Inquiry #1: Will the state please make PDF version of cross sections avaliable?
Inquiry submitted 08/19/2013

Response #1:8/19/13: Your inquiry has been received and is being reviewed. Thank you for your patience.
Response posted 08/19/2013


Response #2:8/20/2013: The cross-sections in PDF file is posted at http://www.dot.ca.gov/hq/esc/oe/project_ads_addenda/02/02-360704/supplemental_info/02-360704%20XS/.
Response posted 08/20/2013




Inquiry #2: Item 66 is for Geosynthetic Reinforcement. Do you want Geosynthetic Reinforcement or Subgrade Enhancement Fabric. No class of fabric or reinforcment is given. Please specify.
Inquiry submitted 09/04/2013

Response #1:09/05/13:Your inquiry has been received and is being reviewed. Thank you for your patience.
Response posted 09/05/2013


Response #2:9/5/13: Your question is under review. An addendum is under consideration. Unless an addendum is issued addressing your concern, please bid per the current contract documents.
Response posted 09/05/2013


Response #3:09/06/13: Please refer to Addendum Number 1, dated September 6, 2013. The information is posted at http://www.dot.ca.gov/hq/esc/oe/project_ads_addenda/02/02-360704.
Response posted 09/06/2013




Inquiry #3: What are the lane closure charts for this project?
Inquiry submitted 09/16/2013

Response #1:9/17/13: Your inquiry has been received and is being reviewed. Thank you for your patience.
Response posted 09/17/2013


Response #2:9/17/13: Yes, please refer to Chart Number One on Page 22 of the Special Provisions. For all other lane restrictions, refer to Section 12-4.02A on page 20 of the Special Provisions.
Response posted 09/17/2013




Inquiry #4: There is a lane closure chart for blasting, but Caltrans does not have a bid item for rock excavation. Caltrans must have an idea of the of the amount of rock excavation. By adding a bid item for this, it will give Caltrans a more accurate bid.
Inquiry submitted 09/16/2013

Response #1:9/17/13: Your inquiry has been received and is being reviewed. Thank you for your patience.
Response posted 09/17/2013


Response #2:You are correct, there is no bid item for rock excavation. Refer to the Information Handout, Geotechnical Design Report(Page 168 of 227 of the Handout). Please bid per the current contract documents.
Response posted 09/17/2013




Inquiry #5: Bid item 71 is for Hot Mix Asphlat, Superpave (Open Graded)(Supply Line On Bridge)

First, what does "Supply Line On Bridge" refer to in this item?

Second, page 71 of the Special Provisions say "For RHMA-SP-O, the grade of asphlt binder must be PG 64-16." Does the State want HMA-SP-O or RHMA-SP-O?

Inquiry submitted 09/17/2013

Response #1:9/17/13: Your inquiry has been received and is being reviewed. Thank you for your patience.
Response posted 09/17/2013


Response #2:9/18/13: Please refer to Addendum Number 3, dated September 18,2013. The Information is posted at http://www.dot.ca.gov/hq/esc/oe/project_ads_addenda/02/02-360704
Response posted 09/18/2013




Inquiry #6: We see the language for the closures on page 20. With this all it says that "when unpaved conditions are provided, the full width of the travel way must be open to traffic on Fridays after 3:00 p.m., Sat., Sun, holidays and when construction operations are not actively in progress." With this said, if we have have construction ongoing we can close the road to one lane 24 hours from Midnight on Monday to Friday at 3:00 p.m. Correct? A lane closure chart and further clarification would be helpful.
Inquiry submitted 09/24/2013

Response #1:9/25/13: Your inquiry has been received and is being reviewed. Thank you for your patience.
Response posted 09/25/2013


Response #2:9/26/13: The last paragraph on page 20 of the Special Provisions states: "Except when unpaved conditions are provided, the full width of the traveled way must be open to traffic on Fridays after 3:00 p.m., Saturdays, Sundays, Designated Holidays, and when construction operations are not actively in progress."(underlined emphasis added). In addition, please refer to page 23 of the Special Provisions, paragraph 4 of Section 12-5.03B Stationary Lane Closures which states: "When traffic is on an unpaved surface, reversing one-way traffic control shall be in-place regardless of the number of unpaved lanes available." Therefore, as long as there are unpaved surfaces, reversing one-way traffic control must be in place at all times. Please bid per the current contract documents.
Response posted 09/26/2013




Inquiry #7: There are not any stage construction plans for this project. What is Caltrans intent on the staging? Can you please include staging plans?
Inquiry submitted 09/24/2013

Response #1:9/25/13: Your inquiry has been received and is being reviewed. Thank you for your patience.
Response posted 09/25/2013


Response #2:9/26/13: No staging plans will be added. The contractor is to develop his own means and methods for the earthwork in coordination with the traffic requirements as described in the contract. Please bid per the current contract documents.
Response posted 09/26/2013




Inquiry #8: Regarding Bid Item 27, Temporary Wetland Protection Mat, the PLAC’s mention an approximate acreage of temporary wetlands disturbance however, nowhere in the PLAC’s or in the plans or special provisions for the project is the temporary disturbance of wetlands delineated, marked or noted. Given the fact that Bid Item 27 is a lump sum item it is difficult to quantify or determine if how much Temporary Wetlands Protection Mat is needed for the project and where the wetland protection mat is to be installed with the given information. Please clarify.

Regarding Sheet 21 of the project plans, if a clear water diversion is necessary to be installed at this area to place new footings and construct piers, the TFESA appears to be in conflict with the TCE and in conflict with the work itself. Please clarify.

Inquiry submitted 09/27/2013

Response #1:9/27/13: Your inquiry has been received and is being reviewed. Thank you for your patience.
Response posted 09/27/2013


Response #2:10/09/13: [1]. Regarding Bid Item 27, Temporary Wetland Protection Mat, refer to Page 2, item 11 (Equipment) of the "US Army Corps of Engineers Nationwide Permit 23 Summary" and to page 1 of the "Central Valley Flood Protection Board Permit # 18858 BD". Please bid per the current contract documents.

[2]. All work must be within the Environmental Study Limits (ESL) and Temporary Fence (Type ESA). Refer to section 5-1.20B(1) of the Standard Specifications and section 14-1.02A of the Special Provisions. Please bid per contract documents.

Response posted 10/09/2013




Inquiry #9: The Quantity table on Sheet 351 of 366 indicates there is 256 LF of Concrete Barrier (Type 80)(Modified). The Plan & Elevation show the Type 80 barrier terminating at or about BB & EB which is 91'-5" resulting in an overall quantity of 183 LF. Where is the additional 73 LF of Type 80 barrier located at this bridge structure?
Inquiry submitted 10/03/2013

Response #1:10/3/13: Your inquiry is under review. Please note that due to the current time frame between the inquiry submittal and the bid opening date, a response may not be provided before the bid opening. If a response is not provided before the bid opening addressing your concern, please bid per the current contract documents. Thank you for your patience.
Response posted 10/03/2013


Response #2:10/4/13: Unless an addendum is issued addressing your concern, please bid per the current contract documents.
Response posted 10/04/2013




Inquiry #10: Addendum 3 calls out PG 64-28M, for Type A and Type O. It's our understanding that the Contractor has their choice of either TR or PM, is this correct?
Inquiry submitted 10/07/2013

Response #1:10/7/13: Your inquiry is under review. Please note that due to the current time frame between the inquiry submittal and the bid opening date, a response may not be provided before the bid opening. If a response is not provided before the bid opening addressing your concern, please bid per the current contract documents. Thank you for your patience.
Response posted 10/07/2013


Response #2:10/8/13: Yes. Refer to Section 39-1.01B and 92-1.02B of the Special Provisions. Please bid per the current contract documents.
Response posted 10/08/2013




Inquiry #11: Please clarify the area of the Temporary Wetland Protection. The plans do not shows the location or the quantity. Please revise the bid item to a square foot or square yards and show the locations.
Inquiry submitted 10/08/2013

Response #1:10/8/13: Your inquiry is under review. Please note that due to the current time frame between the inquiry submittal and the bid opening date, a response may not be provided before the bid opening. If a response is not provided before the bid opening addressing your concern, please bid per the current contract documents. Thank you for your patience.
Response posted 10/08/2013


Response #2:10/9/13 : Please refer to the responseto Inquiry #8.
Response posted 10/09/2013






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.