PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/28/11 EST. NO.01 TIME 01:42 PM R.E. NAME: LANG, TIM 05-0Q6404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/28/11 EST. NO.01 TIME 01:42 PM R.E. NAME: LANG, TIM 05-0Q6404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 02/28/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0Q6404 TIME 01:42 PM ESTIMATE NO. 01 BID OPENING 11/10/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/11 R.E. NAME: LANG, TIM DATE OF THIS ESTIMATE 02/28/11 LOCATION PROGRESS ESTIMATE 05-SLO-101-55.8/57.9 ----------------- CALPORTLAND CONSTRUCTION IN SAN LUIS OBISPO COUNTY IN PASO P O BOX 1280 ROBLES FROM SOUTH PASO ROBLES SANTA MARIA CA 93456 OVERHEAD TO NORTH JUNCTION ROUTE 101/46 SEPARATION FED. AID NO. HSNH-Q101(190)E ,G-Q101(190)E CONSTRUCT MEDIAN BARRIER ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 12,000.0000 12,000.00 0.036 432.00 0.036 432.00 02 PREPARE STORM WATER POLLUTION LS 2,600.0000 2,600.00 0.515 1,339.00 0.515 1,339.00 PREVENTION PLAN 03 TEMPORARY CONSTRUCTION ENTRANCE EA 4,700.0000 9,400.00 0.000 0.00 04 TEMPORARY DRAINAGE INLET PROTECTION EA 340.0000 5,440.00 0.000 0.00 05 STREET SWEEPING LS 16,000.0000 16,000.00 0.000 0.00 06 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 6,300.0000 6,300.00 0.000 0.00 07 STORM WATER ANNUAL REPORT EA 2,000.0000 2,000.00 0.000 0.00 08 CONSTRUCTION AREA SIGNS LS 4,100.0000 4,100.00 0.611 2,505.10 0.611 2,505.10 09 TRAFFIC CONTROL SYSTEM LS 160,000.0000 160,000.00 0.036 5,760.00 0.036 5,760.00 10 PORTABLE CHANGEABLE MESSAGE SIGN LS 13,000.0000 13,000.00 0.036 468.00 0.036 468.00 11 REMOVE METAL BEAM GUARD RAILING LF 7.2500 7,105.00 0.000 0.00 12 REMOVE INLET EA 1,000.0000 3,000.00 0.000 0.00 13 MODIFY INLET EA 2,800.0000 8,400.00 0.000 0.00 14 CAP INLET EA 2,300.0000 9,200.00 0.000 0.00 15 REMOVE CRASH CUSHION (SAND FILLED) EA 100.0000 2,800.00 0.000 0.00 16 CLEARING AND GRUBBING LS 22,000.0000 22,000.00 0.500 11,000.00 0.500 11,000.00 17 ROADWAY EXCAVATION CY 21.0000 80,850.00 0.000 0.00 18 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 0.000 0.00 19 HIGHWAY PLANTING LS 67,000.0000 67,000.00 0.220 14,740.00 0.220 14,740.00 20 EROSION CONTROL (COMPOST BLANKET) CY 61.0000 28,670.00 0.000 0.00 21 COMPOST (INCORPORATE) SQYD 2.0000 20,200.00 0.000 0.00 22 EROSION CONTROL (HYDROSEED) (SQFT) SQFT 0.0800 7,216.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 02/28/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0Q6404 TIME 01:42 PM ESTIMATE NO. 01 BID OPENING 11/10/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/11 R.E. NAME: LANG, TIM DATE OF THIS ESTIMATE 02/28/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PLANT ESTABLISHMENT WORK LS 14,000.0000 14,000.00 0.000 0.00 24 IRRIGATION SYSTEM LS 87,000.0000 87,000.00 0.000 0.00 25 IRRIGATION SLEEVE LF 10.0000 500.00 0.000 0.00 26 8" WELDED STEEL PIPE CONDUIT LF 275.0000 17,875.00 0.000 0.00 (.250" THICK) 27 CLASS 2 AGGREGATE BASE CY 32.0000 133,440.00 0.000 0.00 28 HOT MIX ASPHALT (TYPE A) TON 70.0000 239,400.00 0.000 0.00 29 PLACE HOT MIX ASPHALT SQYD 50.0000 3,450.00 0.000 0.00 (MISCELLANEOUS AREA) 30 TACK COAT TON 450.0000 1,350.00 0.000 0.00 31 MINOR CONCRETE (MINOR STRUCTURE) CY 3,600.0000 24,480.00 0.000 0.00 F) 32 24" REINFORCED CONCRETE PIPE LF 750.0000 2,625.00 0.000 0.00 33 30" REINFORCED CONCRETE PIPE LF 790.0000 3,239.00 0.000 0.00 34 36" REINFORCED CONCRETE PIPE LF 795.0000 3,577.50 0.000 0.00 35 36" PRECAST CONCRETE PIPE RISER LF 1,100.0000 4,840.00 0.000 0.00 36 MISCELLANEOUS IRON AND STEEL LB 1.5000 3,288.00 0.000 0.00 F) 37 CHAIN LINK FENCE (TYPE CL-6) LF 65.0000 1,950.00 0.000 0.00 38 6' CHAIN LINK GATE (TYPE CL-6) EA 1,650.0000 1,650.00 0.000 0.00 39 WILDLIFE PASSAGE WAY (TYPE S) EA 51.0000 19,380.00 0.000 0.00 40 CONCRETE BARRIER (TYPE 25) LF 1,200.0000 13,200.00 0.000 0.00 41 CONCRETE BARRIER (TYPE 25 MODIFIED) LF 1,300.0000 14,300.00 0.000 0.00 42 CONCRETE BARRIER TRANSITION LF 114.0000 6,840.00 0.000 0.00 43 CONCRETE BARRIER (TYPE 60S) LF 42.0000 651,000.00 0.000 0.00 44 ARCHITECTURAL TREATMENT LF 21.0000 325,500.00 0.000 0.00 45 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,500.0000 1,500.00 0.000 0.00 SYSTEM ELEMENTS DURING CONSTRUCTION 46 MODIFY LIGHTING LS 18,500.0000 18,500.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 02/28/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0Q6404 TIME 01:42 PM ESTIMATE NO. 01 BID OPENING 11/10/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/11 R.E. NAME: LANG, TIM DATE OF THIS ESTIMATE 02/28/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 36,244.10 36,244.10 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 36,244.10 36,244.10 47 MOBILIZATION LS 108,000.0000 108,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 2,190,165.50 TOTAL WORK COMPLETED 36,244.10 36,244.10 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 36,244.10 36,244.10 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/24/11 360 02/08/11 02/08/11 07/24/12 4 5 0 0 2% 1% PROGRESS IS SATISFACTORY LANG, TIM RESIDENT ENGINEER PROGRAM CAS145 DATE 02/28/11