Inquiry #1: In light of the drought and wildfires will Caltrans still allow for Alternative Pipe Culvert and specifically plastic pipe to be installed on this project?
Inquiry submitted 11/16/2018

Response #1:Pending
Response posted 11/16/2018




Inquiry #2: Sheets 1229, 1248, and 1249 appear to be missing details for the "Abutment 3 Elevation (North Side)" (La Paz NB Loop On Ramp Bridge), Abutment 1 Layout "Elevation" (La Paz UC Bridge), and Abutment 3 Layout "Elevation" (La Paz UC Bridge). Please provide the revised plan sheets with complete details.
Inquiry submitted 12/06/2018

Response #1:pending
Response posted 12/07/2018




Inquiry #3: Please post the pre-bid sign in sheet. thank you.
Inquiry submitted 12/10/2018

Response #1:Pending
Response posted 12/11/2018




Inquiry #4: On sheet 1477 of the project plans, there's a square footage quantity error for the Sound Wall (Masonry Block). The total length of sound wall is 794.80 L.F. multiplied x CMU Height of 9.34 L.F. = a total square footage of approximately 7,424 SQFT. The engineers estimate shows 6,486 SQFT. Please revise this quantity and the Final Pay quantity for this item. Thanks.
Inquiry submitted 12/10/2018

Response #1:pending
Response posted 12/11/2018




Inquiry #5: Due to the upcoming holidays, the numerous projects bidding in the month of January and the sheer size of this project, we respectfully request a four week postponement to the bid date.
Inquiry submitted 12/12/2018

Response #1:Pending
Response posted 12/13/2018




Inquiry #6: In regards to the removal of El Toro OH Off Ramp Bridge # 55-221 over the existing SCRRA/Metrolink. What are the working windows and will the standard track protection be sufficient to accommodate the Bridge Removal
Inquiry submitted 12/13/2018

Response #1:Pending
Response posted 12/13/2018


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.