rumble strips and signs.
12-0Q1004,2017-01-19,2016-12-27,2017-02-13,ALFARO COMMUNICATIONS CONSTRUCTION,INC.,(310)669-8949,$266,310.00,12-Ora-1,133-Var,Repair Sidewalk, Driveway and Curb
01-0G3804,2017-01-18,2016-11-21,2017-02-16,GRANITE CONSTRUCTION COMPANY,(707)467-4100,$1,905,813.00,01-Men-101-48.1/49.0,Replace Upp Creek Culvert to facilitate a fish passage
02-2H4704,2017-01-18,2016-12-05,2017-02-17,TELFER PAVEMENT TECHNOLOGIES, LLC,(916)383-1756,$1,808,332.50,02-Sha-89-0.0/21.3,Replace AC Surfacing, asphalt-rubber chip seal, striping
05-1C1704,2017-01-18,2016-12-05,2017-03-24,CALPORTLAND CONSTRUCTION,(805)345-3581,$844,950.00,05-SLO-1-5.3/5.8,Construct left turn channelization.
03-0G6104,2017-01-18,2016-12-27,2017-03-03,LAMON CONSTRUCTION CO., INC.,(530)671-1370,$1,558,845.00,03-Yol-84-10.9/13.3,Cold In-Place Recycling and RHMA (Gap Graded) Overlay
06-0T7404,2017-01-18,2016-12-27,2017-02-09,NORTHWEST PAVING,(530)246-4388,$865,123.00,06-Tul-65,216-0.0/R6.9,2.9/11.7,Polymer Asphaltic Emulsion Seal Coat
04-0J6404,2017-01-18,2016-11-14,2017-03-03,DESILVA GATES COSNTRUCTION,(925)829-9220,$55,773,745.00,04-Son-101-29.3/R43.4,RESURFACE AND RESTORE PAVEMENT FOR MAINLINE AND RAMPS
10-1F2604,2017-01-18,2016-12-27,2017-02-17,AMERICAN CIVIL CONSTRUCTORS WEST COAST LLC,(707)746-8028,$1,030,000.00,10-Cal,Mer-4,33,59,99,152-Var,Replace joint seals, treat bridge decks, and replace approach slabs.
08-1E0804,2017-01-12,2016-12-05,2017-02-21,SULLY-MILLER CONTRACTING COMPANY,(714)578-9600,$1,076,000.00,08-SBd-18-88.9/89.6,Construct raised-curb median
01-0C8404,2017-01-12,2016-11-14,2017-02-09,GR SUNDBERG, INC.,(707)825-6565,$1,699,160.00,01-DN,Hum,Lak,Men-20, 36, 101, 175-VAR,REPLACE CRASH CUSHIONS & SAND BARREL ARRAYS
02-2H4004,2017-01-12,2016-12-05,2017-02-13,HAT CREEK CONSTRUCTION & MATERIALS, INC.,(530)335-5501,$818,818.00,02-Las-139-10.0/20.0,Replace AC surfacing, asphalt-rubber chip seal, flush coat, striping
02-0H3804,2017-01-12,2016-12-05,2017-02-03,CONVERSE CONSTRUCTION INC.,(530)378-5591,$465,195.00,02-Plu-70-1.0/1.3,Install Lights in Elephant Butte Tunnel
02-2H3904,2017-01-11,2016-11-28,2017-02-17,TULLIS, INC.,(530)241-5105,$1,700,243.00,02-Teh,Plu-36-91.5/104.0, 0.0/4.0,Replace AC surfacing, asphalt-rubber chip seal, HMA overlay, striping
04-2K5504,2017-01-11,2016-11-21,2017-02-14,GRANITE ROCK COMPANY,(408)574-1400,$5,672,844.00,04-SF-35-2.0/3.2,Capital Preventive Maintenance and Crosswalk Enhancement Improvements
03-4F2604,2017-01-11,2016-12-05,2017-02-06,DREAMBUILDER CONSTRUCTION CORP.,(714)646-3697,$1,495,061.00,03-But-32-R9.2,Install Traffic Signal at Ivy Street (Eastbound and Westbound)
04-2G8904,2017-01-10,2016-10-31,2017-02-09,THOMPSON BUILDERS CORPORATION,(415)456-8972,$3,136,017.50,04-Mrn-1-8.0,Soldier pile wall with tiebacks and embankment confined system.
08-1C6004,2017-01-10,2016-11-28,2017-02-08,DIVERSIFIED LANDSCAPE CO.,(951)245-1686,$593,350.00,08-SBd-71-R6.9/R7.8,Sediment Stabilization, Erosion Control
02-2H3804,2017-01-10,2016-11-28,2017-02-17,ROCKY MOUNTAIN CONSTRUCTION, LLC.,(541)882-8377,$1,312,312.12,02-Mod-139-R6.0/R10.7,Replace AC surfacing; HMA overlay; guardrailing; striping
02-2H3604,2017-01-05,2016-11-14,2017-02-08,J.F. SHEA CONSTRUCTION, INC.,(530)246-4292,$1,299,320.00,02-Sha-5-1.8/R6.5,Cold plane AC,RHMA-O,HMA,replace AC surfacing,guardrailing,striping
03-0G3404,2017-01-05,2016-11-28,2017-02-16,Q & D CONSTRUCTION, INC.,(775)786-2677,$5,031,000.00,03-Nev-80-R12.3/21.2,Cold Plane and Place Polyester Concrete Inlay and Hot Mix Asphalt
03-4F4904,2017-01-05,2016-11-14,2017-02-17,HAT CREEK CONSTRUCTION & MATERIALS, INC.,(530)335-5501,$522,539.00,03-Nev,Sie-89-8.3/8.7, 0.0/11.8,Construct 5 truck turnouts between Truckee and Sierraville
11-408604,2017-01-05,2016-10-31,2017-02-01,HAZARD CONSTRUCTION,(858)587-3600,$5,422,093.00,11-SD-8-T0.5/R0.7,Cold plane and overlay with RHMA, grind PCC, MGS and end treatments.
10-0Y7404,2017-01-05,2016-11-14,2017-02-01,TEICHERT CONSTRUCTION,(916)757-6400,$9,661,118.00,10-Mer-140-6.1/35.8,Rubberized HMA overlay, repair failed areas, and construct curb ramps.
08-1C1404,2017-01-04,2016-11-14,2017-03-17,SEMA CONSTRUCTION, INC,(949)470-0500,$806,989.87,08-Riv-15-4.8/6.5,Roadside Safety Improvements
12-0N2804,2017-01-04,2016-11-28,2017-02-22,AUTOBAHN CONSTRUCTION INC.,(714)769-7025,$359,224.00,12-Ora-5-33.6/34.1,Grind & groove Conc Pvmt, HMA paving, slab replacement & lighting
08-1C6104,2017-01-04,2016-11-21,2017-02-02,PACIFIC RESTORATION GROUP, INC.,(951)940-6069,$443,410.00,08-Riv-15-45.6/47.3,Sediment Stabilization/Erosion control
11-405704,2017-01-04,2016-10-24,2017-02-27,LB CIVIL CONSTRUCTION, INC.,(760)294-0974,$4,864,097.40,11-SD-76-32.6/33.3,Construct roundabout and drainage, concrete and landscape work.
02-2H3304,2017-01-04,2016-11-14,2017-02-03,AMERICAN PAVEMENT SYSTEMS, INC.,(209)522-2277,$2,521,587.00,02-Las,Mod-395-119.0/128.7, 39.9/61.6,Asphalt-rubber chip seal, replace AC surfacing, striping
03-0G5704,2017-01-04,2016-11-14,2017-02-16,SIERRA NEVADA CONSTRUCTION,(775)355-0420,$2,413,007.00,03-Sie-89-19.9/29.6,Hot Mix Asphalt (Type A) Overlay
03-4F7404,2017-01-04,2016-11-21,2017-02-17,MERCER FRASER COMPANY,(707)443-6371,$5,344,663.60,03-Nev-49-23.2/R32.6,Cold In-Place Recycling with HMA Overlay
04-4G4504,2016-12-15,2016-10-03,2017-02-01,R N R CONSTRUCTION, INC.,(916)379-0957,$5,414,091.50,04-Sol-780-7.1,Replace bridge to provide standard vertical clearance.
02-2H3404,2016-12-15,2016-11-21,2017-01-10,ROCKY MOUNTAIN CONSTRUCTION, LLC,(541)882-8377,$1,312,312.32,02-Mod-139-28.0/34.0,HMA Overlay, Replace AC Surfacing, Guardrailing, Striping
02-2H3504,2016-12-14,2016-11-07,2017-01-10,TULLIS, INC.,(530)241-5105,$753,739.00,02-Tri-3-49.7/53.7,Replace AC surfacing, prepaving grinding, HMA, guardrail, striping
02-0H7804,2016-12-14,2016-11-21,2017-02-08,T AND S DVBE, INC.,(530)949-0270,$337,777.00,02-Sha,Sis,Teh-5, 44, 299-VAR,Install Roadside Signs
01-0E5604,2016-12-14,2016-11-21,2017-01-10,CAL STRIPE, INC,(909)884-7170,$1,793,000.00,01-DN,Hum,Lak,Men-VAR-VAR,Install Rumble Strips.
04-235654,2016-12-14,2016-09-26,2017-02-10,DISNEY/O.C. JONES J.V.,(510)526-3424,$45,109,898.20,04-SM-101, 114-1.3/2.5, 5.0/5.3,Reconstruct Interchange
04-3G0804,2016-12-14,2016-10-31,2017-01-20,GRANITE CONSTRUCTION COMPANY,(760)732-0915,$4,854,263.00,04-Son-1-30.5,CONSTRUCT ROADWAY AND SOIL NAIL WALLS
03-3F7604,2016-12-13,2016-10-17,2017-02-14,KNIFE RIVER CONSTRUCTION,(530)891-6555,$22,764,836.10,03-But-191-6.8/8.6,Realign curves, widen shoulders
11-421604,2016-12-13,2016-10-03,2017-01-20,WESTERN RIM CONSTRUCTORS, INC.,(760)489-4328,$5,351,494.24,11-SD-78-13.0/14.1,Construct barrier, retaining wall and widen road.
01-430604,2016-12-13,2016-10-31,2017-01-10,MERCER FRASER COMPANY,(707)443-6371,$3,385,419.00,01-Hum-254-0.8/43.1,REPLACE BRIDGE RAILS AND WIDEN (FOUR BRIDGES)
02-2H3204,2016-12-13,2016-11-14,2017-01-12,AMERICAN PAVEMENT SYSTEMS, INC.,(209)522-2277,$997,220.00,02-Sis,Tri-3-23.0/27.0,42.0/46.7,Asphalt rubber chip seal, replace AC surfacing, striping
03-1F9704,2016-12-07,2016-10-10,2017-02-09,BALDWIN CONTRACTING COMPANY, INC. DBA KNIFE RIVER CONSTRUCT ION,(530)891-6555,$3,167,795.96,03-Sut,But-99-Var,ITS and Operational Improvements.
03-4F4404,2016-12-06,2016-10-17,2017-02-06,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$2,613,102.78,03-Sac,ED,Nev,Pla,Sol,Yol-VAR-VAR,Upgrade Changeable Message Sign to Advanced Variable Message Sign
04-235524,2016-12-06,2016-10-03,2017-01-20,GHILOTTI CONSTRUCTION CO. INC.,(707)585-1221,$16,849,663.67,04-SM-92, 82-R11.0/R11.4, 10.4/10.7,Interchange Improvements, retaining and sound walls.
04-4G5104,2016-12-06,2016-10-10,2017-01-20,M.C.M. CONSTRUCTION, INC.,(916)334-1221,$7,180,475.00,04-Sol-80-31.4, 32.6,Bridge construction
03-1E7604,2016-12-01,2016-10-10,2017-01-20,A. TEICHERT & SON, INC. DBA TEICHERT CONSTRUCTION,(916)757-6400,$3,976,579.00,03-Yub-20, 70-0.5/0.9, 14.3/14.4,Remove median lanes, add left turn lanes, channelize, modify signals
01-402814,2016-12-01,2016-10-10,2016-12-21,WYLATTI RESOURCE MANAGEMENT,(707)983-8135,$2,004,503.20,01-Men-101-50.1/84.6,Rehabilitate Culverts.
10-1F5604,2016-12-01,2016-10-24,2017-01-20,GEORGE REED INC,(209)523-0734,$3,572,578.00,10-SJ-5-R17.5/R22.1,Hot mix asphalt resurfacing.
08-1C6304,2016-12-01,2016-10-10,2017-01-30,HIGH LIGHT ELECTRIC INC,(951)352-9646,$2,458,888.00,08-Riv,SBd-VAR-VAR,Replace ( ESU ) and ( HAR )
07-3X8704,2016-11-30,2016-10-03,2016-12-29,GRIFFITH COMPANY,(562)929-1128,$9,855,198.60,07-LA-105, 405-R2.5, 20.5/R21.1,Slope reconstruction and pavement repair
08-1E6504,2016-11-30,2016-10-31,2016-12-29,POWELL CONSTRUCTORS INC,(909)356-8880,$8,417,460.00,08-Riv-60-R0.0/7.5,INSTALL DOUBLE LUMINAIRE LIGHTINGS AND UPGRADE EXISTING LIGHTINGS
06-0P5904,2016-11-30,2016-10-17,2017-03-03,A. TEICHERT & SON INC. DBA TEICHERT CONSTRUCTION,(916)757-6400,$3,244,187.00,06-Tul-190-4.1/4.8,Intersection improvement, drainage swales, basin and lighting.
02-2H3704,2016-11-30,2016-10-31,2017-01-03,NORTHWEST PAVING,(530)246-4388,$537,327.00,02-Sha-151-0.0/5.5,Asphalt-Rubber Chip Seal, Replace AC Surfacing, Striping
04-209504,2016-11-29,2016-09-26,2017-01-04,GHILOTTI CONSTRUCTION CO. INC.,(707)585-1221,$9,618,869.75,04-Mrn,Son-1-50.2/50.5, 0.0/0.2,Replace Estero bridge and Realign approaching roadway
04-2G5024,2016-11-17,2016-10-10,2016-12-13,FBD VANGUARD CONSTRUCTION,(925)245-1300,$2,379,046.50,04-Ala-13, 24, 80, 84, 880-VAR,UPGRADE EXISTING TRANSITION RAILINGS
04-3G4624,2016-11-17,2016-09-12,2017-01-04,AMERICAN CIVIL CONSTRUCTORS WEST COAST LLC,(707)746-8028,$408,757.50,04-CC,Sol-680-25.0-25.4, 0.0-0.6,Floor Beam Fatigue Crack Mitigation
08-0R1204,2016-11-16,2016-09-12,2016-12-21,GRANITE CONSTRUCTION COMPANY,(760)775-7500,$14,063,063.00,08-SBd-40-0.0/R25.0,Regrade Median Cross Slope
07-302104,2016-11-16,2016-09-19,2016-12-29,SECURITY PAVING COMPANY, INC.,(818)362-9200,$19,416,268.20,07-LA-27,118-18.6/20.1, R0.0/R14.4,Replace PCC pavement and cold plane and place RHMA pavement.
10-1C4704,2016-11-16,2016-10-24,2017-01-13,GEORGE REED,(209)523-0730,$934,145.00,10-Mer,SJ,Sta-99-Var,HMA resurfacing, rumble strip and striping.
12-0M5004,2016-11-16,2016-09-19,2017-01-10,CHUMO CONSTRUCTION INC,(626)960-9502,$11,354,448.12,12-Ora-55-1.2/R17.9,Upgrade Safety Devices
10-1F5904,2016-11-15,2016-10-24,2017-01-12,A. TEICHERT & SON, INC DBA TEICHERT CONSTRUCTION,(916)757-6400,$2,522,001.04,10-Tuo-49, 108-Var,Cold plane AC pavement and RHMA overlay and resurfacing.
01-0B4304,2016-11-15,2016-10-10,2016-12-21,WEST COAST CONTRACTORS, INC.,(541)267-7689,$5,472,485.95,01-Hum-101-111.3/111.7,Restore slope and construct retaining walls.
01-0B5404,2016-11-10,2016-09-26,2017-01-24,GRANITE CONSTRUCTION COMPANY,(707)467-4100,$1,694,121.70,01-Men-162-13.9, 22.7,REPAIR ROADWAY AND CONSTRUCT WALL
07-306004,2016-11-10,2016-10-03,2016-12-12,CHUMO CONSTRUCTION INC,(626)960-9502,$4,703,982.54,07-LA-5,14-R44.6/R45.7, R24.8/R25.0,Slope stabilization and electrical safety improvement
08-1G1404,2016-11-09,2016-10-03,2017-01-05,CALMEX ENGINEERING INC,(909)546-1311,$1,581,870.99,08-Riv-371-61.9/67.8,PREVENTATIVE MAINTENANCE TREATMENT OVERLAY
08-0E5514,2016-11-09,2016-10-17,2016-12-13,CALIFORNIA PROFESSIONAL ENGINEERING, INC.,(626)810-1338,$2,587,261.50,08-SBd-10, 210, L5506 - Var,Install RMS, CCT, VDS, CMS, FO Backbone, ESU Traffic Ops
08-0G8424,2016-11-09,2016-10-03,2016-12-29,HAL HAYS CONSTRUCTION INC.,(951)788-0703,$7,552,526.50,08-SBd-15-R107.3,Upgrade Existing Safety Roadside Rest Areas (SRRA)
04-2G4814,2016-11-09,2016-10-17,2016-12-15,PACIFIC INFRASTRUCTURE CONSTRUCTION, LLC,(707)449-3604,$867,407.80,04-Ala-13-12.1/13.4,TO IMPROVE ADA/PEDESTRIAN RELATED FEATURES AND ACCESS BARRIERS
03-0G4804,2016-11-08,2016-10-10,2016-12-12,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$845,196.68,03-Yol-113, 505-Var,Rehabilitate Bridge Decks
07-257104,2016-11-08,2016-10-10,2017-01-04,SELECT ELECTRIC, INC,(619)460-6060,$4,885,380.00,07-LA-405-0.0/29.2, 39.0/48.6,Upgrade The Existing Communication System
09-356104,2016-11-08,2016-10-03,2017-01-31,RE COM DEVELOPMENT COMPANY,(760)873-3301,$2,871,294.96,09-Mno-395-34.1,Construct maintenance equipment storage building and site work.
07-3W5004,2016-11-03,2016-10-10,2016-12-02,J. MCLOUGHLIN ENGINEERING CO., INC.,(909)944-1037,$2,542,615.50,07-LA-210-R32.9/R36.5,Replace concrete slab.
10-1C4214,2016-11-03,2016-09-12,2016-12-29,BAY CITIES PAVING & GRADING, INC.,(925)687-6666,$2,780,989.02,10-SJ-99-14.3/14.9, 18.4/23.0,Ramp widening, install ramp metering and fiber optic cable.
03-0G4904,2016-11-03,2016-10-03,2016-12-12,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$1,934,769.00,03-Pla,ED-50, 89-VAR,Rehabilitate Bridge Decks
06-0R0504,2016-11-02,2016-09-19,2016-12-09,SECURITY PAVING COMPANY, INC.,(818)362-9200,$2,701,469.00,06-Tul-198-R4.2/R4.9, 6.8/R8.3,Construct concrete median barrier, guardrail and message sign.
07-305504,2016-11-02,2016-09-26,2017-01-05,POWELL CONSTRUCTORS INC,(909)356-8880,$3,601,398.00,07-LA-5-13.7/26.7,Construct Midwest Guardrail System and concrete barriers.
12-0M6104,2016-11-02,2016-10-03,2016-12-21,POWELL CONSTRUCTORS INC,(909)356-8880,$4,327,243.00,12-Ora-55, 57, 91-17.5/17.9; 15.2/16.0; 5.8/6.8; 8.7/R9.5,INSTALL ADDITIONAL LIGHTING AT SEPARATIONS AND UPGRADE GUARDRAIL
07-281504,2016-11-02,2016-08-29,2016-12-09,C. A. RASMUSSEN, INC.,(661)367-9040,$6,794,322.26,07-LA,Ven-101-29.3/38.2,0.0/1.2,Construct storm water treatment systems.
02-4E4204,2016-11-02,2016-09-19,2016-12-14,SIERRA NEVADA CONSTRUCTION,(775)355-0420,$9,527,007.00,02-Las,Sie-70, 395-3.5/3.9, R0.0/R3.1,R0.0/R5.6,RHMA-GG,cold planeAC,polyester conc overlay,PCCapproach slabs,striping
02-4F58U4,2016-11-01,2016-09-26,2016-12-14,J.F. SHEA CONSTRUCTION, INC.,(530)246-4292,$4,359,984.00,02-Sis-5-R57.8/R58.5,Br strengthening, Barrier Rail, HMA, Polyester Conc, Approach Slabs
03-0G6004,2016-11-01,2016-10-10,2016-11-29,S.T.RHOADES CONSTRUCTION INC.,(530)223-9322,$325,336.00,03-Col,Sac-5-VAR,Cold Plane AC Pavement and HMA Overlay
02-4G03U4,2016-10-27,2016-09-19,2016-12-06,TULLIS, INC.,(530)241-5105,$8,883,805.50,02-Teh-36-R75.1/78.4,Excavation, HMA, Gabions, Guardrail, Striping
04-4H2604,2016-10-27,2016-09-19,2016-12-13,FBD VANGUARD CONSTRUCTION,(925)245-1300,$1,393,398.75,04-Ala-580-41.5,Paving, signal and lighting, sidewalk, and curb ramps
04-264H64,2016-10-27,2016-09-19,2016-12-15,WABO LANDSCAPE & CONSTRUCTION, INC.,(510)741-9226,$2,224,631.00,04-Son-12/101-R15.5/R16.0 , 2.0/22.4,Replacement Highway Planting
04-2G9904,2016-10-27,2016-09-19,2017-01-12,BRIDGEWAY CIVIL CONSTRUCTORS, INC.,(707)455-7033,$1,021,981.90,04-SCl-130-5.6/6.0,Construct Retaining Wall
01-415004,2016-10-27,2016-09-19,2016-12-14,MERCER FRASER COMPANY,(707)443-6371,$12,790,950.00,01-Hum-101-109.5/R125.8,Highway Improvements: Overlay/Signs/ADA
11-2M8304,2016-10-27,2016-10-03,2016-12-15,PAVEMENT COATINGS CO.,(714)826-3011,$2,113,957.00,11-SD-94-39.0/65.4,Apply Polymer Modified Asphaltic Emulsion Chip Seal.
04-2A4904,2016-10-26,2016-09-19,2016-12-09,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$7,513,373.00,04-SF-280-R4.8/R6.2,Bridge polyester concrete overlay, drainage and barrier reconstruction
03-3C3804,2016-10-26,2016-09-06,2017-01-23,SECURITY PAVING COMPANY, INC.,(818)362-9200,$26,420,098.60,03-ED-50-75.4/77.3,Hot Mix Asphalt, Roadway Excavation, and Signal and Lighting
04-1SS444,2016-10-26,2016-10-03,2016-12-02,QUIMU CONTRACTING INC.,(707)693-0289,$239,972.50,04-Ala-880-19.3,Earth Work and Alternative Pipeliner
05-1G1504,2016-10-26,2016-09-12,2016-11-28,CALPORTLAND CONSTRUCTION,(805)345-3581,$11,268,900.00,05-SLO-41-19.7/R42.2,Cold In-Place Recycling, cold plane AC Pavement and RHMA-G.
01-0B5104,2016-10-26,2016-09-19,2016-12-12,MENDOCINO CONSTRUCTION SERVICES, INC.,(707)459-2377,$1,953,531.00,01-Men-101-93.2,CONSTRUCT CONCRETE CRIB WALL
08-0Q1304,2016-10-25,2016-10-03,2016-11-28,HIGHLAND CONSTRUCTION, INC.,(714)538-5156,$2,856,825.00,08-SBd-62-1.9/7.6,CONSTRUCT RAISED MEDIAN CURB AND DOUBLE THRIE BEAM BARRIER
11-403204,2016-10-25,2016-09-19,2016-12-12,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$3,590,414.40,11-SD-67-R4.6/19,Install Channelizers, High Friction Surface Treatment, CMS and CCTV
04-2A3204,2016-10-25,2016-09-06,2016-12-01,GHILOTTI CONSTRUCTION CO. INC.,(707)585-1221,$2,734,517.00,04-Nap-121-9.2/9.4,Roadway Widening, Bridge Replacement, Creek Grading
05-1C8704,2016-10-25,2016-09-12,2016-11-28,GRANITE ROCK COMPANY,(408)574-1400,$5,096,297.00,05-SBt-156-0.0/3.0,Resurface pavement with RHMA-G and install midwest guardrail system.
04-2G9604,2016-10-25,2016-09-19,2017-01-20,GORDON N. BALL, INC.,(925)838-5675,$1,416,342.00,04-SCl-9-4.6,CONSTRUCT ROADWAY AND RETAINING WALL
05-1C8404,2016-10-20,2016-09-12,2016-11-16,GRANITE CONSTRUCTION COMPANY,(831)763-6100,$6,272,272.00,05-SBt-156-R10.0/R18.4,Resurface pavement with RHMA-G and install midwest guardrail system.
04-3G7204,2016-10-20,2016-09-19,2016-12-02,GHILOTTI CONSTRUCTION CO. INC.,(707)585-1221,$1,060,330.00,04-Son-12, 101-R16.0, 19.6,Construct 21 Roadside Paving and 5 Maintenance Vehicle Pullouts
02-4G3804,2016-10-20,2016-09-12,2016-11-30,MERCER FRASER COMPANY,(707)443-6371,$5,203,191.00,02-Tri-299-0.0/8.3,Place Rubberized Hot Mix Asphalt, Guardrail, and Some Drainage
07-307204,2016-10-20,2016-09-26,2016-11-16,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$1,375,227.10,07-LA-91, 105,110, and 405-Varies,Place High Friction Surface Treatment.
07-297404,2016-10-20,2016-09-26,2016-11-15,ALDRIDGE ELECTRIC, INC.,(847)247-5274,$2,396,294.00,07-LA-105,110-6.6R/8.0R & 13.2/14.7,INSTALL SAFETY LIGHTING AT INTERCHANGE
12-0H5304,2016-10-20,2016-09-12,2016-11-10,UNITED ENGINEERING & CONSTRUCTION, INC,(818)662-8055,$994,269.00,12-Ora-5-6.8, 22.8,BRIDGE RAIL UPGRADE AND DECK REPLACEMENT
07-305204,2016-10-20,2016-09-12,2016-11-28,C. A. RASMUSSEN, INC.,(661)367-9040,$5,362,544.50,07-Ven-33-15.7,Construct soil nail wall and rock slope protection.
12-0M3504,2016-10-19,2016-08-29,2016-11-29,CHUMO CONSTRUCTION INC,(626)960-9502,$17,250,137.43,12-Ora-405-2.6/6.5,Extd 2nd Aux Ln on SB 405, Repl Exist K-Rail to Type 60/60C Conc Barr
07-290804,2016-10-19,2016-09-26,2016-11-15,GRIFFITH COMPANY,(562)929-1128,$2,462,511.00,07-LA-1-2.4/7.2,Construct curb ramps.
01-0B4404,2016-10-19,2016-09-12,2016-12-01,R. BROWN CONSTRUCTION COMPANY, INC.,(530)629-3702,$2,352,715.50,01-Hum-169-26.4/29.8,CIDH Piles, RSP Placement and HMA
04-4A6704,2016-10-19,2016-09-26,2016-11-09,AMERICA PACIFIC CONSTRUCTION,(559)577-9999,$198,820.00,04-Mrn,Son,Nap-1, 29, 116,128, 131, -VARIOUS,Install Curb Ramps
06-434014,2016-10-18,2016-08-29,2016-11-29,A. TEICHERT & SON INC. DBA TEICHERT CONSTRUCTION,(916)757-6400,$14,514,641.00,06-Tul-65-R15.1/18.0,Widen 2 lanes conventional highway to 4 lanes expressway.
04-4G9604,2016-10-18,2016-09-19,2016-11-09,GHILOTTI CONSTRUCTION CO. INC.,(707)585-1221,$1,241,300.00,04-Sol-37, 80-var,Ramp gore paving
11-415704,2016-10-18,2016-08-29,2016-11-14,FUTURE DB INTERNATIONAL INC.,(949)390-2110,$4,792,817.58,11-SD-78-0.0/R16.5,Enhance lighting and striping, install MGS and concrete barrier.
02-2C0904,2016-10-18,2016-08-29,2016-11-16,M.C.M. CONSTRUCTION, INC.,(916)334-1221,$10,151,652.00,02-Plu-70-50.6/51.7,Bridge Widening and Deck Replacement, HMA, MGS and Culvert Replacement
01-0B1204,2016-10-13,2016-09-19,2016-11-10,S.T. RHOADES CONSTRUCTION, INC.,(530)223-9322,$774,386.30,01-Lak-20-13.5/30.5,UPGRADE CURB RAMPS & SIDEWALK
05-0T9904,2016-10-13,2016-09-12,2016-11-17,THE PROFESSIONAL TREE CARE CO.,(510)549-3954,$846,532.30,05-Mon-101-45.8/49.8,Remove guardrail and tree stumps.
10-0Y6204,2016-10-13,2016-09-12,2016-11-18,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$2,920,074.80,10-Mer,Sta-99-Various,Remove and construct overhead-sign structures.
07-4T8304,2016-10-13,2016-09-12,2016-12-06,ALFARO COMMUNICATIONS CONSTRUCTION,INC.,(310)669-8949,$349,752.10,07-Ven-118-T19.8,Install traffic signal and lighting system.
07-305004,2016-10-13,2016-09-19,2016-11-28,AMERICAN CIVIL CONSTRUCTORS WEST COAST LLC,(707)746-8028,$2,221,000.00,07-LA-105-R0.4/R2.5,Treat bridge deck with methacrylate and replace joint seals.
11-244004,2016-10-13,2016-08-08,2016-12-02,COFFMAN SPECIALTIES, INC.,(858)536-3100,$7,925,000.00,11-SD-5-3.90/9.20,Widen ramps, construct walls, install ramp meters, and landscape work.
10-1C4904,2016-10-13,2016-09-19,2016-12-09,LINEAR OPTIONS, INC.,(530)896-1800,$516,865.00,10-Mer,Sta-33-Var,Centerline and edgeline rumble strips
07-299504,2016-10-12,2016-09-19,2016-11-28,CHRISP COMPANY,(510)656-2840,$450,775.00,07-LA-1-2.6/30.7,Install Flexi Guide 300 Interstate Grade Curb and Qwick Kurb System.
12-0H2704,2016-10-12,2016-09-12,2016-11-01,SPECTRUM CONSTRUCTION GROUP, INC.,(949)299-1400,$1,833,383.70,12-Ora-39-9.8/10.5,HMA & RHMA Pvmt, Curb Ramp, 36" RCP, Signal & Lighting
07-240704,2016-10-12,2016-09-12,2016-11-28,STURGEON ELECTRIC CALIFORNIA, LLC,(909)591-0000,$5,203,000.00,07-LA,Ven-Var-Var,Modify highway advisory radio system and upgrade flashing beacon.
07-300304,2016-10-12,2016-09-19,2016-11-28,BOSCO CONSTRUCTORS INC,(818)306-3884,$1,470,000.00,07-LA-57, 210-VARIES,Pave existing slope under bridge with concrete.
10-0Y2204,2016-10-12,2016-09-19,2016-11-28,DIRT AND AGGREGATE INTERCHANGE, INC.,(503)661-5093,$1,058,888.00,10-Tuo-49,108-various,Metal beam guardrail and end treatment.
11-080234,2016-10-12,2016-09-06,2016-12-06,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$5,118,833.50,11-Imp-98-31.6/32.1,Widen highway, Hot Mix Asphalt (Type A), and Signal and Lighting.
04-3A87A4,2016-10-12,2016-09-19,2016-11-22,EMPIRE LANDSCAPING INC,(530)400-3943,$285,771.00,04-CC-680-24.3,ESTABLISH EXISTING MITIGATION PLANTING
03-0F3104,2016-10-12,2016-08-01,2016-12-12,M.C.M. CONSTRUCTION, INC.,(916)334-1221,$18,923,260.00,03-ED-49-23.6/24.5,Replace bridge.
01-0B2604,2016-10-05,2016-08-29,2016-11-07,FLATIRON WEST INC,(707)742-6000,$3,287,062.25,01-DN-199-8.2,Construct Bridge and Widen Shoulders
05-0G0404,2016-10-04,2016-08-08,2016-11-16,SECURITY PAVING COMPANY, INC.,(818)362-9200,$53,908,138.80,05-SLO,Mon-101-63.2/R69.3, R0.0/R1.9,Roadway rehabilitation and bridge construction.
04-3G0704,2016-09-29,2016-09-06,2016-10-25,VALENTINE CORPORATION,(415)453-3732,$227,369.00,04-Son-1-7.2,Place Rock Slope Protection and Repair Slipout
10-0T7804,2016-09-29,2016-08-22,2016-10-27,GRANITE CONSTRUCTION COMPANY,(916)855-4400,$2,083,411.62,10-Sta-132-1.1/1.8, Install traffic signal and widen intersection.
10-0X5604,2016-09-28,2016-08-22,2016-10-31,GRANITE CONSTRUCTION COMPANY,(916)855-4400,$5,099,194.90,10-Sta-99-R18.0/R19.7,Construct ramp and right-turn lane.
10-0Q1604,2016-09-27,2016-08-22,2016-10-28,TEICHERT CONSTRUCTION,(916)757-6400,$8,252,000.00,10-SJ-99-0.0/5.7,Digouts, hot mix asphalt and rubberized hot mix asphalt resurfacing.
04-2594A4,2016-09-27,2016-09-06,2016-10-28,EMPIRE LANDSCAPING INC,(530)400-3943,$354,141.00,04-Nap-29-R20.4/R20.8,HIGHWAY PLANTING
03-4F0604,2016-09-22,2016-08-01,2016-10-19,TEICHERT CONSTRUCTION,(916)757-6400,$21,442,000.00,03-Gle-5-R0.0/R20.0,HMA Overlay
12-0M4704,2016-09-22,2016-08-29,2016-11-09,DYNALECTRIC,(714)828-7000,$1,833,765.70,12-Ora-1-22.0/29.9,Modify signals, add lighting, modify curb ramps, pavement striping
10-0U2904,2016-09-22,2016-08-08,2016-10-27,TEICHERT CONSTRUCTION,(530)406-4200,$1,439,591.00,10-Mer-165-35.6/36.1,Widen intersection for left turn, replace pipeline.
10-0F2804,2016-09-21,2016-08-15,2016-10-24,K.W. EMERSON, INC.,(209)754-3839,$6,609,288.80,10-Cal-4-43.8/44.3,Widen roadway and construct retaining walls.
03-0H11U4,2016-09-20,2016-08-01,2016-10-18,A. TEICHERT & SON, INC DBA TEICHERT CONSTRUCTION,(916)757-6400,$7,318,000.00,03-Sac-51, 160-4.0/4.3, R44.4/47.0,Pave HMA, replace guard rail & pull boxes, polyester bridge overlay.
06-0T6504,2016-09-14,2016-08-01,2016-10-31,MERCER FRASER COMPANY,(707)443-6371,$3,166,205.00,06-Fre-5-10.0/20.0,Rubberized-HMA resurfacing, repair failed areas and panel replacement.
04-3G59U4,2016-09-14,2016-07-05,2016-10-24,A. TEICHERT & SON, INC. DBA TEICHERT CONSTRUCTION,(916)757-6400,$62,255,746.96,04-Ala-205-0.0/1.0 04-Ala-580-0.0/8.0, 26.1/30.3 10-SJ-580-13.5/15.4,HMA paving, replace approach and PCC slabs, precast concrete pavement.
10-0V6204,2016-09-14,2016-08-22,2016-10-19,GEORGE REED, INC.,(209)523-0734,$1,296,126.50,10-Cal-26-8.3/8.6,Widen and signalize intersection.
08-0R4804,2016-09-13,2016-08-22,2016-10-24,ARAMEXX CONSTRUCTION,(909)746-8066,$1,326,115.00,08-SBd-10, 60-6.2/9.2, R3.4/R4.6,Install vegetation control under guardrail.
10-0X6404,2016-09-13,2016-08-15,2016-10-11,BRIDGEWAY CIVIL CONSTRUCTORS, INC.,(707)455-7033,$1,379,083.00,10-SJ-99-18.5/20.8, 29.3/33.7,Construct slope paving, gore paving, and maintenance vehicle pullouts.
10-0V3004,2016-09-08,2016-08-01,2016-10-04,GEORGE REED INC,(209)523-0730,$1,418,057.50,10-Cal,Mpa-4,49,140-Var,Pedestrian Accessibility Improvements
01-0B5204,2016-09-08,2016-08-08,2016-11-03,GORDON N. BALL, INC.,(925)838-5675,$1,518,247.00,01-Men-128-39.5,Roadway excavation, CIDH piles, & traffic control to stabilize road.
06-0K8004,2016-09-08,2016-08-01,2016-10-27,VIKING CONSTRUCTION COMPANY,(916)852-5530,$2,323,980.00,06-Fre,Kin-33, 41, 43-Var,Seismic restoration
06-0H6424,2016-09-07,2016-08-01,2016-11-03,M.C.M. CONSTRUCTION, INC.,(916)334-1221,$4,177,777.00,06-Ker-99-49.6,Construct pedestrian overcrossing bridge.
02-4G4904,2016-09-07,2016-08-01,2016-10-11,TULLIS, INC.,(530)241-5105,$2,063,478.00,02-Sha-44-44.9/45.5,Excavate and haul soil/rock, place AB/HMA, provide traffic control.
04-3G0604,2016-09-07,2016-08-08,2016-10-06,CCFG CONSTRUCTION,(209)743-4911,$479,450.00,04-Sol-680-R7.7/R7.8,CULVERT REPLACEMENT
07-297704,2016-09-07,2016-08-15,2017-01-31,SPECTRUM CONSTRUCTION GROUP,,9492991400,$1,931,715.41,07-LA-110-23.6/25.5,Install safety lighting.
11-417804,2016-09-01,2016-08-01,2016-09-26,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$984,493.90,11-SD-8,15,52,56,67,76,78,805-Various,Clean and treat bridge deck with methacrylate, replace joint seals.
05-0Q6004,2016-08-31,2016-07-25,2016-09-30,GRANITE ROCK COMPANY,(408)574-1400,$5,664,663.60,05-SCr-17-1.0/1.4,Acacia eradication and slope stabilization with roadway work.
06-0M2504,2016-08-31,2016-08-01,2016-10-06,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$2,334,067.10,06-Fre-198-35.3/35.6,Replace bridge deck at California Aqueduct Bridge
05-1A7504,2016-08-30,2016-07-25,2016-10-05,GRANITE CONSTRUCTION COMPANY,(805)964-9900,$6,219,346.00,05-SB-246-R20.7/26.3,Place RHMA-G, construct curb ramps and sidewalk.
06-0K8104,2016-08-30,2016-07-25,2016-09-30,BRIDGEWAY CIVIL CONSTRUCTORS, INC.,(707)455-7033,$2,278,116.94,06-Ker-99, 178-26.8, R2.0,Seismic restoration and highway planting and irrigation.
03-0F3204,2016-08-25,2016-08-01,2016-09-16,GEORGE REED INC,(209)523-0730,$3,764,786.00,03-Sac-160-L4.2/L10.8,Cold Plane AC Pavement and RHMA-G Overlay
03-3F8204,2016-08-25,2016-08-01,2016-09-22,GD LONG ELECTRIC COMPANY,(707)252-3512,$1,604,234.00,03-But,ED,Nev,Pla,Sac,Sol,Yol-VAR-VAR,Update Highway Advisory Radios
10-1E2004,2016-08-25,2016-08-01,2016-09-21,CENTRAL STRIPING SERVICE, INC.,(916)635-5175,$743,050.07,10-Mpa,Sta-132-Var,Ground in rumble strip.
07-309404,2016-08-25,2016-08-01,2016-09-20,AMERICAN CIVIL CONSTRUCTORS WEST COAST LLC,(707)746-8028,$444,440.00,07-LA-5-R47.7/R47.9,Place high friction surface treatment.
08-1E0104,2016-08-25,2016-08-01,2016-09-20,CHUMO CONSTRUCTION INC,(626)960-9502,$1,212,100.65,08-SBd-15-37.8/40.2,CONSTRUCT CONCRETE BARRIER
01-0B5004,2016-08-25,2016-06-20,2016-10-13,O.C. JONES & SONS, INC,(510)526-3424,$12,791,500.11,01-Men-101-3.8, 5.3,Repair slides.
01-0E2004,2016-08-24,2016-07-25,2016-09-14,BUGLER CONSTRUCTION,(925)416-0700,$1,402,262.00,01-Men-1-43.7/69.7,Repair timber connections and bridge deck repair
01-0G0904,2016-08-24,2016-08-01,2016-09-16,GRANITE CONSTRUCTION COMPANY,(707)467-4100,$2,063,979.10,01-Men-20-33.6/R38.5,RHMA OVERLAY
03-4F0904,2016-08-24,2016-08-01,2016-09-20,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$2,570,654.50,03-Sac-5, 80-17.2, M8.9,Rehabilitate Bridge Decks
03-4F4104,2016-08-24,2016-08-01,2016-09-29,ACTIVU CORPORATION D/B/A IMTECH CORPORATION,(973)343-4900,$1,214,893.77,03-Sac-3074,Electrical work to replace video panels
05-1C1104,2016-08-23,2016-07-25,2016-09-14,SOUZA CONSTRUCTION, INC.,(805)546-8288,$1,824,310.00,05-SLO-101-12.4/29.7,Place contrasting surface treatment at gore areas, replace signs.
06-0P2704,2016-08-23,2016-07-25,2016-09-21,DREAMBUILDER CONSTRUCTION CORP,(714)646-3697,$1,626,061.00,06-Ker-43-16.4/R25.0,Construct ADA Curb Ramps and modify signals and lighting.
01-0C3704,2016-08-23,2016-07-25,2016-11-01,BUGLER CONSTRUCTION,(925)416-0700,$3,141,910.00,01-Men-101-R89.2,Construct concrete fish passage, repair invert, and modify weirs.
07-307304,2016-08-23,2016-08-01,2016-09-22,DREAMBUILDER CONSTRUCTION CORP,(714)646-3697,$917,061.00,07-LA-5, 14-R59.7/R73.2, 35.5/R77.1,Install shoulder rumble strips.
11-237964,2016-08-23,2016-07-11,2016-09-26,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$5,164,927.15,11-SD-8-5.4/10.6, R20.0/R21.6,Install CCTV Cameras, CMS, LDS, VDS, F/O Cable, TMS, RHMA, and Signs.
04-445004,2016-08-16,2016-07-18,2016-09-15,FBD VANGUARD CONSTRUCTION,(925)245-1300,$1,207,272.00,04-SCl-17-7.7,INSTALL WEIGH-IN-MOTION SYSTEM AND CONST MAINTENANCE VEHICLE PULLOUT
01-262014,2016-08-16,2016-06-20,2016-11-09,MERCER FRASER COMPANY,(707)443-6371,$8,365,056.00,01-Men-101-52.1/52.6,RYAN CREEK FISH PASSAGE - COHO SALMON MITIGATION
11-416804,2016-08-10,2016-07-05,2016-11-03,WESTERN RIM CONSTRUCTORS, INC.,(760)489-4328,$1,131,884.65,11-SD-8, 163-2.4, 3.7,High friction surface treatment, MGS, conc barrier and lighting.
07-279114,2016-08-09,2016-06-20,2016-09-19,ORTIZ ENTERPRISES, INC.,(949)753-1414,$15,018,746.97,07-LA-60-R24.4/R25.3,Construct ramps and auxiliary lane.
12-0M4904,2016-08-09,2016-06-20,2016-09-20,POWELL CONSTRUCTORS INC,(909)356-8880,$10,562,457.00,12-Ora-5-1.2/2.2,Widen Fwy and bridge and construct RW, sound wall, and conc barriers.
04-1A2004,2016-08-09,2016-07-18,2016-09-15,GRANITE ROCK COMPANY,(408)574-1400,$1,150,293.00,04-SCl-152-R26.9,CONSTRUCT CONCRETE PAVEMENT AND HIGH SPEED WEIGH-IN-MOTION SYSTEM
11-295204,2016-08-03,2016-06-06,2016-09-06,GRANITE CONSTRUCTION COMPANY,(760)444-1032,$3,496,193.04,11-SD-94-59.6/60.2,Curve Realignment, High Friction Surface Treatment, Drainage Upgrades
04-4G5524,2016-08-02,2016-07-11,2016-09-19,ST FRANCIS ELECTRIC,(510)639-0639,$1,269,686.00,04-Sol-29-0.8/3.0,Crosswalk Enhancements
04-3G6704,2016-08-02,2016-07-11,2016-09-06,DREAMBUILDER CONSTRUCTION CORP,(714)646-3697,$1,225,061.00,04-SM-101-0.9/17.9,Construct Roadside Pavement at Various Locations
06-0R0704,2016-07-28,2016-06-20,2016-09-06,GRANITE CONSTRUCTION COMPANY,(559)441-5700,$8,038,966.00,06-Mad-99-1.5/9.5,Cold plane AC pavement and place HMA (Type A) and RHMA (Gap Graded).
08-0K5214,2016-07-28,2016-06-27,2016-09-21,SEMA CONSTRUCTION, INC,(949)470-0500,$1,866,567.62,08-SBd-15-11.1,Place 12 Wide by 10 High precast reinforced concrete box.
07-2W6604,2016-07-27,2016-06-27,2016-09-06,ODONNELL CONSTRUCTION, INC.,(909)394-4510,$885,228.01,07-LA-10-26.8/30.8,Treat bridge deck with methacrylate and replace joint seals.
12-0N5904,2016-07-27,2016-06-20,2016-08-29,YAKAR,(909)599-1612,$647,819.00,12-Ora-39-11.7/12.2,Install crosswalk,pedestrian signal,raise median & wrought iron fence
08-0R1304,2016-07-27,2016-06-20,2016-11-09,GRANITE CONSTRUCTION COMPANY,(760)775-7500,$4,718,520.00,08-SBd-62-16.8/25.2,INSTALL TWO-WAY LEFT TURN LANES AND WIDEN SHOULDER
04-0G6414,2016-07-27,2016-07-05,2016-09-06,BUGLER CONSTRUCTION,(925)416-0700,$186,220.00,04-Son-116-10.4, 10.5,Seismic restoration.
06-0N9904,2016-07-27,2016-06-20,2016-10-13,VIKING CONSTRUCTION COMPANY,(916)852-5530,$4,425,464.00,06-Fre,Mad-41U-33.1/33.4,0.0/0.3,Bridge scour mitigation, seismic retrofit and upgrade rail.
03-3F9404,2016-07-26,2016-06-20,2016-08-26,VINTAGE PAVING COMPANY, INC,(530)795-0132,$2,076,954.50,03-Sac-99-8.5/22.4,Roadside & slope paving, vegetation removal. Place inert materials.
12-0J6604,2016-07-26,2016-06-20,2016-08-25,LANDSCAPE SUPPORT SERVICES,(818)475-0680,$1,946,325.46,12-Ora-241-14.5/32.5,Storm water mitigation.
08-1F9004,2016-07-20,2016-06-27,2016-08-10,JABRE CONTRACTING INC.,(310)720-0277,$243,142.00,08-SBd-18-58.8/73.4,Install centerline ground-in rumble strips
11-263314,2016-07-20,2016-06-20,2016-08-16,MARINA LANDSCAPE INC.,(714)939-6600,$1,463,237.00,11-Imp-8-R38.8/R39.2,Rock mulch, gravel mulch, slope paving, irrigation and planting.
08-1E1004,2016-07-19,2016-06-20,2016-10-18,HIGHLAND CONSTRUCTION, INC.,7145385156,$1,033,238.50,08-Riv-79-R33.9,Install traffic signal, add through-lane each direction and shoulders.
11-299304,2016-07-19,2016-06-27,2016-08-24,SPECTRUM CONSTRUCTION GROUP, INC.,(949)299-1400,$1,219,022.41,11-SD-5-R48.7, R59.6,Repair pile cap and columns, treat bridge deck with methacrylate.
12-0N6804,2016-07-19,2016-06-27,2016-08-16,CALIFORNIA PROFESSIONAL ENGINEERING, INC.,(626)810-1338,$312,964.45,12-Ora-72-11.9,Modify signals, add safety lighting, update curb ramps.
05-1G4004,2016-07-19,2016-06-27,2016-08-15,CHRISP COMPANY,(510)656-2840,$204,444.50,05-SCr-152-3.7/8.3,Install pavement striping and marking, and rumble strip.
06-0M3704,2016-07-19,2016-06-13,2016-08-10,GRANITE CONSTRUCTION COMPANY,(559)441-5768,$3,184,184.00,06-Kin-43, 137-1.3/1.7, 0.0/0.2,Construct roundabout.
05-1C1204,2016-07-13,2016-06-13,2016-11-22,GRANITE CONSTRUCTION COMPANY,(805)964-9951,$1,728,702.00,05-SB-101-0.4/11.7,Pave gore areas with concrete, shale vegetation control, and mulch.
12-0L7204,2016-07-13,2016-06-06,2016-09-06,CHUMO CONSTRUCTION INC,(626)960-9502,$4,406,407.10,12-Ora-74-2.9/5.0,CONSTRUCT 4-FOOT RIGHT SHOULDER, PAVE TURNOUTS, REPLACE/ADD MBGR
08-1E6604,2016-07-12,2016-06-20,2016-08-08,HIGHLAND CONSTRUCTION, INC.,(714)538-5156,$722,451.00,08-Riv-79-R33.8/40.0,INSTALL DRAINAGE INLETS
06-0S4804,2016-07-12,2016-06-13,2016-08-01,CAL VALLEY CONSTRUCTION,(559)274-0300,$4,049,391.50,06-Tul-65-R9.3/14.0,Cold plane, pave with RHMA-G and modify signal and lighting.
03-3F8104,2016-07-07,2016-06-13,2016-08-01,TIM PAXINS PACIFIC EXCAVATION, INC,(916)686-2800,$1,053,398.00,03-ED,Nev,Pla,Sac,Yol-5, 28, 50, 51, 80, 89, 99, 267-VAR,Repair and upgrade roadside weather information systems
11-409704,2016-07-07,2016-05-31,2016-07-29,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$1,497,816.80,11-SD-8,15,163-Var,Pave gore areas, construct concrete barrier, and place crash cushion.
07-288204,2016-07-07,2016-05-31,2016-09-06,GRIFFITH COMPANY,(714)984-5500,$2,508,000.00,07-LA-5,60-16.0/16.8 & 0.1/R3.1,STORM WATER SOURCE - REPLACEMENT HIGHWAY PLANTING AND IRRIGATION
10-0Q2904,2016-07-06,2016-06-06,2016-07-29,GEORGE REED, INC.,(209)523-0734,$1,219,048.00,10-Mer-165-29.8/30.3,Road realignment and hot mix asphalt pavement.
08-0R5404,2016-07-06,2016-06-13,2016-08-10,ARAMEXX CONSTRUCTION,(909)746-8060,$837,864.00,08-SBd-15-32.5/42.2,Install rock blanket.
04-4H2224,2016-07-06,2016-05-31,2016-11-08,DESILVA GATES CONSTRUCTION,(925)829-9220,$3,438,634.00,04-Ala-24, 580-R2.079, R41.4/46.1,Resurface ramps, construct MGS, concrete barrier, curb ramps.
03-0H9904,2016-06-29,2016-06-06,2016-07-26,CENTRAL STRIPING SERVICE, INC.,(916)635-5175,$312,268.07,03-Nev,Pla-20, 267-0.0/R6.6, 6.8/9.9,Install centerline rumble strips and shoulder rumble strips.
11-409804,2016-06-29,2016-05-23,2016-07-22,PAL GENERAL ENGINEERING INC,(858)638-7100,$1,668,297.83,11-SD-78-1.5/12.2,Pave gore areas, construct pullouts and concrete barrier.
07-289204,2016-06-28,2016-05-23,2016-08-01,STL LANDSCAPE, INC.,(323)581-8200,$2,250,000.00,07-LA-710-R15.8/24.6, INSTALL BIOSWALES, VEGETATION, AND MODIFY EXISTING IRRIGATION SYSTEM.
03-0H7304,2016-06-28,2016-06-06,2016-07-26,LINEAR OPTIONS, INC.,(530)896-1800,$238,585.00,03-Col,Sut,Yol-16, 20, 80-Var,Install Centerline and Shoulder Rumble Strips
06-0S3504,2016-06-22,2016-05-23,2016-07-20,CORAL CONSTRUCTION COMPANY,(503)682-2252,$4,410,514.00,06-Kin,Fre-5-21.6/26.7,0/2.3,10.9/14.9,Construct high tension cable median barrier.
03-0H7104,2016-06-22,2016-05-31,2016-07-20,APPLY-A-LINE, INC.,(530)365-4000,$137,043.80,03-But,Gle-32-R4.2/9.6,0.4/4.6,Install Edgeline and Shoulder Rumble Strips
03-4F9804,2016-06-21,2016-05-23,2016-07-26,WESTERN STRUCTURES,(951)352-4300,$1,129,392.53,03-Sac-51-4.1/4.4,Construct concrete median barrier
10-0G8204,2016-06-21,2016-04-18,2016-07-20,BAY CITIES PAVING & GRADING, INC.,(925)687-6666,$24,111,632.65,10-SJ-132-0.4/7.1,Repair pavement and install ITS elements.
08-1F8604,2016-06-15,2016-05-23,2016-07-20,V A P CONSTRUCTION INC,(714)253-3270,$690,575.00,08-Riv-243-0.7/2.8,7.8/28.3,PLACE CENTERLINE RUMBLE STRIPS
04-1SS594,2016-06-15,2016-05-16,2016-08-10,GHILOTTI BROS., INC.,(415)454-7011,$386,648.00,04-Mrn-580-2.7,Regrade slope and repair down drain.
06-0T5004,2016-06-14,2016-05-23,2016-07-20,CENTRAL STRIPING SERVICE, INC.,(916)635-5175,$352,950.07,06-Mad-41-5.2/34.7,Centerline rumble strip,traffic stripes and flashing beacons.
01-293024,2016-06-14,2016-05-09,2016-07-12,M.C.M. CONSTRUCTION, INC.,(916)334-1221,$777,777.00,01-Men-101-42.1,Upgrade Bridge Rail
12-0716U4,2016-06-09,2016-05-09,2016-07-12,GRIFFITH COMPANY,(714)984-5500,$2,863,999.53,12-Ora-22,405,605-R0.3/R2.9, 20.4/24.0, 3.0/R1.6,Apply permanent erosion control with irrigated highway planting.
07-3X0214,2016-06-08,2016-05-02,2016-06-30,C. A. RASMUSSEN, INC.,(661)367-9040,$3,257,212.60,07-Ven-150-27.4, 29.4,Repair slope failure.
12-0N3604,2016-06-08,2016-05-02,2016-06-30,ODONNELL CONSTRUCTION, INC.,(909)394-4510,$1,241,742.00,12-Ora-91-R1.0, 5.4,Overlay OGAC,Retaining Wall,Conc Barrier,Lighting,Signals,ADA Improve
06-0R2304,2016-06-07,2016-05-16,2016-07-11,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$1,741,625.93,06-Fre-41, 99, 168, 180-Various,HMA-A resurfacing and high-friction surface treatment on ramps.
04-0G7204,2016-06-07,2016-05-02,2016-07-20,BAY CITIES PAVING & GRADING, INC.,(925)687-6666,$1,656,259.30,04-SCl-152-11.9,Install traffic signals and construct right turn lane
04-4G5514,2016-06-02,2016-05-02,2016-07-28,ST FRANCIS ELECTRIC,(510)639-0639,$4,574,894.00,04-SM-82/84-1.4/25.1 & 23.1/24.1,Install Crosswalk Safety Enhancements
01-378134,2016-06-02,2016-05-09,2016-06-24,WYLATTI RESOURCE MANAGEMENT,(707)983-8135,$796,604.92,01-Men-128-30.1/48.5,Culvert Rehabilitation
02-0E24U4,2016-06-02,2016-04-18,2016-07-11,KNIFE RIVER CONSTRUCTION,(530)891-6555,$4,949,400.40,02-Plu-89-20.0/20.6,Rehabilitate pavement and sidewalks to meet current ADA standards
01-0E3604,2016-06-02,2016-05-09,2016-06-27,ROLLN ROCK CONSTRUCTION INC.,(530)925-1408,$271,976.50,01-Hum-96-3.4/35.9,Repair Drainage Systems
07-2849U4,2016-06-01,2016-04-25,2016-06-27,BEADOR CONSTRUCTION COMPANY, INC.,(951)674-7352,$1,367,300.00,07-LA-118-R4.8,Widen Westbound off ramp to increase storage
02-4G2604,2016-06-01,2016-05-02,2016-06-24,DIG IT CONSTRUCTION, INC.,(530)258-3306,$919,893.00,02-Plu-147-0.0/1.0,HMA, full depth reclamation-cement, earthwork,
04-2J2604,2016-06-01,2016-05-09,2016-06-27,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$1,933,586.80,04-SF,SM-101, 280-var,Treat bridge decks with methacrylate and replace joint seals.
07-4T7704,2016-05-26,2016-05-02,2016-09-12,CALPROMAX ENGINEERING, INC,(714)757-5738,$345,095.99,07-LA-91-R12.9/R13.7,Modify signal and lighting.
09-364304,2016-05-26,2016-04-11,2016-07-12,ROAD AND HIGHWAY BUILDERS LLC,(775)852-7200,$10,757,757.00,09-Mno-395-106.3/120.5,Cold planing, cold in-place recycling and hot mix asphalt resurfacing.
11-419704,2016-05-25,2016-04-25,2016-06-20,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$764,235.50,11-SD-5,52-R25.5/R26.3,0.0/0.6,Replace AC surfacing, cold plane and pave with rubberized HMA.
07-4P0204,2016-05-25,2016-05-02,2016-09-12,V A P CONSTRUCTION INC,(714)253-3270,$323,575.00,07-LA-138-44.9,Install traffic signal and lighting
01-0B2904,2016-05-25,2016-04-18,2016-07-11,SHASTA SERVICES, INC. DBA TIMBERWORKS,(530)926-4093,$2,443,350.36,01-DN-101-22.9,Construct Soldier Pile Wall
05-1C8304,2016-05-25,2016-04-11,2016-07-12,CALPORTLAND CONSTRUCTION,(805)345-3581,$11,099,678.00,05-SB-154-R5.9/22.9,Cold In-Place Recycling and RHMA (Gap Graded) resurfacing.
04-2J2504,2016-05-24,2016-04-25,2016-06-20,ETIC,(925)602-4710,$1,615,899.55,04-SCl-Var-Var,Treat bridge decks with methacrylate and replace joint seal.
06-0L3404,2016-05-24,2016-04-18,2016-06-20,GRANITE CONSTRUCTION COMPANY,(559)441-5768,$2,749,067.00,06-Fre-168-T30.1/T30.4,Construct roundabout at intersection.
08-0R4504,2016-05-24,2016-05-02,2016-06-24,A. M. CONCRETE, INC.,(818)362-8300,$839,825.00,08-SBd-15-R20.0/R23.0,Vegetation Control
08-1G0604,2016-05-24,2016-05-02,2016-06-24,VSS INTERNATIONAL, INC.,(916)373-1500,$2,586,532.25,08-Riv-177-0.0/27.0,Localized Dig-Out and place Asphalt Rubber Binder Seal Coat
10-1E4304,2016-05-19,2016-04-25,2016-06-22,GEORGE REED INC,(209)523-0730,$1,401,131.00,10-Ama-88-R60.8/66.6,Hot mix asphalt resurfacing
06-0T8704,2016-05-19,2016-04-11,2016-06-17,SECURITY PAVING COMPANY, INC.,(818)362-9200,$3,350,598.00,06-Tul-99-51.3/52.3,Jointed plane concrete pavement lane and individual slab replacement.
04-4J6104,2016-05-19,2016-04-25,2016-06-23,BAY CITIES PAVING & GRADING, INC.,(925)687-6666,$2,389,081.30,04-Ala-980-0.3/1.7,Cold plane asphalt concrete pavement and RHMA overlay.
05-1E0504,2016-05-19,2016-04-18,2016-06-13,DREAMBUILDER CONSTRUCTION CORP,(714)646-3697,$1,180,701.00,05-Mon-101-52.4/55.2, 60.5/60.8,Construct contrasting surface treatment and drainage facilities.
04-3J6904,2016-05-19,2016-04-11,2016-06-22,ALTA ENGINEERING GROUP, INC,(415)648-4309,$470,796.00,04-SM-280-18.3, 18.6,Upgrade and replace existing pumps and controls.
04-3J4304,2016-05-18,2016-04-25,2016-06-20,NORCAL GENERAL CONSTRUCTION CORPORATION,(408)886-0335,$646,645.00,04-SM-280-10.8,Remove and replace HPS with LED lighting.
04-3J5304,2016-05-18,2016-04-25,2016-06-24,O.C. JONES & SONS, INC.,(510)526-3424,$2,493,700.00,04-SCl-237-6.9/R9.2,Rubberized hot mix asphalt (gap graded) resurfacing.
04-3J6804,2016-05-18,2016-04-25,2016-06-24,MARTIN BROTHERS CONSTRUCTION,(916)381-0911,$734,416.00,04-Sol-113-20.4/21.2,Replace asphalt concrete pavement.
10-0X6304,2016-05-18,2016-04-11,2016-06-24,GRANITE CONSTRUCTION COMPANY,(559)441-5700,$1,462,514.00,10-Mer-99-15.1/16.0,Construct MVP, weed barrier, staircase, and shoulder widening.
08-0K8414,2016-05-18,2016-04-18,2016-06-22,RE COM DEVELOPMENT COMPANY,(760)873-3301,$920,206.04,08-SBd-L5726-L5726,Construct office building
01-0A3704,2016-05-18,2016-04-11,2016-06-20,STEVE MANNING CONSTRUCTION, INC.,(530)222-0810,$1,791,249.30,01-Hum-299-R23.0/R24.0,Reconstruct roadway with AB, HMA, and RHMA, and install MGS and MBGR.
05-1G4604,2016-05-17,2016-04-11,2016-06-13,SOUZA CONSTRUCTION, INC.,(805)546-8288,$1,088,296.00,05-SLO-101-R24.3,Replace existing bridge rail, cold plane and resurface pavement.
04-3J4704,2016-05-17,2016-04-25,2016-06-09,ARGONAUT CONSTRUCTORS,(707)542-4862,$933,180.64,04-Mrn-1-22.8/28.5,46.2/50.5,Cold plane AC pavement and place HMA (Type A).
04-1J6904,2016-05-17,2016-04-25,2016-06-24,ARROW FENCING,(707)485-1128,$513,900.00,04-SF-101, 280-3.5/4.0, R6.7,Upgrade Fences and Gates
04-1J3804,2016-05-17,2016-04-25,2016-06-09,AMERICAN CIVIL CONSTRUCTORS WEST COAST LLC,(707)746-8028,$326,250.00,04-Son-101-var,Treat bridge decks with methacrylate and replace joint seals.
08-1E3004,2016-05-17,2016-04-25,2016-06-30,V A P CONSTRUCTION INC,(714)253-3270,$634,575.00,08-Riv-15-33.1 / 35.8,INSTALL RAMP METERING SYSTEM AT NB & SB ENTRANCE RAMPS
08-1F1104,2016-05-12,2016-04-18,2016-06-30,BRM,(406)261-5359,$722,500.00,08-SBd-38-38.6-L5759,Construct a sand house and chain link fence at Onyx Summit
03-3F8404,2016-05-12,2016-04-18,2016-06-17,TIM PAXINS PACIFIC EXCAVATION, INC,(916)686-2800,$5,686,095.00,03-But,ED,Pla,Nev,Sac,Sut,Yol-VAR-Var,Repair traffic detection equip. & upgrade comm. infrastructure.
04-4J6304,2016-05-12,2016-04-11,2016-06-28,NORTHSTATE EARTH AND WATER INC.,(530)351-3604,$364,905.00,04-Sol-80-17.2,Build materials storage bins with canopy.
04-4J1104,2016-05-12,2016-04-18,2016-06-13,TELFER PAVEMENT TECHNOLOGIES, LLC,(916)383-1756,$1,136,070.00,04-SM-84-17.0/21.5,AC Resurfacing
04-1J5804,2016-05-11,2016-04-11,2016-06-09,CERTIFIED COATINGS COMPANY,(707)639-4414,$4,143,212.00,04-Ala-880-28.2,Spot blast clean and paint the steel girders.
01-0E5704,2016-05-11,2016-04-18,2016-06-08,J.F. SHEA CONSTRUCTION, INC.,(530)246-4292,$934,014.25,01-Hum-101, 299-VAR,Bridge Repair
07-4T7104,2016-05-11,2016-04-18,2016-06-17,FERREIRA CONSTRUCTION CO, INC.,(909)606-5900,$403,921.00,07-LA-66-2.9,Install traffic and pedestrian signals.
12-0P2604,2016-05-11,2016-04-11,2016-06-17,ALL AMERICAN ASPHALT,(951)736-7600,$952,187.10,12-Ora-5-24.8,Park and Ride Parking Lot
12-0J6504,2016-05-10,2016-04-11,2016-06-17,ORTIZ ENTERPRISES, INC.,(949)753-1414,$1,568,933.50,12-Ora-261-0.0/6.2,CONTROL SOURCES OF SEDIMENT USING APPROVED BMPS
04-1J7104,2016-05-10,2016-04-11,2016-06-09,VINTAGE PAVING COMPANY, INC,(530)795-0132,$785,449.53,04-Sol-780-1.4,CONSTRUCT SHOULDER AND SINGLE THRIE BEAM BARRIER
04-3J4404,2016-05-10,2016-04-18,2016-06-14,GEORGE REED, INC.,(209)523-0734,$1,050,848.00,04-Sol-12-R23.5/25.5,Cold plane asphalt concrete pavement and RHMA overlay.
03-0H1804,2016-05-10,2016-04-18,2016-06-17,CAL ELECTRO, INC.,(530)223-5937,$888,755.00,03-Nev-80-19.3,Rehabilitate Inspection Facility and Add Water Supply System
01-0B2804,2016-05-10,2016-04-11,2016-06-08,J.F. SHEA CONSTRUCTION, INC.,(530)246-4292,$3,548,901.00,01-DN-101-17.4,Reconstruct Roadway and Construct Retaining Wall
08-0Q7904,2016-05-05,2016-02-29,2016-06-03,ORTIZ ENTERPRISES, INC.,(949)753-1414,$6,697,874.00,08-SBd-40-R93.1/94.2,REPLACE HOFF WASH BRIDGE (BRIDGE NUMBER 54-0889L/R)
12-0H2434,2016-05-05,2016-04-11,2016-06-15,YAKAR,(909)599-1612,$1,663,845.00,12-LA,Ora-91-R20.6/R20.7, R0.0/R2.8,INSTALL FIBER OPTIC CABLE & CCTVs
10-0Y6304,2016-05-05,2016-03-28,2016-06-24,MIDSTATE BARRIER, INC.,(209)944-9565,$2,499,244.50,10-Mer-99-23.7/R30.4,Construct double thrie beam median barrier.
07-302604,2016-05-04,2016-03-07,2016-07-22,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$11,699,669.00,07-LA-57-R4.4/R12.1,Replace concrete pavement, cold plane and place HMA pavement.
09-362104,2016-05-04,2016-04-11,2016-06-07,QUALCON CONTRACTORS, INC.,(775)782-2006,$397,558.00,09-Iny-395-76.0/77.0,Construct hot mix asphalt median.
04-1J5704,2016-05-04,2016-04-11,2016-06-03,TECHNO COATINGS INC.,(714)635-1130,$1,814,337.00,04-SCl-17, 880-VAR,Spot blast clean and paint the steel girders.
12-0P4504,2016-05-03,2016-04-04,2016-06-03,AUTOBAHN CONSTRUCTION INC.,(714)769-7025,$3,833,501.00,12-Ora-57-11.0/22.5,Individual Slab Replacement (RSC), Grind & Groove Exist Conc Pvmt
11-413504,2016-05-03,2016-02-29,2016-06-23,GRANITE CONSTRUCTION COMPANY,(760)444-1000,$11,043,799.00,11-SD-8-15.3/R21.6,Pavement rehabilitation with RHMA-G and slab replacement.
12-0N0404,2016-04-28,2016-03-14,2016-05-27,R.J. NOBLE COMPANY,(714)637-1550,$12,193,518.80,12-Ora-55,91-14.7/R17.9, 7.5/R18.9 08-Riv-91-R0.0/R1.6,Cold Plane AC Pvmt,HMA Pvmt,Grind & Groove Exist Conc Pvmt, CMS System
05-1F3404,2016-04-28,2016-03-28,2016-06-08,GRANITE ROCK COMPANY,(408)574-1400,$3,463,896.00,05-SCr-236-0.1/17.7,Resurface existing roadway with HMA (Type A) and RHMA-G.
04-1J3504,2016-04-28,2016-04-04,2016-06-13,TRUESDELL CORPORATION OF CALIFORNIA,(602)437-1711,$1,253,028.00,04-Ala-13, 80, 880-VAR,Treat bridge decks with methacrylate and replace joint seals.
05-4482U4,2016-04-27,2016-02-29,2016-06-20,SECURITY PAVING COMPANY, INC.,(818)362-9200,$52,615,740.00,05-SB-101-2.2/3.3,Build and reconstruct bridges, construct ramps and frontage road.
04-1J2504,2016-04-27,2016-04-04,2016-06-03,BAY CITIES PAVING & GRADING, INC.,(925)687-6666,$2,095,264.80,04-Ala-84-R18.0/R22.9,Asphalt concrete resurfacing.
10-0Y5714,2016-04-27,2016-03-28,2016-06-09,STUDEBAKER BROWN ELECTRIC,INC,(916)678-4660,$491,139.00,10-Sta-99-R17.3/M18.9,Install automated warning system and construct MVP.
07-2159U4,2016-04-27,2016-03-07,2016-05-27,SECURITY PAVING COMPANY, INC.,(818)362-9200,$139,567,930.11,07-LA,Ora-5-0.0/1.5, 44.3/44.4,Construct HOV lanes and mix flow lanes.
12-0P4904,2016-04-27,2016-04-04,2016-06-03,R.J. NOBLE COMPANY,(714)637-1550,$1,081,005.10,12-Ora-55,57,405-Var,Cold plane pavement and replace with RHMA type "G".
07-2W9504,2016-04-27,2016-03-21,2016-05-27,ODONNELL CONSTRUCTION, INC.,(909)394-4510,$594,774.44,07-LA-10, 39, 71, 210, 605-Var,Treat bridge decks and replace joint seals.
08-0J8104,2016-04-26,2016-04-04,2016-06-03,DREAMBUILDER CONSTRUCTION CORP,(714)646-3697,$560,661.00,08-SBd-330-30.7/39.3,Rehabilitate Culverts
07-300704,2016-04-26,2016-03-07,2016-05-31,SECURITY PAVING COMPANY, INC.,(818)362-9200,$14,395,951.50,07-LA-5-13.8/19.2,Replace concrete pavement.
12-0N0704,2016-04-26,2016-03-21,2016-06-30,CHUMO CONSTRUCTION INC.,(626)960-9502,$2,288,678.36,12-Ora-5,22,55,73-Var,Cold planning, Guardrail and AC overlay
10-1E5204,2016-04-26,2016-04-04,2016-05-26,CORAL CONSTRUCTION COMPANY,(503)682-2252,$444,444.00,10-SJ-120-R1.3/R3.9,Automatic Warning System and Construct MVP.
04-3J5204,2016-04-26,2016-03-28,2016-06-13,DESILVA GATES CONSTRUCTION,(925)829-9220,$3,313,111.00,04-SCl-880-8.6/10.5,AC Resurfacing
06-0T0804,2016-04-21,2016-03-28,2016-05-17,BENTANCOURT BROS. CONSTRUCTION INC.,(925)454-1521,$772,429.50,06-Fre,Mad,Tul-99-Var,Install traffic monitoring stations.
07-1W8704,2016-04-21,2016-03-28,2016-05-17,PAVEMENT COATINGS CO.,(714)826-3011,$748,905.00,07-LA-23-0.0/8.9,Place slurry seal and shoulder backing.
08-1E9904,2016-04-20,2016-03-07,2016-05-17,DANNY C. HUBBS CONSTRUCTION, INC,(909)790-2215,$366,666.00,08-SBd-330-32.4/43.8,Install Midwest Guardrail System.
12-0P2504,2016-04-20,2016-03-14,2016-05-17,BMC ENTERPRISES INC,(626)813-1027,$899,227.85,12-Ora-405-3.7/3.9,Ramp Widening
07-3W0804,2016-04-20,2016-03-21,2016-05-18,VELARDE CONCRETE CONSTRUCTION, INC.,(818)898-2300,$588,772.47,07-LA-5,14,138,210-Various,Treat bridge deck, replace joint seals, and repair spalled surface.
07-2W0104,2016-04-20,2016-03-28,2016-05-19,C. A. RASMUSSEN, INC.,(661)367-9040,$3,232,520.00,07-Ven-150-0.0/R13.3, 18.6/31.4,Cold plane AC Pvmt and overlay.
07-3W1004,2016-04-19,2016-03-21,2016-05-09,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$1,358,358.00,07-LA-01/105/110/405-var,Treat bridge deck with methacrylate and replace joint seals.
04-2G9404,2016-04-19,2016-03-14,2016-06-03,GORDON N. BALL, INC.,(925)838-5675,$975,920.00,04-Nap-128-17.9,Construct Roadway Retaining System
06-0T6104,2016-04-14,2016-03-21,2016-06-13,PAPICH CONSTRUCTION COMPANY, INC.,(805)473-3016,$2,425,000.00,06-Kin-5-16.6/26.7,Cold plane pavement and resurface with rubberized hot mix asphalt.
01-0E5804,2016-04-14,2016-03-21,2016-05-17,TRUESDELL CORPORATION OF CALIFORNIA,(602)437-1711,$533,533.00,01-Men-1, 101-VAR,BRIDGE REPAIR
07-1W9804,2016-04-14,2016-03-21,2016-05-19,SECURITY PAVING COMPANY, INC.,(818)362-9200,$4,689,689.00,07-LA-91, 110-6.1/R11.4, 9.6/10.3,Grinding, Cold Plane Overlay, and Paving
07-3W0504,2016-04-13,2016-03-14,2016-05-05,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$879,091.50,07-LA-1, 47, 91, 110, 405, 710-VARIES,Treat bridge deck with methacrylate and replace joint seals.
06-0S6504,2016-04-13,2016-03-21,2016-05-13,BRM,(406)261-5359,$1,318,325.80,06-Ker-05-36.1/41.2,Construct high tension cable barrier.
06-0V1404,2016-04-13,2016-03-21,2016-05-13,TELFER PAVEMENT TECHNOLOGIES, LLC,(916)383-1756,$3,188,213.00,06-Fre-5-37.2/48.6,Cold plane AC pavement and RHMA-Gap Graded (BWC) resurfacing.
04-2A3314,2016-04-13,2016-03-21,2016-05-11,AMERICAN CIVIL CONSTRUCTORS WEST COAST LLC,(707)746-8028,$1,611,215.00,04-Ala-84-10.8/18.0,Install delineators, Groove Existing Concrete Pavement, Rumble Strips
06-0T3304,2016-04-12,2016-03-21,2016-05-13,BENTANCOURT BROS. CONSTRUCTION INC.,(925)454-1521,$706,049.90,06-Ker,Tul-99-Var,Install traffic monitoring stations.
09-361304,2016-04-12,2016-03-07,2016-06-22,GRANITE CONSTRUCTION COMPANY,(661)387-7751,$5,626,836.50,09-Iny-395-R122.3/R129.5,Construct rubberized hot mix asphalt overlay.
07-2W9704,2016-04-12,2016-03-14,2016-05-09,TRUESDELL CORPORATION OF CALIFORNIA,(602)437-1711,$1,158,158.00,07-Ven-101,126,150,232 - Var -30.94/38.95R,PATCH SPALLS & METHACRYLATE BRIDGE DECKS, & REPAVE BRIDGE DECK
07-1W8204,2016-04-12,2016-03-21,2016-05-11,ALL AMERICAN ASPHALT,(951)736-7600,$1,496,944.80,07-LA-14-R28.7/R30.9,Cold plane AC pavement and place RHMA.
01-0F2604,2016-04-12,2016-03-21,2016-05-04,MERCER FRASER COMPANY,(707)443-6371,$2,654,246.00,01-Men-162-29.8/34.0,Cold In-Place Recycle, replace AC surfacing, and HMA Overlay
06-0S1204,2016-04-07,2016-03-14,2016-05-10,ROBERT J. FRANK CONSTRUCTION, INC.,(530)222-1408,$237,624.00,06-Fre-245-Var,Replace and abandon culverts
12-0M4004,2016-04-07,2016-03-14,2016-05-06,DREAMBUILDER CONSTRUCTION CORP,(714)646-3697,$645,496.00,12-Ora-91-R0.0/R3.6,CONSTRUCT ROADSIDE PAVING, ACCESS ROADS AND ROCK BLANKETS
10-1E0004,2016-04-07,2016-03-14,2016-05-19,GEORGE REED, INC.,(209)523-0734,$1,972,188.00,10-Sta,SJ-33-18.0/27.1, 0.0/5.0,Rubberized hot mix asphalt resurfacing.
07-3W0604,2016-04-07,2016-03-14,2016-05-10,J. MCLOUGHLIN ENGINEERING CO., INC.,(909)944-1037,$1,097,736.60,07-LA-101, 118, 170, 405-Var,Bridge Repairs and Maintenance
10-1C9904,2016-04-06,2016-03-07,2016-05-16,BAY CITIES PAVING & GRADING, INC.,(925)687-6666,$3,649,496.22,10-SJ-5-R12.4/R17.5,Rubberized-HMA resurfacing, repair failed areas, replace guardrail.
07-3W0704,2016-04-06,2016-03-14,2016-05-05,J. FRANCIS COMPANY,(951)776-9100,$964,654.11,07-LA-2, 5, 134, 210-Var,Treat bridge deck with methacrylate and replace joint seals.
04-3J5104,2016-04-06,2016-03-14,2016-05-04,GRANITE CONSTRUCTION COMPANY,(831)763-6100,$3,440,440.00,04-SM-1-10.6/21.5,Cold plane asphalt concrete pavement and RHMA overlay.
06-0T5504,2016-04-05,2016-03-14,2016-05-05,PAPICH CONSTRUCTION COMPANY, INC.,(805)473-3016,$780,563.55,06-Fre-198-0.0/3.5,Repair failed areas and hot mix asphalt resurface.
05-1G6204,2016-04-05,2016-03-14,2016-05-12,GRANITE CONSTRUCTION COMPANY,(805)964-9951,$4,707,677.00,05-SB-101-27.0/36.0,Cold Plane Existing Roadbed and Place RHMA-Open Graded
01-0B27U4,2016-04-05,2016-02-29,2016-05-11,STEWART ENGINEERING INC,(530)244-8464,$4,055,715.00,01-DN-101-14.9/15.3,Construct retaining walls and reconstruct roadway
07-2W9804,2016-04-05,2016-03-07,2016-05-05,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$856,992.50,07-LA-1,101,405-Var,Treat bridge deck with methacrylate and replace joint seals.
07-2827U4,2016-04-05,2016-02-16,2016-05-12,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$11,499,402.05,07-LA-5,101-16.4, S0.0/25.9,Widen shoulders, install midwest guardrail system and crash cushions.
05-1C0804,2016-03-30,2016-02-22,2016-04-20,SOUZA CONSTRUCTION, INC.,(805)546-8288,$2,300,000.00,05-SLO-101-44.8/59.7,Place contrasting surface treatment at gore tips.
04-3J4604,2016-03-30,2016-03-07,2016-05-05,FBD VANGUARD CONSTRUCTION,(925)245-1300,$813,216.00,04-Ala-680-R12/R16,Individual slab replacement (RSC).
03-0C4714,2016-03-30,2016-02-29,2016-06-03,O.C. JONES & SONS, INC.,(510)526-3424,$1,381,617.00,03-Yol-16-23.2/23.5,Straighten horizontal curve, widen shoulders, install rumble strips
06-0S6004,2016-03-30,2016-03-07,2016-05-04,ETIC,(925)602-4710,$504,783.80,06-Ker,Tul-5, 46, 58, 99, 137, 198-Var,Polyester conc. expansion dam, joint seal and remove chip seal.
02-4E6404,2016-03-30,2016-02-22,2016-05-10,VIKING CONSTRUCTION COMPANY, INC.,(916)852-5530,$5,747,451.00,02-Plu-147-8.9/9.3,Replace Bridge, Guardrailing, HMA, Striping
01-0A9904,2016-03-29,2016-02-22,2016-04-27,MERCER FRASER COMPANY,(707)443-6371,$2,260,122.00,01-Hum-96-R6.2/6.6,Reconstruct & realign roadway, grading, AB, HMA, culverts, guardrail
11-406404,2016-03-29,2016-02-08,2016-04-22,LB CIVIL CONSTRUCTION, INC.,(858)481-5222,$3,875,450.30,11-SD-8, 54, 67, 94, 125, 163, 805, 905-Var,Upgrade railing and drainage, and install concrete barrier.
11-409604,2016-03-29,2016-02-22,2016-04-22,WESTERN RIM CONSTRUCTORS, INC.,(760)489-4328,$1,374,814.60,11-SD-54, 125, 805-Var,Pave areas beyond gore, median, MVP, and relocate cabinets.
07-3W0904,2016-03-29,2016-03-07,2016-04-19,VELARDE CONCRETE CONSTRUCTION, INC.,(818)898-2300,$775,840.17,07-LA-5, 10, 60, 101-Var,Place methacrylate on bridge decks and joint seals
08-1G0804,2016-03-24,2016-02-29,2016-04-27,PAVE-TECH INC.,(760)727-8700,$5,633,113.00,08-Riv-10-R134.3/R144.1,Rehabilitate Pavement
12-0P4604,2016-03-24,2016-02-29,2016-04-22,AMERICA PACIFIC CONSTRUCTION,(559)577-9999,$383,522.00,12-Ora-39-3.6/7.2,CLEAN, LINE, REMOVE AND PLACE CULVERTS
02-1H0204,2016-03-24,2016-02-29,2016-04-13,J.F. SHEA CONSTRUCTION, INC.,(530)246-4292,$2,176,809.00,02-Tri-36-R9.2/15.8,Place HMA with Replace AC Surfacing
05-1G3304,2016-03-24,2016-02-29,2016-04-19,AMERICAN CIVIL CONSTRUCTORS WEST COAST LLC,(707)746-8028,$884,444.00,05-Mon,SBt,SCr-1,25,68,101,158-Var,Seal bridge decks and replace joint seals.
05-1F7304,2016-03-23,2016-02-29,2016-04-13,CORAL CONSTRUCTION COMPANY,(503)682-2252,$786,031.00,05-Mon-156-R0.1/R1.6,Construct high tension cable barrier and rumble strip
09-340904,2016-03-23,2016-02-29,2016-04-18,WILLIAM KANAYAN CONSTRUCTION,(909)337-5428,$1,009,037.00,09-Mno-395-72.5/86.0,Remove and construct culverts.
12-0N9504,2016-03-23,2016-02-29,2016-04-22,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$1,705,738.30,12-Ora-5, 22-R29.1/42.5, R10.4,METHACRYLATE TREATMENT AND JOINT SEAL REPLACEMENT
08-0R5104,2016-03-23,2016-02-29,2016-06-03,WEST COAST PUBLIC WORKS, INC.,(818)206-9990,$977,780.00,08-SBd-15/210-7.5/8.7, 10.8/12.4,Improve worker safety conditions and install vegetation control.
12-0P4804,2016-03-22,2016-02-29,2016-04-22,CAL STRIPE INC.,(909)884-7170,$328,000.00,12-Ora-55, 91-17.4/R17.9, R9.2/R17.2,REMOVE AND REPLACE PAVEMENT DELINEATION
05-1G3504,2016-03-22,2016-02-22,2016-04-12,STOUDENMIRE CORPORATION,(805)461-1454,$1,185,109.20,05-SB,SLO-1, 46, 101, 154, 166, 227-Var, Treat bridge deck, repair concrete and replace bridge joint seals.
03-2F4604,2016-03-22,2016-02-29,2016-04-19,ST FRANCIS ELECTRIC,(510)639-0639,$380,880.00,03-Sac-5-18.7,Modify, upgrade signals, upgrade curb ramps to ADA standards
06-0S4304,2016-03-22,2016-02-29,2016-04-25,CENTRAL VALLEY ASPHALT,(559)562-7802,$658,175.05,06-Fre-99-23.3,Resurface parking lot with hot mix asphalt.
01-0A1004,2016-03-22,2016-02-22,2016-04-28,STEELHEAD CONSTRUCTION, INC.,(530)226-6400,$1,071,228.50,01-DN-101-VAR,Bridge seismic retrofit and clean and paint bridge.
08-1F4904,2016-03-17,2016-02-22,2016-04-12,VSS INTERNATIONAL, INC,(916)373-1500,$1,016,014.00,08-SBd-247-24.0/78.0,Slurry seal and replace asphalt surfacing.
11-2M8604,2016-03-17,2016-02-22,2016-05-03,AMERICAN PAVEMENT SYSTEMS, INC.,(209)522-2277,$3,348,444.00,11-Imp-78-R50.0/80.7,Apply Asphalt Rubber Binder Seal Coat.
12-0N2204,2016-03-17,2016-02-22,2016-04-14,SPINITAR,(714)367-2975,$1,917,714.63,12-Ora-VAR,UPGRADE THE EXISTING AUDIO-VISUAL, AND VIDEO WALL SYSTEM
06-0R0204,2016-03-17,2016-02-22,2016-06-22,ROBERT J. FRANK CONSTRUCTION, INC.,(530)222-1408,$330,488.00,06-Ker-58-T52.1/R52.3,Concrete barrier (Type K), RHMA-Open Graded (Bonded Wearing Course)
04-1J2204,2016-03-16,2016-02-22,2016-04-18,GRANITE CONSTRUCTION COMPANY,(408)327-7013,$683,740.00,04-SM-1-3.3/10.6,Cold plane asphalt concrete pavement and place HMA (A).
03-1F9904,2016-03-16,2016-02-16,2016-05-20,FRANKLIN CONSTRUCTION, INC.,(530)343-9600,$1,592,326.00,03-But-32-9.5/10.2,ADA COMPLIANCE CURB RAMPS, SIGNALS, SIDEWALKS, CROSS SLOPES, ETC.
03-2F5404,2016-03-16,2016-02-16,2016-04-05,TIM PAXINS PACIFIC EXCAVATION, INC,(916)686-2800,$507,688.00,03-Sac-5, 80-VAR,Add, Relocate, or Replace Freeway Lighting at 19 Locations
02-4G8404,2016-03-16,2016-02-22,2016-04-04,CAL ELECTRO, INC.,(530)223-5937,$989,748.00,02-Sha-5, 44, 299-VAR,Modify Fiber Optic Cable System
08-1F6404,2016-03-16,2016-02-22,2016-04-28,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$453,453.00,08-SBd,Riv-10, 259 and 79-Varies,Sandblast, clean, methacrylate sealing the deck and place joint seals
08-0R4404,2016-03-15,2016-02-22,2016-06-29,DREAMBUILDER CONSTRUCTION CORP,(714)646-3697,$797,061.00,08-SBd-15-R23.0/R36.2,INSTALL VEGETATION CONTROL UNDERNEATH EXISTING METAL BEAM GUARD RAIL
09-361904,2016-03-15,2016-02-22,2016-04-19,AMERICAN PAVEMENT SYSTEMS, INC.,(209)522-2277,$1,761,500.00,09-Mno-108, 270, 395-Various,Construct asphalt-rubber seal coat.
01-0E4904,2016-03-15,2016-02-22,2016-03-25,MERCER FRASER COMPANY,(707)443-6371,$1,520,475.00,01-Hum-101-25.5/28.5,RHMA overlay, rumble strips, pavement delineation.
07-4Y8504,2016-03-10,2016-02-16,2016-04-13,CL COATINGS, INC. DBA CL INDUSTRIAL COATINGS, INC.,(562)305-1520,$2,932,356.00,07-LA-103-0.9/1.2,Spot blast, clean and paint existing bridge
03-2F4004,2016-03-10,2016-02-16,2016-03-30,CCFG CONSTRUCTION,(209)743-4911,$224,000.00,03-ED-49-20.3,INSTALL UNDERGROUND PIPES
12-0N9604,2016-03-09,2016-02-16,2016-04-22,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$926,520.90,12-Ora-5, 90,91,241,405-var,Methacrylic treatment and joint seal replacement
12-0N2504,2016-03-08,2016-02-01,2016-04-13,CHUMO CONSTRUCTION INC,(626)960-9502,$935,563.90,12-Ora-133, 405-8.3,13.7,14.7,22.5,Ramp Widening, Cold Plane AC Pvmt & HMA Paving, Hwy Lighting
09-333404,2016-03-08,2016-02-16,2016-04-13,WILLIAM KANAYAN CONSTRUCTION,(909)337-5428,$617,900.00,09-Iny-395-75.1,Earthwork, contour grading and erosion control.
08-1C4004,2016-03-03,2015-12-21,2016-04-04,J. FRANCIS COMPANY,(951)776-9100,$810,659.32,08-Riv-215-22.3/43.2,Apply methacrylate sealing, replace joint seal and install G-11 signs
07-251904,2016-03-03,2016-02-01,2016-03-30,C. A. RASMUSSEN, INC.,(661)367-9040,$3,644,542.00,07-Ven-101-R40.4/R43.6,Cold plane AC pavement, place Hot Mix Asphalt and concrete pavement.
08-0Q3004,2016-03-03,2015-12-21,2016-04-18,SKANSKA USA CIVIL WEST CALIFORNIA DISTRICT INC.,(951)684-5360,$21,379,324.50,08-SBd-138-R17.1/R19.2,Realign section of State Route 138
11-2M9204,2016-03-03,2016-02-08,2016-05-03,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$1,549,476.00,11-Imp-86-8.8/11.4,APPLY ASPHALT RUBBER BINDER SEAL COAT, COLD PLANE AND PAVE WITH RHMA.
05-1G6904,2016-03-03,2016-02-08,2016-03-25,CALPORTLAND CONSTRUCTION,(805)345-3581,$1,029,868.50,05-SLO-1-22.1/25.7,Cold plane asphalt pavement and resurface with RHMA (Open Graded).
03-3F8304,2016-03-03,2016-02-08,2016-03-25,MAY-HAN ELECTRIC INC., DBA M & M ELECTRIC,(916)929-0150,$2,585,110.00,03-But,Col,ED,Nev,Pla,Sac,Sut,Yol,Yub-VAR-VAR,Update CCTV cameras & video transport technology for IP communication
03-0G4704,2016-03-03,2016-02-08,2016-03-22,BALDWIN CONTRACTING COMPANY, INC. DBA KNIFE RIVER CONSTRUCT ION,(530)891-6555,$2,150,412.60,03-Col-45-24.6/28.8,Cold In-Place Recycling & Overlay
03-0G0404,2016-03-03,2016-02-01,2016-03-25,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$973,808.00,03-Sac-5, 50, 51-VAR,Rehabilitate Bridge Decks
05-1G5004,2016-03-02,2016-02-08,2016-03-16,TELFER PAVEMENT TECHNOLOGIES, LLC,(916)383-1756,$717,296.00,05-Mon-183, 218-0.0/R2.1, R0.0/1.9,Slurry seal existing roadbed.
03-0G4504,2016-03-02,2016-02-08,2016-03-25,A. TEICHERT & SON, INC. DBA TEICHERT CONSTRUCTION,(209)983-2300,$1,280,397.00,03-Pla-89-9.0/12.5,Cold Plane AC Pavement and HMA-A Overlay
08-1G1304,2016-03-02,2016-02-08,2016-04-13,SECURITY PAVING COMPANY, INC.,(818)362-9200,$1,969,000.00,08-SBd-58-R0.0/R13.0,Replace Asphalt Concrete Surfacing, Cold plane and Overlay
11-2M7604,2016-03-02,2016-02-01,2016-04-04,MANHOLE ADJUSTING INC,(323)558-8000,$4,302,352.60,11-SD,Imp-78-66.0/95.3; 0.0/13.2,Replace AC surfacing and apply asphalt rubber binder seal coat.
07-2W9404,2016-03-02,2016-02-08,2016-03-30,VELARDE CONCRETE CONSTRUCTION, INC.,(818)898-2300,$848,795.13,07-LA-10, 60, 710-var,Treat bridge deck, place joint seals, and spalls repair
07-4Y6704,2016-03-01,2016-02-08,2016-03-30,ALL AMERICAN ASPHALT,(951)736-7661,$1,108,619.60,07-LA-1-46.9/62.9,Replace asphalt concrete pavement.
10-1E0904,2016-03-01,2016-02-01,2016-03-25,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$688,688.00,10-Mer-5-13.9/27.4,Treat bridge deck, replace approach slabs and joint seals.
08-1C3404,2016-03-01,2016-02-08,2016-04-07,VSS INTERNATIONAL, INC,(916)373-1500,$801,005.00,08-Riv-74-27.5/32.3,PERFORMING SLURRY SEAL AND LOCALIZED DIG-OUT ON ROUTE 74
07-2W9304,2016-03-01,2016-02-08,2016-03-25,GRIFFITH COMPANY,(661)392-6640,$1,070,124.00,07-Ven-33-40.0/42.0,Construct pavement using Cold In-Place Recycling and overlay with HMA.
06-0T6404,2016-03-01,2016-02-08,2016-04-22,GRANITE CONSTRUCTION COMPANY,(559)441-5700,$1,309,900.00,06-Tul-137-7.2/13.2,Cold plane asphalt pavement and apply Rubberized HMA-Gap Graded (BWC).
03-0G2904,2016-03-01,2016-02-08,2016-03-25,F.D. THOMAS, INC.,(541)664-3010,$1,284,575.00,03-But-70-14.8,Paint 2 Bridges
04-3J4504,2016-03-01,2016-02-08,2016-04-13,VINTAGE PAVING COMPANY, INC,(530)795-0132,$429,524.00,04-Sol-113-2.0/7.0,Cold plane AC pavement and place HMA (Type A).
03-4M4504,2016-02-25,2016-02-01,2016-03-14,MICHELS CORPORATION DBA MICHELS PIPELINE CONSTRUCTION,(503)364-1199,$349,941.00,03-Nev-20-Var,Culvert Pipeliner
05-1G6404,2016-02-25,2016-02-01,2016-03-14,GRANITE CONSTRUCTION COMPANY,(805)964-9900,$503,322.00,05-SLO-41-49.6/50.4,Place RHMA (Type A) on existing roadway.
02-1H0504,2016-02-25,2016-02-01,2016-03-11,DIG IT CONSTRUCTION, INC.,(530)258-3306,$953,650.00,02-Plu-89-8.7/12.9,Place HMA with Replace AC Surfacing
08-1F6504,2016-02-25,2016-02-01,2016-03-16,J. FRANCIS COMPANY,(951)776-9100,$528,692.99,08-Riv-60, 91, 215-Varies,Methacrylate bridge decks, repair cracks, deck spalls, joint seals
07-3W1504,2016-02-25,2016-02-01,2016-03-15,TORO ENTERPRISES, INC.,(805)483-4515,$1,476,116.70,07-Ven-1-21.2/27.2,Cold plane asphalt concrete pavement and place RHMA.
08-1G0704,2016-02-25,2016-01-25,2016-04-27,ALL AMERICAN ASPHALT,(951)736-7600,$3,161,996.00,08-SBd-18-31.9/38.5,Rehabilitate pavement for mainline,shoulders and turnouts
11-2M8404,2016-02-25,2016-01-25,2016-03-15,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$2,989,884.00,11-Imp-111,186-56.0/65.4,0.0/2.1,Place RHMA Overlay and Asphalt-Rubber Binder Seal Coat.
11-2M8504,2016-02-24,2016-02-01,2016-03-11,GRANITE CONSTRUCTION COMPANY,(760)444-1000,$1,388,595.00,11-SD-76-34.9/40.8,Cold plane and pave with RHMA (Gap Graded), apply slurry seal.
08-0J9904,2016-02-24,2015-12-21,2016-04-13,STL LANDSCAPE, INC.,(323)581-8200,$2,670,000.00,08-SBd-18-49.0/51.7,Repair and replaced sidewalks, curbs & gutters.
07-3W1204,2016-02-24,2016-02-01,2016-03-22,CAL STRIPE INC.,(909)884-7170,$295,295.00,07-LA-1-35.2/59.9,Replace recessed pavement markers and traffic stripes.
08-0G9004,2016-02-24,2015-12-07,2016-04-14,GRIFFITH COMPANY,(909)270-5040,$9,285,582.00,08-SBd-247-9.6/20.3,WIDENING SHOULDERS
08-1C0914,2016-02-24,2015-12-07,2016-03-30,ALL AMERICAN ASPHALT,(951)736-7600,$17,439,087.60,08-Riv-60-R12.2/22.1 & 26.5/30.4,Mill and Overlay mainline pavement, shoulders, ramps, include digouts
07-2W9604,2016-02-24,2016-01-25,2016-03-22,WESTERN STRUCTURES,(951)352-4300,$1,028,832.06,07-LA-19,60,91,164,605-Var,Treat bridge deck, repair spalls, and replace joint seals.
05-1G5904,2016-02-24,2016-02-01,2016-03-15,PAVEMENT COATINGS CO.,(714)826-3011,$673,385.00,05-SB-1, 246-20.6/23.3, 28.6/29.9,Slurry seal existing roadbed.
06-0T5304,2016-02-23,2016-02-01,2016-03-15,TELFER PAVEMENT TECHNOLOGIES, LLC,(916)383-1756,$1,622,340.90,06-Kin,Tul-137-0.1/2.0; 0.0/7.2,Cold Plane AC Pvmt and apply Rubberized HMA-Gap Graded (BWC)
08-1F6304,2016-02-23,2016-02-01,2016-03-30,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$838,838.00,08-SBd-40-R105.8/149.9,REMOVE ASPHALT, PLACE CONCRETE OVERLAY AND REPLACE JOINT SEALS
01-0E9804,2016-02-23,2016-01-25,2016-03-18,MERCER FRASER COMPANY,(707)443-6371,$2,198,593.50,01-Men-101-T91.3/R100.1,RHMA Overlay
02-1H0404,2016-02-23,2016-02-01,2016-03-15,EAGLE PEAK ROCK & PAVING,(530)233-4568,$1,110,038.00,02-Las-299-12.2/18.5,Asphalt Rubber Seal Coat, Place HMA with Replace AC Surfacing
01-0F1804,2016-02-18,2016-01-25,2016-03-10,GRANITE CONSTRUCTION COMPANY,(707)467-4100,$892,947.00,01-Men-1, 20, 101, 128-VAR,Replace AC Surfacing
01-0A4904,2016-02-18,2016-01-11,2016-03-18,STEVE MANNING CONSTRUCTION, INC.,(530)222-0810,$3,554,665.00,01-Hum-299-R25.0/R25.9,Widen roadway, construct HMA and RHMA overlay, drainage and MGS
05-1G3204,2016-02-18,2016-01-25,2016-03-14,STOUDENMIRE CORPORATION,(805)461-1454,$245,245.00,05-Mon,SLO-41, 101-Var,Seal Bridge deck with Methacrylate , replace joint seals
06-0T6204,2016-02-17,2016-01-25,2016-03-08,GRANITE CONSTRUCTION COMPANY,(559)441-5768,$1,854,214.00,06-Fre-33-11.1/14.8, 16.9/22.7,Bonded Wearing Course resurfacing.
03-0G3804,2016-02-17,2016-01-25,2016-03-10,BALDWIN CONTRACTING COMPANY, INC. DBA KNIFE RIVER CONSTRUCT,(530)891-6555,$900,822.00,03-Gle-32-1.3/R4.3,Cold Plane AC Surfacing & Rubberized Hot Mix Asphalt - Gap Graded.
01-0F0904,2016-02-17,2016-01-25,2016-03-10,MERCER FRASER COMPANY,(707)443-6371,$2,125,670.00,01-Tri-299-8.0/15.0,RHMA Overlay
01-0E5204,2016-02-17,2016-01-25,2016-03-16,MERCER FRASER COMPANY,(707)443-6371,$1,240,954.00,01-Hum-299-39.1/43.0,Replace AC Surfacing, Bonded Wearing Course Overlay
07-2W6404,2016-02-17,2016-01-25,2016-03-22,ODONNELL CONSTRUCTION, INC.,(909)394-4510,$552,190.30,07-LA-10, 710-Var,Treat bridge deck, place joint seals, and repair spalls.
03-0G3304,2016-02-10,2016-01-11,2016-03-10,TELFER PAVEMENT TECHNOLOGIES, LLC,(916)383-1756,$2,018,300.80,03-Nev-49-15.1/17.1, 17.4/21.8,Rubberized Hot Mix Asphalt-Gap Graded (Bonded Wearing Course) Overlay
04-1SS024,2016-02-09,2015-12-07,2016-03-14,RGW CONSTRUCTION, INC.,(925)606-2400,$3,654,282.00,04-Ala-13-8.3,Repair landslide on SR-13 at the Moraga Ave. northbound on-ramp.
08-0N5504,2016-02-09,2015-12-21,2016-04-21,M.C.M. CONSTRUCTION, INC.,(916)334-1221,$7,532,522.00,08-SBd-40-R105.2/R106.5,Replace the left Watson Wash Bridge N0. 0805L
10-1E4404,2016-02-04,2016-01-11,2016-03-11,CHESTER BROSS CONSTRUCTION COMPANY,(573)221-5958,$2,179,159.00,10-Cal-4-49.6/R58.0,HMA resurfacing.
08-1F5204,2016-02-04,2016-01-04,2016-03-21,CALMEX ENGINEERING INC,(909)546-1311,$5,345,393.60,08-SBd-40-0.0/R10.0,PAVEMENT PRESERVATION TREATMENT
09-361104,2016-02-04,2016-01-04,2016-03-03,QUALCON CONTRACTORS, INC.,(775)782-2006,$1,868,400.00,09-Iny-178-48.6/60.0,Construct rubberized hot mix asphalt overlay.
03-0G1104,2016-02-04,2016-01-04,2016-03-10,BALDWIN CONTRACTING COMPANY, INC. DBA KNIFE RIVER CONSTRUCT ION,(530)891-6555,$2,595,863.80,03-But-32-R19.0/R23.9,Rubberized hot mix asphalt (gap graded) overlay
02-1H0004,2016-02-04,2016-01-04,2016-03-04,Q & D CONSTRUCTION, INC.,(775)786-2677,$3,276,000.00,02-Las-395-36.4/47.0,RHMA Overlay, Replace AC Surfacing
08-1F4604,2016-02-03,2016-01-04,2016-03-03,CALMEX ENGINEERING INC,(909)546-1311,$4,653,137.22,08-SBd-330-R29.0/44.1,Rehabilitate pavement
08-1C9104,2016-02-03,2015-12-21,2016-03-11,JABRE CONTRACTING INC.,(310)720-0277,$315,132.50,08-SBd-95-R57.2/80.5,Ground-in rumble strips, center and edge of pavement
07-300604,2016-02-03,2015-12-21,2016-03-01,SECURITY PAVING COMPANY, INC.,(818)362-9200,$12,279,216.00,07-LA-405-20.5/28.0,Replace concrete pavement, cold plane and place HMA pavement.
10-1E2704,2016-02-03,2016-01-04,2016-03-11,STOUDENMIRE CORPORATION,(805)461-1454,$488,888.88,10-Mer-99-13.1/R36.7,Treat bridge deck, replace approach slabs and joint seals.
04-2G4524,2016-02-03,2016-01-11,2016-03-04,DIRT AND AGGREGATE INTERCHANGE, INC.,(503)661-5093,$244,444.00,04-CC-680-22.2/23.9,Concrete Barrier Transitions and MGS
05-0T6304,2016-02-03,2015-12-28,2016-02-24,SOUZA CONSTRUCTION, INC.,(805)546-8288,$6,485,000.00,05-SB-101-45.6/46.4,Realign curve on existing highway.
03-0G3504,2016-02-02,2016-01-11,2016-02-17,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$348,170.00,03-Pla-80-69.2/69.8,Individual Slab Replacement (Rapid Strength Concrete)
02-1H0104,2016-02-02,2016-01-04,2016-03-30,SIERRA NEVADA CONSTRUCTION,(775)355-0420,$2,206,007.00,02-Plu-70-46.2/53.5,Place HMA with Replace AC Surfacing
08-1G1004,2016-02-02,2016-01-04,2016-02-25,PAVEMENT COATINGS CO,(714)826-3011,$1,447,381.60,08-Riv-74-36.5/42.6,Replace Asphalt Concrete Surfacing and Slurry Seal
11-414704,2016-02-02,2015-12-14,2016-03-03,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$2,539,835.00,11-SD-67-9.3/11.2,High friction surface treatment, rumble strips, MGS, drainage.
10-1E1004,2016-02-02,2016-01-11,2016-02-25,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$653,604.94,10-SJ-4, 5-Var,Bridge deck treatment.
08-1C4604,2016-01-28,2015-12-28,2016-03-03,ALL AMERICAN ASPHALT,(951)736-7600,$1,536,207.80,08-Riv-111-T50.0/56.2,Slurry seal and localized digouts
08-1F4804,2016-01-28,2015-12-28,2016-02-24,JFL ELECTRIC,INC,(323)581-4400,$264,960.00,08-Riv,SBd-74, 111, 18 and 38-Various,INSTALL APS PUSH BUTTONS AND COUNT DOWN PEDESTRIAN SIGNALS
03-0G0204,2016-01-28,2016-01-04,2016-02-12,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$426,293.00,03-But,Col,Yub-5, 20, 45, 70, 149-VAR,PLACE POLYESTER CONCRETE OVERLAY
05-1G6704,2016-01-28,2015-12-28,2016-02-22,GRANITE ROCK COMPANY,(408)574-1400,$1,442,943.00,05-Mon-1-40.8/62.5,Cold plane roadway and resurface roadway with HMA (Type A)
02-1H0304,2016-01-28,2016-01-04,2016-03-01,HAT CREEK CONSTRUCTION & MATERIALS, INC.,(530)335-5501,$1,995,995.00,02-Sis-161-9.0/15.0,Cold In-Place Recycle
08-1C7404,2016-01-27,2016-01-04,2016-03-03,JFL ELECTRIC,INC,(323)581-4400,$242,451.00,08-Riv-74-43.2/43.4,INSTALL TRAFFIC SIGNALS
04-2J1404,2016-01-27,2015-12-28,2016-02-24,BC TRAFFIC SPECIALIST,(714)974-1190,$3,180,663.00,04-Ala-13, 24, 80, 84, 92, 238, 580, 680, 880, 980-Various,Replace the overhead sign panels
03-0G3704,2016-01-27,2015-12-28,2016-03-16,TELFER PAVEMENT TECHNOLOGIES, LLC,(916)383-1756,$2,677,500.60,03-ED-50-58.0/67.6,Bonded Wearing Course-Gap Graded Overlay
05-1G6304,2016-01-26,2015-12-21,2016-02-09,CALPORTLAND CONSTRUCTION,(805)345-3581,$2,799,181.00,05-SLO,SB-166-21.0/25.5,Place cold in place recycling overlay on existing roadbed
02-0H9604,2016-01-26,2015-12-21,2016-02-18,AMERICAN PAVEMENT SYSTEMS, INC.,(209)522-2277,$677,689.00,02-Sis-3-0.4/6.9,Asphalt Rubber Chip Seal w/Replace AC Surfacing, Striping
08-1E8604,2016-01-26,2015-12-14,2016-03-02,GRANITE CONSTRUCTION COMPANY,(760)775-7500,$60,973,078.00,08-Riv-10-R74.0/R105.4,REHABILITATE PAVEMENT
10-1E1304,2016-01-26,2015-12-28,2016-02-22,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$728,061.80,10-Mer,Sta,Tuo-5,59,99,108,165-Various ,Repair bridge decks and HMA shoulders.
08-0G7804,2016-01-21,2015-12-07,2016-03-02,DYNALECTRIC,(714)828-7000,$5,888,888.00,08-Riv-215-8.4/38.8,INSTALL CCTV, CMS, CENSUS STATIONS, DETECTIONS, HUBS.
02-4G6504,2016-01-21,2015-12-21,2016-03-01,S.T. RHOADES CONSTRUCTION, INC.,(530)223-9322,$463,117.75,02-Sha-299-88.7/89.2,Widen shoulders, HMA, MBGR, Striping
06-0T5804,2016-01-21,2015-12-21,2016-03-02,TEICHERT CONSTRUCTION,(559)813-3036,$1,028,562.00,06-Fre,Mad-145-40.2/R41.2, R0.0/2.0, 11.0/13.6,Place hot mix asphalt and repair failed areas.
03-0G3604,2016-01-21,2015-12-14,2016-02-05,VINTAGE PAVING COMPANY, INC,(530)795-0132,$1,237,081.60,03-But-162-18.0/22.7,Rubberized Hot Mix Asphalt (Gap Graded) Overlay
04-4A0004,2016-01-20,2015-09-21,2016-03-17,GHILOTTI CONSTRUCTION CO. INC.,(707)585-1221,$2,089,940.00,04-Mrn-101-12.7/14.7,REPLACE BRIDGE RAILINGS AND BRIDGE MEDIAN
04-0J3504,2016-01-20,2015-12-14,2016-03-08,AMERICA PACIFIC CONSTRUCTION,(559)577-9999,$224,322.00,04-Ala-880-8.5,Storm Damage Repair
08-0Q2304,2016-01-20,2015-12-21,2016-04-04,HIGHLAND CONSTRUCTION, INC.,7145385156,$805,893.00,08-SBd-18-110.8,INSTALL TRAFFIC SIGNAL AND PEDESTRIAN REFUGE AREA
12-0P4704,2016-01-20,2015-12-21,2016-02-22,V A P CONSTRUCTION INC,(714)253-3270,$275,975.00,12-Ora-1, 39-19.8/33.7, 0.0/1.1,Replace sidewalks, driveways and curbs at various locations.
08-0R9504,2016-01-20,2015-12-21,2016-02-22,ALL AMERICAN ASPHALT,(951)736-7600,$519,815.20,08-Riv-371-70.6/70.9,Construct left turn lanes
10-1E1804,2016-01-20,2015-12-21,2016-02-22,STOUDENMIRE CORPORATION,(805)461-1454,$438,576.20,10-SJ-5, 205-Various,Treat bridge decks and replace joint seals.
02-0H9904,2016-01-20,2015-12-14,2016-02-18,TULLIS, INC.,(530)241-5105,$1,030,986.00,02-Tri-3-L0.0/0.6,Place HMA, Replace AC Surfacing
02-4G2204,2016-01-14,2015-11-30,2016-02-24,HAT CREEK CONSTRUCTION & MATERIALS, INC.,(530)335-5501,$1,146,875.00,02-Mod-299-52.2/54.7,Place HMA, Replace AC Surfacing, Guardrail and Drainage work
06-0T6004,2016-01-14,2015-11-23,2016-03-01,GRIFFITH COMPANY,(661)392-6640,$4,892,476.00,06-Ker-5, 43-73.0/82.5, 9.2/15.9,Cold plane AC pavement and overlay with RHMA-Gap Graded (BWC).
08-0R7104,2016-01-14,2015-12-07,2016-02-09,CORAL CONSTRUCTION COMPANY,(503)682-2252,$1,123,456.00,08-SBd-15-R87.3/R91.8,INSTALL SINGLE & DOUBLE THRIE BEAM BARRIER IN MEDIAN
10-0Y6404,2016-01-14,2015-12-07,2016-02-24,CORAL CONSTRUCTION COMPANY,(503)682-2252,$1,784,784.00,10-Sta-5-17.3/25.5,Construct cable median barrier.
10-0L9704,2016-01-14,2015-11-23,2016-02-22,GOLDEN STATE BRIDGE, INC.,(925)372-8000,$16,658,884.00,10-Tuo-120-R19.4/R20.0,Bridge deck replacement.
11-414904,2016-01-13,2015-11-23,2016-02-24,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$3,664,645.00,11-SD-67-R21.0/21.6,Widen intersection and cold plane and overlay with HMA.
10-0Y1004,2016-01-13,2015-12-07,2016-02-22,TIM PAXINS PACIFIC EXCAVATION, INC,(916)686-2800,$1,848,873.00,10-Sta-99-R11.7/R15.0,Install double luminaire.
08-1E8704,2016-01-13,2015-12-07,2016-02-09,SULLY-MILLER CONTRACTING COMPANY,(714)578-9600,$12,540,825.00,08-SBd-395-46.0/73.5,COLD PLANE & OVERLAY MAINLINE & SHOULDERS & INSTALL RUMBLE STRIPS
02-0H9704,2016-01-13,2015-12-07,2016-02-18,TELFER PAVEMENT TECHNOLOGIES, LLC.,(916)383-1756,$2,069,995.50,02-Sha-89, 299-VAR,Asphalt Rubber Seal Coat w/Replace AC Surfacing
02-1H1204,2016-01-12,2015-12-07,2016-02-05,CAL STRIPE INC.,(909)884-7170,$279,500.00,02-Las,Sha,Teh-VAR-VAR,Replace Pavement Markers
02-0H9804,2016-01-12,2015-11-23,2016-02-17,HAT CREEK CONSTRUCTION & MATERIALS, INC.,(530)335-5501,$1,599,925.00,02-Plu-89-35.5/R42.2,Cold plane and place HMA with replace AC surfacing
09-361804,2016-01-12,2015-11-30,2016-02-22,VSS INTERNATIONAL, INC,(916)373-1500,$735,777.00,09-Mno-6, 120-R17.5/26.5, 35.0/43.0,Construct seal coat.
10-1E4504,2016-01-12,2015-11-23,2016-02-04,BAY CITIES PAVING & GRADING, INC.,(925)687-6666,$1,275,375.70,10-SJ-5-R23.6/25.3,Repair failed areas and apply rubberized HMA resurfaceing.
05-330784,2016-01-12,2015-11-16,2016-02-10,BROSAMER & WALL, INC,(925)932-7900,$42,370,788.00,05-SLO-46-46.0/50.2,Convert 2-lane to 4 lane expressway.
03-0G4604,2016-01-12,2015-12-07,2016-02-12,GEORGE REED INC,(209)523-0730,$221,995.00,03-Sac-12-3.6, 5.6,Replace AC Surfacing
04-1J6304,2016-01-12,2015-10-19,2016-03-01,GRANITE CONSTRUCTION COMPANY,(408)327-7013,$15,541,310.29,04-SCl-101-16.0 to 27.9,RESURFACE AND REPAIR FLEXIBLE PAVEMENT, PCC SLAB REPLACEMENT
03-4M9404,2016-01-07,2015-11-23,2016-01-22,CORAL CONSTRUCTION COMPANY,(503)682-2252,$199,991.00,03-Sie-49-R11.3/R12.4,Replace guardrail.
02-4G3304,2016-01-07,2015-11-30,2016-01-25,DIG IT CONSTRUCTION, INC.,(530)258-3306,$889,228.00,02-Teh-32-21.5/R24.9,Cold Plane AC, Replace AC Surfacing, HMA Overlay, MBGR, Striping
11-2M6504,2016-01-07,2015-11-23,2016-02-17,AMERICAN PAVEMENT SYSTEMS, INC.,(209)522-2277,$5,470,191.10,11-Imp-86-43.1/67.8,Apply asphalt rubber binder seal coat and replace PCC slabs.
10-1E1204,2016-01-07,2015-11-23,2016-02-04,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$287,297.85,10-Mer,Sta-5-Var,Treat bridge deck with Methacrylate, and replace seals.
10-1C4504,2016-01-06,2015-11-30,2016-02-11,BAY CITIES PAVING & GRADING, INC.,(925)687-6666,$2,060,613.59,10-Mer-59/152-Var,Cold plane AC pavement, HMA shoulder, and rumble strip
10-0T8104,2016-01-06,2015-11-23,2016-02-01,AMERICA PACIFIC CONSTRUCTION,(559)577-9999,$197,325.40,10-Mer-59,99,140,152-Varies,Construction of ADA curb ramps.
09-361604,2016-01-06,2015-11-23,2016-01-28,SULLY-MILLER CONTRACTING COMPANY,(714)578-9600,$1,984,776.00,09-Iny-190-14.0/18.5,Cold in-place recycling and HMA overlay.
02-2E8004,2016-01-06,2015-11-16,2016-02-11,RANDY HILL CONSTRUCTION, INC,(530)892-1918,$5,989,907.72,02-Sis-5-R7.2,Reconstruction of the Dunsmuir Commercial Vehicle Enforcement Facility
05-1G5104,2016-01-06,2015-11-23,2016-01-22,FBD VANGUARD CONSTRUCTION,(925)245-1300,$902,185.00,05-SLO,Mon-101-64.8/R69.3, R0.0/R2.0,Replace individual PCC slabs with rapid strength concrete slabs.
12-0N78U4,2016-01-05,2015-10-26,2016-03-08,KDC INC., DBA DYNALECTRIC,(714)828-7000,$9,214,613.90,12-Ora-5,22,57,73,133,405, etc.-VARIOUS,Install HD CCTVs and modify communication system.
02-0H9504,2016-01-05,2015-11-23,2016-03-11,TELFER PAVEMENT TECHNOLOGIES, LLC.,(916)383-1756,$1,620,953.00,02-Sis-96, 97-77.2/92.0, 2.0/2.6,Asphalt rubber seal coat w/ replace AC surfacing.
01-0B4504,2016-01-05,2015-11-16,2016-02-01,MCCULLOUGH CONSTRUCTION INC,(707)825-1014,$1,670,653.00,01-Hum-299-R10.5/R10.7, R25.8/R26.1,Place rock slope protection and reconstruct roadway at 2 locations
01-0E2804,2015-12-17,2015-11-16,2016-03-01,CENTRAL STRIPING SERVICE, INC.,(916)635-5175,$699,861.07,01-Hum,Men-101-VAR,INSTALL CENTERLINE & SHOULDER RUMBLE STRIPS
07-290004,2015-12-17,2015-10-26,2016-04-06,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$13,210,850.95,07-LA-405-R12.6/R21.2,Construct concrete barriers and install midwest guard rails.
05-0J4904,2015-12-16,2015-11-16,2016-01-13,FBD VANGUARD CONSTRUCTION,(925)245-1300,$5,680,500.00,05-Mon,SBt,SLO,SB,SCr-1, 17, 68, 101, 135, 217-VAR,Replace all freeway exit sign panels with retroreflective sheeting
05-1G6604,2015-12-16,2015-11-16,2016-01-22,PAVEMENT COATINGS CO,(714)826-3011,$337,775.00,05-SLO-1-L16.7/L18.2,Repair failed pavement and resurface roadbed with slurry seal.
03-1F2604,2015-12-16,2015-11-16,2016-01-12,MEYERS EARTHWORK INC.,(530)365-8858,$1,605,406.00,03-Sie-89-0.6/1.8,PRECAST REINFORCED CONCRETE BOX CULVERT, FENCE
07-302904,2015-12-15,2015-09-21,2016-01-13,SECURITY PAVING COMPANY, INC.,(818)362-9200,$15,822,582.30,07-LA-5-C43.9/C46.4,Replace concrete slabs/pavement.
08-1C8404,2015-12-15,2015-11-09,2016-02-04,CL COATINGS, INC. DBA CL INDUSTRIAL COATINGS, INC.,(562)305-1520,$1,123,999.00,08-Riv,SBd-91/10-17.4/20.9,11.5,PRESSURE WASH, SPOT BLAST, CLEAN & PAINT BRIDGE
11-416004,2015-12-15,2015-11-09,2016-02-03,SELECT ELECTRIC, INC.,(619)460-6060,$2,070,367.00,11-Imp,SD-5, 7, 8, 15, 52, etc.-Var,Traffic systems: count, radio, photovoltaic, CCTV and traffic signal.
10-0Q17U4,2015-12-10,2015-09-28,2016-01-27,DESILVA GATES CONSTRUCTION LP,(925)829-9220,$26,332,332.00,10-SJ-132, 580-0.2, L0.0/15.3,Repair pavement, hot mix asphalt resurfacing and install ITS elements
07-258404,2015-12-08,2015-10-26,2016-01-20,POWELL CONSTRUCTORS, INC.,(909)356-8880,$3,958,069.90,07-LA-5-18.4/23.2,Construct biofiltration swales, GSRD and austin vault sand filter
05-0F7004,2015-12-08,2015-10-05,2016-01-22,VIKING CONSTRUCTION COMPANY,(916)852-5530,$17,934,686.30,05-Mon-68-R17.4/R18.0,Widening bridge
05-1F5704,2015-12-08,2015-11-09,2016-01-05,GRANITE CONSTRUCTION COMPANY,(831)763-6100,$641,350.00,05-Mon-68-0.0/1.1,Cold Plane and RHMA-(Gap Graded) Overlay Roadbed and ADA Ramps.
02-0H3604,2015-12-08,2015-11-09,2016-01-06,J. F. SHEA CONSTRUCTION, INC.,(530)246-4200,$387,451.00,02-Teh-5, 32-VAR,Bridge Maintenance
02-0H9404,2015-12-03,2015-11-02,2016-02-10,S.T.RHOADES CONSTRUCTION INC.,(530)223-9322,$1,319,205.98,02-Las-139-53.0/57.0,AC Overlay with Replace AC Surfacing
12-0N3304,2015-12-03,2015-10-19,2016-01-06,SECURITY PAVING COMPANY, INC.,(818)362-9200,$7,571,967.00,12-Ora-5-12.8/21.6,Slab Replacement (RSC), Grind & Groove Conc Pvmt, RHMA-G Pvmt
07-306204,2015-12-03,2015-10-12,2016-01-13,USS CAL BUILDERS,(714)828-4882,$15,011,485.74,07-LA-91-R11.3/R20.7,ROADWAY REHABILITATION
12-0H2254,2015-12-03,2015-10-26,2016-01-20,SMART TECH GROUP INC,(949)800-6040,$833,255.00,12-Ora-73-26.1/28.0,Install fiber optic cables and CCTV camera.
06-0T5904,2015-12-03,2015-10-19,2016-01-14,NORTHWEST PAVING,(530)246-4388,$1,934,911.00,06-Tul-137;190-18.2/27.4; 26.5/56.6,Place Polymer Asphaltic Emulsion (Seal Coat).
04-2J0704,2015-12-03,2015-09-28,2016-03-15,BAY CITIES PAVING & GRADING, INC.,(925)687-6666,$49,896,755.50,04-Ala-880-2.9/27.3,Concrete median barrier, CIDH foundation and lighting,
11-413304,2015-12-02,2015-10-19,2015-12-29,COFFMAN SPECIALTIES, INC.,(858)536-3100,$10,565,000.00,11-SD-15-R6.5/R10.9,PCC Rehabilitation including slab replacement, grinding, curb ramps.
11-415504,2015-12-02,2015-11-02,2016-01-22,CROSSTOWN ELECTRICAL & DATA, INC.,(626)813-6693,$2,942,487.00,11-SD-5, 8, 15, 52, 54, etc-Var,Upgrade Traffic Management System field elements.
07-2750U4,2015-12-02,2015-10-05,2016-03-14,ORTIZ ENTERPRISES, INC.,(949)753-1414,$7,846,375.20,07-Ven-33, 101-0.9/T5.8 2.3/13.8 ,Construct storm water treatment BMP.
12-0M3404,2015-12-02,2015-10-19,2016-03-29,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$2,219,115.03,12-Ora-73, 133-16.6, 4.2,WIDEN RAMP, CONSTRUCT RW AND DI, AND MODIFY LIGHTING
07-306404,2015-12-01,2015-10-12,2016-01-06,SELECT ELECTRIC, INC.,(619)460-6060,$11,663,702.82,07-LA-210-R24.7/R44.9,INSTALL CHANGE MESSAGE SIGNS AND TRAFFIC MONITORING STATIONS
07-287404,2015-11-19,2015-10-05,2015-12-30,ODONNELL CONSTRUCTION, INC.,(909)394-4510,$1,994,796.50,07-LA-405-8.7/11.2,Construct railings and barriers.
12-0N8214,2015-11-19,2015-10-19,2015-12-29,SERVITEK SOLUTIONS INC,(626)227-1650,$821,036.77,12-Ora-1, 74, 133, 142-Var,Install Bluetooth traffic detections, loop detectors and solar panels.
11-2M7304,2015-11-19,2015-10-19,2015-12-22,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$1,617,153.50,11-SD-5,8,15,94,125,805,905-var,Replace bridge joint seals, apply methacrylate.
07-290104,2015-11-19,2015-10-05,2015-12-30,AUTOBAHN CONSTRUCTION INC.,(714)769-7025,$7,832,900.00,07-LA-91, 105-R6.5/R11.0, R4.0/R11.3,Construct metal beam and midwest guardrail and concrete barriers.
10-0Y9504,2015-11-19,2015-10-05,2015-12-18,BAY CITIES PAVING & GRADING, INC.,(925)687-6666,$2,970,000.00,10-SJ-120-6.7/16.7,Repair failed areas and rubberized HMA resurfacing.
02-0E0904,2015-11-19,2015-09-21,2016-02-03,GOLDEN STATE BRIDGE, INC.,(925)372-8000,$25,571,139.50,02-Sha-5-R29.3/R31.1, R45.0/R45.8,Replace bridge, realign roadway and seismic retrofit
04-4G4604,2015-11-19,2015-09-28,2016-01-28,GHILOTTI BROS/RM HARRIS JV,(925)335-3000,$8,376,663.77,04-Mrn-101-1.5/14.0,Remove existing and construct new bridge railings.
04-1SS474,2015-11-19,2015-10-19,2016-01-05,RGW CONSTRUCTION, INC.,(925)606-2400,$2,799,212.50,04-CC-680-R10.5/R11.0,Remove slide, install RSP and anchored wire mesh system.
04-3G4034,2015-11-18,2015-08-24,2016-01-05,AMERICAN CIVIL CONSTRUCTORS WEST COAST, INC.,(707)746-8028,$6,097,372.10,04-CC,Sol-80-13.4/14.1, 0.0/0.6,Resurface Bridge , Install new Joint Seal.
07-129974,2015-11-18,2015-10-19,2015-12-30,FERREIRA CONSTRUCTION CO,, INC.,(909)606-5900,$4,921,321.00,07-LA-210-R18.8/R24.9,Install Fiber Optics and CMS Sign.
06-0T5604,2015-11-18,2015-10-19,2015-12-18,GRANITE CONSTRUCTION COMPANY,(661)387-7747,$663,423.00,06-Ker-99-8.9/10.7,Cold plane, crack seal AC pavement and resurface with RHMA.
04-4S1904,2015-11-18,2015-10-19,2016-01-14,GHILOTTI CONSTRUCTION CO. INC.,(707)585-1221,$1,814,460.00,04-Son-116-15.0,CONSTRUCT PAVEMENT AND SOLDIER PILE WALL
03-1F4004,2015-11-18,2015-09-28,2016-03-10,A. TEICHERT & SON INC. DBA TEICHERT CONSTRUCTION,(916)757-6400,$32,226,145.60,03-Pla-80-35.1/38.3,WIDEN EASTBOUND ROADWAY
07-287604,2015-11-18,2015-10-19,2015-12-30,HIGHLAND CONSTRUCTION, INC.,(714)538-5156,$1,535,214.00,07-LA-101-8.5/9.4,PLACE CONCRETE BARRIER, RAILING, AND LIGHTING
11-416904,2015-11-18,2015-09-28,2015-12-22,SECURITY PAVING COMPANY, INC.,(818)362-9200,$34,451,017.20,11-Imp-8-R90.0/R96.8,Construct CRCP, HMA-A, guardrail, rumble strips and approach slabs.
07-290704,2015-11-18,2015-09-21,2016-04-06,GOLDEN STATE BRIDGE, INC.,(925)372-8000,$15,204,505.00,07-LA-47-0.9/2.0,Restore bridge seismic.
12-0N7904,2015-11-17,2015-10-19,2015-12-18,AEGIS ITS, INC.,(714)575-5734,$2,697,538.00,12-Ora-5,73,91,133,241, etc-VAR,Install AND Upgrade ITS Equipment
07-207604,2015-11-17,2015-10-12,2015-12-30,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$2,948,412.57,07-LA-101-S0.5/17.1,Upgrade existing sign panels and overhead sign structures
11-260414,2015-11-17,2015-10-12,2016-01-11,GRANITE CONSTRUCTION COMPANY,(760)444-1028,$2,099,732.00,11-SD-8-R37.8/R39.1,Drainage improvements for Erosion Control.
08-0R4704,2015-11-17,2015-10-26,2016-01-05,YAKAR,(909)599-1612,$1,267,750.00,08-Riv-10,60-6.3/7.0, 30.3/30.5,Improve worker safety conditions by relocating facilities safely.
03-4F0204,2015-11-17,2015-09-21,2015-12-16,A. TEICHERT & SON, INC. DBA TEICHERT CONSTRUCTION,(209)983-2300,$7,317,000.00,03-Pla-65-R4.8/R12.2,RHMA-O (OGFC) and HMA-A Overlay.
01-0B4704,2015-11-17,2015-10-19,2015-12-22,MENDOCINO CONSTRUCTION SERVICES, INC.,(707)459-2377,$168,806.00,01-Men-1-35.7,REPAIR SLIPOUT
01-0B3204,2015-11-10,2015-09-28,2016-03-18,STEWART ENGINEERING INC,(530)244-8464,$1,977,516.50,01-DN-199-24.7,CONSTRUCT SOLDIER PILE WALL
02-0H9304,2015-11-10,2015-10-19,2015-12-10,AMERICAN PAVEMENT SYSTEMS, INC.,(209)522-2277,$875,770.00,02-Las-139-20.0/30.0,Asphalt Rubber Seal Coat w/ Replace AC Surfacing
07-287104,2015-11-10,2015-09-28,2015-12-22,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$2,308,410.95,07-LA-10, 101-S0.0/S0.1, 0.0/0.1,Construct concrete barrier.
10-0X9704,2015-11-05,2015-09-28,2016-01-29,AMERICAN CIVIL CONSTRUCTORS WEST COAST, INC.,(707)746-8028,$2,485,163.20,10-SJ-4,99-16.0/19.4,18.5,INSTALL AUTOMATED WARNING SYSTEM
07-308604,2015-11-05,2015-10-12,2015-11-30,CROSSTOWN ELECTRICAL & DATA, INC.,(626)813-6693,$2,669,946.00,07-LA-10,710-Various,Upgrade ramp metering system.
11-076714,2015-11-05,2015-09-28,2015-12-14,HAL HAYS CONSTRUCTION INC.,(951)788-0703,$3,091,919.00,11-Imp-5708,Construct office and equipment building.
04-2G4424,2015-11-05,2015-10-12,2015-12-23,MIDSTATE BARRIER, INC.,(209)944-9565,$288,391.00,04-CC-80-5.2/9.7,Upgrade guardrail
02-4G8204,2015-11-05,2015-09-21,2015-12-18,J.F. SHEA CONSTRUCTION, INC.,(530)246-4292,$24,852,817.00,02-Sis-5-R10.7/R19.5,Cold plane, place HMA & RHMA, guardrail, OH signs, drainage, elect.
04-1SS034,2015-11-05,2015-09-28,2015-12-18,GHILOTTI CONSTRUCTION CO. INC.,(707)585-1221,$7,650,793.00,04-Ala-580-R4.9/R5.6,Construct Soldier Pile wall, and Reconstruction of Lanes & Soulders
04-1A6724,2015-11-05,2015-09-21,2015-12-14,CERTIFIED COATINGS COMPANY,(707)639-4414,$16,733,408.00,04-Ala-580-46.0/46.8,Clean and paint steel girder, install TOS, replace sign panels
04-172454,2015-11-05,2015-10-12,2015-12-16,JOHN SEMSEN LANDSCAPING COMPANY,(209)743-4911,$454,444.44,04-Ala-880-18.4 Spot Location,TRASH/DEBRIS REMOVAL; INVASIVE PLANT REMOVAL & PLANT NATIVE SPECIES
04-4H9004,2015-11-04,2015-09-28,2015-12-14,GRANITE ROCK COMPANY,(408)574-1400,$1,538,992.30,04-SF-280-R0.1, R1.5,Concrete Barrier, Retaining Wall, Shoulder and Sidewalk Widening
04-2G8504,2015-11-04,2015-09-28,2016-01-11,RGW CONSTRUCTION, INC.,(925)606-2400,$4,672,858.50,04-Ala-580-R4.0,Construct a 600 foot soldier pile and lagging wall with ground anchor
04-3G4864,2015-11-04,2015-06-29,2015-12-18,LIBERTY MAINTENANCE, INC. DBA OHIO LIBERTY MAINTENANCE, INC.,(330)755-7711,$53,786,915.00,04-SM-92-14.4/16.3,Clean and Paint Structural Steel on Bridge
02-4E8004,2015-11-04,2015-10-12,2016-02-24,HAT CREEK CONSTRUCTION & MATERIALS, INC.,(530)335-5501,$1,167,761.00,02-Sis-161-2.7/4.5,Full Depth Reclamation with Cement and Place Hot Mix Asphalt
01-0B3104,2015-11-04,2015-09-28,2016-01-04,FLATIRON WEST INC,(707)742-6000,$1,788,411.00,01-DN-199-8.7, 21.7,CONSTRUCT BUTTRESSES
11-413704,2015-11-04,2015-09-14,2015-12-15,COFFMAN SPECIALTIES, INC.,(858)536-3100,$47,875,000.00,11-Imp-8-R65.0/R74.5,Construct CRCP, HMA-A, guardrail, and rumble strips.
07-243204,2015-11-04,2015-10-05,2015-12-23,STATEWIDE TRAFFIC SAFETY & SIGNS INC.,(805)929-5070,$2,448,553.03,07-LA-5-39.4/R88.6,Replace overhead sign panels to Type XI retroreflective signs.
07-297204,2015-11-03,2015-10-12,2015-12-11,PTM GENERAL ENGINEERING SERVICES INC.,(951)710-1000,$3,199,199.00,07-LA-105, 710-R12.8/R14.2, R15.4/R16.4,INSTALL LIGHTING, MIDWEST GUARDRAIL SYSTEM, AND PAVEMENT DELINEATION
10-1E4204,2015-11-03,2015-10-12,2015-12-14,GEORGE REED, INC.,(209)523-0700,$2,518,956.50,10-SJ-12-11.0/15.0,Cold In-Place Recycle and HMA Resurfacing.
04-2G9504,2015-11-03,2015-10-12,2015-12-10,STEELHEAD CONSTRUCTORS, INC.,(530)226-6400,$1,061,377.00,04-Nap-128-29.7, LIGHT WEIGHT FILL OF EXPANDED POLYSTYRENE GEOFOAM BLOCKS
04-4G6404,2015-11-03,2015-09-21,2015-12-11,GHILOTTI CONSTRUCTION CO. INC.,(707)585-1221,$3,657,137.00,04-SM-84-21.6,Soldier Pile-Secant Wall, Surfacing Roadway & Electrical Work
04-4A3614,2015-11-03,2015-09-28,2015-12-18,FBD VANGUARD CONSTRUCTION,(925)245-1300,$2,101,582.00,04-SM-1, 82, 101, 280-Var,Replace Metal Beam Guardrail With Concrete Barrier
05-0T9804,2015-11-03,2015-09-21,2015-12-22,GRANITE CONSTRUCTION COMPANY,(831)763-6100,$5,141,683.95,05-SCr-17-8.3/9.4,Widen shoulders, concrete median barrier, soil nail wall and viaducts.
04-264094,2015-11-03,2014-12-08,2016-01-21,GHILOTTI BROS / RM HARRIS JV,(415)454-7011,$42,838,764.51,04-Mrn,Son-101-26.8/27.6, 0.0/2.0,Realign highway and construct new bridge
04-1J3204,2015-10-29,2015-09-21,2016-03-08,GORDON N. BALL, INC.,(925)838-5675,$1,429,690.00,04-Son-116-13.7,Replace retaining wall, drainage, and HMA resurfacing.
04-2J0804,2015-10-29,2015-09-21,2015-11-24,GRANITE ROCK COMPANY,(408)574-1400,$16,899,530.00,04-SM-280-R2.1/10.8,Replace PCC pavement, cold plane AC pavement, and place RHMA-G
04-2J1704,2015-10-29,2015-09-28,2015-12-01,CORAL CONSTRUCTION COMPANY,(503)682-2252,$4,315,290.00,04-SCl-17, 85, 87, 101, 280, 680, 880, 237-VARIOUS,Replace Overhead Sign Panels.
04-4A3624,2015-10-29,2015-09-28,2015-12-02,FBD VANGUARD CONSTRUCTION,(925)245-1300,$1,755,559.50,04-Nap,Sol-80,680-VAR,Replace MBGR with concrete barrier.
04-1A3404,2015-10-29,2015-09-21,2016-01-19,GRANITE ROCK COMPANY,(408)574-1400,$2,095,105.00,04-SCl-9-3.6, 11.4,Replace existing bridge railing.
03-0G0304,2015-10-29,2015-09-21,2016-02-10,VIKING CONSTRUCTION COMPANY, INC.,(916)852-5530,$2,587,589.90,03-ED,Pla-50, 80, 193-VAR,Resurface bridge decks, joint seals, concrete barrier and slabs.
07-255104,2015-10-29,2015-09-08,2016-01-08,POWELL CONSTRUCTORS, INC.,(909)356-8880,$4,924,190.80,07-LA-60-R23.8/R24.5,Construct westbound onramp and concrete pavement
10-0W3604,2015-10-29,2015-10-05,2015-12-14,MAY-HAN ELECTRIC INC., DBA M & M ELECTRIC,(916)929-0150,$342,535.00,10-Ama-49-3.6,Install traffic signals and intersection improvement.
01-378174,2015-10-29,2015-09-21,2015-12-18,WYLATTI RESOURCE MANAGEMENT, INC.,(707)983-8135,$1,453,897.78,01-Men-128-2.8/11.1,Rehabilitate Culverts
01-497714,2015-10-28,2015-09-21,2015-12-14,GRANITE CONSTRUCTION COMPANY,(707)467-4100,$779,789.00,01-Men-1-2.4,Permanent Restoration Slipout/Repair Drainage
03-0F3704,2015-10-28,2015-09-21,2015-12-02,BALDWIN CONTRACTING COMPANY, INC. DBA KNIFE RIVER CONSTRUCTION,(530)891-6555,$4,099,147.73,03-Gle-5-R24.8/R28.6,Lower roadway profile to improve vertical clearance.
04-3G7004,2015-10-28,2015-09-28,2015-12-14,GHILOTTI BROS., INC.,(415)454-7011,$1,992,117.50,04-Mrn,SF-101, 280-Var,Roadside Paving and Maintenance Vehicle Pullout.
04-1SS364,2015-10-27,2015-10-05,2015-12-04,DREAMBUILDER CONSTRUCTION CORP.,(714)646-3697,$667,661.00,04-Son-101-33.5,Repair slipout
04-2G4514,2015-10-27,2015-09-21,2015-11-24,DREAMBUILDER CONSTRUCTION CORP.,(714)646-3697,$2,930,337.18,04-CC-160, 242, 680-var,Reconstruct guardrailing and concrete anchor blocks
03-2F6304,2015-10-27,2015-09-28,2015-11-16,DESILVA GATES CONSTRUCTION LP,(925)829-9220,$958,858.00,03-Sac-5-32.2/32.7,CREATE A LONGER DECELERATION LANE
02-4E4404,2015-10-27,2015-09-21,2015-11-24,HAT CREEK CONSTRUCTION & MATERIALS, INC.,(530)335-5501,$18,595,000.00,02-Mod-139-R10.7/28.0,Full Depth Pavement Reclamation, HMA and Rubberized HMA.
02-0H2104,2015-10-27,2015-09-28,2016-02-05,CORAL CONSTRUCTION COMPANY,(503)682-2252,$1,959,002.00,02-Sha,Sis,Teh-3, 5, 44, 89, 273, 299-VAR,Install overhead sign panels and roadside signs.
07-288024,2015-10-27,2015-09-21,2016-01-05,POWELL CONSTRUCTORS, INC.,(909)356-8880,$1,914,395.50,07-LA-210-R10.5/R15.7,Construct storm water treatment BMP.
07-4T7604,2015-10-27,2015-10-05,2015-11-30,SECURITY PAVING COMPANY, INC.,(818)362-9200,$706,756.00,07-LA-60-R4.0/R8.6,Replace concrete pavement.
10-0P6704,2015-10-22,2015-09-14,2015-12-30,SCS FIELD SERVICES,(925)426-0080,$236,229.00,10-Tuo-5724,Clean up soil, groundwater, perform mechanical and electrical work.
07-308504,2015-10-22,2015-09-28,2016-01-05,SERVITEK SOLUTIONS INC,(626)227-1650,$2,172,624.38,07-Ven-23, 118-R4.8/R11.4, T19.0/R32.6,Upgrade ramp metering system.
04-2J1504,2015-10-22,2015-09-21,2016-01-28,CORAL CONSTRUCTION COMPANY,(503)682-2252,$2,523,200.00,04-CC-4, 80, 580, 680-Var,Replace overhead sign panels, remove walkways and lights.
05-1G2804,2015-10-22,2015-09-21,2015-11-13,PTM GENERAL ENGINEERING SERVICES INC.,(951)710-1000,$1,086,896.00,05-Mon,SLO,SB,SCr-VAR-VAR,Modify signals, install countdown and accessible pedestrian signals.
04-272054,2015-10-21,2015-09-14,2015-11-24,DESILVA GATES CONSTRUCTION LP,(925)829-9220,$1,575,575.00,04-SCl-280-7.5/11.5,RESURFACE AC PAVEMENT AT RAMPS AND UPGRADE ADA CURBRAMPS
04-2G5224,2015-10-21,2015-09-28,2015-12-04,DIRT AND AGGREGATE INTERCHANGE, INC.,(503)661-5093,$1,435,195.00,04-Ala-580 and 680-VAR,Upgrade Transition Railing and end Treatments.
04-2J1804,2015-10-21,2015-09-21,2016-01-12,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$1,416,990.00,04-Mrn,Nap,Son-12,29,37,101,580-VAR,Replace overhead sign panels, remove walkways and lights
10-1C2104,2015-10-21,2015-09-21,2015-11-18,ST. FRANCIS ELECTRIC,(510)639-0639,$2,977,726.85,04, 10-Ala, SJ-5, 205,580-Var,Install fiber optic and traffic management system elements.
11-413604,2015-10-21,2015-08-31,2015-11-18,COFFMAN SPECIALTIES, INC.,(858)536-3100,$50,555,000.00,11-Imp-8-R45.5/R55.0,Construct CRCP, HMA-A, guardrail, rumble strips and approach slabs
07-297804,2015-10-20,2015-09-28,2016-01-08,DREAMBUILDER CONSTRUCTION CORP.,(714)646-3697,$1,447,061.00,07-LA-138-2.1/36.7,INSTALL RUMBLE STRIPS
09-355304,2015-10-20,2015-09-21,2016-01-08,PAVE-TECH INC.,(760)727-8700,$10,311,168.06,09-Iny-127-0.0/21.0,Cold in-place recycling and HMA overlay.
04-2G4414,2015-10-20,2015-09-21,2015-12-11,MIDSTATE BARRIER, INC.,(209)944-9565,$1,287,530.00,04-CC-80, 580-Various,UPGRADE TRANSITION RAILING
05-1G1904,2015-10-15,2015-09-21,2015-11-10,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$1,195,580.00,05-Mon,SBt,SLO,SB,SCr-1,9,17,41, 46, etc-various,Remove and replace sign panels.
04-3G1104,2015-10-15,2015-09-21,2015-11-10,GHILOTTI CONSTRUCTION CO. INC.,(707)585-1221,$540,737.00,04-Son-116-39.8,Place rock slope protection.
07-1193U4,2015-10-15,2015-08-17,2015-11-16,GUY F. ATKINSON,(949)382-7172,$172,198,015.00,07-LA-10-37.2/42.4,Construct HOV lanes, widen bridges, and realign ramps.
03-3F6904,2015-10-15,2015-09-21,2015-11-04,FBD VANGUARD CONSTRUCTION,(925)245-1300,$1,417,167.50,03-Yol-50-0.4/0.6,Relocate existing Weigh In Motion station
12-0L0904,2015-10-15,2015-09-21,2015-11-06,AUTOBAHN CONSTRUCTION INC.,(714)769-7025,$3,095,479.00,12-Ora-57-11.0/22.5,PCC Conform Grinding, Grooving and Slab Replacement
08-0Q2004,2015-10-15,2015-08-31,2015-11-04,DREAMBUILDER CONSTRUCTION CORP.,(714)646-3697,$881,253.00,08-Riv-10, 15-Var,Replace Rock Slope Protection
09-356904,2015-10-15,2015-09-21,2016-01-04,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$2,124,870.00,09-Iny,Mno-6, 108, 136, 158, 168, 182, 395-var,Construct concrete barrier and midwest guardrail system.
12-0N1104,2015-10-14,2015-08-24,2016-01-05,USS CAL BUILDERS,(714)828-4882,$15,014,625.79,12-Ora-133-9.5,STABILIZE SLOPE EMBANKMENT AND ROADWAY AT ROUTE 133/5 SEPARATION.
09-364504,2015-10-14,2015-09-21,2015-12-18,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$843,706.20,09-Ker,Iny-14, 58, 395-various,Install changeable message sign.
10-0K3404,2015-10-14,2015-09-21,2015-11-18,TIM PAXINS PACIFIC EXCAVATION, INC,(916)686-2800,$2,332,739.00,10-Sta-5,99-Var,Install traffic monitoring systems (TMS) at various locations.
08-0R4604,2015-10-14,2015-08-31,2015-11-17,YAKAR,(909)599-1612,$994,929.00,08-Riv-91-10.8/12.9,Improve worker safety at roadside facilities; upgrading guardrail.
04-2J1604,2015-10-14,2015-09-21,2015-12-01,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$601,070.00,04-Sol-12, 37, 80, 113, 505, 680, 780-Var,Replace overhead sign panels, walkways and lights
03-3F6404,2015-10-14,2015-09-21,2015-11-10,MARTIN BROTHERS CONSTRUCTION,(916)381-0911,$1,346,115.00,03-Sac-99-6.9,High Speed Weigh In Motion Replacement
05-1C2404,2015-10-13,2015-09-21,2015-10-30,SOUZA CONSTRUCTION, INC.,(805)546-8288,$1,698,500.00,05-SLO-1-17.7/59.0,Repair shoulders and install rumble strip.
03-4F7104,2015-10-13,2015-09-21,2016-01-12,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$2,530,412.00,03-ED,Pla,Sac,Yol-5, 50, 51, 80, 99-VAR,Replace sign panels and upgrade sign structures.
05-1C0904,2015-10-13,2015-09-21,2015-10-30,CLEAN CUT LANDSCAPE,(559)322-2041,$2,180,636.60,05-Mon-68, 101-Var,Contrast surface treatments and slope paving.
04-2G8304,2015-10-13,2015-09-08,2015-11-20,GRANITE CONSTRUCTION COMPANY,(408)327-7013,$1,555,546.83,04-Ala-13-8.8,CONSTRUCT TWO EARTH-RETAINING STRUCTURES
09-360604,2015-10-13,2015-09-21,2015-10-27,HERBACK GENERAL ENGINEERING,(775)267-6800,$4,408,631.00,09-Mno-395-69.9/76.0,Cold plane asphalt concrete pavement and place hot mix asphalt.
10-1C2204,2015-10-13,2015-09-21,2015-11-17,ST. FRANCIS ELECTRIC, LLC,(510)639-0639,$2,764,979.50,10-Mer,SJ,Sta,Tuo-5,99,108,120,152,205-Varies,TMS element upgrades TMS, RWIS and FO
02-4E6904,2015-10-13,2015-09-21,2016-01-08,CAL ELECTRO, INC.,(530)223-5937,$1,890,029.00,02-Las,Sac-395, 5-49.6, 23.3,Upgrade water and wastewater systems and establish mitigation planting
07-3X7114,2015-10-08,2015-08-17,2015-11-16,POWELL CONSTRUCTORS, INC.,(909)356-8880,$6,255,779.65,07-LA-60-R7.4/R8.1,Realign ramps, widen bridge, and replace ramps pavement.
08-0K2924,2015-10-07,2015-08-03,2015-10-30,J. MCLOUGHLIN ENGINEERING CO., INC.,(909)944-1037,$25,855,928.00,08-SBd-10-32.9/R37.4,Replace existing (PCCP) with (RSCP).
04-2G5014,2015-10-07,2015-08-10,2015-11-03,MIDSTATE BARRIER, INC.,(209)944-9565,$4,155,900.00,04-Ala-24, 80,84, 92, 880, 980-Var,Upgrade Existing Transition Railings
10-1E4104,2015-10-01,2015-09-08,2015-11-20,GEORGE REED INC,(209)523-0730,$1,989,120.00,10-Tuo-108-R21.0/27.0,37.8/45.5,Cold plane and resurface with HMA.
03-0G1004,2015-09-30,2015-09-08,2015-10-20,VINTAGE PAVING COMPANY, INC,(530)795-0132,$1,083,125.40,03-Sie-89-19.9/29.6,Replace AC Surfacing
04-2G5404,2015-09-29,2015-08-31,2016-01-06,OGRADY PAVING INC.,(650)966-1926,$4,769,298.60,04-SCl-82-14.8/18.1,Reconstruct traffic signals, drainage systems, sidewalks, and curbs.
11-408004,2015-09-29,2015-08-31,2015-11-24,PAL GENERAL ENGINEERING INC,(858)638-7100,$1,276,646.00,11-SD-79-0.0/29.6,Upgrade bridge rail and guardrail, and slope repair.
11-002714,2015-09-24,2015-08-24,2015-10-26,CLEAN CUT LANDSCAPE,(559)322-2041,$798,801.00,11-SD-5-R20.3/R21.4,Irrigation, planting and erosion control work.
07-316604,2015-09-24,2015-08-31,2015-10-02,NORDIC INDUSTRIES, INC.,(530)742-7124,$8,234,261.00,07-LA-1-41.8/42.1,Reconstruct rock slope protection.
04-264H34,2015-09-24,2015-08-03,2015-11-04,GHILOTTI BROS/RM HARRIS JV,(925)335-3000,$2,706,563.15,04-Mrn-101-18.9/25.8,CONSTRUCT SOUND WALLS AND HIGHWAY PLANTING
04-4H8304,2015-09-23,2015-08-24,2015-10-15,WESTERN STRUCTURES,(951)352-4300,$2,962,034.82,04-Ala-24, 580, 680, 880 & 980-Var,Bridge repair work
08-0M2804,2015-09-23,2015-08-03,2015-11-04,M.C.M. CONSTRUCTION, INC.,(916)334-1221,$10,600,000.00,08-SBd-15-171.8/ 173.8,Bridge replacement and widen, conc and HMA pvmt, cold plane AC pvmt.
06-0Q0204,2015-09-22,2015-08-31,2015-10-20,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$518,518.00,06-Fre,Mad-41,99,168,180-Var,Treat bridge deck and replace joint seals.
04-1SS354,2015-09-22,2015-08-31,2015-10-12,REGE CONSTRUCTION, INC.,(707)894-5143,$387,792.00,04-Son-101-11.6,Regrade Slope
04-0J9404,2015-09-22,2015-08-31,2015-12-23,MCGUIRE AND HESTER,(510)632-7676,$553,850.00,04-Ala-5706,Construct vehicle rinse station.
10-0V2904,2015-09-17,2015-08-03,2015-10-26,GEORGE REED, INC.,(209)523-0737,$904,211.00,10-Cal-26-8.8/9.1,Widen roadway with RHMA-G overlay, install culverts and MGS.
07-293404,2015-09-17,2015-08-17,2015-12-07,WEST COAST PUBLIC WORKS, INC.,(818)256-9401,$3,010,497.40,07-LA-5-25.2/25.9,Construct median concrete barrier.
12-0N5404,2015-09-16,2015-08-03,2015-10-14,ORTIZ ENTERPRISES, INC.,(949)753-1414,$9,391,173.32,12-Ora-405-8.4,Remove and repair damaged roadway, slope embankment
04-3G1704,2015-09-16,2015-08-17,2015-10-12,PACIFIC INFRASTRUCTURE CONSTRUCTION, LLC,(707)449-3604,$875,125.00,04-SF-101-3.4,CONSTRUCT SOLDIER PILE RETAINING WALL AND RECONSTRUCT SLOPE
04-1SS414,2015-09-15,2015-07-27,2015-10-26,GORDON N. BALL, INC.,(925)838-5675,$1,871,121.00,04-Ala-13-4.9,Construct soldier pile retaining wall and reconstruct shoulder.
04-3G4574,2015-09-15,2015-08-17,2015-10-21,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$4,756,936.70,04-CC,Mrn,SF-580, 80-6.1/7.8, 0.0/2.6; 5.7/7.7,REPLACE JOINT SEALS, CONSTRUCT APPROACH SLAB, REPAIR DECK DRAINS
11-299204,2015-09-15,2015-08-03,2015-10-13,FUTURE DB INTERNATIONAL INC.,(949)390-2110,$2,491,341.48,11-SD-94, 805-Var,Seismic retrofit 4 bridges on Routes 94 and 805.
05-1F69U4,2015-09-10,2015-07-20,2015-10-12,GRANITE ROCK COMPANY,(408)574-1400,$22,809,871.00,05-Mon-101-55.2/73.8,Replace failed pavement with concrete or HMA and overlay with RHMA.
04-286804,2015-09-10,2015-08-17,2015-10-13,FBD VANGUARD CONSTRUCTION,(925)245-1300,$1,823,141.70,04-CC-04 & 29-R11.0;04-29-R9.1,Install High Speed Weigh In Motion System
02-4F7104,2015-09-10,2015-08-03,2015-09-29,TULLIS, INC.,(530)241-5105,$890,875.00,02-Teh-5-R24.4/R25.2,R26.3/R26.8,Cold plane and pave ramps.
04-4G4704,2015-09-10,2015-08-03,2015-10-12,VIKING CONSTRUCTION COMPANY, INC.,(916)852-5500,$1,838,798.00,04-Mrn-580-3.3/4.5,Replace existing bridge railing with conc barrier Mod Type 736 and 80.
06-360234,2015-09-09,2015-07-20,2015-10-15,A. TEICHERT & SON INC. DBA TEICHERT CONSTRUCTION,(559)813-3025,$15,423,000.00,06-Tul-99-35.2/R37.3,Widen highway from 4-lanes to 6-lane.
07-4Y7004,2015-09-09,2015-08-10,2015-10-12,MURPHY INDUSTRIAL COATINGS, INC.,(562)427-7720,$5,696,175.00,07-LA-405-8.8,Clean and paint steel girders.
07-292204,2015-09-09,2015-08-03,2015-10-02,DREAMBUILDER CONSTRUCTION CORP.,(714)646-3697,$1,746,640.00,07-LA-2, 134-Various,Place midwest guardrail system, stamped concrete, and pavement.
11-2T1904,2015-09-03,2015-07-13,2015-12-15,COFFMAN SPECIALTIES, INC.,(858)536-3100,$9,285,000.00,11-SD-15-M5.6/R6.0,Construct bike facility w/HMA-A, walls, barriers, lights & OH sign.
03-0G0504,2015-09-03,2015-07-27,2015-09-25,AMERICAN CIVIL CONSTRUCTORS WEST COAST, INC.,(707)746-8028,$2,183,099.60,03-Yol-5, 113-Var,Overlay 15 bridge decks with polyester and methacrylate
05-1E0604,2015-09-02,2015-08-10,2015-10-30,GRANITE CONSTRUCTION COMPANY,(408)327-7013,$4,848,536.08,05-Mon-101-47.7/53.9,Construction Median Barrier, Widen Shoulder and Rumble Strips
11-415404,2015-09-02,2015-07-27,2015-09-30,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$1,474,563.00,11-SD-8-16.0/R30.5,Replace bridge end treatments, signs and striping, lighting and loops.
01-0B3004,2015-09-02,2015-07-27,2015-10-02,J. F. SHEA CONSTRUCTION, INC.,(530)246-4292,$3,387,881.60,01-DN-101-21.9,STABILIZE ROADWAY
03-2F3304,2015-09-01,2015-07-20,2015-09-29,BALDWIN CONTRACTING COMPANY, INC. DBA KNIFE RIVER CONSTRUCT ION,(530)891-6555,$9,876,093.90,03-But-99-30.1/T37.5,RHMA-O (OGFC) and HMA-A Overlay
12-0E31A4,2015-09-01,2015-08-03,2015-09-22,STL LANDSCAPE, INC.,(323)581-8200,$818,022.00,12-Ora-5,74-9.3/10.0 , 0.0/0.2,Install permanent erosion control with irrigation systems, planting.
08-3555V4,2015-08-27,2015-06-15,2015-11-05,AMES CONSTRUCTION, INC.,(951)356-1275,$70,455,276.90,08-SBd-15-42.5/46.0,Widen I-15, Reconstruct 3 ICS, Construct 2 new BR and widen 3 BR.
04-1SS484,2015-08-27,2015-08-03,2015-09-29,GRANITE ROCK COMPANY,(408)574-1400,$159,240.00,04-SCl-87-4.9,Place permeable material blanket and replace pavement slab.
06-0R1504,2015-08-27,2015-07-20,2015-09-30,PAVE-TECH INC.,(760)727-8700,$13,438,235.91,06-Ker-58-R88.5/R99.8,Cold plane existing pavement and resurface with new RHMA.
04-1J1904,2015-08-26,2015-07-27,2015-09-28,GRANITE CONSTRUCTION COMPANY,(408)327-7013,$4,096,327.58,04-Ala-13-4.3/R9.6,Cold plane asphalt concrete pavement and overlay with RHMA-G.
01-0B3604,2015-08-26,2015-07-20,2015-10-07,MERCER FRASER COMPANY,(707)443-6371,$1,066,950.00,01-Hum-36-35.9,RECONSTRUCT ROADWAY AND DRAINAGE
08-0R2204,2015-08-26,2015-08-03,2015-09-24,ALCORN FENCE COMPANY,(323)875-1342,$4,207,164.00,08-SBd-18-T8.3/R17.7,Install median double thrie beam barrier.
07-292104,2015-08-25,2015-07-20,2015-09-29,MARTINEZ LANDSCAPE CO., INC.,(818)364-9188,$1,243,755.00,07-LA-101,134,170-11.4/11.8, 0.0/0.5, R14.5/R14.8,Construct stamped concrete and enhance roadside area safety.
04-2G5214,2015-08-25,2015-07-06,2015-09-30,DIRT AND AGGREGATE INTERCHANGE, INC.,(503)661-5093,$3,496,222.00,04-Ala-580 & 680-I-580 ( PM 19.4/46.0) & I-680 (PM 3.3/21.7),UPGRADE TRANSITION RAILING AT VARIOUS LOCATIONS
04-1SS374,2015-08-25,2015-07-27,2016-01-25,GRANITE CONSTRUCTION COMPANY,(707)467-4100,$568,528.50,04-Son-121-10.2,CONSTRUCT SHOULDERS AND STEEL SOLDIER PILES WITH PILE CAP
01-487404,2015-08-25,2015-07-27,2015-09-23,MERCER FRASER COMPANY,(707)443-6371,$5,825,925.00,01-Hum-299-R29.2/38.6,RHMA overlay with guardrail reconstruction.
09-361404,2015-08-19,2015-07-20,2015-09-16,PAVE-TECH INC.,(760)727-8700,$2,691,000.43,09-Iny-395-R0.0/R8.6,Rubberized HMA thin blanket overlay.
04-1J1704,2015-08-19,2015-07-27,2015-09-16,O.C. JONES & SONS, INC.,(510)526-3424,$2,032,131.00,04-Son-1-0.0/7.1,Cold plane asphalt concrete pavement and place RHMA.
03-4F0404,2015-08-18,2015-07-20,2015-09-10,DESILVA GATES CONSTRUCTION LP,(925)829-9220,$3,388,488.00,03-Pla,Yub-65-R23.8/R24.3, 0.0/0.6, 1.7/R4.8,HMA overlay
10-1C0904,2015-08-18,2015-07-20,2015-10-09,GOLDEN STATE BRIDGE, INC.,(925)372-8000,$5,298,628.60,10-SJ-4-R16.6/R17.4,Repair bridge.
09-350604,2015-08-18,2015-07-20,2015-09-18,SPIESS CONSTRUCTION CO., INC.,(805)937-5859,$910,712.00,09-Iny-168-16.8/17.5,Construct curb, gutter and sidewalks.
11-410604,2015-08-13,2015-07-13,2015-09-22,WESTERN RIM CONSTRUCTORS, INC.,(760)489-4328,$1,359,008.29,11-Imp,SD-5,54,75,78,115,163-Var,InstalL CURB RAMPS & SIDEWALKS. Install & MODIFY SIGNAL, LIGHTING.
01-0E2304,2015-08-13,2015-07-20,2015-11-16,STEWART ENGINEERING INC,(530)244-8464,$1,787,954.50,01-Hum-101-R48.7,REHABILITATE BRIDGE DECK
05-1A8704,2015-08-13,2015-07-06,2015-09-08,GRANITE CONSTRUCTION COMPANY,(831)763-6100,$1,083,868.00,05-SCr-1, 17-17.0, 0.0,Widen shoulder, cold plane pavement and overlay with HMA.
06-0M0504,2015-08-13,2015-06-22,2015-09-11,LEES PAVING, INC.,(559)651-1337,$2,325,366.55,06-Fre-168-T29.0/T29.4,Realign 2-Lane Roadway
03-4E8604,2015-08-13,2015-06-29,2015-09-08,A. TEICHERT & SON, INC DBA TEICHERT CONSTRUCTION,(916)645-4800,$5,337,812.00,03-Pla-193-4.4/5.5,CURVE IMPROVEMENT
04-1J5904,2015-08-13,2015-07-20,2015-10-20,GRANITE ROCK COMPANY,(408)574-1400,$603,287.20,04-SM-1-32.0/32.2,ROCK SLOPE PROTECTION, PAVED TRAIL AND STAIRCASE
03-0H1504,2015-08-12,2015-07-20,2015-09-03,MIDSTATE BARRIER, INC.,(209)944-9565,$854,980.00,03-Sac,Sut-99-35.2/36.9, 0.0/1.7,Install thrie beam median barrier
04-3G6804,2015-08-12,2015-07-13,2015-09-16,GRANITE ROCK COMPANY,(408)574-1400,$741,472.90,04-SM-101,280,380-Var, Construct Roadside Pavement, MVPs, and Install Access Gates.
11-407604,2015-08-12,2015-07-06,2015-09-16,PETERSON CHASE GENERAL ENGINEERING CONSTRUCTION INC,(949)252-0441,$2,273,062.40,11-SD-5,8,52-Var,Upgrade rail and install concrete barrier
10-0Y9804,2015-08-12,2015-07-20,2015-09-08,CHRISP COMPANY,(209)948-2175,$655,902.00,10-Cal-49-var,Construct rumble strips.
01-0B03U4,2015-08-12,2015-06-29,2015-10-13,R. BROWN CONSTRUCTION COMPANY, INC.,(530)629-3702,$5,342,383.25,01-Hum-96-8.3/8.9,SOLDIER PILE WALL WITH GROUND ANCHORS, HMA, GABION WALL AND DRAINAGE
05-1C1304,2015-08-11,2015-07-20,2015-08-25,SOUZA CONSTRUCTION INC,(805)546-8288,$350,525.00,05-SLO-1-R12.6,CONSTRUCT SIDEWALK AND INSTALL CONCRETE BARRIER WITH CRASH CUSHIONS
04-2G8604,2015-08-11,2015-07-13,2015-08-31,GORDON N. BALL, INC.,(925)838-5675,$1,649,952.00,04-Ala-580-R33.4,Construct retaining wall, planting, and modify lighting.
12-0N1404,2015-08-11,2015-07-06,2015-09-08,ALL AMERICAN ASPHALT,(951)736-7600,$975,342.40,12-Ora-57-20.7/21.2,SHOULDER WIDENING, MODIFY CURBS, GUTTER, AND DRAINAGE
10-0S7204,2015-08-11,2015-07-13,2015-09-11,GEORGE REED, INC.,(209)523-0734,$2,611,277.50,10-Ama-49-4.0/7.0,Cold plane asphalt concrete pavement and hot mix asphalt resurfacing.
07-2W7604,2015-08-05,2015-07-13,2015-08-31,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$960,034.76,07-LA-5, 118, 210-Var,Treat bridge deck with methacrylate and replace joint seals.
01-463924,2015-08-05,2015-06-22,2015-08-25,APEX FENCE COMPANY INC,(530)365-3316,$4,097,371.50,01-Hum-VAR-VAR,Reconstruct guard railing.
03-2F6004,2015-08-05,2015-06-22,2015-09-04,ROBERT J. FRANK CONSTRUCTION,(530)222-1408,$857,316.00,03-ED-49-15.0,Roadway excavation, curbs, HMA paving & signal and lighting.
10-0Y6504,2015-08-04,2015-07-13,2015-08-26,CENTRAL STRIPING SERVICE, INC.,(916)635-5175,$650,070.07,10-Cal,SJ-12,26-Var,Construct rumble strips.
12-0N3404,2015-08-04,2015-07-06,2015-10-06,WESTERN STRUCTURES,(951)352-4300,$2,266,581.76,12-Ora-22, 55, 57-Various,METHACRYLATE TREATMENT, JOINT SEAL REPAIR, AND POLYESTER CONC OVERLAY
04-4A4804,2015-07-30,2015-06-22,2015-10-20,GORDON N. BALL, INC.,(925)838-5675,$9,552,755.00,04-Ala-260-R0.8/R2.0,Replace Guardrail, restore Portal Building, Install CCTV
02-4E8904,2015-07-30,2015-06-22,2015-08-20,J. F. SHEA CONSTRUCTION, INC.,(530)246-4292,$1,983,967.00,02-Sha-299-47.5/48.1,Earthwork, HMA, concrete box culvert and weirs, and drainage.
01-0B3404,2015-07-29,2015-06-22,2015-08-20,MERCER FRASER COMPANY,(707)443-6371,$1,489,626.00,01-Hum-36-22.8/27.7,RECONSTRUCT ROADWAY & DRAINAGE
09-351204,2015-07-29,2015-06-22,2015-09-09,CUTTING EDGE CONCRETE SERVICES,(760)955-2888,$1,715,686.16,09-Iny-395-R20.3/R22.3,Widen shoulders, install culverts and widen bridge.
06-424714,2015-07-29,2015-06-22,2015-09-01,GRANITE CONSTRUCTION COMPANY,(661)399-3361,$5,525,494.70,06-Ker-119-R10.0/R13.3,Construct truck climbing lanes and widen shoulders.
06-0N9604,2015-07-28,2015-06-22,2015-09-24,AMERICAN CIVIL CONSTRUCTORS WEST COAST, INC.,(707)746-8028,$6,945,265.44,06-Ker-204-5.4/6.7,Clean and paint existing bridge structural steel and place HMA overlay
01-0A3204,2015-07-28,2015-06-22,2015-08-19,R. BROWN CONSTRUCTION COMPANY, INC.,(530)629-3702,$1,858,087.50,01-Hum-299-30.2/30.6,Widen roadway, construct HMA overlay, drainage and guardrail
07-293804,2015-07-28,2015-06-22,2015-09-08,CROSSTOWN ELECTRICAL & DATA, INC.,(626)813-6693,$2,165,436.16,07-LA-110-8.6/14.0,Modify communication system.
11-409304,2015-07-23,2015-05-26,2015-09-01,ABHE & SVOBODA, INC.,(952)447-6025,$17,433,710.00,11-SD-75-R21.0/R21.6,Clean and paint the Coronado bridge and build traveler systems.
06-0S2704,2015-07-23,2015-06-22,2015-08-18,GRANITE CONSTRUCTION COMPANY,(661)399-3361,$4,903,682.00,06-Ker-395-0.0/R23.4,Resurface existing pavement with RHMA (gap graded).
05-1A7604,2015-07-23,2015-06-22,2015-08-12,GRANITE CONSTRUCTION COMPANY,(831)763-5578,$7,122,069.98,05-Mon-1-R77.6/R85.3,Grind PCC traveled lanes, cold plane and pave AC shoulders and ramps.
06-0S9304,2015-07-22,2015-06-29,2015-08-18,PELAGIC ENGINEERING,(805)984-3421,$235,905.00,06-Fre,Ker,Mad,Tul-58, 63, 65, 137, 145, etc-Var,Modify Signals
10-0Y90U4,2015-07-22,2015-06-15,2015-12-04,BAY CITIES PAVING & GRADING, INC.,(925)687-6666,$4,966,899.95,10-SJ-99-18.4/23.0,Place JPCP (RSC), cold plane AC pavement, and install ramp metering.
01-0E2604,2015-07-22,2015-06-29,2015-08-19,MERCER FRASER COMPANY,(707)443-6371,$3,267,122.50,01-DN-101-20.4/23.6,Cold Plane AC, place HMA Type A, place High Friction Surface Treatment
01-4939U4,2015-07-21,2015-06-29,2015-08-20,GRANITE CONSTRUCTION COMPANY,(707)467-4100,$1,165,212.50,01-Men-20, 162-7.14/29.18, 5.28/22.45,Construct Turnouts
01-0B5704,2015-07-21,2015-06-22,2015-08-13,MENDOCINO CONSTRUCTION SERVICES, INC.,(707)459-2377,$2,477,668.00,01-Men-253-6.9,Construct Soldier Pile Wall
04-3G7104,2015-07-21,2015-06-29,2015-08-24,PACIFIC INFRASTRUCTURE CONSTRUCTION, LLC,(707)449-3604,$964,468.00,04-Ala-238, 580, 680, 880-Various,Construct Roadside Paving and Maintenance Vehicle Pullout
06-0S2804,2015-07-21,2015-06-22,2015-08-17,PAVE-TECH INC.,(760)727-8700,$3,783,110.70,06-Ker-58-R136.0/R143.8,Cold plane AC Pavement and resurface with RHMA (Gap Graded).
05-0R5104,2015-07-21,2015-06-22,2015-08-26,PACIFIC INFRASTRUCTURE CONSTRUCTION, LLC,(707)449-3604,$1,092,510.00,05-Mon,SCr-1, 9, 68, 218-Various,Construct curb ramps, sidewalks, and modify signal and lightings.
06-0S7504,2015-07-16,2015-06-22,2015-08-05,STATEWIDE TRAFFIC SAFETY & SIGNS INC.,(805)929-5070,$1,333,322.80,06-Ker-5, 58, 99, 178-var,Remove and replace sign panels.
10-0Y6804,2015-07-16,2015-06-22,2015-08-05,CHRISP COMPANY,(510)656-2840,$130,585.00,10-SJ-88-15.4/19.4,Construct rumble strips.
02-3E8004,2015-07-15,2015-06-22,2015-08-31,STIMPEL-WIEBELHAUS ASSOCIATES INC.,(530)223-6605,$756,713.00,02-Sha-273-15.0/15.8,Construct and Modify ADA Curb Ramps
02-0H2904,2015-07-15,2015-06-22,2015-08-13,CENTRAL STRIPING SERVICE, INC.,(916)635-5175,$556,330.00,02-Sha,Sis-89, 97-VAR,Ground-in Rumble Strips, Striping and Markers
07-2W6804,2015-07-14,2015-06-22,2015-08-03,TRUESDELL CORP. OF WI, INC. DBA TRUESDELL CORP. MIDWEST,(602)437-1711,$488,488.00,07-LA-5,110,134-Var,Treat bridge deck with methacrylate and replace joint seals.
06-0S7404,2015-07-14,2015-06-22,2015-08-17,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$1,525,426.00,06-Fre,Kin,Tul-5, 41, 168, 180, 198-Varies,Remove and replace sign panels.
06-0N1804,2015-07-02,2015-06-08,2015-07-29,SECURITY PAVING COMPANY, INC.,(818)362-9200,$2,056,277.00,06-Kin-198-R8.8/R10.6,Construct concrete barrier and install new drainage system.
06-0G9004,2015-07-02,2015-05-26,2015-10-08,A. TEICHERT & SON INC. DBA TEICHERT CONSTRUCTION,(559)813-3025,$9,968,937.40,06-Mad-41-11.7/13.4,Construct passing lanes.
05-0T5404,2015-07-01,2015-05-26,2015-07-21,GRANITE ROCK COMPANY,(408)574-1400,$4,535,533.00,05-SCr-129-9.5/10.0,Realign roadway and place HMA over aggregate base.
04-4S2204,2015-07-01,2015-05-26,2015-08-05,GHILOTTI CONSTRUCTION CO. INC.,(707)585-1221,$1,704,874.00,04-Mrn-1-11.0,Construct retaining wall, road, drainage, and landscape.
03-1A8434,2015-06-30,2015-05-11,2015-09-09,DON GARCIA EXCAVATING & PAVING, INC.,(530)577-0558,$7,980,629.00,03-ED-89-13.8/18,Cold plan AC pavement, Hot Mix Asphalt Concrete and Culvert
07-276004,2015-06-30,2015-05-26,2015-09-01,GRANITE CONSTRUCTION COMPANY - PALMDALE OFFICE,(661)726-4447,$1,776,260.40,07-Ven-101-14.1/21.1,Build treatment BMP and MVP.
06-462214,2015-06-25,2015-05-18,2015-07-28,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$3,047,590.00,06-Kin-198-R15.4/R16.0,Replace bridge deck
04-297624,2015-06-25,2015-05-04,2015-09-30,DESILVA GATES CONSTRUCTION,(925)829-9220,$34,721,242.16,04-Ala-84-22.9/25.7,Widen existing roadway, construct retaining walls, signal and lighting
04-2641A4,2015-06-25,2015-06-01,2015-07-31,BORTOLUSSI & WATKIN, INC.,(415)453-4675,$553,044.00,04-Nap,Sol-12-0.0/3.3, 0.0/R2.6,Highway planting, irrigation, and Plant Establishment.
06-0J5304,2015-06-24,2015-05-11,2015-09-23,LEES PAVING, INC.,(559)651-1300,$2,868,657.30,06-Tul-190-20.9/21.2,Intersection improvement
02-0E3604,2015-06-24,2015-05-26,2015-07-28,RANDY HILL CONSTRUCTION, INC,(530)892-1918,$5,431,708.18,02-Teh-5-10.5,Reconstruct and rehabilitate buildings and landscape and parking lot.
11-2M7804,2015-06-24,2015-05-26,2015-07-22,GRANITE CONSTRUCTION COMPANY,(760)444-1028,$4,606,605.00,11-Imp-8-R28.0/R40.9,Cold Plane AC, pave with HMA, place asphalt rubber binder seal coat.
07-2W7404,2015-06-24,2015-05-26,2015-08-31,J. MCLOUGHLIN ENGINEERING CO., INC.,(909)944-1037,$959,784.58,07-LA-110-VARIOUS,Treat bridge deck with methacrylate and replace joint seals.
11-282304,2015-06-23,2015-05-18,2015-07-21,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$822,710.25,11-SD-5-31.7,GRADE SLOPE, APPLY EROSION CONTROL MATERIALS, RESTORE IRRIGATION.
06-0M2604,2015-06-23,2015-05-18,2015-07-21,GRANITE CONSTRUCTION COMPANY,(661)399-3361,$1,813,686.80,06-Ker-58-R99.2/R99.8,Replace eastbound Sand Canyon Road bridge and resurface the ramps.
04-1G8304,2015-06-18,2015-05-18,2015-07-28,CORAL CONSTRUCTION COMPANY,(503)682-2252,$3,120,263.00,04-SM-280-R0.3/M27.1,UPGRADE TO STANDARD THE EXISTING METAL BEAM GUARD RAIL CONNECTIONS.
11-2M7404,2015-06-18,2015-05-18,2015-07-21,MANHOLE ADJUSTING INC,(323)558-8000,$3,074,091.00,11-Imp-111-23.9/40.5,Place asphalt rubber binder seal coat, construct rumble strips.
07-2W7304,2015-06-18,2015-05-26,2015-07-29,AUTOBAHN CONSTRUCTION INC.,(714)769-7025,$918,186.22,07-LA-110-VARIOUS,Treat bridge deck with methacrylate and replace joint seals.
10-3A7504,2015-06-18,2015-05-18,2015-07-17,A. TEICHERT & SON INC. DBA TEICHERT CONSTRUCTION,(209)983-2300,$4,276,000.00,10-SJ-4-0.0/4.3, 4.4/5.4, 6.9/8.3,Repair failed areas and resurface with rubberized HMA.
07-2W7004,2015-06-17,2015-05-26,2015-07-10,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$986,198.65,07-LA-1,10,405-VARIOUS,Treat bridge deck with methacrylate and replace joint seals.
10-1C0004,2015-06-17,2015-05-04,2015-07-20,HIGHWAY SPECIALTY CO. INC.,(530)949-5681,$698,676.70,10-Mer,SJ,Sta-4, 5, 59, 99, 108, 120, 152-Various,Replace sign panels.
10-0X3904,2015-06-17,2015-05-11,2015-07-17,GEORGE REED, INC.,(209)523-0734,$4,162,898.00,10-Cal-4-R0.0/R21.1,Repair failed areas and rubberized HMA resurfacing.
04-1G8504,2015-06-17,2015-05-18,2015-07-13,DREAMBUILDER CONSTRUCTION CORP,(714)646-3697,$901,061.00,04-SM,Sol-92/780-varies,Install Midwest Guardrail System.
01-0A5204,2015-06-17,2015-05-11,2015-07-10,R. BROWN CONSTRUCTION COMPANY, INC.,(530)629-3702,$2,558,796.25,01-Hum-299-R21.1/R21.5,Widen roadway with HMA and AB, construct MSE and MGS
01-0B4004,2015-06-16,2015-05-11,2015-07-10,MERCER FRASER COMPANY,(707)443-6371,$1,545,385.00,01-Hum-101-R15.0 , 29.4,Reconstruct Structural Section, Horizontal Drains, Paving, Guardrail
10-0X6104,2015-06-16,2015-05-11,2015-07-20,GOLDEN STATE BRIDGE, INC.,(925)372-8000,$1,860,888.20,10-Mer-5-21.4,Rehabilitate bridge deck and replace bridge rails.
04-2G4104,2015-06-16,2015-05-26,2015-07-15,FBD VANGUARD CONSTRUCTION,(925)245-1300,$656,090.00,04-Ala-680-R20.0/R20.3,REPLACE METAL GUARDRAIL WITH CONCRETE BARRIER
07-2W7504,2015-06-11,2015-05-18,2015-06-30,J. FRANCIS COMPANY,(951)776-9100,$666,955.00,07-LA-405, 710-1.6/15.8, 7.8/10.9,Treat bridge deck surface and replace bridge joint seals.
11-288814,2015-06-11,2015-03-30,2015-07-31,FLATIRON WEST, INC.,(760)916-9100,$11,952,886.00,11-SD-11, 125, 905-Var,Construct freeway to freeway connectors.
10-0W5904,2015-06-10,2015-05-11,2015-06-25,CHESTER BROSS CONSTRUCTION COMPANY,(573)221-5958,$5,464,350.00,10-Ama-88-R54.7/R60.8,Cold plane AC pavement, replace AC surfacing, and place SAMI-R.
01-0A6904,2015-06-10,2015-05-18,2015-07-06,APEX FENCE COMPANY INC,(530)365-3316,$682,400.00,01-Lak-20-1.1/3.9,Install Metal Beam Guard Rail
10-0Q2204,2015-06-09,2015-05-11,2015-07-17,GEORGE REED INC.,(209)523-0734,$6,577,707.00,10-Ama-88-46.9/R54.7,Repair failed areas, hot mix asphalt resurfacing, and place SAMI-R.
02-4F6104,2015-06-09,2015-05-04,2015-07-06,J. F. SHEA CONSTRUCTION, INC.,(530)246-4292,$3,949,218.90,02-Sha,Sis-5-VAR,Polyester concrete overlay on bridges and reconstruct AC approaches
05-0S2504,2015-06-04,2015-05-04,2015-06-17,A. M. CONCRETE, INC.,(818)362-8300,$1,944,815.00,05-SB-101-13.2/27.1,Place contrasting surface treatment at gore tips.
06-0E3404,2015-06-04,2015-05-04,2015-08-12,STL LANDSCAPE, INC.,(323)581-8200,$680,000.00,06-Ker-99-21.7/24.7,Construct maintenance vehicle pullouts and gore area textured paving.
10-0X4204,2015-06-04,2015-05-11,2015-06-25,GEORGE REED, INC.,(209)523-0734,$1,070,474.50,10-Tuo-49 -R8.8/12.8,Repair failed areas and HMA resurfacing.
12-0H8904,2015-06-03,2015-05-11,2015-07-10,HIGHLAND CONSTRUCTION, INC.,(714)538-5156,$1,016,072.50,12-Ora-55, 5-9.6/12.0, 29.6/31.1,ROADSIDE SAFETY IMPROVEMENT
10-0K1404,2015-06-03,2015-05-04,2015-07-28,A. TEICHERT & SON, INC. DBA TEICHERT CONSTRUCTION,(530)406-4200,$3,186,280.00,10-Sta-120-0.0/4.1,Cold plane, repair failed areas, HMA resurfacing, and curb ramps.
02-4E8124,2015-06-03,2015-05-11,2015-06-30,TULLIS, INC.,(530)241-5105,$2,857,646.00,02-But,Las,Plu,Sha-5, 36, 70,299-VAR,Widen, pave and lighting at chain control locations
06-0Q8804,2015-06-03,2015-05-11,2015-06-23,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$583,583.00,06-Fre,Ker,Kin,Mad,Tul-5, 33, 41, 99-varies,Treat bridge decks, replace seal, joints and paint.
03-3F1704,2015-06-03,2015-05-04,2015-07-16,MARTIN BROTHERS CONSTRUCTION,(916)381-0911,$2,630,850.00,03-Sac-5, 50, 51, 99-VAR,VEGETATION CONTROL AND PAVE GORE AREAS
04-4G6304,2015-06-03,2015-05-11,2015-07-20,TKO GENERAL ENGINEERING AND CONSTRUCTION INC,(650)465-8697,$283,549.44,04-SM-280-R25.5,Repair Side Slope and Construct Rock Slope Protection and Drainage
04-4G5914,2015-06-02,2015-05-04,2015-06-24,RGW CONSTRUCTION, INC.,(925)606-2400,$774,752.00,04-SM-280-9.4,Repair pipe system and back fill sinkhole.
03-3F0804,2015-06-02,2015-05-04,2015-06-23,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$4,994,672.00,03-Sac-51-0.2/1.1,Rehabilitate and Resurface Bridge Deck
12-0N1304,2015-06-02,2015-05-11,2015-06-30,HIGH LIGHT ELECTRIC, INC.,(951)352-9646,$337,878.00,12-Ora-57-20.7/21.8,Safety Lighting and Midwest Guardrail
08-0P9804,2015-06-02,2015-05-11,2015-06-19,DREAMBUILDER CONSTRUCTION CORP,(714)646-3697,$451,061.00,08-SBd-18-101.9,SIGNALIZE INTERSECTION AND CONSTRUCT LANDING PAD AND CROSSWALK
02-4F2904,2015-06-02,2015-05-11,2015-06-25,AMERICAN CIVIL CONSTRUCTORS WEST COAST, INC.,(707)746-8028,$314,313.50,02-Sha-44-58.9/59.6,Place High Friction Surface Treatment
01-0B3504,2015-06-02,2015-05-11,2015-07-06,MERCER FRASER COMPANY,(707)443-6371,$995,796.00,01-Hum-36-30.2,Rock underdrain & trenchless culvert installation; cold plane & pave.
06-430714,2015-05-28,2015-05-04,2015-06-25,WABO LANDSCAPE & CONSTRUCTION, INC.,(510)741-9226,$306,329.00,06-Tul-216-1.9/2.9,Install landscaping.
12-0M1204,2015-05-28,2015-04-27,2015-06-22,BMC ENTERPRISES,(626)813-1027,$865,945.78,12-Ora-5-28.3/28.6,Widen existing 2-lane on-ramp to 3-lane on-ramp.
10-0W1104,2015-05-28,2015-04-27,2015-07-17,FBD VANGUARD CONSTRUCTION,(925)245-1300,$1,436,950.00,10-SJ-4-R16.2,Replace conc pavement and base/apply high friction surface treatment.
09-352404,2015-05-28,2015-04-27,2015-06-12,RE COM DEVELOPMENT COMPANY,(760)873-3301,$626,687.87,09-Mno-5710,Modify existing truck shed and construct new truck shed addition.
10-0X1604,2015-05-27,2015-04-27,2015-06-25,GEORGE REED, INC.,(209)523-0700,$805,366.50,10-Ama-49-4.3, 4.6,Local road realignment, traffic signals, storm drain, and parking lot.
01-0E3704,2015-05-27,2015-05-11,2015-06-30,WYLATTI RESOURCE MANAGEMENT, INC.,(707)983-8135,$234,224.85,01-Men-1-85.3/104.7,Remove and replace culverts and drainage inlets
06-0S5904,2015-05-27,2015-05-04,2015-06-23,BUGLER CONSTRUCTION,(925)416-0700,$342,000.00,06-Tul-198-R14.6,Repair bridge girder.
03-4F3304,2015-05-27,2015-05-04,2015-06-12,VINTAGE PAVING COMPANY, INC,(530)795-0132,$430,100.00,03-SJ,Sac-5-49.4/49.8, 0.0/18.3,Construct crossovers and maintenance vehicle pullouts at 10 locations
12-0K4104,2015-05-21,2015-04-27,2015-06-30,ALL AMERICAN ASPHALT,(951)736-7600,$1,626,864.30,12-Ora-133-4.2/8.3,Rubberized Hot Mix Asphalt Overlay
08-0N5404,2015-05-21,2015-04-27,2015-06-19,DESERT CONCEPTS CONSTRUCTION, INC.,(760)200-9007,$550,075.70,08-SBd-62-32.7,33.3/33.5,CONSTRUCT SIDEWALK,CURB RAMPS, AND DRIVEWAYS
08-0R8114,2015-05-21,2015-04-27,2015-06-16,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$522,967.00,08-Riv-215-R15.0,INSTALL A WEIGH-IN-MOTION (WIM) SYSTEM
01-0E2104,2015-05-21,2015-04-27,2015-06-16,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$702,877.70,01-Hum-36, 96, 101, 254-VAR,BRIDGE DECK REPAIR
01-0E5904,2015-05-21,2015-04-27,2015-06-18,DARREN TAYLOR CONSTRUCTION,INC,(530)378-2211,$1,939,555.50,01-Men-20-R0.0/7.1,HMA OVERLAY
01-0C6104,2015-05-20,2015-04-27,2015-06-19,STEWART ENGINEERING INC,(530)244-8464,$1,378,473.50,01-Men-1-40.2,Clean & Paint Bridge
01-378144,2015-05-20,2015-04-27,2015-06-25,GRANITE CONSTRUCTION COMPANY,(707)467-4100,$753,860.00,01-Men-128-Var,Culvert Rehabilitation
06-0Q4404,2015-05-20,2015-04-27,2015-06-18,EMMETTS EXCAVATION, INC.,(559)299-1256,$619,984.00,06-Tul-137-R15.4/R15.7,Cold plane pavement, repair failed areas and reconstruct curb ramps.
06-0S8204,2015-05-20,2015-04-27,2015-06-30,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$414,099.10,06-Fre-41-R25.4,Replace MBGR with concrete barrier, drainage, and modify electrical.
08-0R9604,2015-05-20,2015-04-27,2015-06-17,MGP CONSTRUCTION,(909)982-2364,$1,261,274.38,08-SBd-5724,PARADISE VALLEY MAINTENANCE STATION IMPROVEMENT
07-2W8304,2015-05-20,2015-04-27,2015-06-18,INTERMOUNTAIN SLURRY SEAL, INC.,(775)358-1355,$2,721,721.00,07-LA-2-26.4/82.3,Mainline seal coat
08-0N6804,2015-05-19,2015-04-27,2015-06-17,ODONNELL CONSTRUCTION, INC.,(909)394-4510,$673,409.40,08-SBd-71-R1.6/R1.8,WIDEN THE OFF- RAMP FROM THE OUTSIDE SHOULDER
08-1F0004,2015-05-19,2015-04-27,2015-06-10,C&W CONSTRUCTION SPECIALTIES, INC.,(805)642-0204,$224,103.15,08-Riv-62-R6.9-9.2,INSTALL MIDWEST GUARDRAIL SYSTEM
10-0W9804,2015-05-19,2015-04-27,2015-06-23,TIM PAXINS PACIFIC EXCAVATION, INC,(916)686-2800,$204,428.72,10-Sta-108-37.6,Install roadway warning lights, flashing beacons, and curb ramps.
07-1W5104,2015-05-19,2015-04-27,2015-06-17,FLEMING ENVIRONMENTAL INC.,(714)871-2800,$762,291.00,07-LA-5718,Install Wash Rack
11-2M7504,2015-05-19,2015-04-27,2015-06-22,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$2,048,951.00,11-SD-163-0.6/4.0,Cold plane and pave with rubberized hot mix asphalt.
01-0B2404,2015-05-19,2015-04-27,2015-06-16,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$884,884.00,01-Hum-VAR-VAR,REHAB BRIDGE DECK
01-0E2904,2015-05-19,2015-04-27,2015-06-19,MERCER FRASER COMPANY,(707)443-6371,$2,630,030.50,01-Hum-101-R10.2/R11.4, R22.5/25.5,HMA OVERLAY
03-4F3904,2015-05-19,2015-04-27,2015-06-05,WESTERN STRUCTURES,(951)352-4300,$629,552.51,03-ED,Sac,Yol-49, 50, 80-VAR,PLACE HIGH FRICTION SURFACE TREATMENT
07-183124,2015-05-14,2015-04-20,2015-05-29,MARTINEZ LANDSCAPE CO., INC.,(818)364-9188,$1,490,000.10,07-LA-710-9.8/18.4,Perform highway planting and install irrigation system.
04-1J8304,2015-05-14,2015-04-20,2015-06-09,FBD VANGUARD CONSTRUCTION,(925)245-1300,$1,022,775.00,04-Ala-680-R12.4/R15.9,Replace concrete pavement.
06-0S7804,2015-05-14,2015-04-20,2015-06-12,TELFER HIGHWAY TECHNOLOGIES,(916)383-1756,$3,668,766.00,06-Fre-269-0.5/8.6, 10.0/24.8,Repair failed areas and crack treatment with RHMA-G (BWC) overlay.
04-3E7704,2015-05-14,2015-04-20,2015-06-09,ETIC,(925)602-4710,$599,519.46,04-SCl-17, 85, 87, 101, 130, 237-VAR,Treat bridge decks with methacrylate and replace joint seals.
04-1G5404,2015-05-14,2015-04-20,2015-06-15,NORCAL GENERAL CONSTRUCTION CORPORATION,(408)886-0335,$284,232.00,04-SM-82-17.1,Construct signalized intersection.
10-0W1404,2015-05-14,2015-03-30,2015-06-24,BAY CITIES PAVING & GRADING, INC.,(925)687-6666,$2,704,318.00,04,10-SCl, Mer-152-R35.0/R35.2,R0.0/R2.4,Reconstruct shoulders and construct median barrier.
08-1C1104,2015-05-14,2015-04-20,2015-06-12,ALL AMERICAN ASPHALT,(951)736-7600,$1,534,559.90,08-Riv-371-56/61.9,72.9/77.2,Rubberized Hot Mix Asphalt Gap Graded and localized dig-out
10-0W8004,2015-05-13,2015-04-20,2015-06-12,CCFG CONSTRUCTION,(209)743-4911,$348,101.00,10-Tuo-120-27.4,Stabilize slope with steel soldier pile walls.
08-1E2904,2015-05-13,2015-04-20,2015-06-05,CHRISP COMPANY,(510)656-2840,$231,075.00,08-SBd-210-10.3/21.4,REMOVE HOV LANE BUFFER, PLACE CONTINUOUS HOV ACCESS STRIPE AND SIGNS
11-2M7704,2015-05-13,2015-04-20,2015-06-23,MANHOLE ADJSUTING INC,(323)558-8000,$2,499,154.50,11-Imp-115-R8.5/21.2,Apply asphalt rubber binder seal coat and slurry seal.
10-0Y8504,2015-05-13,2015-04-20,2015-06-12,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$573,188.95,10-Mer,SJ,Sta-5,33,59,99-Var,Treat bridge decks and replace joint seals.
11-2T0414,2015-05-13,2015-04-20,2015-06-22,CLEAN CUT LANDSCAPE,(559)322-2041,$1,137,004.95,11-SD-805-26.8/27.3,Install highway planting, erosion control and irrigation systems.
04-3E3904,2015-05-13,2015-04-20,2015-06-09,GRANITE ROCK COMPANY,(408)574-1400,$2,684,050.00,04-CC-4-0.0/4.9,Cold plane asphalt concrete pavement and overlay with RHMA.
06-0S3004,2015-05-13,2015-04-20,2015-06-09,GRIFFITH COMPANY,(661)392-6600,$2,165,344.00,06-Ker-33,119-19.6/27.0; 20.2/27.3,Resurfacing existing pavement with RHMA-G Bounded Wearing Course.
06-0S2604,2015-05-13,2015-04-20,2015-06-09,PAPICH CONSTRUCTION COMPANY, INC.,(805)473-3016,$3,670,077.77,06-Kin-41-17.1/R39.9,Cold plane failed areas and place RHMA on existing pavement.
04-4H8404,2015-05-12,2015-04-20,2015-06-09,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$693,753.46,04-CC-4,24,80,242,580-VAR,Treat bridge decks with methacrylate resin and replace joint seals.
06-0P9804,2015-05-12,2015-04-20,2015-06-03,CAL VALLEY CONSTRUCTION,(559)274-0300,$208,511.50,06-Fre-168-R6.9/R7.1,Construct concrete barrier.
04-1J7604,2015-05-12,2015-04-20,2015-06-17,CE GREEN INC,(916)365-4925,$419,600.00,04-Sol-80-39.8,Build materials storage bins with canopy.
04-1J1504,2015-05-12,2015-04-20,2015-06-09,ARGONAUT CONSTRUCTORS,(707)542-4862,$2,298,615.10,04-Son-121-0.0/R7.3,Place rubberized hot mix asphalt (gap graded).
03-4F2704,2015-05-12,2015-04-20,2015-06-02,STUDEBAKER BROWN ELECTRIC, INC,(916)678-4660,$183,694.50,03-Gle,Sac-16, 32, 50, 80, 160-VAR,Install and/or modify signals and and signs
04-3E2304,2015-05-12,2015-04-20,2015-06-09,GRANITE ROCK COMPANY,(408)574-1400,$599,847.00,04-Ala-13-9.0/10.0,Replace asphalt concrete surfacing.
07-4T7304,2015-05-12,2015-04-20,2015-06-03,HIGHLAND CONSTRUCTION, INC.,(714)538-5156,$710,867.00,07-LA-405-41.7,Realign existing sound wall at ramp terminus.
08-0Q5004,2015-05-12,2015-04-20,2015-06-08,PAVEMENT COATINGS CO,(714)826-3011,$1,581,295.90,08-SBd,Riv-62-66.0/91.0,PLACE SEAL COAT
08-1E4104,2015-05-06,2015-03-30,2015-05-29,ODONNELL CONSTRUCTION, INC.,(909)394-4510,$1,083,048.90,08-SBd-15, 210, 330-Various,Rehabilitate Bridge Surfacing
10-1E0104,2015-04-30,2015-03-30,2015-05-15,GEORGE REED INC.,(209)523-0734,$3,848,731.50,10-Cal-12, 26-9.9/18.2, 3.1/14.0,RHMA overlay
10-0V9004,2015-04-29,2015-03-30,2015-06-23,CHESTER BROSS CONSTRUCTION COMPANY,(573)221-5958,$3,888,888.00,10-Ama-88-15.0/32.3,Rubberized HMA resurfacing, repair failed areas, and dike replacement.
04-2J2804,2015-04-28,2015-03-30,2015-05-29,BAY CITIES PAVING & GRADING, INC.,(925)687-6666,$3,662,456.40,04-Sol-780-0.5/7.4,Rubberized hot mix asphalt concrete surfacing.
01-262064,2015-04-28,2015-03-16,2015-06-30,BORTOLUSSI & WATKIN, INC.,(415)453-4675,$4,275,232.00,01-Men-101-48,Wetland and Riparian Mitigation Planting.
08-1E3204,2015-04-23,2015-03-30,2015-05-14,SMART TECH GROUP INC,(949)800-6040,$156,206.00,08-SBd-15-41.4,Construct sidewalk and reconstruct curb ramps and signal pole.
08-1C7604,2015-04-23,2015-03-23,2015-05-20,MATICH CORPORATION,(909)382-7400,$4,042,000.00,08-SBd-18-R17.7/31.9,38.5/39.8 and 44.3/48.1,Cold plane and replace HMA (Type A) overlay
08-1F5304,2015-04-23,2015-03-30,2015-05-19,SULLY-MILLER CONTRACTING COMPANY,(714)578-9600,$2,367,000.00,08-SBd-15-70.1/75.3,Rehabilitate pavement, fog seal shoulders
04-2J2004,2015-04-23,2015-03-30,2015-05-29,BAY CITIES PAVING & GRADING, INC.,(925)687-6666,$3,468,196.95,04-SCl-152-30.4/35.2,Cold plane AC pavement and place rubberized hot mix asphalt.
03-0G1504,2015-04-23,2015-03-23,2015-05-20,A. TEICHERT & SON INC. DBA TEICHERT CONSTRUCTION,(209)983-2300,$3,998,277.00,03-Nev-49-0.0/9.6, 11.1/R14.4,RHMA-O (OGFC) Overlay
06-0S2404,2015-04-23,2015-03-30,2015-05-27,VSS INTERNATIONAL, INC.,(916)373-1500,$1,049,135.00,06-Fre-33-R63.0/69.1, 72.8/R83.0,Place polymer asphaltic emulsion (seal coat).
05-1G3404,2015-04-23,2015-03-23,2015-06-08,TELFER HIGHWAY TECHNOLOGIES,(916)383-1756,$4,528,777.00,05-SLO-101-R23.9/32.3,Overlay existing roadbed with RHMA Gap Graded (Bonded Wearing Course).
05-1F8504,2015-04-23,2015-03-16,2015-05-14,GRANITE ROCK COMPANY,(408)574-1400,$2,689,970.00,05-SBt-25-38.2/44.2,Cold in-place recycling and place hot mix asphalt (Type A).
03-0G2104,2015-04-23,2015-03-23,2015-05-13,A. TEICHERT & SON, INC DBA TEICHERT CONSTRUCTION,(209)983-2300,$1,152,423.00,03-Sac-99-15.5/18.1,RHMA-O HB (OGFC) Overlay
04-1J2604,2015-04-22,2015-03-30,2015-05-29,GRANITE CONSTRUCTION COMPANY,(831)750-0673,$2,333,649.50,04-SCl-237-R4.0/6.9,Cold plane asphalt concrete pavement and place RHMA (Gap Graded).
06-0P6504,2015-04-22,2015-03-30,2015-05-22,ESLICK CONSTRUCTION, INC.,(559)593-8630,$337,814.47,06-Tul-201-5.8/23.3,Remove and place culverts, headwall and flared end sections.
06-0S2104,2015-04-22,2015-03-23,2015-05-19,GRANITE CONSTRUCTION COMPANY,(559)441-5768,$821,552.00,06-Kin-269-1.1/5.6,Resurface existing pavement with RHMA (bonded wearing course).
06-0T1904,2015-04-22,2015-03-30,2015-05-19,GRANITE CONSTRUCTION COMPANY,(559)441-5700,$2,719,842.00,06-Fre-145-13.2/20.5,Cold-in-place-recycling with HMA overlay
02-4G7304,2015-04-22,2015-03-23,2015-05-21,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$1,690,326.40,02-Sha-VAR-VAR,Polyester concrete and hot mix asphalt paving
07-2W7104,2015-04-22,2015-03-23,2015-05-15,AUTOBAHN CONSTRUCTION INC.,(714)769-7025,$1,093,991.55,07-Ven-1,33,101-Var,Treat bridge deck with methacrylate and repair spalls.
08-1C4204,2015-04-22,2015-03-30,2015-05-12,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$393,393.00,08-Riv-15, 71, 91-Var,Bridge rehabilitation and pavement marker replacement.
10-1E0204,2015-04-22,2015-03-30,2015-05-15,GEORGE REED, INC.,(209)523-0734,$1,871,203.20,10-Mpa-49-18.5/27.0,Repair failed areas and resurface with rubberized HMA
08-1C0504,2015-04-21,2015-03-30,2015-05-15,ALL AMERICAN ASPHALT,(951)736-7600,$1,443,266.90,08-Riv-79-R33.9/40.3,Cold Plane, Rubberized Hot Mix Asphalt (Gap Grades), Fog Seal
10-0X5404,2015-04-21,2015-03-30,2015-06-09,APEX FENCE COMPANY INC,(530)365-3316,$1,348,639.00,10-SJ-5-41.7/45.9,Construct median barrier.
08-1E4304,2015-04-21,2015-03-23,2015-05-14,WESTERN STRUCTURES,(951)352-4300,$935,210.27,08-SBd,Riv-10,15,60,83,215-VARIOUS,BRIDGE PRESERVATION
02-4E6004,2015-04-21,2015-03-23,2015-05-13,TIMBERWORKS,(530)926-4093,$738,577.78,02-Tri-3-30.8/31.1,Replace sidewalks, HMA, Construct retaining wall and Drainage
05-0T2704,2015-04-21,2015-03-30,2015-05-18,GRANITE ROCK COMPANY,(408)574-1400,$660,692.50,05-Mon-68-19.0/19.3,Install Traffic Signals and realign Hitchcock Road.
06-0S2904,2015-04-21,2015-03-23,2015-05-19,GRIFFITH COMPANY,(661)392-6640,$2,507,765.00,06-Ker-43-9.2/16.1,Cold in-place recycling and overlay with HMA (Type A).
04-2J7104,2015-04-21,2015-03-30,2015-05-20,NORTHWEST PAVING,(530)246-4388,$1,654,724.00,04-SM,SCl-35-0.0/21.0,Resurface roadway with sand cover (Seal).
06-0Q7204,2015-04-16,2015-03-23,2015-05-15,TEICHERT CONSTRUCTION,(559)813-3100,$2,580,592.00,06-Ker-33-27.0/34.2,Cold-in-place recycling and HMA overlay
05-1F6104,2015-04-16,2015-03-23,2015-05-19,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$792,678.50,05-SB-101-R14.2,Cold plane pavement and install concrete pavers in roadbed.
05-492804,2015-04-16,2015-02-23,2015-05-27,PAPICH CONSTRUCTION CO. INC,(805)473-3016,$19,724,469.30,05-SLO-1-64.0/R66.9,Construct bridges and realign two lane highway.
04-1J2104,2015-04-16,2015-03-23,2015-05-12,OGRADY PAVING INC.,(650)966-1926,$622,886.00,04-SM-84-17.0/21.5,Replace asphalt concrete surfacing.
03-4M4604,2015-04-16,2015-03-23,2015-05-19,DREAMBUILDER CONSTRUCTION CORP.,(714)646-3697,$447,661.00,03-Sie-89-15.8/28.1,Rehabilitate Culvert
08-1C3504,2015-04-16,2015-03-23,2015-05-14,ALL AMERICAN ASPHALT,(951)736-7600,$893,239.60,08-Riv-74-32.3/36.5,PAVEMENT REHABILITATION
07-2W7804,2015-04-16,2015-03-23,2015-05-14,STOUDENMIRE CORPORATION,(805)461-1454,$462,462.00,07-LA-2, 27, 101, 170, 210, 405, 710-Var,Treat Bridge Deck with Methacrylate, Repair Spalls, and Joint Seals
02-4F3904,2015-04-16,2015-03-16,2015-06-03,HAT CREEK CONSTRUCTION & MATERIALS, INC.,(530)335-5501,$989,898.00,02-Plu-147-7.5/8.9,Pulverize Pavement and Hot Mix Asphalt Overlay
01-0C9404,2015-04-16,2015-03-23,2015-05-20,AMERICAN PAVEMENT SYSTEMS, INC.,(209)522-2277,$779,798.00,01-Hum-96-3.7/11.6,AR Chip Seal
04-4H8204,2015-04-15,2015-03-23,2015-05-12,AMERICAN CIVIL CONSTRUCTORS WEST COAST, INC.,(707)746-8028,$370,363.50,04-Mrn-1,101,580-Var,Treat bridge deck with methacrylate and replace joint seals.
04-3E3404,2015-04-15,2015-03-23,2015-05-12,VINTAGE PAVING COMPANY, INC,(530)795-0132,$887,298.00,04-Mrn-1-17.0/19.0,Place rubberized hot mix asphalt (gap graded).
05-1F9404,2015-04-15,2015-03-23,2015-05-12,CALPORTLAND CONSTRUCTION,(805)345-3581,$1,356,664.20,05-SLO-227-7.1/R10.3,Resurface pavement with RHMA (Gap Graded) and guardrail work.
08-1E2204,2015-04-15,2015-03-23,2015-05-12,SULLY-MILLER CONTRACTING COMPANY,(714)578-9600,$5,464,670.00,08-SBd-127-3.0/10.5 37.7/41.47,Cold recycle in-place (CIR) existing pavement and place HMA-A overlay.
12-0N3504,2015-04-15,2015-03-23,2015-06-25,PRO TECH ENGINEERING CORP,(714)446-0800,$479,845.00,12-Ora-5,91,405-Var,Modify Lighting, Ramp Metering System and Changeable message sign.
07-1W7004,2015-04-15,2015-03-23,2015-05-07,PAVEMENT COATINGS CO,(714)826-3011,$513,226.80,07-LA-66-0.0/3.0,Slurry seal mainline and repair failed areas.
07-2W9204,2015-04-14,2015-03-23,2015-05-07,ODONNELL CONSTRUCTION, INC.,(909)394-4510,$815,802.00,07-LA-10-29.4, 29.5,Treat bridge deck and replace joint seals.
01-0E5104,2015-04-14,2015-03-23,2015-05-12,MERCER-FRASER COMPANY,(707)443-6371,$2,073,743.00,01-Tri-299-0.0/8.0,HMA Overlay, Striping
06-0S2504,2015-04-14,2015-03-23,2015-05-15,AMERICAN PAVEMENT SYSTEMS, INC.,(209)522-2277,$4,833,343.00,06-Ker-166, 178-9.0/24.5, 27.2/57.1,Apply asphalt rubber seal coat and flush coat to existing pavement.
04-4H8104,2015-04-14,2015-03-23,2015-05-07,STOUDENMIRE CORPORATION,(805)461-1454,$679,859.56,04-Nap,Sol-29,121,37,80,780-Var,Treat bridge decks with methacrylate and replace joint seals.
04-3E7904,2015-04-14,2015-03-16,2015-07-31,CERTIFIED COATINGS COMPANY,(707)639-4414,$5,164,268.00,04-SM-101-23.7,Spot blast clean and paint the entire steel girders and bent caps.
05-1F8904,2015-04-14,2015-03-09,2015-05-13,RGW CONSTRUCTION, INC.,(925)606-2400,$3,878,561.00,05-Mon-1-28.0/28.4,Construct viaduct.
05-1F3604,2015-04-14,2015-03-23,2015-06-09,BUGLER CONSTRUCTION,(925)416-0700,$694,531.00,05-SCr-1-31.6, 36.3,Install cathodic anodes and scour monitor, and repair concrete spall
03-0G1304,2015-04-14,2015-03-23,2015-05-13,GEORGE REED, INC.,(209)523-0700,$1,686,215.40,03-ED-49-0.0/9.6,RHMA (bonded wearing course) overlay, replace dike and guardrailing
04-1J8404,2015-04-09,2015-03-16,2015-05-07,GHILOTTI CONSTRUCTION CO. INC.,(707)585-1221,$799,020.00,04-Mrn-1-13.1/15.0,Resurfacing with rubberized hot mix asphalt.
03-0G1804,2015-04-09,2015-03-16,2015-05-01,SIERRA NEVADA CONSTRUCTION,(775)355-0420,$629,007.00,03-Yol-128-7.8/10.0,Place Slurry Seal
06-0S1704,2015-04-09,2015-03-16,2015-05-06,GRANITE CONSTRUCTION COMPANY,(559)441-5700,$1,521,912.50,06-Fre-33-11.1/14.8,Cold in Place Recycling and HMA resurfacing.
06-0T1804,2015-04-09,2015-03-09,2015-05-06,GRANITE CONSTRUCTION COMPANY,(559)441-5700,$2,689,417.00,06-Tul-99-41.3/52.0,Place rubberized HMA open graded (BWC) on existing pavement.
09-361504,2015-04-09,2015-03-16,2015-04-30,QUALCON CONTRACTORS, INC.,(775)782-2006,$3,466,720.00,09-Iny-190-73.3/96.8,Hot mix asphalt thin blanket overlay.
07-3P7004,2015-04-09,2015-03-16,2015-05-15,MGP CONSTRUCTION,(909)982-2364,$929,990.00,07-LA-L5724,Construct maintenance station
08-1F5404,2015-04-09,2015-03-16,2015-05-01,MATICH CORPORATION,(909)382-7400,$1,394,000.00,08-SBd-138-R15.2/17.1, 19.2/R24.1,REPLACE AC SURFACING, 0.1 COLD PLANE AND 0.1 OVERLAY RHMA-G
01-0E4404,2015-04-09,2015-03-16,2015-05-06,TIDEWATER CONTRACTORS, INC.,(541)469-5341,$1,322,954.50,01-DN-101-35.7/39.9,Cold Plane AC Pavement, HMA Overlay, Rumble Strips, Dikes, Striping
01-0E7404,2015-04-08,2015-03-16,2015-05-01,CENTRAL STRIPING SERVICE, INC.,(916)635-5175,$243,922.00,01-Men,Hum-101-VAR,REPLACE STRIPING & PAVEMENT MARKERS
02-3E7714,2015-04-08,2015-02-17,2015-06-25,MERCER-FRASER COMPANY,(707)443-6371,$9,375,280.40,02-Tri-299-36.9/53.5,HMA Paving, ADA Ramps, Polyester Concrete and Guardrail
03-0G1604,2015-04-08,2015-03-16,2015-05-19,A. TEICHERT & SONS, INC. DBA TEICHERT CONSTRUCTION,(916)645-4800,$1,862,283.00,03-Yol-16-31.7/R40.6,Rubberized hot mix asphalt (gap graded) overlay.
08-1F4704,2015-04-08,2015-03-16,2015-05-14,GRIFFITH COMPANY,(661)392-6640,$3,532,186.00,08-SBd-178-0.0/7.5,Grind and recycle existing pavement, AC overlay and shoulder backing
08-1F0304,2015-04-08,2015-03-16,2015-04-30,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$377,653.00,08-SBd-215-11.8/12.8,INSTALL MIDWEST GUARDRAIL SYSTEM
07-4T7404,2015-04-08,2015-03-16,2015-05-21,ODONNELL CONSTRUCTION, INC.,(909)394-4510,$271,834.60,07-LA-134-R10.8/R11.5,Construct median concrete barrier.
08-1F5804,2015-04-07,2015-03-16,2015-04-29,AMERICAN PAVEMENT SYSTEMS, INC.,(209)522-2277,$889,271.00,08-SBd-18-103.9/115.9,Place preventive pavement treatment, install centerline rumble strips.
07-4T7004,2015-04-07,2015-03-16,2015-05-15,CARLSONS CONSTRUCTION INC.,(530)842-6063,$453,226.52,07-LA-10-41.0,Construct soil nail and slope protection.
02-0H3004,2015-04-07,2015-03-16,2015-05-01,J.F. SHEA CONSTRUCTION, INC.,(530)246-4292,$2,726,940.00,02-Sha-44-R14.4/34.0,Place HMA, replace AC surfacing
01-493704,2015-04-07,2015-03-02,2015-06-09,MERCER-FRASER COMPANY,(707)443-6371,$1,892,180.20,01-Hum-96-11.0/R13.2,Shoulder widening, HMA overlay, radar sign and LED crossing systems
03-0G1404,2015-04-07,2015-03-16,2015-05-01,NORTHWEST PAVING,(530)246-4388,$1,398,408.00,03-Yol-16-0.0/18.9,POLYMER ASPHALTIC EMULSION CHIP SEAL
05-1F3904,2015-04-07,2015-03-16,2015-05-04,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION,INC.,(949)252-0441,$330,128.82,05-SB-101,154-1.6/22.5,Seal bridge decks with methacrylate, and polyester concrete overlay.
04-0G2104,2015-04-07,2015-03-02,2015-04-24,GORDON N. BALL, INC.,(925)838-5675,$1,047,677.00,04-Ala-13-9.9/10.1,Upgrade shoulder/sidewalk and construct a retaining wall.
06-0S1804,2015-04-07,2015-03-16,2015-05-06,AGEE CONSTRUCTION CORPORATION,(559)299-3290,$484,282.00,06-Fre-63-0.0/2.0,Cold plane and resurface with HMA.
05-1C9404,2015-04-02,2015-03-09,2015-04-21,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$816,025.68,05-Mon-1-11.7/43.1,Seal bridge deck, replace joint seals and paint steel bridge elements.
05-1A3304,2015-04-02,2015-03-02,2015-04-28,GRANITE CONSTRUCTION COMPANY,(805)964-9951,$3,107,091.00,05-SB,SLO-166-55.1/70.6,Overlay existing roadbed with Rubberized HMA (Open Graded)
11-405504,2015-04-02,2015-01-20,2015-05-07,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$5,244,784.50,11-SD-8-6.9/8.2,Construct conc. shoulders and median barrier, and upgrade guardrail.
12-0N3104,2015-04-02,2015-03-02,2015-04-28,WESTERN STRUCTURES,(951)352-4300,$763,157.44,12-Ora-5, 73-12.5, 11.3/27.3,Methacrylate and Polyester Concrete Overlay
07-4T7504,2015-04-02,2015-03-09,2015-04-27,GRANITE CONSTRUCTION COMPANY,(805)964-9951,$594,247.00,07-Ven-1-27.1/28.5,Cold plane asphalt concrete pavement and place HMA.
02-3E7304,2015-04-02,2015-02-17,2015-05-15,J. F. SHEA CONSTRUCTION, INC.,(530)246-4200,$4,651,059.00,02-Sis-5-68.3,Replace Bridge
07-1W2404,2015-04-01,2015-03-02,2015-06-30,CL COATINGS, INC. DBA CL INDUSTRIAL COATINGS, INC.,(562)305-1520,$16,601,000.00,07-LA-5-20.3,Blast and paint the existing bridge.
05-1F7804,2015-04-01,2015-03-02,2015-04-24,TELFER HIGHWAY TECHNOLOGIES,(916)383-1756,$3,125,575.18,05-SLO-101-32.3/35.6,Resurface existing pavement with bounded wearing course.
03-3F7904,2015-04-01,2015-03-09,2015-05-06,TIM PAXINS PACIFIC EXCAVATION, INC,(916)686-2800,$272,349.00,03-Sut-20-16.5,Replace signal poles for E/B and W/B traffic, upgrade ADA facilities.
05-1A7204,2015-04-01,2015-02-17,2015-05-12,GRANITE CONSTRUCTION COMPANY,(805)964-9951,$9,422,361.00,05-SB-101-21.0/27.1,Cold plane and overlay existing roadbed with RHMA-G.
09-356004,2015-04-01,2015-03-09,2015-04-24,GRANITE CONSTRUCTION COMPANY,(661)387-7747,$854,783.00,09-Mno-6-0.8/2.4,Shoulder widening and place shoulder rumble strip.
07-2W6904,2015-03-26,2015-02-23,2015-04-23,AUTOBAHN CONSTRUCTION INC.,(714)769-7025,$722,341.10,07-LA-5-Various,Treat bridge deck with methacrylate and replace joint seals.
10-0W6004,2015-03-26,2015-02-23,2015-04-28,CHESTER BROSS CONSTRUCTION COMPANY,(573)221-5958,$3,753,400.00,10-Ama-88-R66.6/71.7,Cold plane asphalt concrete pavement and hot mix asphalt resurfacing.
04-1SS524,2015-03-26,2015-02-17,2015-04-29,BAY CITIES PAVING & GRADING, INC.,(925)687-6666,$1,237,421.45,04-SCl-280-R2.6,Reconstruct embankment and roadway.
03-0G0904,2015-03-25,2015-02-23,2015-04-15,BALDWIN CONTRACTING CO., INC. DBA KNIFE RIVER CONSTRUCTION,(530)891-6555,$2,122,196.00,03-Yub-49-0.0/6.4,Bonded Wearing Course-Gap Graded Overlay and Replace Guardrailing
03-4F1604,2015-03-25,2015-03-02,2015-05-05,ALL PHASE EXCAVATING AND CONSTRUCTION INC.,(530)604-6011,$247,695.00,03-But-99-R34.2/R36.3,INSTALL STREET LIGHTING
05-1C9304,2015-03-25,2015-02-23,2015-04-15,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$859,535.84,05-Mon-101-R21.9/87.0,Seal bridge decks with methacrylate or polyester.
06-0S2004,2015-03-25,2015-02-23,2015-04-17,AGEE CONSTRUCTION CORPORATION,(559)299-3290,$763,984.00,06-Tul-245-12.0/16.0, 21.0/26.0,Resurface existing pavement with hot mix asphalt (Type A).
02-299714,2015-03-25,2015-02-17,2015-05-27,ROCKY MOUNTAIN CONSTRUCTION,(541)882-8370,$2,400,400.40,02-Mod-299-39.3/40.5,Widen Shoulders, Improve Drainage, and Install Radar Feedback Signs
10-0W6104,2015-03-25,2015-02-17,2015-04-24,GEORGE REED INC,(209)523-0730,$7,224,957.00,10-Alp-88-0.0/7.5,Cold plane AC pavement, and repair failed pavement and HMA resurfacing
09-359904,2015-03-24,2015-03-02,2015-04-20,PAVE-TECH INC.,(760)727-8700,$4,086,177.00,09-Iny,Mno-127, 120-34.5/41.8, 43.0/45.1,Cold in-place recycled pavement and HMA overlay.
07-4T6104,2015-03-24,2015-03-02,2015-05-11,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$268,936.60,07-LA-101-16.7,CONSTRUCT CURB RAMPS AND MODIFY SIGNAL AND LIGHTING
07-1W6404,2015-03-24,2015-03-02,2015-04-10,J. MCLOUGHLIN ENGINEERING CO., INC.,(909)944-1037,$844,431.24,07-LA-5,14,126,138-Var,Apply methacrylate resin to bridge deck and install joint seals.
01-0E3904,2015-03-24,2015-03-02,2015-04-13,DARREN TAYLOR CONSTRUCTION,INC,(530)378-2211,$937,802.00,01-Hum,Men-101, 162-VAR,Replace AC Surfacing
06-0Q2104,2015-03-19,2015-02-17,2015-06-03,WABO LANDSCAPE & CONSTRUCTION, INC.,(510)741-9226,$3,939,896.00,06-Fre-180-R58.5/R62.4,Place rock blanket, highway planting, and irrigation.
03-4E5404,2015-03-19,2015-02-17,2015-04-07,DREAMBUILDER CONSTRUCTION CORP.,(714)646-3697,$704,061.00,03-Sie-49-48.3/49.2,Replace Culverts
06-0S2204,2015-03-19,2015-02-23,2015-04-21,INTERMOUNTAIN SLURRY SEAL, INC.,(775)358-1355,$1,652,652.00,06-Fre,Mad,Tul-145, 198, 201-Var,Asphalt-rubber binder seal Coat.
03-4M6704,2015-03-19,2015-02-23,2015-04-03,MIDSTATE BARRIER, INC.,(209)944-9565,$319,251.00,03-Sac-104-9.5/16.9,Replace Guardrailing
07-2W8704,2015-03-19,2015-02-23,2015-04-23,ALL AMERICAN ASPHALT,(951)736-7600,$3,499,221.00,07-Ven-33-12.3/57.5,Place HMA and perform digouts.
10-0Y9104,2015-03-18,2015-02-23,2015-05-21,TEICHERT CONSTRUCTION,(559)813-3025,$2,119,070.00,10-Mer-59-23.3/33.7,Repair failed areas and construct RHMA resurfacing.
08-1F5004,2015-03-18,2015-02-23,2015-04-10,PAVE-TECH INC.,(760)727-8700,$2,417,169.00,08-Riv-111-6.0/18.4,Cold Plane 0.1 and Overlay RHMA-G
07-3P7204,2015-03-18,2015-02-23,2015-04-15,AUTOBAHN CONSTRUCTION INC.,(714)769-7025,$273,111.50,07-LA-60-0.5,Replace concrete slabs/pavement.
06-0S2304,2015-03-18,2015-02-23,2015-04-10,NORTHWEST PAVING,(530)246-4388,$761,408.00,06-Mad,Mpa-41,49-40.9/45.7,0.0/4.9,1.3/9.3,Polymer asphaltic emulsion seal coat.
06-0P0604,2015-03-18,2015-02-17,2015-04-03,WESTERN STRUCTURES,(951)352-4300,$787,033.98,06-Fre,Tul-5, 33, 137, 216, 245, 269-VARIOUS,Treat bridge deck and replace joint seal.
03-3F7004,2015-03-18,2015-02-23,2015-04-10,STEELHEAD CONSTRUCTORS, INC.,(530)226-6400,$426,777.00,03-Yub-49-6.1, 6.3,repair embankment at pm 6.1 and repair pavement settlement at pm 6.3
04-4G6104,2015-03-17,2015-02-17,2015-04-10,FBD VANGUARD CONSTRUCTION,(925)245-1300,$275,899.60,04-SCl-87-9.0/9.2,Replace K-rail and guardrail with Type 60 concrete barrier.
03-3F3404,2015-03-17,2015-02-17,2015-06-17,FD THOMAS, INC,(541)664-3010,$8,984,000.00,03-Sac-160-L7.0,Remove existing paint and repaint bridge using a containment system
03-0G2604,2015-03-17,2015-02-23,2015-05-13,BALDWIN CONTRACTING COMPANY, INC. DBA KNIFE RIVER CONSTRUCT ION,(530)891-6555,$2,377,881.00,03-But-162-0.0/7.7,Cold In-Place Recycling and HMA Overlay
02-4G1404,2015-03-17,2015-02-23,2015-04-17,HAT CREEK CONSTRUCTION & MATERIALS, INC.,(530)335-5501,$2,656,656.00,02-Las-395-R24.7/36.4,Place HMA with replace AC surfacing
06-0M0204,2015-03-17,2015-02-09,2015-05-15,AGEE CONSTRUCTION CORPORATION,(559)299-3290,$1,415,982.00,06-Fre-168-R36.0,Construct retaining walls, concrete deck, and railing at vista point.
07-1W7204,2015-03-17,2015-02-23,2015-04-07,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$632,275.10,07-LA-134-0.0/R6.1,Replace concrete slab with rapid strength concrete.
10-1C9304,2015-03-12,2015-02-17,2015-04-30,GEORGE REED, INC.,(209)523-0700,$3,415,823.00,10-Ama-124-R2.5/R10.3,Cold-in-Place Recycling and Hot Mix Asphalt Overlay
01-0B3704,2015-03-12,2015-02-17,2015-04-15,ROBERT J. FRANK CONSTRUCTION,(530)222-1408,$204,620.00,01-Hum-36-44.4,Install horizontal drains, grade ditch and hydroseed
01-262054,2015-03-12,2015-02-02,2015-04-15,HANFORD APPLIED RESTORATION & CONSERVATION,(707)996-6633,$12,631,386.78,01-Men-101-45.0/50.8,Wetland and Riparian Planting and Erosion Control
04-1637N4,2015-03-12,2015-02-19,2015-03-19,POWER ENGINEERING CONSTRUCTION COMPANY,(510)337-3800,$2,417,000.30,04-SF-101-9.0,Modify and Extend Storm Drain Outfall with 54" SW-HDPE Pipe.
02-4G1204,2015-03-12,2015-02-09,2015-04-01,TULLIS, INC.,(530)241-5105,$3,992,330.00,02-Tri-3, 36-L0.0/L0.1, 27.1/R41.2,Cold-in-Place Recycle with HMA Overlay
03-4F7004,2015-03-11,2015-02-02,2015-04-03,BALDWIN CONTRACTING CO., INC. DBA KNIFE RIVER CONSTRUCTION,(530)891-6555,$1,023,374.03,03-Pla-80-31.8,Increase on and off-ramp radius and lane width of Illinoistown OC.
03-3F1804,2015-03-11,2015-02-17,2015-04-03,VINTAGE PAVING COMPANY, INC,(530)795-0132,$1,811,631.05,03-Sac-5, 99-VAR,Vegetation Control and Gore Area Paving
06-0T1704,2015-03-11,2015-02-17,2015-04-03,GRIFFITH COMPANY,(661)392-6600,$1,538,549.00,06-Ker-58-28.2/31.5,Cold in-place recycling, cold plane and HMA (TYPE A) overlay.
10-0W5604,2015-03-11,2015-01-05,2015-04-10,GEORGE REED, INC.,(209)523-0734,$6,140,762.00,10-SJ-12-5.0/11.0,Repair pavement failure and HMA overlay.
03-0F2704,2015-03-10,2015-02-17,2015-05-15,ROBERT J. FRANK CONSTRUCTION,(530)222-1408,$393,246.00,03-Yub-65-2.2,Scour Mitigation and Repair Spalled Surface Area
03-4F3604,2015-03-10,2015-02-17,2015-03-27,AMERICAN CIVIL CONSTRUCTORS,(707)746-8028,$473,415.00,03-Yol,ED,Sac-5, 50, 51-VAR,Installation of high friction surface treatment at three locations.
02-0H0004,2015-03-10,2015-02-17,2015-04-02,TULLIS, INC.,(530)241-5105,$1,998,721.00,02-Sha-5, 273-R16.2/R19.0, 19.7/20.0,Cold Plane and Place HMA
07-2W8404,2015-03-05,2015-02-09,2015-03-19,VELARDE CONCRETE CONSTRUCTION, INC.,(818)898-2300,$491,115.00,07-LA-57,101-Var,Replace concrete channel and pipe lining.
08-0L5904,2015-03-05,2015-01-05,2015-04-06,RED MOUNTAIN, LLC CONSTRUCTION-DIVISION,(805)439-1042,$455,441.60,08-Riv-10-R135.10,REPLACE SEPTIC TANK SYSTEM
08-0Q4704,2015-03-05,2015-01-12,2015-04-15,SULLY-MILLER CONTRACTING COMPANY,(714)578-9600,$4,387,000.00,08-SBd-15-R29.6/42.5, 45.3/70.1,Rehabilitate Pavement, fog seal shoulders, slurry seal ramps
03-0G1704,2015-03-05,2015-02-09,2015-03-25,VSS INTERNATIONAL, INC.,(916)373-1500,$815,375.00,03-Pla-28-0.8/5.9, 10.5/11.1,Micro-Surfacing
05-1F8704,2015-03-05,2015-02-09,2015-04-03,FERREIRA CONSTRUCTION CO,, INC.,(909)606-5900,$391,581.00,05-SLO-46-R4.3/R7.6,Remove wire mesh fences and place new fence (Type WM, Metal Post).
04-013524,2015-03-04,2014-07-14,2015-03-19,CALIFORNIA ENGINEERING CONTRACTORS INC/SILVERADO CONTRACTORS INC, JV DIR #1000007939,(925)461-1500,$69,470,000.00,04-SF,Ala-80-8.6/8.9, 0.0/1.2,Remove Bridge (Portion) and Salvage Bridge Elements
03-0G1904,2015-03-03,2015-02-09,2015-03-20,AMERICAN PAVEMENT SYSTEMS, INC.,(209)522-2277,$1,119,748.00,03-Sac-104-4.6/17.7,Hot Applied Chip Seal
02-4G3404,2015-02-26,2015-02-02,2015-04-20,ROCKY MOUNTAIN CONSTRUCTION, INC.,(541)882-8377,$2,025,525.02,02-Mod-299-14.7/20.0,Cold in-place recycle and place HMA
10-0Y9404,2015-02-26,2015-02-02,2015-05-01,GEORGE REED, INC.,(209)523-0734,$2,495,256.00,10-Ama-88-38.0/46.9,Rubberized-HMA resurfacing, localized digouts, and dike replacement.
02-0H0104,2015-02-25,2015-02-02,2015-03-17,J.F. SHEA CONSTRUCTION, INC.,(530)246-4292,$1,286,115.00,02-Sis-89-0.0/7.0,Place HMA with replace AC surfacing
01-0B4104,2015-02-25,2015-01-20,2015-03-16,MERCER-FRASER COMPANY,(707)443-6371,$1,124,406.00,01-Hum-101-R40.9/R41.2,Rock Slope Protection and Underdrains
06-0S1904,2015-02-25,2015-02-02,2015-03-17,ODONNELL CONSTRUCTION, INC.,(909)394-4510,$210,690.00,06-Tul-198-R3.8/6.7,Construct individual slab replacement.
08-1C9004,2015-02-24,2015-02-02,2015-03-19,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$775,368.20,08-Riv,SBd-15, 60, 138 & 215-Varies,Bridge Rehab, and repair approach slab
10-1C9004,2015-02-24,2015-02-02,2015-03-12,GEORGE REED, INC.,(209)523-0734,$1,465,344.00,10-Sta-132-41.0/51.0,Repair failed areas and rubberized HMA resurfacing.
07-2W8604,2015-02-18,2015-01-20,2015-03-09,AUTOBAHN CONSTRUCTION INC.,(714)769-7025,$1,030,661.00,07-LA-71-1.4/R3.6,Cold plane AC pavement and place rubberized HMA.
11-2M6404,2015-02-18,2015-01-20,2015-03-09,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$619,967.50,11-SD-67-R5.8/R18.5,Cold plane and pave with Hot Mix Asphalt.
09-335004,2015-02-18,2015-01-12,2015-03-09,PAPICH CONSTRUCTION CO. INC.,(805)473-3016,$5,799,999.00,09-Mno-395-52.3/R53.7,Slope stabilization, erosion control and plant establishment.
05-1F8804,2015-02-18,2015-01-26,2015-03-13,VSS INTERNATIONAL, INC.,(916)373-1500,$825,095.00,05-SCr-152-T0.3/R2.0,Slurry seal existing roadbed.
04-259404,2015-02-18,2014-12-01,2015-03-17,GHILOTTI BROS., INC.,(415)454-7011,$11,125,777.00,04-Nap-29-25.5/28.4,Overlay, roadway widening and construct two-way left-turn lanes.
03-4M7904,2015-02-18,2015-01-20,2015-03-06,J.F. SHEA CONSTRUCTION, INC.,(530)246-4292,$1,015,075.00,03-But-99-24.5/30.2,PCC Grinding & Replace Slabs, AC Paving & Striping, Modify Signal
04-1J5204,2015-02-12,2015-01-05,2015-03-18,GORDON N. BALL, INC.,(925)838-5675,$943,914.00,04-SM,Ala-84-R28.8/R29.3, R0.5,INSTALL SIDEWALK, SITE FURNISHINGS, SIGNS, NATIVE PLANTING, IRRIGATION
03-1F4204,2015-02-12,2015-01-05,2015-05-13,VIKING CONSTRUCTION COMPANY, INC.,(916)852-5530,$3,096,763.00,03-But-99-40.5/40.8,Widen shoulder on structure.
07-2W8804,2015-02-12,2015-01-20,2015-04-07,CAL STRIPE, INC.,(909)884-7170,$421,421.00,07-LA,Ven-23,27,33,150-Var,Replace recessed markers and striping.
01-0B4604,2015-02-12,2015-01-05,2015-03-27,R. BROWN CONSTRUCTION COMPANY, INC.,(530)629-3702,$300,090.50,01-Hum-299-32.1,Soldier pile retaining wall, concrete barrier, paving and guardrailing
02-4G7204,2015-02-11,2015-01-12,2015-03-03,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$1,747,156.20,02-Sis-5, 89-VAR,Bridge maintenance, polyester concrete overlay
05-0T5004,2015-02-11,2015-01-05,2015-03-27,RSB GROUP, INC.,(949)454-1999,$699,985.00,05-Mon,SLO,SB,SCr-1, 101, 154-Var,Vista point rehabilitation and install interpretive displays.
07-2W0604,2015-02-11,2015-01-20,2015-02-25,J. FRANCIS COMPANY,(951)776-9100,$987,284.00,07-LA-105,710-Var,Treat bridge deck with methacrylate and replace joint seals.
07-2W6504,2015-02-05,2015-01-12,2015-03-06,WEST COAST STRUCTURES INC DBA WESTERN STRUCTURES,(951)352-4300,$1,117,000.00,07-LA-57, 60, 71-Var,Treat bridge deck with methacrylate.
03-4F1304,2015-02-05,2015-01-12,2015-03-02,WEST COAST STRUCTURES INC DBA WESTERN STRUCTURES,(951)352-4300,$2,076,611.25,03-Sac,But-5, 50, 51, 80, 99, 191-VAR,Place High Friction Surface Treatment
05-0C6404,2015-01-29,2014-11-03,2015-02-27,PAPICH CONSTRUCTION CO. INC.,(805)473-3016,$14,885,001.00,05-SB-246-12.3/R16.7,Construct passing lane, left-turn channelization and drainage systems.
02-4E7904,2015-01-29,2015-01-05,2015-02-25,STATEWIDE TRAFFIC SAFETY AND SIGNS, INC.,(805)929-5070,$802,817.20,02-Sha-5-R10.7/R15.5,Install tubular overhead signs, lighting and sign illumination
10-0Y9204,2015-01-29,2015-01-05,2015-02-18,CHESTER BROSS CONSTRUCTION COMPANY,(573)221-5958,$3,398,110.00,10-Alp-88-7.5/25.3,Repair failed areas and hot mix asphalt resurfacing.
11-410304,2015-01-29,2015-01-05,2015-02-18,V A P CONSTRUCTION INC,(714)253-3270,$505,575.00,11-SD-8-37.9,Cold plane and overlay Descanso Maintenance Station with HMA.
09-359704,2015-01-29,2014-12-29,2015-02-24,CORAL CONSTRUCTION COMPANY,(503)682-2252,$344,443.00,09-Mno-395-46.2, 96.0,Construct concrete barrier and guardrail.
10-1C0304,2015-01-29,2015-01-05,2015-02-18,CCFG CONSTRUCTION,(209)743-4911,$203,375.90,10-Tuo-49, 108-var,Excavate embankment and modify traffic signal and lighting.
07-2656U4,2015-01-28,2014-09-22,2015-02-25,GRANITE CONSTRUCTION COMPANY,(661)726-4447,$8,751,487.00,07-LA-138-69.9/75.0,Widen roadway and cold plane asphalt pavement and place HMA.
02-4G9604,2015-01-28,2014-12-29,2015-02-11,DIG IT CONSTRUCTION, INC.,(530)258-3306,$825,490.00,02-Plu-89-16.4/20.0,Place HMA with replace AC surfacing.
06-0N5604,2015-01-28,2014-12-29,2015-02-23,GRANITE CONSTRUCTION COMPANY,(661)387-7747,$537,041.00,06-Ker-58-R94.5,Widen intersection, place HMA (Type A), and modify lighting.
02-4G9904,2015-01-22,2014-12-29,2015-02-09,HAT CREEK CONSTRUCTION & MATERIALS, INC.,(530)335-5501,$1,049,940.00,02-Las-395-133.0/139.0,0.10 HMA Thin Blanket Overlay w/Replace AC Surfacing
03-4M8604,2015-01-22,2014-12-15,2015-02-11,ARROW FENCING,(707)485-1128,$218,505.00,03-Nev-80-15.0/16.4,Replace damaged fence
03-4M7204,2015-01-22,2014-12-29,2015-02-04,C.C. MYERS, INC.,(916)635-9370,$1,155,555.00,03-Sac,Yol-50-VAR,Rehabilitate Bridge Decks
03-4F6704,2015-01-22,2014-12-22,2015-02-10,AMERICA PACIFIC CONSTRUCTION,(559)577-9999,$174,426.00,03-Nev-49-3.4,Construct right turn lane.
08-0R7404,2015-01-22,2014-12-08,2015-02-04,JABRE CONTRACTING INC.,(310)720-0277,$80,946.00,08-Riv-371-PM 56.3/60.2,Install Centerline and Edge-line Rumble Strip
12-0M1104,2015-01-22,2014-11-24,2015-02-10,ALL AMERICAN ASPHALT,(951)736-7600,$1,545,163.80,12-Ora-73-23.6/25.2,Widen NB Rte 73, Place Overlay, Widen NB MacArthur Blvd on-ramp
08-1E3304,2015-01-22,2014-12-15,2015-02-18,ALL AMERICAN ASPHALT,(951)736-7600,$1,413,970.00,08-Riv-74-71.8/80.3,REHAB PAVEMENT
07-4Y6604,2015-01-22,2014-12-29,2015-02-09,TORO ENTERPRISES, INC.,(805)483-4515,$839,171.10,07-Ven-1-R14.2/R15.5,Place rubberized HMA on mainline and slurry seal on ramps.
10-0Y8904,2015-01-21,2014-12-22,2015-02-18,GEORGE REED, INC.,(209)523-0734,$3,092,642.00,10-Alp-89-10.0/21.4,21.4/24.0,Repair failed area and rubberized hot mix asphalt resurfacing.
04-4A0904,2015-01-21,2014-11-10,2015-02-23,GORDON N. BALL, INC.,(925)838-5675,$6,000,382.00,04-Nap-29-47.0/47.2 ,BRIDGE REPLACEMENT
03-0F6904,2015-01-21,2014-11-17,2015-05-18,VIKING CONSTRUCTION COMPANY, INC.,(916)852-5530,$2,632,505.00,03-But-70-24.0/24.5,Replace bridge
04-1SS574,2015-01-21,2014-12-01,2015-03-09,GORDON N. BALL, INC.,(925)838-5675,$169,451.00,04-Sol-80-19.6,Repair Drainage System
05-1F8404,2015-01-15,2014-12-08,2015-02-23,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$1,017,225.40,05-SB-101-10.0/10.6,Replace concrete slabs with precast concrete individual slabs.
05-1C8004,2015-01-14,2014-12-08,2015-01-30,SOUZA CONSTRUCTION INC,(805)546-8288,$277,166.00,05-SLO-101-37.7,Realign Off Ramp
07-2W7704,2015-01-08,2014-12-01,2015-01-30,WEST COAST STRUCTURES, INC DBA WESTERN STRUCTURES,(951)352-4300,$373,937.00,07-LA-118, 210, 405-Various,Treat bridge deck with methacrylate and replace joint seals.
11-261604,2015-01-08,2014-11-17,2015-01-28,LB CIVIL CONSTRUCTION,(858)481-5222,$5,293,502.00,11-SD-5-4.0/R22.3,Gore paving, construct concrete barrier and install crash cushions.
04-3E4204,2015-01-07,2014-12-01,2015-01-27,G. BORTOLOTTO & COMPANY, INC.,(650)595-2591,$1,076,805.39,04-SCl-35-14.1/17.1,Rubberized asphalt concrete overlay.
04-4H8504,2015-01-07,2014-12-01,2015-02-06,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$538,672.00,04-SM-280,380-Var,Treat bridge decks with methacrylate and replace joint seals.
06-0P0704,2015-01-07,2014-12-01,2015-01-28,GRANITE CONSTRUCTION COMPANY,(661)387-7747,$282,444.00,06-Ker-58-R85.1,Widen and reconstruct existing asphalt concrete pavement.
08-0N56U4,2014-12-18,2014-10-27,2015-01-22,OHL USA, INC.,(949)242-4432,$20,616,067.80,08-SBd-40-R94.7/R99.7,Bridge Replacements.
11-407004,2014-12-18,2014-10-27,2015-02-04,COFFMAN SPECIALTIES, INC,(858)536-3100,$34,885,000.00,11-SD-8-R61.2/R77.8,Cold plane, RHMA overlay, and replace approach slabs.
08-0P8204,2014-12-18,2014-11-17,2015-01-26,JABRE CONTRACTING INC.,(310)720-0277,$371,975.00,08-Riv-215-R9.2/R15.4,Line and/or Invert Pave 3 Culverts
12-0N2404,2014-12-18,2014-11-17,2015-01-14,V A P CONSTRUCTION INC,(714)253-3270,$285,575.00,12-Ora-39-1.1/ 8.2,Repair Conc Curb & Gutter, Conc SW, Conc Dwy, Cold Plane AC, HMA
02-4G9804,2014-12-17,2014-11-17,2015-01-09,ROCKY MOUNTAIN CONSTRUCTION, INC.,(541)882-8377,$1,344,134.34,02-Sis-97-17.0/24.0,Cold Plane and Place HMA
03-1A8454,2014-12-17,2014-11-03,2015-01-14,A. TEICHERT & SON, INC. DBA TEICHERT CONSTRUCTION,(530)406-4200,$3,996,219.77,03-ED-89-24.9/27.2,Cold plane, HMA overlay and culvert rehabilitation
03-3F6604,2014-12-17,2014-11-03,2015-01-21,BAY CITIES PAVING & GRADING INC,(925)687-6666,$2,088,769.43,03-Sac-160-L1.4/L4.2,Rubberized Hot Mix Asphalt, roadway excavation and replace guardrail.
11-241514,2014-12-11,2014-10-20,2015-01-28,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$8,084,176.00,11-SD-163-8.4/9.4,Reconstruct interchange.
10-0W4304,2014-12-10,2014-10-06,2014-12-24,BAY CITIES PAVING & GRADING, INC,(925)687-6666,$1,419,817.62,10-SJ-99-4.5/23.0,Widen roadway and install ramp metering system.
06-325514,2014-12-10,2014-11-03,2015-01-02,WABO LANDSCAPE & CONSTRUCTION, INC.,(510)741-9226,$667,615.00,06-Kin-198-R8.9/R10.1,Landscaping and plant establishment.
09-358604,2014-12-09,2014-10-27,2015-01-13,PAVE-TECH INC.,(760)729-7592,$2,942,124.00,09-Iny-190-24.5/40.0,Hot mix asphalt thin blanket overlay.
08-0M2004,2014-12-04,2014-10-20,2015-01-28,GRANITE CONSTRUCTION COMPANY,(408)327-7013,$5,796,835.00,08-Riv-371-67.7/72.9,CONSTRUCT 4 RIGHT SHOULDER ON BOTH DIRECTIONS OF ROUTE 371
03-4F1204,2014-12-03,2014-11-03,2014-12-24,AMERICAN CIVIL CONSTRUCTORS WEST COAST, INC.,(707)746-8028,$424,415.00,03-Sac-5-12.9,Treat bridge deck; apply High Friction Surface Treatment & striping.
03-2F9904,2014-12-03,2014-11-03,2014-12-31,O.C. JONES & SONS, INC.,(510)526-3424,$3,872,002.10,03-Sac-160-R0.0/12.0,Rubberized Hot Mix Asphalt (Gap Graded) Overlay
06-0Q2704,2014-11-20,2014-09-22,2014-12-11,SECURITY PAVING COMPANY, INC.,(818)362-9200,$14,038,336.50,06-Fre-5-48.8/53.0,Place hot mix asphalt and continuously reinforced concrete pavement.
06-0H6304,2014-11-20,2014-09-22,2015-01-05,M C M CONSTRUCTION, INC.,(916)334-1221,$3,261,418.00,06-Tul-198-R12.0,Construct pedestrian overcrossing
07-2055A4,2014-11-20,2014-09-29,2015-01-09,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$3,106,852.10,07-LA-2-14.1/14.8,Construct soundwalls, curb ramps and sidewalk.
09-358804,2014-11-20,2014-10-27,2015-01-09,QUALCON CONTRACTORS INC.,(775)782-2006,$2,219,566.00,09-Mno-395-R44.6/50.7,Thin blanket hot mix asphalt overlay.
07-4Y6404,2014-11-20,2014-10-27,2014-12-31,INTERMOUNTAIN SLURRY SEAL, INC.,(775)355-5237,$487,487.00,07-Ven-150-32.0/34.4,Slurry seal mainline and repair failed areas.
07-259024,2014-11-20,2014-09-22,2014-12-31,ORTIZ ENTERPRISES, INC.,(949)753-1414,$15,680,893.39,07-LA-5,10,91,110,134-Var,Install austin vault sand filters and biofiltration swale and strips
08-0Q7604,2014-11-19,2014-09-29,2014-12-19,J. MCLOUGHLIN ENGINEERING CO., INC.,(909)944-1037,$33,864,800.50,08-SBd-10-0.0/30.9,Replace PCC Slabs, MBGR, Cold Plane and HMA Shoulder Overlay
11-282504,2014-11-19,2014-09-29,2014-12-16,WESTERN RIM CONSTRUCTORS, INC.,(760)489-4328,$4,366,997.46,11-SD-15, 94, 805-var,STORM WATER MITIGATION, CONSTRUCT BIOSWALES AND FILTRATION TRENCHES.
04-3G1204,2014-11-19,2014-10-13,2014-12-12,GRANITE CONSTRUCTION COMPANY,(707)467-4100,$1,099,963.50,04-Son-128-1.8,CONSTRUCT SOLDIER PILE WALL AND PLACE CULVERT.
01-0C4604,2014-11-19,2014-09-15,2014-12-09,MERCER-FRASER COMPANY,(707)443-6371,$4,740,700.00,01-Hum-299-R5.5/R11.0,Cold Plane AC, Digouts, Rubberized HMA, MBGR, Striping, Crack Sealing
02-3E4104,2014-11-19,2014-09-22,2014-12-22,STEVE MANNING CONSTRUCTION, INC.,(530)222-0810,$27,173,164.00,02-Sha-299-0.3/7.1,Earthwork, hot mix asphalt paving, and drainage work.
08-043514,2014-11-14,2014-09-08,2014-12-30,SKANSKA-TEICHERT A JOINT VENTURE,(951)684-5360,$126,510,018.00,08-SBd-58-R22.2/R31.1,REALIGN AND WIDEN 2 TO 4 LANES EXPRESSWAY
07-3X9304,2014-11-13,2014-10-13,2014-12-29,DBX, INC.,(951)296-9909,$8,569,369.50,07-LA,Ven-101,110,118,170,405-Var,Install theft resistant pull boxes and replace lighting systems.
10-0A8304,2014-11-13,2014-10-06,2014-12-08,DREAMBUILDER,(714)646-3697,$1,263,061.00,10-SJ-88-6.1/8.9,Upgrade approach bridge rail and extend culverts.
11-2T2514,2014-11-13,2014-10-20,2014-12-17,CLEAN CUT LANDSCAPE,(559)322-2041,$970,497.40,11-SD-805-4.4/5.5,Install highway planting and automatic irrigation systems.
01-0C3504,2014-11-13,2014-10-13,2015-02-12,GHILOTTI BROS., INC.,(415)454-7011,$3,839,414.00,01-Lak-29-R34.4/R40.0,Cold plane AC, apply crack treatment and place rubberized HMA overlay.
04-0J5804,2014-11-13,2014-10-20,2014-12-15,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$1,910,545.50,04-SCl-VAR-VAR,Treat bridge decks with methacrylate and replace joint seals.
02-4G9704,2014-11-13,2014-10-20,2014-12-08,AMERICAN PAVEMENT SYSTEMS, INC.,(209)522-2277,$1,826,340.40,02-Sis-3-6.9/23.0,Asphalt rubber seal coat with replace asphalt concrete surfacing.
04-3G1604,2014-11-13,2014-10-06,2014-12-12,RGW CONSTRUCTION, INC.,(925)606-2400,$3,606,859.35,04-CC-24-5.2/5.6,Construct multi-tired slope stressing system.
06-432604,2014-11-06,2014-09-29,2015-02-27,MYERS AND SONS, CONSTRUCTION LP,,$3,850,672.00,06-Fre-33-10.9/11.1,Replace bridge, reconstruct roadway, and install RSP.
07-287304,2014-11-06,2014-09-29,2014-12-29,YAKAR,(909)599-1612,$1,433,960.91,07-LA-210-R39.8/R42.2,Storm water mitigation and erosion control.
12-0M7204,2014-11-06,2014-09-22,2014-12-03,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$2,968,062.22,12-Ora-91,405-VAR,Seismic retrofit four (4) bridges.
01-362914,2014-11-06,2014-10-06,2014-12-12,DESILVA GATES CONSTRUCTION LP,(925)829-9220,$8,265,267.00,01-Men-101-9.6/10.7,11.2/20.9,Rubberized Hot Mix Asphalt Overlay
01-4154U4,2014-11-05,2014-09-29,2014-12-24,MERCER-FRASER COMPANY,(707)443-6371,$8,387,138.00,01-Men-101-64.7/69.3, 74.8/81.4,Cold plane AC pavement, RHMA overlay, striping and guardrail.
03-3F8904,2014-11-05,2014-10-13,2014-12-08,AMERICA PACIFIC CONSTRUCTION,(559)577-9999,$237,102.00,03-ED-50-17.0/17.3,Install drainage pipe culverts & inlets; HMA paving and striping.
05-1A7004,2014-11-05,2014-09-15,2014-12-24,JOHN MADONNA CONSTRUCTION CO., INC.,(805)543-7751,$9,534,641.80,05-SLO-1-73.7/74.0,Construct Soldier Pile Retaining Wall
04-2G8704,2014-11-05,2014-10-13,2015-01-16,DREAMBUILDER,(714)646-3697,$333,061.00,04-Mrn-1-R1.4,Construct soil nail wall, additional shoulder, and guardrail.
06-0P1404,2014-11-05,2014-09-15,2014-12-03,GRIFFITH/COFFMAN JOINT VENTURE,(661)392-6640,$40,344,304.00,06-Ker-5-62.5/73.1,Concrete lane and panel replacement and grind concrete pavement.
05-1C8604,2014-10-30,2014-09-22,2014-11-20,GRANITE CONSTRUCTION COMPANY,(408)327-7013,$9,976,229.00,05-SCr-1-20.2 / 37.4,Overlay with RHMA-G.
12-0L92U4,2014-10-30,2014-10-06,2015-02-24,DREAMBUILDER,(714)646-3697,$1,899,061.00,12-Ora-5-0.0/29.6,UPGRADE CURB RAMPS, CROSSWALK STRIPING, PED PUSH BUTTONS, AND LIGHTING
07-2838U4,2014-10-30,2014-10-06,2014-12-23,YAKAR,(909)599-1612,$889,310.48,07-LA-2,101,134,210-Var,Establish plants and install irrigation facilities.
07-3X9204,2014-10-30,2014-10-06,2015-01-23,YAKAR,9095991612,$8,114,354.50,07-LA-5, 47, 101-Var,Modify lighting and sign illumination and modify pull box cover
07-274804,2014-10-30,2014-09-22,2014-12-09,MCM CONSTRUCTION, INC.,(916)334-1221,$2,070,732.00,07-LA-18-0.2,Replace bridge deck and railing, repair bent caps and columns.
08-0Q7514,2014-10-30,2014-09-22,2014-12-04,CHUMO CONSTRUCTION INC.,(626)960-9502,$7,372,230.40,08-SBd,Riv-60-R0.0/R4.6, R3.0/R6.9,Replacement of Concrete Slabs
11-2M4604,2014-10-30,2014-10-06,2014-11-21,PENHALL COMPANY,(510)357-8810,$2,271,040.00,11-Imp-86-R21.9/43.1,Grind existing PCC, replace PCC slabs and place joint seal.
06-0Q2504,2014-10-29,2014-09-15,2014-12-03,GRANITE CONSTRUCTION COMPANY,(559)441-5700,$4,544,846.00,06-Kin-198-R9.5/R14.7,Cold in-place recycling and HMA Overlay
06-0P1804,2014-10-29,2014-09-15,2014-12-03,GRANITE CONSTRUCTION COMPANY,(559)441-5700,$13,982,722.00,06-Kin-5-9.0/16.5,Cold plane AC pavement and overlay the existing pavement.
04-4C2004,2014-10-29,2014-09-22,2014-12-03,GRANITE ROCK COMPANY,(408)574-1400,$4,759,837.00,04-SCl-152-R9.9/21.9 ,Cold plane and overlay, pedestrian ramp, replace loop detector
02-4G4804,2014-10-29,2014-09-15,2014-11-24,RTA CONSTRUCTION, INC.,(530)223-1100,$1,722,381.50,02-Sha-299-18.4/18.7,Retaining wall, colored and textured sidewalk, colored curb and gutter
04-272044,2014-10-29,2014-09-22,2014-11-25,GRANITE ROCK COMPANY,(408)574-1400,$4,895,733.00,04-SCl-280-7.8/11.5,Rehabilitate PCC and AC pavements, upgrade guardrails and signs.
03-3E1104,2014-10-29,2014-10-06,2014-11-25,F.D. THOMAS, INC.,(541)664-3010,$1,487,000.00,03-Nev-80-28.0,Paint Structures
04-3G7604,2014-10-28,2014-09-15,2014-12-18,GHILOTTI CONSTRUCTION COMPANY, INC.,(707)585-1221,$585,148.00,04-Nap-128-20.2,Install horizontal drains, slope indicators, and highway planting.
04-4A3424,2014-10-28,2014-09-29,2015-01-27,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$951,154.80,04-Ala-24 , 580-Var,Replace Gore Signs with Overhead Signs.
03-3F0004,2014-10-28,2014-09-29,2014-11-25,KNIFE RIVER CONSTRUCTION,(530)891-6555,$4,436,894.50,03-Yub-20-13.3/20.3,RHMA overlay, replace guardrail
10-0X3004,2014-10-28,2014-10-06,2014-11-17,TIM PAXINS PACIFIC EXCAVATION INC,(916)686-2800,$169,678.90,10-Mer,Sta-99, 108, 140-Var,Install flashing beacons and signs.
08-1C3704,2014-10-28,2014-09-29,2014-12-30,SKANSKA USA CIVIL WEST CALIFORNIA DISTRICT INC.,(951)684-5360,$14,569,140.00,08-Riv-95-L0.0/36.2,HMA Overlay, Upgrade Curb Ramp, and upgrade Metal Beam Guard Railing
10-0C9004,2014-10-28,2014-10-06,2014-11-13,DREAMBUILDER,(714)646-3697,$525,861.00,10-Sta-108-31.2,Widen roadway and provide driveway access.
12-0F96A4,2014-10-23,2014-09-02,2014-11-25,FLATIRON WEST, INC.,(760)916-9100,$49,439,932.62,12-Ora-5-3.0/3.7,Freeway Widening, Bridge Reconstruction, Landscape & Electrical
07-3X9104,2014-10-23,2014-09-22,2014-12-03,CROSSTOWN ELECTRICAL & DATA, INC.,(626)813-6693,$5,448,240.00,07-LA-10,90,110-various,Install tamper proof pull boxes and lighting conversion
07-287204,2014-10-23,2014-09-22,2014-11-21,MARTINEZ LANDSCAPE CO., INC.,(818)364-9188,$958,732.10,07-LA-134-1.6/2.7,Perform planting, install irrigation, and construct slope paving.
10-0X3204,2014-10-23,2014-09-29,2014-11-20,GEORGE REED, INC.,(209)523-0734,$529,715.00,10-Sta,Mer-108,165-33.1/36.1, 30.0/32.4,,Cold plane AC pavement and construct rumble strips.
03-3F6504,2014-10-23,2014-09-22,2014-12-16,GRANITE CONSTRUCTION COMPANY,(775)358-8792,$3,966,966.00,03-Nev-89-1.2/8.7,Cold in-place recycling and hot mix asphalt overlay.
04-1SS224,2014-10-23,2014-09-29,2014-11-17,GHILOTTI CONSTRUCTION COMPANY, INC.,(707)585-1221,$1,033,575.00,04-Son-128-2.4, 2.6,Retaining wall and slope protection.
03-3F6704,2014-10-22,2014-09-15,2014-12-03,MARTIN BROTHERS CONSTRUCTION,(916)381-0911,$5,918,358.50,03-ED-49-23.9/35.0,Pavement overlay
06-0P9704,2014-10-22,2014-09-22,2014-12-03,GRANITE CONSTRUCTION COMPANY,(559)441-5700,$1,699,924.00,06-Mad-152-R0.0/1.1,CONSTRUCT HIGH TENSION CABLE BARRIER AND RUMBLE STRIP
06-0H6414,2014-10-22,2014-09-15,2015-01-22,MCM CONSTRUCTION, INC.,(916)334-1221,$2,998,316.00,06-Ker-178-R4.4,Remove and replace pedestrian overcrossing
02-4E4304,2014-10-22,2014-09-15,2014-11-07,TULLIS, INC.,(530)241-5105,$5,190,953.00,02-Sha-44-R4.2/R14.5,Rehabilitate Pavement
01-488604,2014-10-22,2014-08-11,2015-01-14,GHILOTTI CONSTRUCTION COMPANY, INC.,(707)585-1221,$3,292,539.00,01-Lak-20, 29-8.2/8.6, 52.3/52.5,Improve Intersection
07-3X9404,2014-10-22,2014-09-22,2014-12-09,SELECT ELECTRIC,INC.,(619)460-6060,$3,910,264.00,07-LA-5,10,14,60,91, etc.-Var,Modify communication system.
11-406904,2014-10-21,2014-09-15,2014-11-25,DALEY CORPORATION,(619)390-3900,$9,099,685.68,11-SD-8-R25.9/R32.2,Pavement overlay and roadside safety features upgrade.
12-0J6404,2014-10-21,2014-09-29,2015-01-05,ODONNELL CONSTRUCTION, INC.,(909)394-4510,$950,295.00,12-Ora-55-7.6/9.9,Control source of sediment; Implementation of erosion control measures
02-4F7404,2014-10-21,2014-09-29,2014-11-14,R. BROWN CONSTRUCTION COMPANY, INC.,(530)629-3702,$300,730.00,02-Tri-299-19.2/19.5,Install Double Twisted Wire Mesh Drapery
06-0P1504,2014-10-21,2014-09-15,2014-11-12,SECURITY PAVING COMPANY, INC.,(818)362-9200,$5,195,219.00,06-Kin-198-0.0/7.4,Cold plane AC pavement, overlay with RHMA-G, and modify lighting.
05-0T6404,2014-10-21,2014-09-15,2014-11-19,JOHN MADONNA CONSTRUCTION CO., INC.,(805)543-7751,$1,999,488.50,05-SBt-25-18.8/19.5,Realign existing asphalt concrete pavement.
02-4G00U4,2014-10-16,2014-09-22,2014-11-17,TULLIS, INC.,(530)241-5105,$447,477.00,02-Sis-97-2.1/2.5,Hot mix asphalt, aggregate base, roadway excavation
06-0Q2404,2014-10-16,2014-09-22,2014-11-12,TEICHERT CONSTRUCTION,(559)813-3100,$1,747,374.00,06-Fre-41-R3.0/M6.1,Cold In-Place Recycling and Hot Mix Asphalt Resurfacing
07-3X8204,2014-10-16,2014-09-22,2014-11-25,CHUMO CONSTRUCTION INC.,(626)960-9502,$1,285,516.11,07-LA-39-21.7, 22.0,Repair slope failure.
07-2881U4,2014-10-16,2014-07-21,2015-02-06,FLATIRON WEST, INC.,(760)916-9100,$105,495,711.78,07-LA-210-R16.1/R25.8,Construct concrete pavement, precast concrete panels, and slabs.
07-288504,2014-10-16,2014-09-15,2014-11-13,POWELL CONSTRUCTORS, INC.,(909)356-8880,$4,147,107.00,07-LA-405-10.5/12.6,Weigh station construction and pavement rehabilitation.
11-275504,2014-10-16,2014-08-25,2014-12-23,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$10,968,441.50,11-SD-67-R0.0/R5.9,Cold Plane, Place RHMA-G, Concrete Barrier and Guardrail.
07-2W5404,2014-10-15,2014-09-15,2014-12-22,GEMS ENVIRONMENTAL MANAGEMENT SERVICES, INC.,(925)671-6822,$1,563,005.66,07-Ker-5725,Construct wash building facility.
06-0Q0104,2014-10-15,2014-09-22,2014-11-13,AMERICAN CIVIL CONSTRUCTORS WEST COAST, INC.,(707)746-8028,$1,793,000.00,06-Fre-41-R23.1,Bridge deck resurfacing.
03-4F3404,2014-10-15,2014-09-15,2015-01-14,GRANITE CONSTRUCTION,,$3,555,555.00,03-Pla,Nev-80-69.3/69.8, 0.0/R2.3,Install underdrain and replace AC ditch with minor concrete gutter.
06-0E6804,2014-10-15,2014-04-07,2014-11-17,ABHE & SVOBODA, INC.,(952)447-6025,$330,580.00,06-Mad-99-R1.0-28.2,Paint bridges.
05-0R8304,2014-10-15,2014-09-15,2014-12-15,DESERT CONCEPTS CONSTRUCTION, INC.,(760)200-9007,$997,556.35,05-SB,SLO-1, 101, 135-Var,Construct concrete curb ramps, sidewalk and HMA pavement.
01-0B0804,2014-10-15,2014-09-15,2014-11-07,TIDEWATER CONTRACTORS, INC.,(541)469-5341,$3,329,448.00,01-DN-101-R4.4/9.4,RHMA-WMA Overlay, MBGR construction, and striping.
02-4E90U4,2014-10-15,2014-09-15,2014-12-08,KNIFE RIVER CONSTRUCTION,(530)891-6555,$3,056,107.50,02-Teh-32-5.1/6.3,Curve realignment, cold plane, AB, HMA, drainage, guardrail, striping
11-0223U4,2014-10-09,2014-08-18,2014-12-18,FLATIRON WEST, INC.,(760)916-9100,$60,930,519.00,11-SD-5-R29.1/R30.5,Replace and widen bridge, reconstruct ramps and intersection.
07-275704,2014-10-09,2014-09-15,2014-11-05,CL INDUSTRIAL COATINGS INC,(562)305-1520,$3,249,890.00,07-LA-103-0.1,Paint steel structure.
06-0Q5804,2014-10-08,2014-09-15,2014-10-29,ROADWAY ENGINEERING WORKS INC,(209)541-0920,$950,000.00,06-Ker-58, 99-Var,Replace conductors and secure service equipment encl and pull boxes.
04-4S0504,2014-10-08,2014-09-02,2014-11-05,RGW CONSTRUCTION, INC.,(925)606-2400,$1,854,455.38,04-SCl-09-4.2,Construct Tie-Back wall, roadway, and drainage.
05-0S0304,2014-10-08,2014-09-15,2014-11-04,DREAMBUILDER,(714)646-3697,$318,061.00,05-SB-1,101,192,246-Var,Construct curb ramps, sidewalks and modify signal and lighting.
06-0P8104,2014-10-08,2014-09-15,2014-11-21,DESERT CONCEPTS CONSTRUCTION, INC.,(760)200-9007,$1,644,162.75,06-Ker-178-100.6/102.7,Reconstruct median with raised curb median.
04-3G4434,2014-10-08,2014-09-15,2014-10-31,GOLDEN STATE BRIDGE, INC.,(925)372-8000,$1,285,025.00,04-SF-80-5.8/7.8,Replace bridge ladders and greaselines.
03-3F0404,2014-10-08,2014-09-15,2014-12-12,ROADWAY ENGINEERING WORKS INC,(209)541-0920,$1,266,302.00,03-Sac-5-23.3,Replace All Pump House Components
03-4F0704,2014-09-24,2014-08-11,2014-10-31,DESILVA GATES CONSTRUCTION LP,(925)829-9220,$5,265,815.00,03-Sac-50-17.1,Widen structure, extend weave lane, and add ramp metering.
10-0X3504,2014-09-24,2014-09-02,2014-10-08,LINEAR OPTIONS, INC.,(530)896-1800,$254,396.00,10-Ama,Tuo-16,88,120 -var,Construct rumble strips in existing AC pavement.
08-0P2804,2014-09-24,2014-08-11,2014-11-13,POWELL CONSTRUCTORS, INC.,(909)356-8880,$1,010,500.50,08-Riv-60-1.6,INSTALL TRAFFIC SIGNALS, REALIGN LEFT TURN LANE, WIDEN RAMP
08-383504,2014-09-17,2014-08-11,2014-10-10,GRANITE CONSTRUCTION COMPANY,(760)732-0910,$2,026,265.10,08-Riv-74-63.0,REPLACE HURKEY CREEK BRIDGE
02-4F6304,2014-09-17,2014-08-25,2014-10-06,ROBERT J. FRANK CONSTRUCTION, INC.,(530)222-1408,$224,570.00,02-Tri-3-R26.2,Roadway excavation, Rock Slope Protection and HMA
03-2F2904,2014-09-17,2014-08-11,2014-12-08,TEICHERT CONSTRUCTION,(530)406-4200,$3,309,698.88,03-Pla-267-0.0/6.8,Rehab Pavement
04-1SS044,2014-09-17,2014-08-11,2014-10-22,GHILOTTI CONSTRUCTION COMPANY, INC.,(707)585-1221,$1,479,264.00,04-Ala-580-R31.7/R31.9,Construct Soldier Pile wall, & repair Concrete pavement and shoulder.
04-2G3624,2014-09-17,2014-08-18,2014-10-09,BORTOLUSSI & WATKIN, INC.,(415)453-4675,$626,975.60,04-Ala-92-R5.1/R5.8,Replacement Highway Planting.
11-080174,2014-09-11,2014-08-11,2014-10-22,ACCU CONSTRUCTION, INC.,(714)641-4730,$2,272,323.00,11-SD-76-R7.3/12.0,Install irrigation systems, highway planting and erosion control.
12-0M3704,2014-09-11,2014-08-11,2014-10-30,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$397,468.90,12-Ora-5, 55, 57, 405-VAR,Upgrade and Retrofit CMS Signs with safety cabling and brackets
11-238404,2014-09-10,2014-07-21,2014-10-09,FLATIRON WEST, INC.,(760)916-9100,$11,134,915.00,11-Imp-7-0.0/1.2,Pavement rehabilitation, replace AC with CRCP.
03-3E1204,2014-09-10,2014-08-04,2014-10-06,J.F. SHEA CONSTRUCTION, INC.,(530)246-4292,$1,483,114.20,03-But-70-26.7/27.1,Bridge seismic retrofit, structural concrete and hot mix asphalt
04-3G6504,2014-09-10,2014-08-04,2014-10-08,DESILVA GATES CONSTRUCTION LP,(925)829-9220,$12,754,321.00,04-Sol-680-0.35/13.10,Rehabilitate Pavement.
04-0G2224,2014-09-10,2014-08-18,2014-10-08,GRANITE ROCK COMPANY,(408)574-1400,$1,134,943.00,04-SM-1,35,82,84,109,280-Var,Construct curb ramps and sidewalk.
04-041004,2014-09-09,2014-06-30,2014-11-24,MYERS AND SONS / ACC JV,(916)283-9950,$26,583,658.65,04-SM,Ala-92-R14.4/R18.8,R0.0/R2.6,RESURFACE ORTHOTROPIC DECK AND ELECTRICAL UPGRADES.
06-0M8204,2014-09-03,2014-06-30,2014-10-10,EMMETTS EXCAVATION, INC.,(559)299-1256,$924,203.10,06-Fre-41,180-Var,Widen Shoulder and Construct Concrete Barrier
04-0G7104,2014-09-03,2014-08-04,2014-09-26,BUGLER CONSTRUCTION,(925)416-0700,$1,413,306.00,04-SM-280-R21.3,Seismic retrofit.
10-0W1904,2014-09-03,2014-06-30,2014-12-19,A. TEICHERT & SON, INC DBA. TEICHERT CONSTRUCTION,(209)983-2300,$23,029,680.00,10-SJ-99-22.9/38.8,Pavement Resurfacing
10-0V6604,2014-09-03,2014-06-23,2014-10-08,BAY CITIES PAVING & GRADING, INC.,(925)687-6666,$39,414,624.36,10-Mer,Sta,SJ-5-32.2/32.5, 0.0/28.1, 0.0/R12.4,Place HMA, repair failed areas, and construct guard railing.
08-0R6704,2014-09-03,2014-08-11,2014-09-26,CAL STRIPE INC.,(909)884-7170,$167,728.00,08-SBd-18-PM R17.8/34.5,INSTALL CENTERLINE RUMBLE STRIP
01-0E1804,2014-09-03,2014-08-11,2014-09-29,GRANITE CONSTRUCTION COMPANY,(707)467-4100,$225,915.00,01-Men-101-58.9/61.8,HMA Overlay on Roadside Rest Area Parking Lots.
02-2E74U4,2014-08-27,2014-07-28,2014-10-08,HAT CREEK CONSTRUCTION & MATERIALS, INC.,(530)335-5501,$3,398,929.00,02-Sha-299-83.0/84.0,Roadway Excavation, Hot Mix Asphalt, Drainage.
02-4E8114,2014-08-27,2014-07-28,2014-09-30,TULLIS, INC.,(530)241-5105,$1,790,072.00,02-Plu,Sis,Tri-5, 3, 70-VAR,HMA, aggregate base, electrical & excavation
03-4M7404,2014-08-27,2014-07-21,2014-10-02,AMERICAN CIVIL CONSTRUCTORS WEST COAST, INC.,(707)746-8028,$4,596,515.23,03-Col,Yol-5, 80, 505-VAR,Bridge Deck Poly Overlay, Joint Seals, Bearing Pads, & Epoxy Repairs
05-1A7304,2014-08-27,2014-07-21,2014-09-15,PAPICH CONSTRUCTION CO INC,(805)473-3016,$4,697,000.00,05-Mon-101-49.8/55.3,Cold plane roadway, overlay with HMA and grind concrete pavement.
04-1SS464,2014-08-27,2014-08-04,2014-09-23,FBD VANGUARD CONSTRUCTION,(925)245-1300,$604,599.80,04-CC-680-R17.7/R17.9,Compaction Grouting and PCC Pavement Replacement.
05-0Q5904,2014-08-27,2014-07-21,2014-09-30,GRANITE ROCK COMPANY,(408)574-1400,$1,999,850.00,05-SCr-9-3.8/18.7,Install retaining wall and viaduct, and modify drainage system
10-0T8204,2014-08-27,2014-07-28,2014-09-24,QUIMU CONTRACTING INC.,(707)693-0289,$525,800.20,10-SJ-4,5,26-Var,Construct ADA Curb Ramps
11-298204,2014-08-27,2014-08-04,2014-10-10,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$3,174,826.00,11-SD-905-6.5/10.4,Replace asphalt concrete surfacing and signs.
10-0V4904,2014-08-27,2014-07-28,2014-09-30,K.W. EMERSON, INC.,(209)754-3839,$823,412.00,10-Tuo-108-R3.1, R3.9,Construct rock slope protection.
07-294704,2014-08-21,2014-06-23,2014-11-19,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$53,645,672.00,07-LA-101-11.8/35.3,Replace concrete pavement, cold plane and place RHMA-SP-G.
12-0H0344,2014-08-21,2014-07-14,2014-09-12,AUTOBAHN CONSTRUCTION, INC.,(714)769-7025,$2,496,863.50,12-Ora-073-25.7-28.0,GRIND AND GROOVE PCC PVMT; COLD PLANE AC PVMT; UPGRADE CURB RAMPS
04-1SS054,2014-08-19,2014-07-07,2014-09-19,GRANITE CONSTRUCTION COMPANY,(831)724-1011,$2,553,021.25,04-Ala-580-32.5 ,Construct soldier pile retaining wall.
07-295504,2014-08-14,2014-06-23,2014-09-15,OHL USA, INC.,(949)242-4432,$19,262,649.40,07-LA-101-1.8/8.4,Replace PCC pavement and cold plane and overlay.
12-0H9004,2014-08-14,2014-07-07,2014-09-02,WESTCOAST PUBLIC WORKS, INC.,(818)256-9401,$1,065,520.00,12-Ora-55-4.6/5.9,Slope paving,narrow area paving, valve relocation, access paths, MVPs
11-404404,2014-08-14,2014-07-07,2014-09-08,CLEAN CUT LANDSCAPE,(559)322-2041,$1,219,972.20,11-Imp-78, 111-R9.2/R14.0, 23.5/23.8,Install slope paving, highway planting and irrigation systems.
01-0C9004,2014-08-13,2014-07-21,2014-10-01,GRANITE CONSTRUCTION COMPANY,(707)467-4100,$646,576.50,01-Men-101-50.7/51.2,Superelevation Correction, Open Grade AC Overlay, MBGR, Striping
05-0T7604,2014-08-13,2014-07-21,2014-09-02,GRANITE CONSTRUCTION COMPANY,(831)763-6100,$433,238.00,05-Mon-1-R77.6,Aquajito on-ramp overlay
12-0H1604,2014-08-07,2014-06-30,2014-10-14,ALL AMERICAN ASPHALT,(951)736-7600,$3,411,914.00,12-Ora-1-25.9/29.9,REMOVE AND REPLACE EXISTING PAVEMENT WITH 0.2 RHMA
12-0H20U4,2014-08-07,2014-06-30,2014-09-04,WEST COAST PUBLIC WORKS INC,(818)206-9990,$3,536,910.00,12-Ora-55, 73-2.8/5.924.7/27.8,Highway planting and irrigation replacement
01-0E4804,2014-08-07,2014-08-01,2014-08-11,GRANITE CONSTRUCTION COMPANY,(831)724-1011,$1,508,661.50,01-Men-128-23.3/R26.8,Replace AC Surfacing, HMA Overlay, and Place Rumblestrips.
03-1A8424,2014-08-06,2014-03-24,2014-09-26,QUALCON CONTRACTORS INC.,(775)782-2006,$11,415,112.50,03-ED-89-8.6/13.8,Storm Water Quality Improvements and Overlay
04-4A8104,2014-08-05,2014-06-30,2014-09-12,GALLAGHER & BURK INC,(510)261-0466,$1,756,430.00,04-Ala-880-R32.8/R34.0,Storm Water Mitigation.
11-406604,2014-07-31,2014-07-07,2014-08-25,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$7,334,592.50,11-SD-76-R4.2/R7.6,Install barrier, turn pockets, guardrail and end treatments.
02-3E7904,2014-07-30,2014-06-23,2014-09-24,J.F. SHEA CONSTRUCTION, INC.,(530)246-4292,$4,947,910.00,02-Tri-299-12.3/12.9,Construct sidehill viaducts, place HMA, install barrier railing
01-0B0004,2014-07-30,2014-06-23,2014-08-20,O.C. JONES & SONS, INC.,(510)526-3424,$16,752,199.00,01-Lak-20-13.5/31.4,Replace hot mix asphalt, apply gap graded rubberized hot mix asphalt.
04-4A8304,2014-07-29,2014-06-30,2014-08-22,GORDON N BALL INC,(925)838-5675,$431,288.00,04-Ala-13-5.3/5.6,Drainage and shoulder paving.
04-0G7504,2014-07-29,2014-07-07,2014-08-26,APEX FENCE CO INC,(530)365-3316,$253,358.00,04-Sol-113-R21.8,Construct thrie beam barrier.
11-2T2504,2014-07-24,2014-05-27,2014-08-11,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$5,538,158.55,11-SD-805-9.5/10.3,Widen freeway with JPCP, construct barrier, modify electrical systems.
08-3401U4,2014-07-24,2014-05-12,2014-09-10,FLATIRON/HARDY & HARPER A JOINT VENTURE,(760)916-9100,$47,428,041.31,08-SBd-2, 138-6.2/6.4,2.3/R15.2,Widening highway, bridges and constructing retaining walls.
10-0K0214,2014-07-23,2014-06-23,2014-08-20,WABO LANDSCAPE & CONSTRUCTION, INC.,(510)741-9226,$619,420.50,10-Mer-99-15.8/17.3,Highway Planting and Irrigation.
10-0W6904,2014-07-23,2014-06-23,2014-08-15,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$2,133,133.00,10-SJ-4, 5, 99, 205-Var,Bridge Rehabilitation
03-2F0004,2014-07-23,2014-06-23,2014-08-11,DIRT AND AGGREGATE INTERCHANGE, INC.,(503)661-5093,$6,792,222.00,03-But,Col,Gle,Sut,Yol,Yub-16, 32, 45, 70, 113, 162-VAR,Reconstruct Guard Rail and End Treatments
04-4A8204,2014-07-22,2014-06-23,2014-09-19,GORDON N BALL INC,(925)838-5675,$296,035.00,04-Ala-80-6.2/6.4,Storm water mitigation
12-0J61U4,2014-07-17,2014-06-02,2014-08-12,ACCU CONSTRUCTION INC,(714)641-4730,$4,759,072.40,12-Ora-5, 405-19.2/22.2, 0.0/1.2,Highway Planting, Erosion Control, Electric Service (Irrigation)
08-0J9304,2014-07-17,2014-06-23,2014-08-25,AUTOBAHN CONSTRUCTION INC,(714)769-7025,$544,031.00,08-SBd-15-147.6,BRIDGE REHABILITATION
10-0Y6904,2014-07-16,2014-06-23,2014-08-05,AMERICAN CIVIL CONSTRUCTORS WEST COAST, INC.,(707)746-8028,$409,900.00,10-SJ-5,99-var,Construct high friction surface treatment.
09-346504,2014-07-16,2014-06-16,2014-08-06,QUALCON CONTRACTORS INC.,(775)782-2006,$975,869.00,09-Mno-266-2.1/2.7,Construct roadway realignment.
11-2T1784,2014-07-10,2014-06-09,2014-08-05,WESTERN RIM CONSTRUCTORS, INC.,(760)489-4328,$582,542.76,11-SD-5-R35.8/R38.5,Planting, irrigation and rock blanket work.
06-0P5604,2014-07-09,2014-06-16,2014-07-29,GRIFFITH COMPANY,(661)392-6640,$2,447,442.00,06-Ker-58-36.3/39.9,Widen shoulders and install shoulder rumble strip.
06-0P8404,2014-07-09,2014-06-16,2014-08-04,GRANITE CONSTRUCTION COMPANY,(831)724-1011,$3,451,485.00,06-Ker-223-4.8/R17.2,Widen outside shoulder and construct rumble strip.
05-1F3204,2014-07-09,2014-06-16,2014-07-29,TRAFFIC DEVELOPMENT SERVICES, INC.,(805)523-1914,$555,572.00,05-SB-101-13.0/22.8,Replace overhead guide signs and barrier delineations.
03-3F7704,2014-07-09,2014-06-16,2014-07-24,CHRISP COMPANY,(510)656-2840,$1,525,567.00,03-But,Col,ED,Nev,Pla,Sac,Sut,Yol,Yub-16, 20, 49, 50, 70, 80, 99, 149-VAR,Install shoulder and centerline rumble strips.
05-1C3304,2014-07-09,2014-06-16,2014-09-08,GRANITEROCK COMPANY,(408)574-1423,$2,085,568.00,05-Mon-101-57.1/60.8,Construct high tension cable median barrier and install rumble strip.
04-294944,2014-07-08,2014-05-05,2014-08-06,MARINA LANDSCAPE INC,(714)939-6600,$2,358,529.90,04-Ala,CC-24-5.3/6.2 0.0/1.3,Replacement Highway Planting and Irrigation.
04-152724,2014-07-08,2014-04-28,2014-08-12,BAY CITIES PAVING & GRADING INC,(925)687-6666,$11,745,322.36,04-CC-4/242-R8.0/25.2 & 0.0/3.4,Install ramp metering & TOS elecments.
10-0J92U4,2014-07-02,2014-06-09,2014-07-24,MYERS AND SONS CONSTRUCTION, LP,(916)283-9950,$4,488,449.00,10-Sac,SJ-12-5.5/6.2, 0.0/0.5,Bridge and control house rehabilitation.
07-295704,2014-06-26,2014-04-21,2014-07-21,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION INC,(949)252-0441,$21,829,880.00,07-LA-605-R0.0/20.5,Replace concrete pavement, cold plane and place HMA pavement.
11-263304,2014-06-26,2014-05-05,2014-07-30,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$11,894,734.00,11-Imp-8-R38.8/R39.1,Bridge replacement and modify interchange.
07-295604,2014-06-26,2014-05-05,2014-07-31,C A RASMUSSEN INC,(661)367-9040,$23,420,654.00,07-LA-5-19.2/28.9,Cold plane AC Pvmt and overlay.
01-496504,2014-06-25,2014-05-19,2014-07-14,MERCER-FRASER COMPANY,(707)443-6371,$919,737.00,01-Hum-5711,Excavate petroleum impacted soil, place HMA and import borrow
04-3G7504,2014-06-24,2014-06-02,2014-07-16,ROBERT J FRANK CONSRUCTION INC,(530)222-1408,$123,036.00,04-SM-92-2.5,CONSTRUCT ROCK SLOPE PROTECTION, DITCH LINING, AND INSTALL DRAINAGE
04-014104,2014-06-24,2014-05-05,2014-07-29,TABER CONSTRUCTION INC,(925)682-6133,$14,234,058.00,04-Ala-5785,Construct SFOBB warehouse.
11-257154,2014-06-19,2014-04-28,2014-08-04,AMES CONSTRUCTION INC,(951)356-1275,$75,213,841.50,11-SD-15,76-R46.2/R46.8, R12.1/R17.7,Construct 4 lane highway.
07-295004,2014-06-19,2014-05-12,2014-07-07,POWELL CONSTRUCTORS INC,(909)356-8880,$8,785,193.50,07-LA-10-41.7/48.3,Cold plane AC Pvmt and place rubberized HMA, superpave.
10-1C0204,2014-06-18,2014-05-12,2014-07-16,WEST COAST STRUCTURS INC DBA WESTERN STRUCTURES,(951)352-4300,$1,209,316.94,10-SJ-12-R4.4,Bridge rehabilitation.
01-474904,2014-06-18,2014-05-05,2014-07-24,GRANITE CONSTRUCTION COMPANY,(707)467-4100,$5,110,299.50,01-Men-1-70.3/70.7,Repair Storm Damage
05-330764,2014-06-18,2014-05-27,2014-10-09,PACIFIC RESTORATION GROUP, INC.,(951)940-6069,$1,031,448.75,05-SLO-46-37.6/40.4,Irrigation, planting, and plant establishment.
03-4M2004,2014-06-18,2014-05-19,2014-07-02,BLAISDELL CONSTRUCTION INC.,(530)365-4444,$634,745.00,03-But,Col,Gle-5, 20, 32, 162-Var,Bridge scour, apply RSP (light, method B) & Conc (slope protection).
04-2G8404,2014-06-17,2014-06-02,2014-06-25,GHILOTTI CONSTRUCTION COMPANY INC,(707)585-1221,$333,380.00,04-Ala-61-19.2,Modify a drainage system.
08-336304,2014-06-12,2014-04-28,2014-07-25,POWELL CONSTRUCTORS INC,(909)356-8880,$1,428,980.00,08-SBd-38-26.3/26.8,BRIDGE DECK REPLACEMENT
07-296804,2014-06-12,2014-04-28,2014-09-05,SULLY MILLER CONTRACTING COMPANY,(714)578-9600,$20,279,175.00,07-LA-405-28.0/39.0,Place HMA and RHMA (Type G) and grind concrete pavement.
07-294904,2014-06-12,2014-05-05,2014-07-07,SECURITY PAVING COMPANY INC,(818)362-9200,$9,757,977.00,07-LA-5-6.8/13.8,Replace PCC pavement and cold plane and overlay.
04-1A5514,2014-06-10,2014-05-05,2014-09-12,C C MYERS INC,(916)635-9370,$10,525,383.00,04-SF-101/280-1.5/1.8,R4.1/R4.4,REPLACE BARRIER RAILINGS
04-3E4704,2014-06-10,2014-04-21,2014-06-24,WESTERN STRUCTURES,(951)352-4300,$697,985.00,04-SM,SF-1,92,101,280-Var,Treat bridge decks with methacrylate and replace joint seals.
10-0V6804,2014-06-04,2014-04-28,2014-08-05,GEORGE REED, INC.,(209)523-0734,$3,371,209.00,10-Sta-120-6.1/11.3,Repair failed areas and apply rubberized HMA.
02-3C0714,2014-06-04,2014-04-21,2014-06-25,HAT CREEK CONSTRUCTION & MATERIALS, INC.,(530)335-5501,$12,183,831.00,02-Las-395-61.5/R76.6,Pulverize Roadbed , HMA, Roadway Excavation
08-0J8504,2014-05-29,2014-04-01,2014-07-01,STEVE P RADOS INC,(714)835-4612,$5,866,648.00,08-SBd-138-R24.1,Replace existing bridge.
11-408504,2014-05-29,2014-05-05,2014-08-04,WESTERN RIM CONSTRUCTORS INC,(760)489-4328,$1,339,604.31,11-SD-125-9.7/12.1,Install median barrier type STBB.
07-4T5604,2014-05-29,2014-05-05,2014-06-12,UNIQUE PERFORMANCE CONSTRUCTION INC,(714)528-2220,$295,024.00,07-LA-107-4.2,Modify signal and lighting and ADA curb ramps
05-0S7904,2014-05-28,2014-04-21,2014-06-17,CALPORTLAND CONSTRUCTION,(805)345-3581,$2,899,927.20,05-SLO-101-R21.6/R23.9,Repave roadway with rubberized HMA and construct guardrail.
01-378124,2014-05-28,2014-05-05,2014-06-19,KENS WATER TENDER, INC.,(530)629-4397,$538,629.50,01-Men-128, 253-VAR,Rehabilitate Culverts
08-1C4104,2014-05-22,2014-04-07,2014-06-12,J MCLOUGHLIN ENGINEERING CO INC,(909)944-1037,$2,530,243.40,08-SBd-15, 40, 127, 58, 95 and 247-Varies,Bridge rehab, shoulder & ramp seal, install G-11s and guardrail
07-1W6104,2014-05-22,2014-04-21,2014-06-10,VELARDE CONCRETE CONSTRUCTION INC,(818)898-2300,$1,141,830.67,07-LA-1,47,91,110,405,710-Var,Treat bridge deck with methacrylate and replace joint seals.
03-4M8504,2014-05-21,2014-04-21,2014-06-17,GRANITE CONSTRUCTION COMPANY,(916)855-4400,$2,753,753.00,03-Sac-50-R5.8/12.9,Rubberized HMA (Open Graded) Overlay
04-4H5704,2014-05-20,2014-04-21,2014-06-11,WINDSOR FUEL COMPANY,(925)427-5266,$2,383,119.00,04-Son-12-18.8/21.7,Resurfacing with Rubberized Bounded Wearing Course.
04-3E5104,2014-05-20,2014-04-21,2014-06-05,PETERSON CHASE GENERAL ENGINEERING CONSTRUCTION INC,(949)252-0441,$1,915,952.14,04-Ala-VAR-VAR,Treat bridge deck with methacrylate resin and replace joint seals.
11-2M6304,2014-05-15,2014-04-01,2014-06-09,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$4,294,738.00,11-SD-76-24.1/34.9,Cold In-Place Recycling.
08-0N4004,2014-05-15,2014-04-21,2014-06-10,SMART TECH GROUP INC,(949)800-6040,$444,055.60,08-SBd-18-59.9/63.3,INSTALL MBGR AND END TREATMENTS
07-273104,2014-05-15,2014-04-21,2014-06-10,HIGHLAND CONSTRUCTION INC,(714)538-5156,$1,427,864.00,07-LA-105, 110-Var,Replace joint seals and concrete spalls.
07-4T6804,2014-05-15,2014-04-14,2014-06-12,SMART TECH GROUP INC,(949)800-6040,$450,356.80,07-LA-105-R0.9, R4.7,Apply high friction surface treatment and construct curb ramp.
08-1C8904,2014-05-15,2014-04-14,2014-06-10,AUTOBAHN CONSTRUCTION INC,(714)769-7025,$1,131,885.25,08-Riv-10-R110.4/R152.4,BRIDGE PREVENTIVE MAINTENANCE
08-0R8104,2014-05-15,2014-04-07,2014-06-10,ABSL CONSTRUCTION,(510)727-0900,$735,918.50,08-Riv-215-R15.0,INSTALL A WEIGH IN MOTION (WIM) SYSTEM
07-1W5904,2014-05-15,2014-04-14,2014-06-04,VELARDE CONCRETE CONSTRUCTION INC,(818)898-2300,$1,384,839.00,07-LA-10, 39, 210, 605-Var,Treat bridge deck with methacrylate and replace joint seals.
08-0R9704,2014-05-15,2014-04-21,2014-06-11,FLEMING ENVIRONMENTAL INC,(714)871-2800,$1,186,570.00,08-Riv-5730,Construct washrack, material bins, emulsion tank and canopy.
11-292304,2014-05-15,2014-04-21,2014-06-11,CLEAN CUT LANDSCAPE,(559)322-2041,$1,741,878.95,11-SD-805-0.9/1.1, 2.5/2.9,Storm water mitigation, slope erosion repair, planting and irrigation.
12-0M7104,2014-05-15,2014-04-21,2014-06-05,ALL AMERICAN ASPHALT,(951)736-7600,$3,995,626.00,12-Ora-241-17.3/25.0 PM,Cold Plane & Overlay W/Rubberized HMA(Open Grade) and HMA(Open Grade)
10-0X7704,2014-05-14,2014-04-07,2014-06-05,PETERSON-CHASE GENERAL ENGINERING CONSTRUCTION, INC.,(949)252-0441,$414,672.98,10-Mer,Sta-5, 59, 99, 132-var,Treat bridge decks and replace joint seals.
09-358304,2014-05-14,2014-04-21,2014-06-09,WILLIAM KANAYAN CONSTRUCTION,(909)337-5428,$351,312.00,09-Mno-108, 158, 182, 395-var,Replace culverts.
01-0C9504,2014-05-14,2014-04-21,2014-06-10,GRANITE CONSTRUCTION COMPANY,(707)467-4100,$1,398,981.40,01-Men-101-R100.1/R103.8,Bonded Wearing Course
03-4M8204,2014-05-14,2014-04-21,2014-06-09,A. TEICHERT & SON, INC. DBA TEICHERT CONSTRUCTION,(530)406-4200,$1,922,074.50,03-Sac-5, 99-29.5/30.5, 32.1/36.9,Rubberized Hot Mix Asphalt (Open Graded) Overlay
03-4M7304,2014-05-14,2014-04-14,2014-06-05,WEST COAST STRUCTURES, INC DBA WESTERN STRUCTURES,(951)352-4300,$1,239,245.65,03-Sac-51,99,160-VAR,Polymer overlay bridge decks; spot blast & paint steel members.
05-1F4804,2014-05-14,2014-04-14,2014-06-10,AMERICAN CIVIL CONSTRUCTORS WEST COAST, INC.,(707)746-8028,$289,279.00,05-SB-101-47.3/47.9,Place high friction surface treatment on existing roadbed.
04-235844,2014-05-13,2014-02-24,2014-06-25,GHILOTTI CONSTRUCTION COMPANY INC,(707)585-1221,$44,991,507.50,04-SM-101-16.3/17.1,Reconstruct overcrossing, retaining walls, ground improvement,
04-3E2404,2014-05-13,2014-04-21,2014-06-04,OGRADY PAVING INC,(650)966-1926,$241,170.00,04-SM-35-21.0/23.0,Cold plane asphalt concrete pavement and place hot mix asphalt.
04-3E3604,2014-05-13,2014-04-14,2014-06-04,WINDSOR FUEL COMPANY,(925)427-5266,$1,626,850.00,04-Sol-37-0.1/7.4,Cold plane pavement and place rubberized hot mix asphalt.
07-4Y9204,2014-05-08,2014-04-07,2014-05-29,J MCLOUGHLIN ENGINEERING CO INC,(909)944-1051,$4,243,170.00,07-LA-14-R24.8/R32.1,Replace concrete slabs.
08-1C1304,2014-05-08,2014-04-14,2014-06-09,SKANSKA USA CIVIL WEST CALIFORNIA DISTRICT INC,(951)684-5360,$1,258,000.00,08-Riv-111-47.2/T50.0,Cold plane, overlay with RHMA-Type G, and replace AC surfacing
08-0R2104,2014-05-08,2014-04-14,2014-06-17,STERNDAHL ENTERPRISES INC,(818)834-8199,$267,620.00,08-Riv-60-R0.0/11.9,Stripe to continuos access HOV lanes
11-2M4404,2014-05-08,2014-04-07,2014-06-02,SKANSKA USA CIVIL WEST CALIFORNIA DISTRICT INC,(951)684-5360,$2,990,000.00,11-Imp-111-40.5/65.4,Overlay with HMA (Type A) and place Asphalt Rubber Seal Coat.
08-0R4004,2014-05-08,2014-04-14,2014-06-04,ALL AMERICAN ASPHALT,(951)736-7600,$2,581,601.20,08-SBd-2, 138-0.0/6.4, 0.0/4.8,COLD PLANE, OVERLAY AND REPLACE ASPHALT CONCRETE SURFACING
07-1W5204,2014-05-08,2014-04-07,2014-06-09,FUTURE DB INTERNATIONAL INC,(949)390-2111,$429,910.00,07-LA-5704,Install wash rack.
07-1W6504,2014-05-08,2014-04-07,2014-06-03,THE SUN GROUP,(949)476-3133,$912,930.74,07-LA-101, 134-Various,Treat bridge deck with methacrylate and replace joint seals.
10-0X4404,2014-05-07,2014-04-07,2014-05-30,ODONNELL CONSTRUCTION, INC.,(909)394-4510,$297,425.60,10-Mpa-49-2.9,Remove and replace bridge deck overlay.
10-0F7404,2014-05-07,2014-04-14,2014-06-19,AMERICAN CIVIL CONSTRUCTORS WEST COAST, INC.,(707)746-8028,$1,126,100.00,10-Mer-5-17.5,Bridge Girder Retrofit
03-4M8404,2014-05-07,2014-04-14,2014-06-24,ACME CONCRETE PAVING INC, DBA ACPI,(509)242-1234,$7,647,894.82,03-Nev-80-21.2/28.1,Grind Wearing Course, Profile Grind PCC, Apply Concrete Hardener
05-0R5304,2014-05-07,2014-04-14,2014-05-28,CALPORTLAND CONSTRUCTION,(805)345-3581,$720,124.35,05-Mon,SLO-1, 101-Var,Construct curb ramps, sidewalks and modify signal and lighting,
05-1C9004,2014-05-07,2014-04-14,2014-05-28,CALPORTLAND CONSTRUCTION,(805)345-3581,$5,357,315.80,05-SLO-46-50.2/60.9,Resurface existing pavement with gap graded RHMA.
02-4G1904,2014-05-07,2014-03-10,2014-06-03,TULLIS, INC.,(530)241-5105,$1,746,671.00,02-Sha-299-60.0/67.8,Place HMA, Replace AC Surfacing
03-4M6604,2014-05-07,2014-04-07,2014-05-21,MIDSTATE BARRIER, INC.,(209)944-9565,$339,412.50,03-Sac-104-3.7/8.5,Replace Guardrailing
02-4F1004,2014-05-07,2014-04-14,2014-05-23,DIG IT CONSTRUCTION, INC.,(530)258-3306,$1,107,318.00,02-Plu-070-23.7/23.9,Place Rock Slope Protection and reconstruct and overlay roadway
01-0A3604,2014-05-07,2014-04-07,2014-06-02,MERCER-FRASER COMPANY,(707)443-6371,$2,614,717.00,01-Hum-299-19.3/19.8,Geosynthetic reinforced embankment, roadway ex, base, and HMA paving
01-499104,2014-05-07,2014-04-14,2014-05-22,ROBERT J. FRANK CONSTRUCTION, INC.,(530)222-1408,$453,080.00,01-DN-101-0.9/23.9,Repair and replace culverts and downdrains. Install culvert liners.
01-0C4804,2014-05-07,2014-04-07,2014-05-28,MERCER-FRASER COMPANY,(707)443-6371,$3,989,170.00,01-Hum-101-69.9/75.1,Place RHMA Overlay
04-1A2604,2014-05-06,2014-04-14,2014-05-29,GORDON N BALL INC,(925)838-5675,$895,302.00,04-Sol-80-4.0/4.3,Upgrade Drainage Systems.
04-3E3704,2014-05-06,2014-04-14,2014-05-22,O C JONES & SONS INC,(510)526-3424,$699,857.00,04-Nap-29-0.0/5.1,Cold plane asphalt concrete pavement and place hot mix asphalt.
04-4G4004,2014-05-06,2014-04-14,2014-05-29,BAY CITIES PAVING & GRADING,(925)687-6666,$592,640.50,04-Ala-13-13.2/13.7,Cold plane asphalt concrete and place hot mix asphalt.
04-2G6004,2014-05-06,2014-04-14,2014-06-19,GHILOTTI CONSTRUCTION COMPANY INC,(707)585-1221,$1,119,553.40,04-Son-101-R54.2/R56.2,Cold plane pavement and place HMA-A, and install drainage systems.
07-1W5604,2014-05-01,2014-04-01,2014-05-28,TRUESDELL CORPORATION OF CALIFORNIA INC,(602)437-1711,$1,285,285.00,07-Ven-23,101,118,126,150-Var,Treat bridge deck with methacrylate and replace joint seals.
08-1C3904,2014-05-01,2014-04-07,2014-06-09,J MCLOUGHLIN ENGINEERING CO INC,(909)944-1037,$945,267.15,08-SBd-10, 210-Varies,RESURFACE BRIDGE DECKS AND REPLACE JOINT SEALS
11-416204,2014-05-01,2014-04-07,2014-06-06,GRANITE CONSTRUCTION COMPANY,(760)732-0915,$468,468.00,11-SD-15-R36.2/R37.0,Grind and overlay ramps, upgrade curb ramps.
07-1W6904,2014-05-01,2014-03-24,2014-05-28,ALL AMERICAN ASPHALT,(951)736-7600,$1,364,333.00,07-LA-72-0.0/6.8,Place RHMA overlay and asphaltic emulsion membrane.
10-0X7804,2014-04-30,2014-04-07,2014-05-21,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.,(949)252-0441,$788,243.30,10-SJ-5,26,88,132-var,Treat bridge decks, replace joint seals, and replace approach slabs.
09-358904,2014-04-30,2014-04-01,2014-05-23,W JAXON BAKER, INC.,(530)241-2112,$4,209,344.00,09-Mno-395-R12.6/35.3,Hot mix asphalt, superpave thin blanket overlay.
03-3M9204,2014-04-30,2014-04-01,2014-05-21,SIERRA NEVADA CONSTRUCTION, INC.,(775)355-0420,$2,396,007.00,03-ED-193-R6.0/12.7,Cold In-Place Recycling with Hot Mix Asphalt Overlay
03-4M6104,2014-04-30,2014-04-01,2014-05-22,C.C. MYERS, INC.,(916)635-9370,$1,948,000.00,03-Nev-80-R9.0, 28.1,Substructure mitigation and bridge deck polyester overlay.
03-4M9604,2014-04-30,2014-04-01,2014-05-21,WINDSOR FUEL,(925)427-5266,$1,257,827.50,03-Pla-49-2.5/7.6,Micro-Surfacing and Replace AC Surfacing
03-1F8904,2014-04-30,2014-04-07,2014-06-03,KNIFE RIVER CONSTRUCTION,(530)891-6555,$623,565.09,03-Nev-49-17.1/17.4,Add four-foot wide paved shoulder
01-0A8104,2014-04-30,2014-04-07,2014-05-20,BUGLER CONSTRUCTION,(925)416-0700,$391,775.00,01-Men-1, 128-VAR,Bridge concrete spall repair, joint seals, cable restrainers.
02-4F4104,2014-04-30,2014-04-07,2014-05-22,R. BROWN CONSTRUCTION COMPANY, INC.,(530)629-3702,$647,938.75,02-Sis-96-33.2,Cable mesh attenuator system, rock exc, drainage, cold plane, pave
01-0C8804,2014-04-30,2014-04-07,2014-05-20,INTERMOUNTAIN SLURRY SEAL, INC.,(775)355-5237,$561,561.00,01-Hum-96-16.8/23.0,Place Seal Coat
04-2A2504,2014-04-29,2013-08-19,2014-05-29,BAY CITIES PAVING & GRADING INC,(925)687-6666,$13,620,050.95,04-SCl-152-0.1/5.2,Roadway Realignment and Construct Retaining Walls
07-4Y9704,2014-04-24,2014-04-01,2014-05-19,SECURITY PAVING COMPANY INC,(818)362-9200,$2,882,789.00,07-LA-101-8.0/11.5,Cold plane AC Pvmt and place RHMA, Superpave.
08-1C9204,2014-04-24,2014-04-01,2014-05-22,ALL AMERICAN ASPHALT,(951)736-7600,$3,493,521.70,08-SBd-18, 83, 210-T6.0/9.1, 7.2/11.1, 1.1/R29.6,Slurry Seal, Cold Plane, Overlay, and Localized Dig-out
07-1W7304,2014-04-24,2014-03-24,2014-05-21,ALL AMERICAN ASPHALT,(951)736-7600,$287,872.00,07-LA-710-T30.9/T31.8,Cold plane AC pavement and place RHMA(G)
11-416104,2014-04-24,2014-03-24,2014-05-30,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$544,920.00,11-SD-15-M20.3 / M20.9,Cold plane and overlay off and on ramp.
07-1W6204,2014-04-24,2014-03-24,2014-05-22,WESTERN STRUCTURES,(951)352-4300,$857,094.49,07-LA-1-9.9,Treat bridge deck with methacrylate and replace joint seals.
10-1C0104,2014-04-23,2014-04-01,2014-05-13,VIKING CONSTRUCTION COMPANY, INC.,(916)852-5530,$556,277.00,10-SJ-120-R0.8,Bridge rehabilitation.
10-0S8704,2014-04-23,2014-03-24,2014-05-13,GEORGE REED, INC.,(209)523-0700,$183,667.00,10-Sta-4-6.3/6.6,Widen shoulder and install rumble strip.
06-0Q8004,2014-04-23,2014-03-17,2014-05-15,GRIFFITH COMPANY,(661)392-6600,$1,186,353.60,06-Ker-58-31.8/39.7,Repair failed pavement, overlay with RHMA and install rumble strip.
02-4G1604,2014-04-23,2014-03-10,2014-05-13,J.F. SHEA CONSTRUCTION, INC.,(530)246-4292,$6,262,844.00,02-Sha,Sis-5-58.0/67.0, 0.0/2.7,Cold Plane & Replace 0.1 RHMA-G and/Dig-Outs
03-4M7004,2014-04-23,2014-03-24,2014-05-12,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$1,555,555.00,03, 04-Sac,SJ,Sol,Yol-5, 12-VAR,Resurface Bridge Decks, replace joint seals, place HMA at approaches.
03-4M8304,2014-04-23,2014-03-24,2014-05-12,KNIFE RIVER CONSTRUCTION,(530)891-6555,$1,702,204.50,03-But-99-R37.2/44.4,Rubberized Hot Mix Asphalt (Gap Graded) Overlay
06-0P0504,2014-04-23,2014-03-24,2014-05-16,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$733,733.00,06-Ker-65,99,178,223-Var,Repair bridge deck and joint seal.
03-4M6904,2014-04-23,2014-03-24,2014-05-19,C.C. MYERS, INC.,(916)635-9370,$495,325.30,03-ED-50-19.6, 25.3,Remove AC surfacing, place Polyester Concrete Overlay and HMA.
06-0Q7504,2014-04-23,2014-03-24,2014-05-21,GRANITE CONSTRUCTION COMPANY,(559)441-5768,$2,357,000.00,06-Fre-33-16.7/22.7,Cold In-Place Recycle AC pavement and resurface existing pavement.
03-4M2604,2014-04-23,2014-03-24,2014-06-18,DREAMBUILDER,(714)646-3697,$345,131.00,03-Sie-89-27.2/29.6,Corrugated steel pipe and pipeliner
06-0R2404,2014-04-23,2014-03-17,2014-06-12,GRANITE CONSTRUCTION COMPANY,(559)263-9601,$399,580.00,06-Fre-5-37.1/41.7,44.9/46.5,Cold plane and resurface roadway.
06-0Q4204,2014-04-23,2014-03-24,2014-05-22,RE COM DEVELOPMENT COMPANY,(760)873-3301,$934,315.84,06-Ker-5713,Construct mechanics facility and site work.
02-4F7004,2014-04-23,2014-03-24,2014-05-12,Q & D CONSTRUCTION INC.,(775)786-2677,$1,040,674.60,02-Las,Plu,Teh-VAR-VAR,Bridge Maintenance
03-3F9504,2014-04-23,2014-03-24,2014-06-20,HERBACK GENERAL ENGINEERING,(775)267-6800,$429,306.80,03-Nev-49-5.6/6.0,Widen to add a northbound turn lane and a 8-foot wide paved shoulder.
01-0C4204,2014-04-23,2014-04-01,2014-05-30,DARREN TAYLOR CONSTRUCTION, INC.,(530)378-2211,$1,126,945.25,01-Hum,Men-20, 101, 255-VAR,Replace Asphalt Concrete Surfacing
04-3E3504,2014-04-22,2014-03-24,2014-05-15,MCK SERVICES INC,(925)957-9200,$590,003.80,04-SCl-130-18.7/22.5,Cold plane asphalt concrete pavement and place hot mix asphalt.
04-4H4904,2014-04-22,2014-03-24,2014-06-17,MCK SERVICES INC,(925)957-9200,$741,721.00,04-Ala-84-6.9/8.0,Cold plane AC pavement and place HMA (Type A) at spot locations.
07-1W0904,2014-04-17,2014-03-24,2014-05-08,ALL AMERICAN ASPHALT,(951)736-7600,$931,564.90,07-Ven-23-17.8/20.9,Cold in-place recycling and place rubberized HMA, superpave.
08-0Q4904,2014-04-17,2014-03-24,2014-05-20,VSS INTERNATIONAL INC,(916)373-1500,$2,874,372.00,08-SBd-95-56.1/64.5,Placing Seal Coat
12-0F96C4,2014-04-17,2014-02-03,2014-06-17,FLATIRON WEST INC,(760)916-9100,$44,312,578.27,12-Ora-5-3.7/6.2,Add HOV lane in each direction
11-2M6104,2014-04-17,2014-03-24,2014-05-07,PETERSON CHASE GENERAL ENGINEERING CONSTRUCTION INC,(949)252-0441,$198,924.90,11-Imp-8,78,86-VAR,Clean & treat bridge decks with methacrylate and repair joint seals.
07-1W6304,2014-04-17,2014-03-24,2014-05-13,PETERSON CHASE GENERAL ENGINEERING CONSTRUCTION INC,(949)252-0441,$802,222.30,07-LA-2-14.5/R23.2,Replace approach slabs and treat bridge deck with methacrylate.
11-416404,2014-04-17,2014-03-24,2014-05-08,DREAMBUILDER,(714)646-3697,$709,061.00,11-SD-78-R17.0/R17.4,Cold plane, place RHMA-G, concrete barrier and guardrail.
06-0Q8304,2014-04-16,2014-03-03,2014-05-15,WINDSOR FUEL COMPANY,(925)427-5266,$2,376,000.00,06-Ker-178-R2.0/R7.5,Repair failed pavement and overlay with RHMA (BWC-G).
12-0M8404,2014-04-10,2014-03-17,2014-04-29,STEINY AND COMPANY INC,(626)338-9923,$304,820.00,12-Ora-5, 91, 405-Var,Modify lighting, lighting and signal, and closed circuit television
11-406704,2014-04-10,2013-12-09,2014-06-13,FLATIRON WEST INC,(760)916-9100,$33,410,524.00,11-SD-5-R58.1/R72.4,PCC rehabilitation including PPCP, JPCP (RSC), and approach slabs.
08-0K2804,2014-04-10,2014-01-13,2014-05-06,SECURITY PAVING COMPANY INC,(818)362-9200,$15,747,747.00,08-SBd-40-R73.0/R89.0,Cold Plane, Overlay and Place Rumble Strip on Roadway
07-4T6404,2014-04-10,2014-03-17,2014-05-05,HYPA ENGINEERING INC,(818)343-8844,$599,500.00,07-LA-105-R14.3,Modify groundwater treatment electrical equipment.
07-297004,2014-04-10,2014-03-03,2014-05-08,GRANITE CONSTRUCTION COMPANY,(661)726-4447,$7,077,770.00,07-LA-138-50.0/63.4,Place HMA superpave (Type A), and modify signal and lighting.
11-2M6704,2014-04-10,2014-03-17,2014-05-07,WINDSOR FUEL COMPANY,(925)427-5266,$1,609,811.30,11-SD-76-R2.9/R7.5,Cold plane and pave with HMA (Bonded Wearing Course-Gap Graded)
09-359004,2014-04-09,2014-03-10,2014-04-25,GRANITE CONSTRUCTION CO.,(831)724-1011,$2,161,874.00,09-Iny-190-18.5/24.6,Cold in-place recycled pavement and place HMA, superpave overlay.
05-1F3804,2014-04-09,2014-03-03,2014-05-02,CAL STRIPE, INC.,(909)884-7170,$299,999.99,05-Mon-1-42.0/72.3,Place thermoplastic traffic striping.
02-4G2704,2014-04-09,2014-03-17,2014-05-02,TULLIS, INC.,(530)241-5105,$2,797,055.50,02-Sis-3-36.0/R46.9,Thin Blanket Overlay with Digouts
06-0Q4504,2014-04-09,2014-03-03,2014-05-08,ROADWAY ENGINEERING WORKS INC,(209)541-0920,$769,104.00,06-Ker-5-6.0/9.0,Install extinguishable message signs.
05-1A3904,2014-04-09,2014-02-24,2014-05-02,PAPICH CONSTRUCTION CO. INC.,(805)473-3016,$3,499,999.99,05-SB-101-84.1/90.9,Overlay existing roadway with RHMA (Bonded Wearing Course-Gap Graded)
02-4G1804,2014-04-09,2014-03-03,2014-04-25,TULLIS, INC.,(530)241-5105,$1,066,175.50,02-Tri-3-6.5/11.0,HMA, Cold Plane AC Pavement, Replace AC Surfacing
06-0R2204,2014-04-09,2014-03-10,2014-05-07,PAPICH CONSTRUCTION CO. INC.,(805)473-3016,$3,399,999.00,06-Tul-137-18.2/27.4,Cold in-place recycling and overlay with HMA, Superpave (Type A).
05-1A8904,2014-04-09,2014-03-17,2014-05-02,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$993,993.00,05-Mon-1-67.9,Repair spalled concrete, extract chloride, install cathodic protection
03-4M6804,2014-04-09,2014-03-10,2014-04-25,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$1,079,079.00,03-But,Gle,Pla,Sut,Yub-VAR-VAR,Replace Joint Seals and Place Methacrylate on 18 Bridge Decks
06-0Q7904,2014-04-09,2014-03-17,2014-06-09,VSS INTERNATIONAL,,$1,082,000.00,06-Ker-46, 65-54.0/57.8, 0.7/6.1 ,Place asphalt-rubber binder and flush coat.
02-4F6904,2014-04-09,2014-03-03,2014-04-28,SHASTA CONSTRUCTORS, INC.,(530)365-3930,$1,526,995.76,02-Sha,Sis,Teh-5, 89, 99-VAR,Bridge Maintenance
04-1J3104,2014-04-08,2014-03-03,2014-05-29,ANVIL BUILDERS INC,(415)285-5000,$193,899.00,04-CC-4-3.9/R10.3,Culvert rehabilitation.
07-296704,2014-04-03,2014-03-03,2014-04-29,C A RASMUSSEN INC,(661)367-9040,$16,328,926.00,07-Ven-118-T18.7/R32.6,Place HMA superpave and replace concrete slabs.
11-2M6604,2014-04-03,2014-03-10,2014-05-20,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$2,324,845.00,11-Imp-98-32.3/39.6,Overlay with HMA (Type A) and apply Asphalt Rubber Seal Coat.
12-0N2904,2014-04-03,2014-03-03,2014-05-05,R J NOBLE COMPANY,(714)637-1550,$964,354.50,12-Ora-5, 57, 261-Var,Remove and Replace Rubberized Hot Mix Asphalt
07-4T6904,2014-04-03,2014-03-10,2014-05-19,AUTOBAHN CONSTRUCTION INC,,$394,370.00,07-LA-60-R6.8/R8.6,Replace damaged PCC slabs.
11-406504,2014-03-27,2014-03-03,2014-04-22,WESTERN RIM CONSTRUCTORS INC,(760)489-4328,$3,043,694.70,11-SD-15-R36.8/R40.8,Install High Tension Cable Barrier, upgrade MBGR and terminal systems.
07-284504,2014-03-27,2014-03-03,2014-04-17,STL LANDSCAPE INC,(323)581-8200,$550,000.00,07-LA-14-R56.5/R57.0,Lamont Odett Vista Point enhancement.
11-2M4904,2014-03-27,2014-03-03,2014-04-23,CALMEX ENGINEERING INC,(909)546-1311,$2,253,842.14,11-SD-79-35.1 / 53.0,Cold plane, overlay with Rubberized HMA, place rumble strips.
07-278204,2014-03-27,2014-03-03,2014-04-18,STL LANDSCAPE INC,(323)581-8200,$640,000.00,07-LA-10, 110, 118, 134, 210, 710-Var,Upgrade curb ramps.
07-1W1004,2014-03-27,2014-03-03,2014-04-16,SECURITY PAVING COMPANY INC,(818)362-9200,$1,330,547.00,07-Ven-34-6.3/12.8,Cold plane AC pavement and place RHMA, superpave (Gap Graded).
06-0Q8104,2014-03-26,2014-03-03,2014-06-06,CHESTER BROSS CONSTRUCTION COMPANY,(573)221-5958,$1,899,477.00,06-Ker-155, 204-R6.5/R11.0; R0.0/3.7,Cold plane asphalt concrete pavement and replace with hot mix asphalt.
05-1A3504,2014-03-26,2014-02-18,2014-04-14,CALPORTLAND CONSTRUCTION,(805)345-3581,$758,144.00,05-SB-246-29.9/31.4,Repave existing pavement with hot mix asphalt (Type A).
05-1A3804,2014-03-26,2014-03-03,2014-04-28,OGRADY PAVING INC,(650)966-1926,$1,512,246.50,05-SCr-152-R2.0/8.3,Overlay roadway with rubberized HMA and construct guardrail.
03-3F8604,2014-03-26,2014-02-24,2014-04-17,SIERRA NEVADA CONSTRUCTION, INC.,(775)355-0420,$455,007.00,03-Nev-49-9.1,Reconstruct embankment and roadway.
05-1C3404,2014-03-26,2014-02-24,2014-04-18,GRANITE CONSTRUCTION COMPANY,(831)724-1000,$895,113.00,05-SB-101-27.0/28.1,Construct concrete median barrier and rumble strips.
06-0P3004,2014-03-26,2014-02-24,2014-04-17,BOWMAN ASPHALT,INC.,(661)334-1356,$788,928.00,06-Ker-99-46.9/48.6,Widen shoulder and construct rumble strip.
02-4G2004,2014-03-26,2014-02-24,2014-04-18,LINEAR OPTIONS, INC.,(530)896-1800,$229,263.00,02-Plu,Sha,Sis-5, 44, 49, 70, 89-VAR,Replace Pavement Markers
06-0P1704,2014-03-26,2014-02-24,2014-05-20,CHESTER BROSS CONSTRUCTION COMPANY,(573)221-5958,$6,643,174.00,06-Tul-99-25.0/27.6,Replace failed concrete panels with HMA, and pave with RHMA-SP-G.
03-4M4404,2014-03-26,2014-03-03,2014-04-18,QUIMU CONTRACTING INC.,(707)693-0289,$347,875.00,03-ED-50-47.7/51.6,Rehabilitate Culverts
02-4G1504,2014-03-26,2014-02-10,2014-04-28,MARTIN BROTHERS CONSTRUCTION,(916)381-0911,$3,126,740.00,02-Sha-44, 273-L0.0/L0.4, 14.5/17.1,Thin Blanket Overlay, Dig Outs, Modify Signal
06-487504,2014-03-26,2014-01-13,2014-04-22,AGEE CONSTRUCTION CORPORATION,(559)299-3290,$8,638,155.22,06-Kin-198-R16.5/R17.2,Re-construct interchange
03-4M7104,2014-03-26,2014-03-03,2014-04-22,TRUESDELL CORPORATION OF CALIFORNIA, INC.,(602)437-1711,$2,558,558.00,03-Nev,Pla-80, 267-VAR,Replace Joint Seals and Apply Methacrylate on 9 Bridge Decks
10-0X3804,2014-03-26,2014-02-10,2014-04-17,A. TEICHERT & SON, INC. DBA TEICHERT CONSTRUCTION,(209)983-2300,$834,816.00,10-SJ-4-14.2/15.9,Repair failed areas and apply HMA.
10-0X4004,2014-03-26,2014-01-13,2014-04-17,GEORGE REED, INC.,(209)523-0730,$5,227,875.00,10-Cal-4-28.0/49.6,Rubberized HMA overlay and localized digouts.
01-0C8304,2014-03-26,2014-03-03,2014-05-20,GRANITE CONSTRUCTION COMPANY,(707)467-4100,$1,743,387.00,01-Lak-29-R48.4/52.4,Cold In-Place Recycling
04-3S8304,2014-03-25,2014-03-03,2014-04-23,DREAMBUILDER,(714)646-3697,$376,061.00,04-SCl-17-3.1/4.4,Construct shoulder and drainage system, repair slope, and place EC.
12-0M7304,2014-03-20,2014-02-18,2014-04-10,AUTOBAHN CONSTRUCTION INC,(714)769-7025,$894,040.40,12-Ora-5-VAR,METHACRYLATE SEAL BRIDGE DECKS AND REPLACE FALLING JOINT SEALS
07-4T5904,2014-03-20,2014-02-24,2014-04-14,UNIQUE PERFORMANCE CONSTRUCTION INC,(714)528-2220,$539,531.35,07-LA-187-4.3,Modify signal, curb ramps and median island.
07-2W0804,2014-03-20,2014-02-24,2014-04-11,CAROLINO CONSTRUCTION CORPORATION,(619)948-9163,$1,160,921.50,07-LA-105-R7.0/R13.2,Treat bridge deck with methacrylate.
11-2M5104,2014-03-20,2014-02-18,2014-06-05,VSS INTERNATIONAL INC,(916)373-1500,$3,404,894.00,11-Imp-86-11.3 / 20.6,Replace AC, Place asphalt rubber seal coat, cold plane and overlay.
12-0M5804,2014-03-20,2014-02-24,2014-05-02,FUTURE DB INTERNATIONAL INC,(949)390-2111,$796,115.58,12-Ora-39-0.7/1.1,CONST SIDEWALK WITH MINOR CONCRETE AND DRAINAGE CULVERT.
04-3G4844,2014-03-19,2013-10-28,2014-04-10,CERTIFIED COATINGS COMPANY,(707)639-4414,$28,638,941.00,04-CC,Mrn-580-6.3/7.7,0.0/2.5,CLEAN AND PAINT BRIDGE
04-0A7104,2014-03-18,2013-09-30,2014-04-30,RGW CONSTRUCTION INC,(925)606-2400,$52,751,741.20,04-Ala-880-28.4/29.2,Widen roads, reconstruct ramps with HMA, replace 2 conc overcrossings.
11-275604,2014-03-13,2014-02-18,2014-04-07,SHIPLEY CONSTRUCTION & PLUMBING,(760)365-7957,$334,800.00,11-SD-15-54.0,Install generator, reconstruct building, and CCTV.
12-0M3004,2014-03-13,2014-02-18,2014-04-04,ALL AMERICAN ASPHALT,(951)736-7600,$2,168,851.00,12-Ora-405-0.0/12.9,Cold Plane and Overlay with RHMA-G and HMA-O, Loop Detectors
08-3348V4,2014-03-13,2014-02-18,2014-04-22,PACIFIC RESTORATION GROUP INC,(951)940-6069,$1,136,872.75,08-Riv-215/60-37.36/38.49,12.2/14.0,This is a landscape replacement plan for the I-215 Corridor Project.
12-0M7404,2014-03-13,2014-02-10,2014-04-07,WESTERN STRUCTURES,(951)352-4300,$1,216,127.67,12-Ora-1, 5, 22, 405, 605-var,METHACRYLATE SEAL BRIDGE DECKS AND REPLACE FAILING JOINT SEALS
07-1W6804,2014-03-13,2014-02-18,2014-04-11,ODONNELL CONSTRUCTION INC,(909)394-4510,$1,238,420.00,07-LA-10, 605-Var,Place deck methacrylate, and replace bridge joint seals.
11-076704,2014-03-13,2014-02-10,2014-04-11,HAL HAYS CONSTRUCTION INC,(951)788-0703,$9,235,443.00,11-Imp-5708,Construct maintenance station buildings, pavement and landscape.
10-0X4104,2014-03-12,2014-02-18,2014-03-28,GEORGE REED, INC.,(209)523-0730,$1,886,688.00,10-SJ,Cal-12-20.8/L23.2, 23.2/27.6, 0.0/3.0,Place RHMA Superpave (Gap Graded).
09-359104,2014-03-12,2014-02-03,2014-04-03,QUALCON CONTRACTORS INC.,(775)782-2006,$415,150.00,09-Iny-178-60.0/62.2,Place hot mix asphalt, superpave thin blanket overlay.
10-0Y1204,2014-03-12,2013-11-25,2014-06-04,A. TEICHERT & SON, INC DBA TEICHERT CONSTRUCTION,(209)983-2300,$2,058,772.00,10-Mer-59-7.9/14.1,COLD IN-PLACE RECYCLING AND PLACE HOT MIX ASPHALT
10-0W0004,2014-03-12,2013-11-25,2014-04-02,SIERRA NEVADA CONSTRUCTION, INC.,(775)355-0420,$3,897,007.00,10-Cal,Ama-26-14.0/38.3, 0.0/4.6,Repair failed areas and apply rubberized HMA (Gap Graded).
02-4F4504,2014-03-12,2014-02-18,2014-04-14,TULLIS, INC.,(530)241-5105,$1,482,741.00,02-Sha-5-R34.3/R36.8,Improve Roadway Drainage
01-497104,2014-03-12,2014-02-10,2014-05-21,INNOVATIVE CONSTRUCTION SOLUTIONS,(510)782-5415,$315,182.00,01-Men-5718,Construct ozone sparge system & sparge wells for soil remediation.
01-0B8404,2014-03-12,2014-02-10,2014-04-11,TIDEWATER CONTRACTORS, INC,(541)469-5341,$849,839.50,01-DN-199-T0.0/4.2,Bonded Wearing Course
01-0C4104,2014-03-12,2014-01-27,2014-04-07,MERCER-FRASER COMPANY,(707)443-6371,$741,612.00,01-Hum-211-73.2/R74.4,Place Hot Mix Asphalt Overlay
02-4E3104,2014-03-12,2014-02-10,2014-04-14,R. BROWN CONSTRUCTION COMPANY, INC.,(530)629-3700,$999,363.50,02-Tri-299-45.9/46.2,Roadway excavation, paving and drainage.
03-4M5804,2014-03-12,2014-02-18,2014-04-15,MARTIN BROTHERS CONSTRUCTION,(916)381-0911,$1,419,834.00,03-Sac,Yol-50, 99, 160-VAR,Individual Slab Replacement
03-4M8004,2014-03-12,2014-01-27,2014-04-07,INTERMOUNTAIN SLURRY SEAL, INC.,(775)355-5237,$821,821.00,03-ED-89-0.0/8.6,Place a Microsurface Layer
05-1A3604,2014-03-12,2014-02-18,2014-04-03,CALPORTLAND CONSTRUCTION,(805)345-3581,$457,679.00,05-SLO-41-19.7/21.7,Repave existing roadbed with HMA(Type A)-SP.
02-4G1704,2014-03-12,2014-02-10,2014-04-14,AMERICAN PAVEMENT SYSTEMS, INC.,(209)522-2277,$1,203,524.00,02-Mod-395-23.3/40.0,Asphalt Rubber Chip Seal with DigOuts
04-3E2204,2014-03-11,2014-02-18,2014-03-24,MCK SERVICES INC,(925)957-9200,$1,079,197.00,04-Nap-29-13.5/19.8,Cold plane asphalt concrete pavement and place HMA (Type A).
07-292504,2014-03-06,2014-01-27,2014-04-03,TRAFFIC DEVELOPMENT SERVICES,(805)523-1914,$182,733.00,07-Ven-101-5.2,Modify traffic signal
07-1W2204,2014-03-06,2014-02-10,2014-03-24,PETERSON CHASE GENERAL ENGINEERING CONSTRUCTION INC,(949)252-0441,$1,872,912.12,07-LA-10,60,91,105,210, etc.-Var,Replace overhead signs.
07-284204,2014-03-06,2014-01-27,2014-03-26,YAKAR,(909)599-1612,$694,493.15,07-LA-5-18.2/26.7,Improve irrigation system and planting.
12-0M8804,2014-03-06,2014-02-10,2014-04-03,SOUTHWEST PIPELINE & TRENCHLESS CORP,(310)329-8717,$383,026.00,12-Ora-39-1.6/3.2,CULVERT CLEANING AND LINING
04-4S4504,2014-03-05,2014-02-10,2014-03-28,GHILOTTI CONSTRUCTION COMPANY INC,(707)585-1221,$747,044.50,04-Mrn-1-31.2,Construct steel soldier piles and install MBGR.
04-3A8704,2014-03-05,2013-10-21,2014-04-16,GOLDEN STATE BRIDGE INC,(925)372-8000,$12,595,220.30,04-CC-680-22.7/24.8,Retrofit bridge, replace bridge, and construct emergency access lane.
04-4S6204,2014-03-04,2014-01-27,2014-04-11,GRANITE CONSTRUCTION COMPANY,(831)724-1011,$1,388,398.25,04-Son-1-34.3/34.7,Construct soldier pile tie-back wall and widening roadway.
08-0F6604,2014-02-27,2014-01-13,2014-04-28,SKANSKA USA CIVIL WEST CALIFORNIA DISTRICT INC,(951)684-5360,$9,356,000.00,08-SBd-247-1.8/9.6,Construct Shoulders, Cold Plane and HMA Overlay
07-2W4704,2014-02-27,2014-01-27,2014-03-26,DREAMBUILDER,(714)646-3697,$1,558,061.00,07-LA-1, 5, 10, 90, 101, etc.-Var,Salvage and replace crash cushions with heavy duty attenuators.
11-265014,2014-02-27,2014-01-21,2014-03-21,CLEAN CUT LANDSCAPE,(559)322-2041,$3,773,053.70,11-SD-5, 163-R15.7/R16.3, 0.5/3.2,Install highway planting and automatic irrigation systems.
10-381514,2014-02-26,2014-01-13,2014-03-18,A. TEICHERT & SON INC. DBA TEICHERT CONSTRUCTION,(559)813-3025,$4,372,799.00,10-Mer-140,165-16.2,26.7/30.0,Pavement rehabilitation and shoulder widening.
09-353104,2014-02-26,2014-01-13,2014-04-15,GRANITE CONSTRUCTION COMPANY,(661)399-3361,$3,535,294.00,09-Mno-395-6.9/R9.9,Cold in-place recycled pavement and HMA superpave overlay.
03-4M8904,2014-02-26,2014-02-03,2014-03-27,ARROW FENCING,(707)485-1128,$242,905.00,03-Nev-80, 89-13.2/15.0, R0.6/R1.1,Replace fence.
06-0R1204,2014-02-26,2014-02-03,2014-03-21,CHESTER BROSS CONSTRUCTION COMPANY,(573)221-5958,$1,767,477.00,06-Tul-65-21.8/28.4,Place asphalt rubber binder and repair failed areas.
05-1A4604,2014-02-26,2014-02-03,2014-03-17,GRANITE CONSTRUCTION COMPANY,(831)724-1000,$2,658,336.00,05-SB,SLO-166-R25.5/R34.9,Overlay existing roadway with rubberized HMA.
03-4M1804,2014-02-26,2014-01-21,2014-03-18,AMERICA PACIFIC CONSTRUCTION,(559)577-9999,$185,323.00,03-Gle-162-37.7/51.0,Rehab Culverts
06-0P7504,2014-02-26,2014-01-21,2014-04-11,NORTHWEST PAVING,(530)246-4388,$1,168,796.00,06-Ker-46-37.5/49.0,Apply polymer modified asphalt chip seal
06-0Q2904,2014-02-26,2014-01-13,2014-03-21,W. JAXON BAKER, INC.,(559)221-9246,$385,415.00,06-Tul-99-22.4,Cold plane asphalt concrete pavement and pave with hot mix asphalt.
02-4F4004,2014-02-26,2014-01-27,2014-03-18,TULLIS, INC.,(530)241-5105,$379,456.00,02-Tri-36-15.8/16.0,Roadway Rehabilitation to correct profile, cross slopes and drainage
07-2W4304,2014-02-20,2014-01-27,2014-03-12,TRAFFIC DEVELOPMENT SERVICES,(805)523-1914,$746,406.00,07-LA-5,10, 105,118, 134, etc.-Var,Replace crash cushions.
08-0G6204,2014-02-13,2014-01-06,2014-03-14,ALL AMERICAN ASPHALT,(951)736-7600,$10,394,281.00,08-SBd-38-15.0/49.5,Cold plane, overlay, centerline rumble strips and Midwest Guardrail
08-0R1904,2014-02-13,2014-01-13,2014-04-03,SMART TECH GROUP INC,(949)800-6040,$236,556.40,08-Riv-74-22.9-23.3,Install Traffic Signals and Midwest Guard Rail
10-0X4304,2014-02-12,2014-01-13,2014-02-27,GEORGE REED INC,(209)523-0734,$2,713,430.00,10-Tuo-108-R11.3/R21.0,Rubberized HMA overlay with localized digouts.
01-484704,2014-02-12,2014-01-06,2014-04-15,GORDON N. BALL, INC.,(925)838-5675,$1,618,985.00,01-Men-1, 128-40.1/40.9, 0.0,Construct MBGR & Centerline Rumble Strips
02-4E4104,2014-02-12,2014-01-13,2014-03-18,J. F. SHEA CONSTRUCTION, INC.,(530)246-4292,$5,171,620.00,02-Tri-299-53.5/64.0,Hot mix asphalt overlay. Reconstruct guard rail and end treatments.
05-1A6204,2014-02-12,2014-01-06,2014-03-19,PRISM ENGINEERING INC,(510)782-4100,$927,530.00,05-SB-101-46.9,Remodel comfort station and landscaping.
06-0P1604,2014-02-12,2014-01-06,2014-03-13,A. TEICHERT & SON INC. DBA TEICHERT CONSTRUCTION,(559)813-3025,$3,640,331.60,06-Kin-198-R14.7/R17.9,Cold in-place recycling and place hot mix asphalt overlay.
06-0M4204,2014-02-12,2013-12-30,2014-03-18,FBD VANGUARD CONSTRUCTION,(925)245-1300,$1,226,252.10,06-Fre-41,180-R24.5/24.8, R57.9/R58.6,Replace the existing metal beam guard rail with concrete barrier .
05-1C1804,2014-02-12,2014-01-06,2014-04-10,GRANITEROCK COMPANY DBA PAVEX CONSTRUCTION DIVISION,(408)574-1423,$3,122,991.00,05-SCr-17-9.4/9.8,Widen shoulder and construct soil nail wall
04-3E4004,2014-02-11,2014-01-13,2014-03-26,CHESTER BROSS CONSTRUCTION CO,(209)920-3595,$2,932,448.00,04-Nap-128-19.1/34.3,Rubberized bonded Wearing Course -gap graded overlay.
08-0G2904,2014-02-06,2013-12-30,2014-04-18,ALL AMERICAN ASPHALT,(951)736-7600,$2,122,643.48,08-SBd-15-12.8,WIDEN AND SIGNALIZE EXIT RAMPS AT SIERRA AVENUE INTERCHANGE
07-259204,2014-02-06,2013-12-30,2014-03-10,BALTAZAR CONSTRUCTION INC,(626)339-8610,$1,965,606.62,07-LA-10-R8.8/13.5,Construct austin vault sand filter beds.
04-265604,2014-02-04,2013-12-02,2014-03-10,GRANITE ROCK COMPANY,(408)574-1400,$7,147,138.00,04-SM-1-40.6/40.9,Bridge replacement , roadway and creek re-alignment
04-153304,2014-02-04,2013-11-25,2014-04-02,BAY CITIES PAVING & GRADING INC,(925)687-6666,$11,495,702.11,04-SCl-101-0.0/26.7,Install TOS, ramp metering and ramp widening.
08-0L9004,2014-01-30,2014-01-06,2014-02-18,INTEGRATED WATER SERVICES INC,(925)895-3895,$786,862.20,08-Riv-10-R71.8/R72.3,Upgrade Waste Water Treatment System.
11-002704,2014-01-30,2013-09-03,2014-03-17,LB CIVIL CONSTRUCTION INC,(858)481-5222,$6,073,482.00,11-SD-5, 8-R19.9/R21.2, R0.0/R0.7,JPCP, widen Conn, construct MBGR, RW, CCTV, and lighting.
10-0Y2604,2014-01-29,2013-12-30,2014-03-05,KNIFE RIVER CONSTRUCTION,(209)948-0302,$1,420,431.00,10-Sta-33-14.5/17.9,Cold in-place recycling and HMA resurfacing.
10-0Q8004,2014-01-29,2013-12-30,2014-02-20,NORCAL GENERAL CONSTRUCTION CORPORATION,(408)886-0335,$704,393.68,10-SCl,SBt-152,156-Var,Install 3 Changeable Message Signs
05-1C9104,2014-01-29,2013-12-30,2014-02-28,AMERICAN CIVIL CONSTRUCTORS WEST COAST, INC.,(707)746-8028,$599,373.60,05-Mon,SCr-1, 68, 129-var,Methacrylate deck seal, polyester concrete, and replace joint seal.
03-0F2204,2014-01-29,2013-11-18,2014-02-25,VIKING CONSTRUCTION COMPANY, INC.,(916)852-5500,$5,241,718.50,03-ED-50-R30.7/R31.7,Replace Bridge.
06-0P3804,2014-01-29,2013-12-30,2014-02-24,PAPICH CONSTRUCTION CO. INC.,(805)473-3016,$239,999.00,06-Tul-99-9.0/10.6,Slab replacement with rapid strength concrete or hot mix asphalt.
02-4E6304,2014-01-29,2014-01-06,2014-04-08,STEWART ENGINEERING INC,(530)244-8464,$2,389,390.00,02-Sis-96-56.0,Fish Passage - Replace Culvert with Bridge
02-4E6104,2014-01-29,2014-01-06,2014-02-25,R. BROWN CONSTRUCTION COMPANY, INC.,(530)629-3700,$233,797.50,02-Tri-299-48.3, 49.5,Place RSP and modify drainage.
02-4E2804,2014-01-29,2013-12-30,2014-02-25,TULLIS, INC.,(530)241-5105,$1,022,640.00,02-Sis-5-R45.6/R47.3, R62.0/R62.8,HMA Widening, Lighting and Signs
04-3G7404,2014-01-28,2013-12-30,2014-04-11,DRILL TECH DRILLING & SHORING INC,(925)978-2060,$1,180,771.00,04-Son-1-29.9,Replace Culvert with Ramming 108" Steel Casing.
04-3E5004,2014-01-28,2013-12-16,2014-02-25,MYERS AND SONS CONSTRUCTION LP,(916)283-9950,$705,660.60,04-Sol-80, 113, 505-Var,Treat bridge decks with methacrylate and replace joint seals.
11-2M4304,2014-01-23,2013-12-09,2014-02-07,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION INC,(949)252-0441,$797,310.50,11-SD-8-6.3/9.0,Slab replacement, cold plane and place HMA.
08-0P3104,2014-01-23,2013-12-16,2014-02-20,SMART TECH GROUP INC,(949)800-6040,$326,480.40,08-SBd-395-16.2,INSTALL TRAFFIC SIGNAL, INTERCONNECT, RAMP METER, AND LIGHTING
04-3E4604,2014-01-22,2013-12-09,2014-02-12,AMERICAN CIVIL CONSTRUCTORS WEST COAST INC,(707)746-8028,$787,585.00,04-CC-4,24,80,160,242,680-Var,Treat bridge decks with methacrylate and replace joint seals.
04-3E3104,2014-01-22,2013-12-23,2014-02-12,FBD VANGUARD CONSTRUCTION INC,(925)245-1300,$662,200.00,04-SCl-101-R5.0/R17.7,Individual slab replacement with rapid strength concrete.
07-1W5804,2014-01-16,2013-12-09,2014-03-06,AUTOBAHN CONSTRUCTION INC,(714)769-7025,$822,794.00,07-LA-105-R0.5/R6.3,Apply methacrylate resin to bridge deck and install joint seals.
04-245444,2014-01-14,2013-11-18,2014-02-07,GHILOTTI CONSTRUCTION COMPANY INC,(707)585-1221,$2,258,326.00,04-Son-101-33.3,Widen HMA street, replace PCC sidewalks, install signals and lighting.
05-1A3404,2014-01-14,2013-12-09,2014-03-11,CALPORTLAND CONSTRUCTION,(805)345-3581,$959,323.00,05-SB-192-R0.0/2.8,Cold plane existing pavement and place HMA (Type A) overlay.
07-215954,2014-01-09,2013-10-14,2014-04-24,SECURITY PAVING COMPANY INC,(818)362-9200,$79,220,576.40,07-LA-5-0.0/7.6,Widening freeway and reconstruct overhead and overcrossing structures
09-354304,2014-01-08,2013-11-18,2014-02-04,QUALCON CONTRACTORS INC,(775)782-2006,$837,390.00,09-Mno-6-2.4/4.0,Shoulder widening.
04-1A2904,2014-01-08,2013-08-26,2014-03-11,GHILOTTI CONSTRUCTION COMPANY INC,(707)585-1221,$7,418,001.00,04-Son-12-9.6,Replace bridge and widen approaches.
06-0N2004,2014-01-08,2013-12-02,2014-02-04,MIDSTATE BARRIER INC,(209)944-9565,$1,845,039.30,06-Mad-99-20.2/22.7,INSTALL MEDIAN BARRIER AND OVERHEAD SIGNS
02-4G1104,2014-01-07,2013-12-02,2014-02-05,DIG IT CONSTRUCTION INC,(530)258-3306,$1,413,430.00,02-Teh-32-10.0/16.0,Asphalt Rubber Overlay with Dig Outs
04-3E5504,2014-01-07,2013-12-02,2014-01-21,JEFFCO PAINTING & COATING,(707)562-1900,$452,275.00,04-Nap,Sol-29, 80-11.6, 1.8,Spot blast clean and paint all steel elements.
05-1A0904,2014-01-07,2013-11-25,2014-03-10,AMERICA PACIFIC CONSTRUCTION,(559)577-9999,$199,669.80,05-SLO-58-20.1,Replace culvert
06-0Q8404,2014-01-07,2013-11-18,2014-02-10,NORTHWEST PAVING,(530)246-4388,$2,286,123.00,06-Ker-43, 58, 223-Var,Place polymer asphaltic emulsion (seal coat) and repair failed areas.
07-1170U4,2013-12-19,2013-10-14,2014-02-10,AMES CONSTRUCTION, INC.,(951)356-1275,$91,210,746.50,07-LA-10-33.2/37.2,Construct HOV lanes, widen bridges, and realign ramps.
04-4A6304,2013-12-18,2013-11-25,2014-01-30,GHILOTTI BROS INC,(415)454-7011,$1,504,218.70,04-SF,SCl-9,35,82,152,280,880 -Var,Construct curb ramps.
06-0Q7704,2013-12-18,2013-11-18,2014-02-19,TEICHERT CONSTRUCTION,(559)813-3100,$1,515,429.00,06-Tul-43-0.0/9.5, Repair pavement and overlay with HMA Superpave (Type A).
06-0J9204,2013-12-18,2013-11-25,2014-01-28,RSB GROUP INC,(949)454-1999,$1,198,426.15,06-Fre-145-32.8/33.4,Construct roundabout.
09-358504,2013-12-18,2013-11-18,2014-01-29,INTERMOUNTAIN SLURRY SEAL INC,(775)358-1355,$561,686.00,09-Mno-6-26.5/32.3,Apply asphalt rubber seal coat on existing pavement.
10-0W1204,2013-12-18,2013-11-12,2014-01-23,BAY CITIES PAVING & GRADING INC,(925)687-2122,$7,386,080.22,10-SJ-4-R8.3/T14.3,Widen and overlay existing highway.
03-3F4404,2013-12-17,2013-10-28,2014-01-08,HANSEN BROS ENTERPRISES,(530)273-3381,$1,980,000.00,03-Pla-89-T8.6/12.8,Install Pipe and Raise Profile
07-3X3504,2013-12-12,2013-11-04,2014-01-16,RSB GROUP INC,(949)454-1999,$644,015.00,07-LA-105-R2.6,Reconstruct slope and hydroseed.
10-0X2104,2013-12-11,2013-11-04,2014-01-23,TRICON AQUATICS,(916)638-8667,$5,395,360.00,10-Alp,Ama,Cal-4,88-Var,Construct wash buildings.
04-4A2604,2013-12-11,2013-11-12,2014-01-09,APEX FENCE CO INC,(530)365-3316,$2,395,000.00,04-Ala,CC-4, 80, 84, 580, 680-Var,Install and upgrade MBGR
05-0C9014,2013-12-10,2013-11-12,2013-12-23,BEAR ELECTRICAL SOLUTIONS INC,(408)449-5178,$366,075.00,05-SCr-1-8.4/14.9,Install closed circuit television system.
07-1W1404,2013-12-05,2013-11-04,2013-12-18,AUTOBAHN CONSTRUCTION INC,(714)769-7025,$1,106,692.00,07-LA-1-21.9/23.9,Cold plane AC pavement and place RHMA (Gap Graded-WMA).
04-4A5104,2013-12-04,2013-08-26,2014-01-14,GOLDEN STATE BRIDGE INC,(925)372-8000,$3,977,777.00,04-SF-280-R5.2/R6.0,Hinge Replacement
08-0G8404,2013-11-21,2013-10-21,2013-12-12,RSM2 CONTRACTORS INC,(619)698-7777,$8,158,512.45,08-SBd,Sac-5,15-23.3,107.3,Upgrade Existing Roadside Rest Area
10-0S1104,2013-11-20,2013-08-19,2013-12-16,BROSAMER & WALL INC,(925)932-7900,$51,977,490.30,10-SJ-4,5-Var,Construct roadway, viaduct, retaining walls, and MSE walls.
04-0A5344,2013-11-20,2013-09-09,2014-03-19,DESILVA GATES-VIKING JV,(925)829-9220,$45,812,551.00,04-Sol-12,80-2.1/2.8,12.0/13.1,Realign I-80 to connect directly with the I-80/SR-12 interchange.
04-3E2104,2013-11-19,2013-10-21,2014-02-07,ABSL CONSTRUCTION,(510)727-0900,$371,912.50,04-Son-101-29.3/R38.7,Replace existing concrete pavement.
11-282404,2013-11-14,2013-09-09,2013-12-12,WESTERN RIM CONSTRUCTORS INC,(760)489-4328,$2,778,921.34,11-SD-15, 94-Var,Construct sand filters and infiltration devices.
02-1E0604,2013-11-13,2013-10-21,2013-12-10,STUDEBAKER BROWN ELECTRIC INC,(916)788-1626,$209,900.00,02-Mod-139-22.6/22.8,Install closed circuit television and road weather information system.
08-435414,2013-11-07,2013-09-30,2013-12-05,DREAMBUILDER,(714)646-3697,$314,061.00,08-SBd-40-18.0,Rock Slope Protection
07-3X3904,2013-11-07,2013-09-09,2014-01-30,PETERSON CHASE GENERAL ENGINEERING CONSTRUCTION INC,(949)252-0441,$2,241,528.50,07-LA-1-8.7,Construct steel solder pile wall
12-0H2084,2013-11-07,2013-08-12,2014-02-05,CHUMO CONSTRUCTION INC,(626)960-9502,$2,480,085.50,12-Ora-55-17.0/17.7,SLOPE REPAIR
07-290904,2013-11-07,2013-10-07,2013-12-10,PETERSON CHASE GENERAL ENGINEERING CONSTRUCTION INC,(949)252-0441,$706,650.00,07-LA-210-R6.8/R7.1,Salvage MBGR and install concrete barrier (Type 736 SV Mod).
04-2A6204,2013-11-06,2013-08-26,2014-01-23,RGW CONSTRUCTION INC,(925)606-2400,$8,241,477.85,04-Sol-12-20.6/23.5,Widen shoulders and intersections and place HMA.
06-0Q8504,2013-11-06,2013-10-14,2013-12-05,NORTHWEST PAVING,(530)246-4388,$668,327.00,06-Ker-119-0.0/r9.5,Apply Polymer Asphaltic Emulsion (Seal Coat)
03-3E1004,2013-11-06,2013-08-26,2014-01-28,RGW CONSTRUCTION INC,(925)606-2400,$20,643,515.00,03-Pla-080-8.1/37.8,Improving Vertical Clearance
05-0T9704,2013-11-05,2013-10-14,2013-12-05,SOUZA CONSTRUCTION INC,(805)546-8288,$674,258.19,05-SB-246-33.2/33.5,Construct left turn channelization.
12-0F96E4,2013-10-31,2013-08-19,2013-12-04,SHIMMICK CONSTRUCTION COMPANY INC,(949)333-1500,$35,508,869.00,12-Ora-5-6.2/8.7,Construct HOV lane. Reconstruct Ramps and Structures Widening,
07-272404,2013-10-31,2013-08-26,2013-12-04,FUTURE DB INTERNATIONAL INC,(949)390-2111,$1,128,198.50,07-LA-5-14.9/16.8,Replace planting and irrigation system
06-0Q6604,2013-10-30,2013-10-07,2013-11-19,MICHELS PIPELINE CONSTRUCTION,(503)364-1199,$324,462.00,06-Fre-168-L32.5/R36.2,Cured-in-place pipeliner.
07-4X1104,2013-10-28,2013-10-21,2013-10-28,C A RASMUSSEN INC,(661)367-9040,$4,128,795.80,07-LA-2,5-15.1,22.5,Repair fire damage to bridge and roadway.
08-0J0104,2013-10-24,2013-09-30,2013-11-20,DREAMBUILDER,(714)646-3697,$468,901.00,08-SBd-18-53.5,Construct Left turn in both directions, widen shoulder west bound
11-294804,2013-10-24,2013-07-29,2013-11-19,RSM2 CONTRACTORS INC,(619)698-7777,$1,275,147.66,11-Imp-186-0.0/0.4,Construct bicycle and pedestrian facilities.
08-0M4204,2013-10-24,2013-09-30,2013-11-18,ALCORN FENCE COMPANY,(323)875-1342,$460,733.00,08-Riv-74-6.9/10.2,Install metal beam guard railing
06-0Q5404,2013-10-22,2013-09-16,2013-11-19,ROADWAY ENGINEERING WORKS INC,(209)541-0920,$5,998,555.00,06-Fre,Mad-5,41,99,145-Var,Repair damaged electrical and irrigation equipment
07-4H9004,2013-10-17,2013-08-26,2013-11-13,POWELL CONSTRUCTORS INC,(909)356-8880,$1,876,702.75,07-LA-60-20.6,Construct retaining wall and widen off-ramp.
04-4S7704,2013-10-16,2013-09-23,2013-10-30,DREAMBUILDER,(714)646-3697,$318,061.00,04-Mrn-1-1.0 ,Modify and upgrade drainage system.
05-0G0704,2013-10-15,2013-08-26,2013-11-21,FLATIRON WEST INC,(760)916-9100,$16,629,374.00,05-SB-101-22.3/23.0,UPGRADE DRAINAGE CULVERTS
06-0Q5504,2013-10-15,2013-09-16,2013-11-19,TABER CONSTRUCTION INC,(925)682-6133,$5,430,650.00,06-Fre-168, 180-VAR,Electrical equipment replacement.
08-0N5104,2013-10-10,2013-09-16,2013-11-19,ALABBASI,(951)776-9300,$1,878,000.00,08-Riv,SBd-15-51.5/51.7, 1.8/2.2,REMOVE METAL BEAM GUARD RAILING AND PLACE CONCRETE BARRIER (TYPE 732B)
08-449104,2013-10-10,2013-08-26,2013-12-17,J MCLOUGHLIN ENGINEERING CO INC,(909)944-1037,$4,103,484.66,08-Riv-111-1.5,Replace Bridge with precast PS I girders and construct RW.
07-2777U4,2013-10-10,2013-08-26,2013-11-07,YAKAR,(909)599-1612,$2,448,840.95,07-LA-5, 134-25.2/27.5, 4.8/R5.9,Erosion control and slope paving.
07-259014,2013-10-10,2013-08-19,2013-11-08,POWELL CONSTRUCTORS INC,(909)356-8880,$2,991,605.05,07-LA-710-6.7/R15.9,Install sand filters, bioswales, and biostrip.
09-353304,2013-10-09,2013-09-09,2013-11-07,HERBACK GENERAL ENGINEERING,(775)267-6800,$972,216.55,09-Mno-395-34.1,Building demolition, site work and utilities.
04-3G0204,2013-10-09,2013-09-09,2013-12-18,PAVEX CONSTRUCTION DIVISION,(408)574-1400,$598,081.00,04-SM-35-13.1,Construct Soldier Beam Retaining Wall.
02-360704,2013-10-09,2013-08-19,2013-11-05,J F SHEA CONSTRUCTION INC,(530)246-4292,$21,694,433.00,02-Sha-299-30.3/40.7,Repair Roadway with Superpave HMA Over AB.
01-476604,2013-10-08,2013-09-03,2013-11-04,GOLDEN STATE BRIDGE INC,(925)372-8000,$3,075,817.45,01-Men-128-35.0/35.3,Repair slope and construct ground anchors.
03-3F4104,2013-10-08,2013-09-09,2013-11-20,DREAMBUILDER,(714)646-3697,$882,061.00,03-Pla-49, 80, 193-VAR,Install Concrete Barrier
08-0K2304,2013-10-03,2013-08-26,2013-11-08,SKANSKA USA CIVIL WEST CALIFORNIA DISTRICT INC,(951)684-5360,$3,968,324.50,08-Riv-10-R57.6/R60.9,PAVE SHOULDER WITH RHMA-G, REPLACE CONC SLABS, RAMPS, GRIND CONC
07-2759U4,2013-10-03,2013-08-26,2013-10-29,YAKAR,(909)599-1612,$1,348,290.75,07-LA-101, 110-1.6,23.7,Install irrigation and plants for erosion control.
07-4T5704,2013-10-03,2013-08-26,2013-11-05,PETERSON CHASE GENERAL ENGINEERING CONSTRUCTION INC,(949)252-0441,$848,313.30,07-LA-105-R0.5,Place high friction surface treatment and install overhead sign.
12-0H4404,2013-10-03,2013-08-12,2013-10-30,ORTIZ ENTERPRISES INCORPORATED,(949)753-1414,$11,397,909.00,12-Ora-73-10.0/24.5,Storm Water Mitigation and Slope Stabilization.
01-0C1004,2013-10-02,2013-09-09,2013-12-17,NORTHWEST PAVING,(530)246-4388,$509,911.00,01-Hum-36-40.5/45.7,Place Rubberized Seal Coat
01-479404,2013-10-01,2013-08-12,2013-12-10,FLATIRON WEST INC,(707)742-6000,$13,624,157.50,01-DN-199-20.3/25.9,Widen shoulders with HMA over AB, replace bridge and const ret walls.
03-1F9104,2013-10-01,2013-08-26,2013-11-19,HANSEN BROS ENTERPRISES,(530)273-3381,$774,699.00,03-Nev-49-4.3/4.8,Widen, Add Shoulder at 2 Locations
07-1952U4,2013-09-26,2013-07-29,2013-11-21,SECURITY PAVING COMPANY INC,(818)362-9200,$24,660,757.40,07-Ven-23, 101-3.3/3.8, R0.1/R4.5,Widen freeway and ramps and reconstruct median.
11-287904,2013-09-26,2013-08-26,2013-10-25,S & B ENGINEERING INC,(619)390-6570,$647,451.50,11-SD-94-32.8/40.3,Adjust MBGR and upgrade end treatments.
11-287704,2013-09-26,2013-07-22,2013-10-24,KINSMAN CONSTRUCTION INC,(858)875-2950,$1,357,829.00,11-SD-5506,Repair Maintenance Laboratory Building.
09-351604,2013-09-25,2013-08-26,2013-10-25,GRANITE CONSTRUCTION COMPANY,(661)399-3361,$5,163,772.00,09-Iny-395-45.6/50.3, 50.9/52.9,Cold in-place recycled pavement and HMA superpave overlay.
03-2F1504,2013-09-25,2013-08-26,2014-02-26,SIERRA NEVADA CONSTRUCTION INC,(775)355-0420,$947,007.00,03-ED-49-30.9/31.3,Widen highway for left turn channelization
04-1A6714,2013-09-25,2013-08-26,2014-02-27,BAY LINE CUTTING AND CORING INC,(510)527-1000,$4,299,000.00,04-Ala-580-46.0/46.6,Rehabilitate Bridge Deck.
05-463814,2013-09-25,2013-08-26,2013-10-25,EMPIRE LANDSCAPING INC.,(530)400-3943,$495,762.50,05-SB-101-83.2/83.8,Irrigation, planting, erosion control, and plant establishment.
06-0J9304,2013-09-25,2013-09-03,2013-10-15,JABRE CONTRACTING,(310)720-0277,$912,589.00,06-Fre,Ker,Tul-33, 46, 63, 119, 216, 223-Var,Extend box culvert and pipe culvert and construct headwall.
04-2A4304,2013-09-24,2013-08-19,2013-11-19,RGW CONSTRUCTION INC,(925)606-2400,$4,959,174.30,04-SCl-9-2.5/7.0,Widen roadway for realignment, soil nail walls and soldier pile wall
06-0N3604,2013-09-24,2013-08-26,2013-10-15,C A RASMUSSEN INC,(661)367-9040,$1,218,487.00,06-Ker-5-10.4/R15.8,Replace damaged asphalt concrete pavement with concrete.
01-378164,2013-09-24,2013-08-26,2013-12-04,ARGONAUT CONSTRUCTORS,(707)542-4862,$3,939,199.50,01-Men-128-VAR,Culvert Rehabilitation
07-1W3204,2013-09-19,2013-08-26,2013-10-15,DREAMBUILDER,(714)646-3697,$223,086.00,07-LA-405-6.0/6.5,Construct sidewalk, curb and curb ramps.
11-408904,2013-09-19,2013-08-19,2013-10-21,TRUESDELL CORPORATION OF CALIFORNIA INC,(602)437-1711,$2,058,058.00,11-SD-5, 15, 52, 56, 78, etc.-Var,Clean and treat bridge deck with methacrylate and replace joint seals.
08-0M4504,2013-09-19,2013-08-26,2013-10-09,DREAMBUILDER,(714)646-3697,$461,061.00,08-SBd-38-R5.2/5.5,Construct Left Turn Lane
12-0L74U4,2013-09-19,2013-07-29,2013-10-14,ALL AMERICAN ASPHALT,(951)736-7600,$14,678,599.55,12-Ora-55-2.0/11.8,Rehabilitate pavement with PCC and HMA and Construct Median Barrier.
07-288014,2013-09-19,2013-07-29,2013-10-18,SECURITY PAVING COMPANY INC,(818)362-9200,$40,356,010.57,07-LA-210-R9.7/R16.1,Replace exist Pvmt with PCC and HMA and Replace Median Conc Barrier.
06-0N3904,2013-09-18,2013-08-26,2013-10-28,MASS X INC,(559)472-3274,$242,386.84,06-Tul-245-20.8,Construct rock slope protection.
03-1F3304,2013-09-17,2013-08-26,2013-10-14,DOUG VEERKAMP GENERAL ENGINEERING INC,(530)676-0825,$416,637.40,03-ED-193-18.7,Place HMA, roadway excavation and erosion control
01-450904,2013-09-17,2013-08-12,2013-10-15,STEELHEAD CONSTRUCTORS INC,(530)226-6400,$3,755,503.00,01-Hum-169-13.6/23.4,Widen rdwy with HMA over AB, const soldier pile and soil nail walls.
07-278804,2013-09-12,2013-08-19,2013-10-15,BRUTOCO ENGINEERING & CONSTRUCTION INC,(909)350-3535,$1,879,006.50,07-LA-5-R54.4/R54.8,Upgrade existing truck inspection facility and replace concrete slabs.
02-4E5304,2013-09-10,2013-07-01,2013-10-25,J F SHEA CONSTRUCTION INC,(530)246-4292,$5,990,867.00,02-Sha-Var-Var,Rehab bridges with polyester conc overlay and rdwy with HMA over AB.
07-278304,2013-09-05,2013-06-10,2013-10-02,POWELL CONSTRUCTORS INC,(909)356-8880,$2,470,000.00,07-LA-405-4.3,Rehabilitate bridge.
08-0K5204,2013-09-05,2013-08-12,2013-10-16,COFFMAN SPECIALTIES INC,(858)536-3100,$1,885,000.00,08-SBd-15-11.1,Construct Reinforced Concrete Box Culvert
12-0M4304,2013-09-05,2013-08-12,2013-10-08,KAVEH ENGINEERING AND CONSTRUCTION INC,(714)793-6655,$447,808.00,12-Ora-261-0.0,3.5,CULVERT JOINT SEALING, CONTACT GROUTING AND INVERT PAVING
11-056324,2013-09-05,2013-07-01,2013-10-02,COFFMAN SPECIALTIES INC,(858)536-3100,$49,685,000.00,11-SD-11, 905 - 0.0/1.6,R9.9/R10.7,Construct freeway connection to Route 905.
12-0L9704,2013-09-05,2013-08-12,2013-12-13,TRAFFIC DEVELOPMENT SERVICES,805-523-1914,$605,220.00,12-Ora-39-2.1, 3.1, 6.1,Modify signal and lighting at various locations.
11-401404,2013-08-29,2013-06-03,2013-10-02,GRANITE CONSTRUCTION COMPANY,(760)732-0915,$9,657,643.00,11-SD-VAR-VAR,Replace MBGR with Concrete Barrier and upgrade Crash Cushions.
01-0C5104,2013-08-27,2013-08-12,2013-09-19,AMERICAN CIVIL CONSTRUCTORS WEST COAST INC,(707)746-8028,$222,900.00,01-Hum,DN-101,199-Var,Place High Friction Surface Treatment
01-0C3604,2013-08-27,2013-08-12,2013-09-19,AMERICAN CIVIL CONSTRUCTORS WEST COAST INC,(707)746-8028,$552,148.00,01-Men-101-R21.4/R26.1,Install High Friction Surface Treatment
12-0G3314,2013-08-22,2013-07-22,2013-10-03,PACIFIC RESTORATION GROUP INC,(951)940-6069,$2,006,001.00,12-Ora-91-9.1/15.1,Highway Replacement Planting & Irrigation Systems
10-0S9504,2013-08-21,2013-07-29,2013-09-19,BRIAN J FEDERICO,(209)839-0963,$644,571.98,10-Mer-99-13.1/R36.7,PAINT BRIDGE AND SLOPE PAVING
03-2F9704,2013-08-21,2013-07-08,2013-09-04,GEORGE REED INC,(209)523-0734,$1,399,717.00,03-Col-20-28.2/30.5,Superpave hot mix asphalt overlay
06-462204,2013-08-20,2013-07-08,2013-09-24,GRANITE CONSTRUCTION COMPANY,(559)441-5700,$4,459,284.00,06-Kin-198-R14.7/R18.0,Replace Pavement with HMA and rehabilitate bridge decks.
04-2356A4,2013-08-20,2013-07-15,2013-09-18,BORTOLUSSI & WATKIN INC,(415)453-4675,$1,016,104.00,04-SM-101-0.9/3.6,Replace highway planting and irrigation.
05-0T0004,2013-08-13,2013-07-22,2013-09-12,GRANITE CONSTRUCTION COMPANY,(805)964-9951,$3,391,036.00,05-SB-154-R7.8/R8.3,Construct rural roundabout.
05-0R9104,2013-08-13,2013-07-08,2013-11-22,RGW CONSTRUCTION INC,(925)606-2400,$1,725,252.00,05-SCr-1-9.7/17.6,Construct concrete barrier, barrier slab and metal beam guard railing.
01-0B1304,2013-08-13,2013-07-22,2013-10-08,TIDEWATER CONTRACTORS INC,(541)469-5341,$294,754.50,01-DN-101-13.3,HMA Leveling
08-0M3104,2013-08-08,2013-07-15,2013-08-23,RAKAN INC,(949)698-9872,$185,560.00,08-SBd,Riv-210,60,91-Var,UPGRADE PEDESTRIAN FACILITIES
12-0C5604,2013-08-08,2013-06-17,2013-10-11,OHL USA INC,(949)242-4432,$18,596,892.95,12-Ora-91-8.1/9.3, 10.1,Widen rdwy and bridge, const retaining walls and new bypass off-ramp.
07-2768U4,2013-08-08,2013-07-08,2013-09-23,STL LANDSCAPE INC,(323) 581-8200,$1,680,000.00,07-LA-210-R0.8/R4.9,Perform highway planting.
09-354104,2013-08-07,2013-07-15,2013-08-28,GRANITE CONSTRUCTION COMPANY,(661)399-3361,$2,282,029.00,09-Mno-395-63.9/65.1,Cold in-place recycled pavement and hotmix asphalt superpave overlay.
06-0H1704,2013-08-07,2013-07-08,2013-12-04,EMMETTS EXCAVATION INC,(559)299-1256,$2,336,823.80,06-Fre-180-77.2,Widen shoulder and replace bridge.
01-0A2304,2013-08-06,2013-07-08,2013-09-05,ROBERT J FRANK CONSTRUCTION INC,(530)222-1408,$484,157.00,01-Men-020-R0.0,Construct Sidewalk, Curb Ramps, and Retaining Wall
08-491804,2013-08-01,2013-06-10,2013-08-15,MATICH CORPORATION,(909)382-7400,$10,560,000.00,08-Riv-62-0.0/R6.7,REHABILITATE ROADWAY PAVEMENT AND WIDEN MEDIAN SHOULDERS
07-3X4104,2013-08-01,2013-07-08,2013-11-07,GRANITE CONSTRUCTION,6617264447,$1,298,462.00,07-LA-2-32.5,Regrade slope and construct debris wall.
08-0M6904,2013-08-01,2013-07-01,2013-08-16,V A P CONSTRUCTION INC,(714)253-3270,$369,575.00,08-SBd-95-57.0/R57.3,Install sidewalks, curbs, ramps and construct retaining walls
01-0B1004,2013-07-30,2013-07-08,2013-09-20,DESERT CONCEPTS CONSTRUCTION INC,(760)200-9007,$868,779.60,01-Hum-101-86.3/87.8,Install Cable Median Barrier
04-4S1604,2013-07-30,2013-07-08,2013-10-28,GORDON N BALL INC,(925)838-5675,$511,125.00,04-Son-1-21.7,Replace retaining wall and highway planting
08-0N5704,2013-07-25,2013-06-17,2013-08-23,ODONNELL CONSTRUCTION INC,(909)394-4510,$175,380.00,08-SBd-40-R140.7,Bridge Seismic Retrofit
08-368504,2013-07-25,2013-06-03,2013-10-14,LAS VEGAS PAVING CORPORATION,(702)251-5800,$38,987,288.00,08-SBd-15-177.3/181.1 ,CONSTRUCT COMMERCIAL VEHICLE ENFORCEMENT FACILITY (CVEF)
11-404304,2013-07-25,2013-06-03,2013-08-16,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$2,848,439.75,11-SD-5-R23.9/R25.5,Construct Outer Separation Barrier, widen shoulder, modify drainage.
03-0F2304,2013-07-24,2013-05-13,2013-08-26,MYERS AND SONS CONSTRUCTION LP,(916)649-4504,$17,322,574.75,03-Sac-50-L1.3/L2.2,Bridge Widening, PCC Overlay and Replace Concrete Barrier.
04-2A1104,2013-07-24,2013-06-17,2013-10-24,GORDON N BALL INC,(925)838-5675,$2,186,629.00,04-Nap-121-20.2/20.4 PM,Bridge removal, bridge replacement and roadway widening.
10-0T1604,2013-07-23,2013-07-01,2013-10-02,CHESTER BROSS CONSTRUCTION,(209) 920-3595,$2,099,445.00,10-SJ-26-18.5/19.0,Curve realignment and replace bridge.
01-459704,2013-07-23,2013-06-17,2013-08-28,GOLDEN STATE BRIDGE INC,(925)372-8000,$2,114,143.00,01-Hum-101-97.7/100.7,Seismic retrofit bridge columns and abutments, const concrete barrier.
10-0G8004,2013-07-16,2013-04-29,2013-08-13,OC JONES & SONS, INC,(510)526-3424,$29,049,024.00,10-SJ-12-0.1/R4.4,Pavement rehabilitation and bridge construction.
08-0K3104,2013-07-11,2013-06-17,2013-10-03,LAS VEGAS PAVING CORPORATION,(702)251-5800,$2,022,122.00,08-SBd-95-51.2/51.7,Realign roadway with HMA over aggregate base.
07-265904,2013-07-11,2013-06-03,2013-10-01,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION INC,(949)252-0441,$2,623,136.25,07-LA-101-1.6/10.4,Replace bridge railing.
01-364324,2013-07-09,2013-06-03,2013-08-15,KENS WATER TENDER INC,(530)629-4397,$1,155,898.00,01-Men-1, 20, 101-Var,Replace drainage systems and install pipeliners and RSP.
12-0L3804,2013-06-27,2013-05-28,2013-10-17,HIGHLAND CONSTRUCTION, INC.,(714)538-5156,$1,836,531.50,12-Ora-39-1.1/19.2,Curb Ramp and Sidewalk Improvments.
11-290404,2013-06-27,2013-05-20,2013-07-31,GRANITE CONSTRUCTION COMPANY,(760)732-0915,$12,756,879.00,11-SD-94-14.9/30.0,Cold plane, place RHMA-G, rumble strips, MBGR and curb ramps.
06-0E6604,2013-06-26,2013-06-03,2013-07-19,CLEANCUT LANDSCAPE,(559)322-2041,$673,112.00,06-Ker-99-17.5/29.9,Replace chain link railing, place slope paving and irrigation conduit.
01-0B1904,2013-06-26,2013-06-03,2013-08-15,DIRT AND AGGREGATE INTERCHANGE INC,(503)661-5093,$955,555.00,01-Hum-101-54.3/56.8,Install median high tension cable barrier.
06-0N3804,2013-06-25,2013-06-03,2013-08-05,GRANITE CONSTRUCTION COMPANY,(661)399-3361,$465,675.00,06-Ker-178-14.3, 15.7,Construct concrete slab.
03-1A7314,2013-06-25,2013-05-13,2013-08-08,DON GARCIA EXCAVATING AND PAVING INC,(530)577-0558,$5,371,038.10,03-ED-50-67.6/72.9,Construct storm water BMPs, bike lanes and drainage systems.
03-0F3004,2013-06-25,2013-05-28,2013-09-05,PROVEN MANAGEMENT INC,(415)421-9500,$1,398,754.00,03-ED-50-17.8, 19.6,Retrofit Columns and Add Bracing.
07-4T5804,2013-06-20,2013-05-28,2013-07-18,TRAFFIC DEVELOPMENT SERVICES,(805)523-1914,$265,792.00,07-LA-210-R24.2,Install traffic signal and construct ADA curb ramps.
12-0L7504,2013-06-20,2013-05-13,2013-08-08,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION INC,(949)252-0441,$616,890.00,12-Ora-91-R0.3,Ramp shoulder widening, Planting, Modify Traffic Signal
04-3S7524,2013-06-19,2013-05-20,2013-07-09,KENS WATER TENDER INC,(530)629-4397,$344,555.00,04-Son-1-40.1,Replace culvert and install rock slope protection.
11-290304,2013-06-13,2013-05-13,2013-08-15,PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION INC,(949)252-0441,$2,833,423.00,11-SD-75, 805-9.0, 20.2,Footing/Column Retrofit, Concrete Barrier, Planting and Irrigation.
06-0E6704,2013-06-12,2013-05-20,2013-07-03,RSB GROUP INC,(949)454-1999,$323,462.00,06-Tul-99-6.1/29.9,Paint bridge and construct slope paving.
04-1123H4,2013-06-11,2013-05-13,2013-07-01,EMPIRE LANDSCAPING INC,(530)400-3943,$1,729,894.00,04-SM-1-38.2/39.7,Install irrigation system and highway planting.
11-402804,2013-06-06,2013-04-15,2013-07-02,HAZARD CONSTRUCTION COMPANY,(858)587-3600,$3,147,883.00,11-SD-52-5.0/6.2,Cold plane and HMA overlay, reconstruct MBGR.
11-264114,2013-05-30,2013-04-02,2013-07-15,DISNEY CONSTRUCTION INC,(650)259-9545,$16,548,443.00,11-SD-163-1.4,Bridge seismic retrofit.
04-1G5604,2013-05-21,2013-04-08,2013-10-07,FLATIRON WEST INC,(707)742-6000,$3,198,824.00,04-Ala-880-31.0/31.6,Upgrade median barrier.
11-2T1834,2013-05-03,2013-03-25,2013-07-12,WESTERN RIM CONSTRUCTORS INC,(760)489-4328,$5,165,986.98,11-SD-805-5.8/13.0,To construct sound walls.
02-2E3504,2013-04-30,2013-04-08,2013-07-19,STEELHEAD CONSTRUCTORS INC,(530)226-6400,$3,962,664.00,02-Tri-299-0.4/0.9,Curve Improvement with HMA over AB and Construct Retaining Walls.