Inquiry #1: Page 34 of the special provisions for section 39 states: Add to the table in the 1st paragraph of section 39-2.02B(2)
Surface Abrasion loss (max, g/cm2)f California test 360 0.4

This test method is antiquated, the equipment to run this test is not in use today. CTM 360 was for use with the Hveem mix design method (not superpave) with references in the test method to CTM 304 and CTM 308 which are no longer in use. Superpave requires the use of AASHTO test methods and not CTM's. Furthermore Gyratory test specimens are 6" in diameter, this test method requires 4" test specimens compacted using the kneading compactor which is also no longer being used.

Is Caltrans going to issue an addendum removing the surface abrasion requirement from the contract prior to bid time ?

Inquiry submitted 09/26/2017

Response #1:
Submitted for consideration.
Response posted 09/26/2017


Response #2:
Refer to Addendum No. 1, dated October 5, 2017.
Response posted 10/12/2017




Inquiry #2: Page 34 of the Special provisions for section 39 states:

Replace Reserved in section 39-2.02B(3):

The grade of asphalt binder for Type A HMA at O'Brynes Ferry Intersection in Tuolumne County Route
120 PM 11.241/11.486 must be PG 76-22.

PG76-22 is a modified binder and there is no specification in Section 92 of the Standard Specifications for a PG 76-22 neat.

Is the intent of this specification to use a PG76-22M per section 92 of the Standard Specifications?

Inquiry submitted 09/28/2017

Response #1:
Submitted for consideration.
Response posted 09/28/2017


Response #2:
Refer to Addendum No. 1, dated October 5, 2017.
Response posted 10/12/2017




Inquiry #3: Can Cal Trans please provide a detail and location for Bid Item 21 Roadway Excavation (NOA)?
Inquiry submitted 09/29/2017

Response #1:
Submitted for consideration.
Response posted 09/29/2017


Response #2:
Refer to Sheet No. 3 of 138 of the contract plans. The location of roadway excavation is: Sta – PM 13.250 TO 13.420.
Response posted 10/04/2017




Inquiry #4: On Sheet C-2 of the project plans the Overside Drain Detail references the thickness of the RHMA-G to be 0.15'. The Cross Sections show an overlay thickness of 0.20'. Please revise accordingly
Inquiry submitted 09/29/2017

Response #1:
Submitted for consideration.
Response posted 09/29/2017


Response #2:
Refer to Addendum No. 1, dated October 5, 2017.
Response posted 10/12/2017




Inquiry #5: For item 77 Thermoplastic Traffic Stripe is the 4" striping replaced with the new standard 6" striping per Caltrans Revised 2015 Standard Specifications dated 7-21-17.
Inquiry submitted 10/09/2017

Response #1:
Submitted for consideration.
Response posted 10/09/2017


Response #2:
Yes, the Thermoplastic Traffic Stripe (Sprayable) will be the latest 6” standard as described in Section 84 of the Contract Special Provisions.
Response posted 10/12/2017




Inquiry #6: Are advanced flaggers required?
Inquiry submitted 10/11/2017

Response #1:
Submitted for consideration.
Response posted 10/11/2017


Response #2:
Yes, flaggers are required per section 12-4-02C(7)(b).
Response posted 10/16/2017




Inquiry #7: Addendum 1 was issued and stated that bid item 63 was replaced. Looking at the original bid items, it seems as if the two are the exact same item description, and quantity. Can you please clarify what has changed?
Inquiry submitted 10/11/2017

Response #1:
"RETROREFLECTIVE" was misspelled.
Response posted 10/11/2017




Inquiry #8: Bid Items #47 DownDrain, are there profiles? do any of these DownDrains need Elbows, or Anchor Assemblies? Is the length in quantities including the 6 foot stinger from the entrance taper?
Inquiry submitted 10/16/2017

Response #1:
Submitted for consideration.
Response posted 10/18/2017


Response #2:
There are no profiles.

Refer to Section 69-1.04 of the Standard Specifications.
Response posted 10/18/2017






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, “JOB SITE AND DOCUMENT EXAMINATION” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.