Inquiry #1: Plan PL-1 Plant Legend shows seed mix, but there is no bid item for the seed mix. Please clarify that the seed mix price should be included in the bid item 67 Compost.
Inquiry submitted 11/24/2017

Response #1:This project was re-advertised on November 6, 2017. Please refer to the re-advertised package.

There is no seed mix in the up-dated PL-1 Plant Legend sheet. There is no bid item of Compost in the new contract package.
Response posted 11/27/2017




Inquiry #2: Special Provisions section 72-1.04 says that Payment for rock slope protection fabric is not included in the payment for rock slope protection. Under which item can the slope protection fabric be paid?
Inquiry submitted 11/25/2017

Response #1:Submitted for consideration.
Response posted 11/30/2017


Response #2:Please refer to Addendum No. 1, dated December 5, 2017.
Response posted 12/06/2017




Inquiry #3: The quantity for class 2 aggregate base shown on Plan LQ-1 does not include the class 2 aggregate base quantity for the item No. 69 roadside paving. Please verify the quantity for total class 2 aggregate base.
Inquiry submitted 11/25/2017

Response #1:There is no separate Bid Item for CL2 AB. Refer to Landscape Layout Sheets and LD-14 to determine the quantity for CL2 AB. Note - As you see, Item No. 69, Roadside Paving (Misc Areas)is paid per SQYD.
Response posted 11/30/2017




Inquiry #4: What is the thickness of Item 36 Gravel Mulch?
Inquiry submitted 12/03/2017

Response #1:Submitted for consideration.
Response posted 12/06/2017


Response #2:Please refer to Addendum No. 2, dated December 14, 2017.
Response posted 12/15/2017




Inquiry #5: What is the thickness of Item 36 Gravel Mulch?
Inquiry submitted 12/04/2017

Response #1:Submitted for consideration.
Response posted 12/06/2017


Response #2:Please refer to Addendum No. 2, dated December 14, 2017.
Response posted 12/15/2017




Inquiry #6: Should we mow the grass for Item 33 Sod after planting and during the plant establishment period?
Inquiry submitted 12/04/2017

Response #1:Submitted for consideration.
Response posted 12/06/2017


Response #2:Please bid in accordance with Section 20-4.03B and 20-3.02C(3)(e) of the Standard Specifications.
Response posted 12/06/2017




Inquiry #7: What is the thickness of Bid Item 36 Gravel Much?
Inquiry submitted 12/06/2017

Response #1:Submitted for consideration.
Response posted 12/06/2017


Response #2:Please refer to Addendum No. 2, dated December 14, 2017.
Response posted 12/15/2017




Inquiry #8: Plan WPCQ-1 Temporary Water Pollution Control Quantities shows BMP quantities for Landscape Layout Plan, but there is no BMP shown on Landscape Layout Plan. Please provide us with BMP layout plans.
Inquiry submitted 12/06/2017

Response #1:Submitted for consideration.
Response posted 12/06/2017


Response #2:The quantities of BMP items are based on estimate needed on construction work shown on Layout Plans. Bid as it shown on the contract package. The final amount will be decided upon the approved Storm Water Pollution Prevention Plan (SWPPP). The Contract has a pay item for Prepare SWPPP.
Response posted 12/06/2017




Inquiry #9: LD-13 Landscape Detail shows rock blanket on slope. At the top of slope, there is 24" concrete band that is covered with rocks and construction joints at 6' O.C. Please verify that rocks and construction joints are required for the 24" concrete band.
Inquiry submitted 12/06/2017

Response #1:Submitted for consideration.
Response posted 12/06/2017


Response #2:Please bid as you see it.
Response posted 12/11/2017




Inquiry #10: LD-13 Landscape Detail shows rock blanket on slope. At the top of slope, there is 24" concrete band that is covered with rocks and construction joints at 6' O.C. Please verify that rocks and construction joints are required for the 24" concrete band.
Inquiry submitted 12/06/2017

Response #1:Submitted for consideration.

Please note you sent this twice.
Response posted 12/06/2017


Response #2:Please bid as you see it.
Response posted 12/11/2017




Inquiry #11: Special Provisions page 27 shows irrigation controller price $3,766.00 per each. Does this price include controller enclosure cabinet? If not, under which item can the controller enclosure cabinet be paid? SiteOne quoted us the controller price $4,130.91 per each, not $3,766.00.
Inquiry submitted 12/07/2017

Response #1:Submitted for consideration.
Response posted 12/07/2017


Response #2:Please bid in accordance with the Contract Plans and Special Provisions.
Response posted 12/11/2017


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.