PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/22/12 EST. NO.01 TIME 03:57 PM R.E. NAME: GRANADOS, ANTHONY 02-3E6404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/22/12 EST. NO.01 TIME 03:57 PM R.E. NAME: GRANADOS, ANTHONY 02-3E6404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE LATE COZEEP CANCEL -640.00 01 -640.00 -640.00 TOTAL DEDUCTIONS -640.00 -640.00 PROGRAM CAS145 PAGE 1 DATE 08/22/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-3E6404 TIME 03:57 PM ESTIMATE NO. 01 BID OPENING 03/13/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/12 R.E. NAME: GRANADOS, ANTHONY DATE OF THIS ESTIMATE 08/22/12 LOCATION PROGRESS ESTIMATE 02-TEH-5-19.2/ .0 ----------------- PETERSON-CHASE GENERAL IN SHASTA AND TEHAMA COUNTIES AT ENGINEERING CONSTRUCTION INC VARIOUS LOCATIONS. 1792 KAISER AVENUE IRVINE CA 92614 FED. AID NO. N O N E BRIDGE MAINTENANCE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 960.0000 960.00 0.246 236.16 0.246 236.16 002 PREPARE WATER POLLUTION CONTROL LS 1,299.0000 1,299.00 0.750 974.25 0.750 974.25 PROGRAM 003 TEMPORARY MULCH SQYD 53.3000 2,665.00 0.000 0.00 004 TEMPORARY FIBER ROLL LF 5.9000 1,180.00 0.000 0.00 005 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 884.0000 884.00 0.000 0.00 006 PORTABLE RADAR TRAILER EA 2,001.0000 2,001.00 0.400 800.40 0.400 800.40 007 CONSTRUCTION AREA SIGNS LS 4,330.0000 4,330.00 0.700 3,031.00 0.700 3,031.00 008 TRAFFIC CONTROL SYSTEM LS 50,300.0000 50,300.00 0.400 20,120.00 0.400 20,120.00 009 PORTABLE CHANGEABLE MESSAGE SIGN LS 2,432.0000 2,432.00 0.400 972.80 0.400 972.80 010 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.6000 8,384.00 4,815.000 7,704.00 4,815.000 7,704.00 011 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 59.3000 29,650.00 0.000 0.00 012 REMOVE UNSOUND CONCRETE CF 32.0000 4,832.00 0.000 0.00 013 REMOVE POLYESTER CONCRETE OVERLAY SQFT 3.9000 42,900.00 11,184.000 43,617.60 11,184.000 43,617.60 014 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.1300 7,659.60 47,789.400 6,212.62 47,789.400 6,212.62 015 CLEAN BRIDGE DECK SQFT 0.1400 2,412.20 0.000 0.00 016 LEAD COMPLIANCE PLAN LS 3,300.0000 3,300.00 1.000 3,300.00 1.000 3,300.00 017 AGGREGATE BASE (APPROACH SLAB) CY 493.0000 22,185.00 0.000 0.00 018 HOT MIX ASPHALT (TYPE A) TON 514.0000 35,466.00 0.000 0.00 019 GRIND CONCRETE APPROACH SURFACE SQFT 5.5000 74,965.00 0.000 0.00 020 STRUCTURAL CONCRETE, APPROACH SLAB CY 1,346.0000 114,410.00 0.000 0.00 (TYPE R) 021 PAVING NOTCH EXTENSION CY 167.0000 10,020.00 0.000 0.00 022 CLEAN EXPANSION JOINT LF 13.0000 7,462.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 08/22/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-3E6404 TIME 03:57 PM ESTIMATE NO. 01 BID OPENING 03/13/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/12 R.E. NAME: GRANADOS, ANTHONY DATE OF THIS ESTIMATE 08/22/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 RAPID SETTING CONCRETE PATCH CF 27.0000 4,077.00 0.000 0.00 024 FURNISH POLYESTER CONCRETE OVERLAY CF 92.0000 408,480.00 3,445.000 316,940.00 3,445.000 316,940.00 025 PLACE POLYESTER CONCRETE OVERLAY SQFT 0.7000 41,244.00 50,101.400 35,070.98 50,101.400 35,070.98 (F) 026 JOINT SEAL (MR 1/2") LF 16.5000 5,247.00 0.000 0.00 027 JOINT SEAL (MR 1") LF 18.5000 6,179.00 0.000 0.00 028 TREAT BRIDGE DECK SQFT 0.4800 8,270.40 0.000 0.00 (F) 029 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 37.0000 7,030.00 0.000 0.00 030 THERMOPLASTIC TRAFFIC STRIPE LF 0.9000 8,037.00 0.000 0.00 (SPRAYABLE) 031 PAVEMENT MARKER (RETROREFLECTIVE) EA 24.2000 3,872.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 08/22/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-3E6404 TIME 03:57 PM ESTIMATE NO. 01 BID OPENING 03/13/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/12 R.E. NAME: GRANADOS, ANTHONY DATE OF THIS ESTIMATE 08/22/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 438,979.81 438,979.81 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 438,979.81 438,979.81 032 MOBILIZATION LS 100,600.0000 100,600.00 0.950 95,570.00 0.950 95,570.00 ORIGINAL CONTRACT AMOUNT 1,022,733.20 TOTAL WORK COMPLETED 534,549.81 534,549.81 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -640.00 -640.00 TOTAL 533,909.81 533,909.81 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/14/12 65 00/00/00 05/29/12 10/23/12 21 38 0 0 52% 32% PROGRESS IS SATISFACTORY *** SUSPENDED ON 05/29/12. GRANADOS, ANTHONY RESIDENT ENGINEER PROGRAM CAS145 DATE 08/22/12