Inquiry #1: The plans only have pages 1-56, pages 57-59 are not in the file. Are these plansheets removed from the bid?
Inquiry submitted 06/25/2018

Response #1:
(#1)-Your inquiry has been received and is being reviewed.

Response posted 06/27/2018


Response #2:
An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 1, issued on Monday, July 16, 2018.
Please bid per the current contract documents.
Response posted 07/16/2018




Inquiry #2: On Sheet Q-1, there is an area from PM 14.29 to 17.14 that shows no cold planning nor HMA Type A, but falls within the area of the typical section that shows .25' cold plane and .25' HMA, with GPI. Are we just overlaying this area as per the typical section for PM 0.0 to 11.6, or is there an error in the table?
Inquiry submitted 07/17/2018

Response #1:
(#2)-Your inquiry has been received and is being reviewed.
Response posted 07/18/2018


Response #2:
Your attention is directed to plan sheet 2 for new structural section from PM 11.6/17.9 and note 3.
Please bid per the current contract documents.
Response posted 07/18/2018




Inquiry #3: Based on the quantities provided on Sheet Q-1, it appears that the tack coat for the Geosynthetic Pavement Interlayer is included in the quantities for "Tack Coat" and will be paid under bid item #24 - Tack Coat. Please confirm that this is the case.
Inquiry submitted 07/26/2018

Response #1:
(#3)-Your inquiry has been received and is being reviewed.
Response posted 07/27/2018


Response #2:
Response posted 07/27/2018


Response #3:
Tack coat for GPI is included with the tack coat bid item on the plans and estimate.
Response posted 07/31/2018




Inquiry #4: The response given for Inquiry #3 mentions Addendum #3. I do not believe addendum #2 has been issued as of 7/27.
Inquiry submitted 07/27/2018

Response #1:
(#4)-Response to Inquiry #3 has been revised and is still being reviewed.
Response posted 07/27/2018


Response #2:
Response to Inquiry #3 has been corrected to Tack coat for GPI is included with the tack coat bid item on the plans and estimate.
Response posted 07/31/2018




Inquiry #5: The plans do not indicate variable depth cold planing and paving. Please consider allowing this. Without variable depth, it can only be expected to match the existing roads smoothness.
Inquiry submitted 07/30/2018

Response #1:
(#5)-Your inquiry has been received and is being reviewed. If a response is not posted before bid opening addressing your inquiry, please bid per the current contract documents.
Response posted 07/30/2018


Response #2:
Please refer to the contract bid items 18 ?Prepaving Inertial Profiler? and 19 ?Prepaving Grinding Day? and the Revised Standard Specification section 36-3 for Pavement Smoothness requirements. Please bid per the current contract documents.
Response posted 07/31/2018




Inquiry #6: Where is the removal of the existing Fiber Weed Mat Paid?
Inquiry submitted 08/01/2018

Response #1:
(#6)-Your inquiry has been received and is being reviewed. If a response is not posted before bid opening addressing your inquiry, please bid per the current contract documents.
Response posted 08/01/2018


Response #2:
Attention is directed to the Special Provisions sections 83-2.01B and 83-2.01C for bid items Vegetation Control (Minor Concrete) and Vegetation Control Mat(Rubber or Fiber).
Response posted 08/01/2018




Inquiry #7: Spec Section 83 states that we are to identify posts longer than 6' by painting 2 inch tall numerals on them. There is no bid item identifying that posts longer than 6' are required. Please add a bid item for longer posts if they are required. I know almost half of what is currently in the ground is longer than 6'.
Inquiry submitted 08/01/2018

Response #1:
(#7)-Your inquiry has been received and is being reviewed. If a response is not posted before bid opening addressing your inquiry, please bid per the current contract documents.
Response posted 08/01/2018


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.