Inquiry #1: 1- Ref Plan Sheets 3 and 10- For Location # 18 your plans call for both Minor Concrete Veg. Control (Note on Shhet 10) and Section "B-B" which calls for a nominal 1'-11" x 1'-0" x 4" deep " Grout" at each post. Which detail do you want? If the " Grout" is required how is it measured and paid for?


2-Ref Special Provision Section 10-1.31, 4 th paragraph- Is there any " MBGR Modified" required on this project?

Inquiry submitted 01/08/2013

Response #1:1) Grout is one elements of the work item VEGETATION CONTROL (MINOR CONCRETE); and is included in the payment. Bid per plans. 2) Bid per plans.
Response posted 01/08/2013




Inquiry #2: 1- Ref Plan Sheets 10,60 and 63-Location # 18 appears to require K Rail and Crash Cusion Modules for 100 Ft + along Travelled Way. Per sheet 10 (C-7) the ETW to face of Anchor block or MBGR varies from 2'-0" t0 9'-6". Standard Plan THD-7 ( Sheet 60) calls for K rail to be set from 4 feet to 8 feet and greater. Seems as though the details here conflict, on the existing shoulder which is any thing less than 6'-0" wide. Will this be reviewed and revised prior to Bid date?
Inquiry submitted 01/08/2013

Response #1:Bid per plans.
Response posted 01/08/2013




Inquiry #3: 1- Ref Plan Sheets 13 and 63-Location # 26 appears to require K Rail and Crash Cusion Modules for 100 Ft + along Travelled Way. Per sheet 13 (C-10) the length of the removal/ replacement of MBGR is over 200 LFT. Where will the 60 LFT and 14 Crash Cushion Modules be placed? Seems as though the details here conflict. Will this be reviewed and revised prior to Bid date?

Inquiry submitted 01/08/2013

Response #1:Bid per plans.
Response posted 01/08/2013




Inquiry #4: 1- Ref Plan Sheets 13-Location # 26 appears to require removal of existing MBGR from in front of the Fountain Ave. Br. Abutment/Wall. However no new MBGR or Concrete Anchor Block is called for to replace the removed MBGR. Is that what you want? Will this be reviewed and revised prior to Bid date?

Inquiry submitted 01/08/2013

Response #1:Bid per plans.
Response posted 01/08/2013




Inquiry #5: 1- Ref Plan Sheets 14-Location # 28 appears to require removal of existing MBGR, constructing new CAB to the Figueroa Street Abutment, but does not call for K Rail or Rapid Strength Concrete. This is inconsistant to other locations shown that have either Rapid Set Concrete or K Rail. Is that what you want? Will this be reviewed and revised prior to Bid date?

Inquiry submitted 01/08/2013

Response #1:Bid per plans.
Response posted 01/08/2013




Inquiry #6: 1- Please help me locate the "Traffic Handling Details Plan" noted in Traffic Chart # 12, to be able to determine your requirement.

2- Location # 7 appears to be in the area covered by Traffic Chart#1. Traffic Chart #1 appears to be inconsisitant with the number of freeway lanes at Location #7 as there are only two freeway lanes there. Is there another Traffic Chart to use for work at Location #7?

Inquiry submitted 01/09/2013

Response #1:Bid per plans.
Response posted 01/09/2013






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.