Inquiry #1: I would like to register for the prebid meeting and site visit.
Inquiry submitted 08/03/2017

Response #1:To register and for more information regarding the prebid meeting/site review, see link below:

www.dot.ca.gov/dist4/construction/contracts/04-3G3644/tour/tour.html
Response posted 08/03/2017




Inquiry #2: Can you post the list of prebid meeting attendees and the slides?
Inquiry submitted 08/17/2017

Response #1:You can download the lists of attendees and the Power Point slides below.

Meeting List of Attendees

Site Visit List of Attendees

Power Point Slides
Response posted 08/17/2017




Inquiry #3: Per sections A-A and B-B on E-30 it appears the wireway extends the length of the bridge on the upper and lower lines, starting on the San Rafael side of the bridge and extending to the Richmond side of the bridge. However, surveying the site it appears the wireway on the San Rafael
side doesn’t start until just before Pier A (mile marker 278.5) for the upper level, and just before Pier 8 (mile marker 286.5) for the lower level.

Please confirm the existing raceway location from mile marker 250 to 287(is there existing conduit poured into the concrete barrier, or is there existing conduit run below the deck?). Please also confirm armored cable is not required if in conduit (per notes 12, 13, 14, and 18).


Inquiry submitted 08/29/2017

Response #1:Submitted for consideration.
Response posted 09/28/2017




Inquiry #4: Need exact placement for temporary generators and transformers. Will there be any relocating of these units throughout project?
Inquiry submitted 09/18/2017

Response #1:Submitted for consideration.
Response posted 09/19/2017




Inquiry #5: 1. What is the existing SCADA Software (e.g. Wonderware, iFix, etc)?
2. What is the existing GE PLC Programming Software for the existing GE Fanuc PLCs?
3. I could not find a requirement for spares of the SCADA / Communications equipment. Please confirm that no spares are required.
4. Drawing E-90 refers to Drawings 3262-DA5 and 3262-DX4. Please provide these referenced drawings.
5. Drawing E-126 refers to Drawing 3262-DE5. Please provide this referenced drawing.

Inquiry submitted 09/21/2017

Response #1:Submitted for consideration.
Response posted 09/22/2017




Inquiry #6: Inquire has not been answered or recognized. Is the answer forth coming?

Inquiry submitted for Caltrans contract 04-3G3644 on August 29, 2017.

Per sections A-A and B-B on E-30 it appears the wireway extends the length of the bridge on the upper and lower lines, starting on the San Rafael side of the bridge and extending to the Richmond side of the bridge. However, surveying the site it appears the wireway on the San Rafael side doesn’t start until just before Pier A (mile marker 278.5) for the upper level, and just before Pier 8 (mile marker 286.5) for the lower level.

Please confirm the existing raceway location from mile marker 250 to 287(is there existing conduit poured into the concrete barrier, or is there existing conduit run below the deck?). Please also confirm armored cable is not required if in conduit (per notes 12, 13, 14, and 18).



You will be notified by email when a response has been posted.

Inquiry submitted 09/27/2017

Response #1:Submitted for consideration.
Response posted 09/28/2017




Inquiry #7: Can a barge be moored to the two substation piers for any length of time?
Inquiry submitted 09/27/2017

Response #1:Submitted for consideration.
Response posted 09/28/2017


Response #2:Please refer to Information Handout, Typical conditions imposed by the Coast Guard during bridge projects. The United States Coast Guard (USCG), Bridge Office must be provided with the contractors proposed method of construction at least 30 days prior to beginning to allow proper review and coordination prior to official Coast Guard approval. Once approved, USCG will provide appropriate notices to the mariners concerning work schedules and locations of equipment. USCG will determine if a barge can be moored to the piers for any length of time.
Response posted 10/19/2017




Inquiry #8: Will another addendum be issued for this project prior to the bid date?
Inquiry submitted 10/03/2017

Response #1:Submitted for consideration.
Response posted 10/04/2017


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.