Note: This list is not updated when addenda are issued. For informational purposes only.
Contract Number 07-3P7904
Date Adv.: 11/13/2017

Item No.Item
Code
Item Description Unit of
Measure
Estimated
Quantity
1120090CONSTRUCTION AREA SIGNSLSLUMP SUM
2120100TRAFFIC CONTROL SYSTEMLSLUMP SUM
3130100JOB SITE MANAGEMENTLSLUMP SUM
4130200PREPARE WATER POLLUTION CONTROL PROGRAMLSLUMP SUM
5130620TEMPORARY DRAINAGE INLET PROTECTIONEA3
6130900TEMPORARY CONCRETE WASHOUTLSLUMP SUM
7153121REMOVE CONCRETE (CY)CY15
8170103CLEARING AND GRUBBING (LS)LSLUMP SUM
9190130ROADWAY EXCAVATION (SLIDE REMOVAL)CY90
10198010IMPORTED BORROW (CY)CY1,500
11210300HYDROMULCHSQFT72,800
12210430HYDROSEEDSQFT72,800
13721420CONCRETE (DITCH LINING)CY15
14999990MOBILIZATIONLSLUMP SUM