Inquiry #1: I am a material supplier of item #32 Weed Control Mat (Fiber). I am unable to come up with the quantites that you call out for this item. Please review the following and advise, so that I can quote the correct material amount.
Example: Location 88
Sheet Q-11 Location #88 Weed Control mat fier calls out for 997 SY.
Sheet Q-5 Metal Beam Guard Rail location 88 calls out 262.5 lf x 5' wide.
Material which showes on Sheet C-3 = 1312.5 SF /9=145.83 SY
This quantity discrepancy appears throughtout the project

Inquiry submitted 10/10/2012

Response #1: 10/10/12: Your inquiry has been received and is being reviewed. Thank you for your patience.
Response posted 10/10/2012


Response #2: 10/12/12: Your question is under review. An addendum is under consideration. Unless an addendum is issued addressing your concern, please bid per the current contract documents.
Response posted 10/12/2012


Response #3: 10/26/12: Please refer to Addendum No. 1. Please refer to the information posted at http://www.dot.ca.gov/hq/esc/oe/project_ads_addenda/01/01-463914/
Response posted 10/26/2012




Inquiry #2: How does Caltrans plan on protecting the Concrete Anchor Blocks at locations since it's the only two locaiton's that don't have a "k" Rail detail.

Locations 28,96,97,102,106 and 107 calls for "K" Rail but there is no Concrete work to be done at these locations. What is the K rail required for?

Inquiry submitted 11/12/2012

Response #1:11/13/12: Your inquiry is under review. Please note that due to the current time frame between the inquiry submittal and the bid opening date, a response may not be provided before the bid opening. If a response is not provided before the bid opening addressing your concern, please bid per the current contract documents. Thank you for your patience.
Response posted 11/13/2012






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.