District 8 San Bernardino/Riverside
DAILY FREEWAY AND HIGHWAY LANE CLOSURE REPORT
Caltrans Public Affairs: (909) 383-4631
      District Traffic Management (DTM) Report: Thursday April 25, 2013 8:58 AM  
Closure # Log # Route County Begin
PM
End
PM
Date
From
Date
To
Time
In
Time
Out
Dir Location /
Additional Information
Remarks
M10ZA 4 10 Riv 12.9 12 04/28/13 04/28/13 5:01 AM 10:01 AM WB Begin:  Route 243/8th St
End:  22nd St
Restriction: #3, #4 of 4 lanes
Reason: Bridge Work
 
M10ZA 6 10 Riv 12.9 12.9 04/28/13 04/28/13 5:30 AM 11:30 AM WB Begin: WB Route 10
End:  Route 243/8th St
Restriction: Full off ramp closure
Reason: Bridge Work
 
M10IA 2 10 Riv 16.5 17.7 04/27/13 04/27/13 6:01 AM 12:01 PM EB Begin:  Fields Rd
End:  Apache Trail
Restriction: #3, #4 of 4 lanes, right shoulder
Reason: Pavement Repair
 
M10IA 1 10 Riv 17.7 17.7 04/27/13 04/27/13 6:01 AM 12:01 PM EB Begin: EB Apache Trail
End: EB Route 10
Restriction: Full on ramp closure
Reason: Pavement Repair
 
C10EC 1 10 Riv 19.4 24.6 04/28/13 04/29/13 8:01 PM 4:01 AM EB Begin:  East Cabazon
End:  Haugen-Lehman Way
Restriction: #4, #5, #2, #1 of 5 lanes
Reason: Bridge Work
 
C10EC 11 10 Riv 19.4 24.6 04/28/13 04/29/13 10:01 PM 4:01 AM WB Begin:  East Cabazon
End:  Haugen-Lehman Way
Restriction: #4, #3, #2, #1 of 4 lanes
Reason: Bridge Work
 
C10EC 2 10 Riv 19.4 24.6 04/29/13 05/03/13 8:01 PM 4:01 AM EB Begin:  East Cabazon
End:  Haugen-Lehman Way
Restriction: #5, #4, #1, #2, #3 of 5 lanes
Reason: Bridge Work
 
C10EC 1 10 Riv 19.4 24.6 05/03/13 05/04/13 10:01 PM 7:01 AM EB Begin:  East Cabazon
End:  Haugen-Lehman Way
Restriction: #4, #5, #2, #1 of 5 lanes
Reason: Bridge Work
 
C10EC 3 10 Riv 19.4 24.6 05/03/13 05/04/13 10:01 PM 6:01 AM WB Begin:  East Cabazon
End:  Haugen-Lehman Way
Restriction: #3, #4, #2, #1 of 4 lanes
Reason: Bridge Work
 
C10EC 21 10 Riv 24.6 24.6 04/29/13 04/29/13 12:01 AM 4:01 AM WB Begin:  Haugen-Lehman Way
End: WB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10EC 26 10 Riv 24.6 24.6 04/29/13 04/29/13 12:01 AM 4:01 AM EB Begin: EB Route 10
End:  Haugen-Lehman Way
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10EC 22 10 Riv 24.6 24.6 04/29/13 04/30/13 8:01 PM 4:01 AM WB Begin:  Haugen-Lehman Way
End: WB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10EC 27 10 Riv 24.6 24.6 04/29/13 04/30/13 8:01 PM 4:01 AM EB Begin: EB Route 10
End:  Haugen-Lehman Way
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10EC 23 10 Riv 24.6 24.6 04/30/13 05/01/13 8:01 PM 4:01 AM WB Begin:  Haugen-Lehman Way
End: WB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10EC 28 10 Riv 24.6 24.6 04/30/13 05/01/13 8:01 PM 4:01 AM EB Begin: EB Route 10
End:  Haugen-Lehman Way
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10EC 24 10 Riv 24.6 24.6 05/01/13 05/02/13 8:01 PM 4:01 AM WB Begin:  Haugen-Lehman Way
End: WB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10EC 29 10 Riv 24.6 24.6 05/01/13 05/02/13 8:01 PM 4:01 AM EB Begin: EB Route 10
End:  Haugen-Lehman Way
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10EC 25 10 Riv 24.6 24.6 05/02/13 05/03/13 8:01 PM 4:01 AM WB Begin:  Haugen-Lehman Way
End: WB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10EC 30 10 Riv 24.6 24.6 05/02/13 05/03/13 8:01 PM 4:01 AM EB Begin: EB Route 10
End:  Haugen-Lehman Way
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10EC 5 10 Riv 24.6 24.6 05/03/13 05/04/13 10:01 PM 6:01 AM WB Begin:  Haugen-Lehman Way
End: WB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10EC 6 10 Riv 24.6 24.6 05/03/13 05/04/13 10:01 PM 6:01 AM EB Begin: EB Route 10
End:  Haugen-Lehman Way
Restriction: Full off ramp closure
Reason: Bridge Work
 
P10YA 4 10 Riv 27.7 26.2 04/25/13 04/26/13 9:01 AM 4:01 PM WB Begin:  Whitewater River
End:  White Water Roadside Rest Area
Restriction: #1 of 4 lanes
Reason: Utility Work
 
C10UA 1 10 Riv 39.5 39.5 04/23/13 05/03/13 8:01 PM 7:59 PM WB Begin: WB Route 10
End: NB/SB Date Palm Dr
Restriction: Long-term full off ramp closure
Reason: Roadway Excavation
 
C10UA 2 10 Riv 39.5 39.5 04/23/13 05/03/13 8:01 PM 7:59 PM WB Begin: NB/SB Date Palm Dr
End: WB Route 10
Restriction: Long-term full on ramp closure
Reason: Roadway Excavation
 
C10UA 4 10 Riv 43 36.1 04/24/13 04/26/13 5:01 PM 4:59 AM WB Begin:  Bob Hope Dr
End:  Gene Autry Trail
Restriction: #3, #4 of 4 lanes, right shoulder
Reason: Miscellaneous Work
 
C10UA 1 10 Riv 43 36.1 04/26/13 04/27/13 7:01 PM 6:59 AM WB Begin:  Bob Hope Dr
End:  Gene Autry Trail
Restriction: #3, #4 of 4 lanes, right shoulder
Reason: Miscellaneous Work
 
C10UA 2 10 Riv 43 36.1 04/27/13 04/28/13 6:01 PM 7:59 AM WB Begin:  Bob Hope Dr
End:  Gene Autry Trail
Restriction: #4, #3 of 4 lanes, right shoulder
Reason: Miscellaneous Work
 
C10UA 3 10 Riv 43 36.1 04/28/13 04/29/13 7:01 PM 4:59 AM WB Begin:  Bob Hope Dr
End:  Gene Autry Trail
Restriction: #3, #4 of 4 lanes, right shoulder
Reason: Miscellaneous Work
 
C10UA 4 10 Riv 43 36.1 04/29/13 05/03/13 5:01 PM 4:59 AM WB Begin:  Bob Hope Dr
End:  Gene Autry Trail
Restriction: #3, #4 of 4 lanes, right shoulder
Reason: Miscellaneous Work
 
C10UA 1 10 Riv 43 36.1 05/03/13 05/04/13 7:01 PM 6:59 AM WB Begin:  Bob Hope Dr
End:  Gene Autry Trail
Restriction: #3, #4 of 4 lanes, right shoulder
Reason: Miscellaneous Work
 
C15UC 8 15 Riv 8.7 6.6 04/24/13 04/25/13 9:01 PM 5:01 AM SB Begin:  Route 215
End:  Route 79/Winchester Rd
Restriction: #4, #3, #5 of 5 lanes
Reason: Pavement Repair
 
C15UC 13 15 Riv 8.7 8.7 04/24/13 04/25/13 9:01 PM 5:01 AM SB Begin: SB Route 215
End: SB Route 79/Winchester Rd
Restriction: Full off ramp closure
Reason: Pavement Repair
 
C15UC 9 15 Riv 8.7 6.6 04/25/13 04/26/13 9:01 PM 5:01 AM SB Begin:  Route 215
End:  Route 79/Winchester Rd
Restriction: #5, #3, #4 of 5 lanes
Reason: Pavement Repair
 
C15UC 14 15 Riv 8.7 8.7 04/25/13 04/26/13 9:01 PM 5:01 AM SB Begin: SB Route 215
End: SB Route 79/Winchester Rd
Restriction: Full off ramp closure
Reason: Pavement Repair
 
C15UC 1 15 Riv 8.7 6.6 04/26/13 04/27/13 9:01 PM 5:01 AM SB Begin:  Route 215
End:  Route 79/Winchester Rd
Restriction: #4, #3, #5 of 5 lanes
Reason: Pavement Repair
 
C15UC 3 15 Riv 8.7 8.7 04/26/13 04/28/13 9:01 PM 7:01 AM SB Begin: SB Route 215
End: SB Route 79/Winchester Rd
Restriction: Full off ramp closure
Reason: Pavement Repair
 
C15UC 2 15 Riv 8.7 6.6 04/27/13 04/28/13 11:01 PM 7:01 AM SB Begin:  Route 215
End:  Route 79/Winchester Rd
Restriction: #5, #4, #3 of 5 lanes
Reason: Pavement Repair
 
C15UC 8 15 Riv 8.7 6.6 05/01/13 05/02/13 9:01 PM 5:01 AM SB Begin:  Route 215
End:  Route 79/Winchester Rd
Restriction: #4, #5, #3 of 5 lanes
Reason: Pavement Repair
 
C15UC 13 15 Riv 8.7 8.7 05/01/13 05/02/13 9:01 PM 5:01 AM SB Begin: SB Route 215
End: SB Route 79/Winchester Rd
Restriction: Full off ramp closure
Reason: Pavement Repair
 
C15UC 9 15 Riv 8.7 6.6 05/02/13 05/03/13 9:01 PM 5:01 AM SB Begin:  Route 215
End:  Route 79/Winchester Rd
Restriction: #5, #3, #4 of 5 lanes
Reason: Pavement Repair
 
C15UC 14 15 Riv 8.7 8.7 05/02/13 05/03/13 9:01 PM 5:01 AM SB Begin: SB Route 215
End: SB Route 79/Winchester Rd
Restriction: Full off ramp closure
Reason: Pavement Repair
 
C15UC 1 15 Riv 8.7 6.6 05/03/13 05/04/13 9:01 PM 5:01 AM SB Begin:  Route 215
End:  Route 79/Winchester Rd
Restriction: #5, #4, #3 of 5 lanes
Reason: Pavement Repair
 
C15UC 3 15 Riv 8.7 8.7 05/03/13 05/04/13 9:01 PM 7:01 AM SB Begin: SB Route 215
End: SB Route 79/Winchester Rd
Restriction: Full off ramp closure
Reason: Pavement Repair
 
C15FE 6 15 Riv 33.3 35.6 04/25/13 04/26/13 9:01 PM 5:01 AM NB Begin:  Temescal Canyon Rd
End:  Weirick Rd/Dos Lagos Dr
Restriction: #2, #3 of 3 lanes, right shoulder
Reason: Bridge Work
 
C15FE 22 15 Riv 33.3 35.6 04/25/13 04/27/13 10:01 PM 6:01 AM SB Begin:  Temescal Canyon Rd
End:  Weirick Rd/Dos Lagos Dr
Restriction: #2, #1, #3 of 15 lanes, left shoulder, right shoulder
Reason: Grinding and Paving
 
C15FE 11 15 Riv 33.3 38.7 04/29/13 04/30/13 9:01 PM 5:01 AM NB Begin:  Temescal Canyon Rd
End:  Ontario Ave
Restriction: #2, #1 of 3 lanes, left shoulder
Reason: Bridge Work
 
C15FE 7 15 Riv 33.3 37.8 04/29/13 04/30/13 10:01 PM 7:01 AM SB Begin:  Temescal Canyon Rd
End:  El Cerrito Rd
Restriction: #2, #3 of 3 lanes, right shoulder
Reason: Grinding and Paving
 
C15FE 12 15 Riv 33.3 38.7 04/30/13 05/01/13 9:01 PM 5:01 AM NB Begin:  Temescal Canyon Rd
End:  Ontario Ave
Restriction: #1, #2 of 3 lanes, left shoulder
Reason: Bridge Work
 
C15FE 8 15 Riv 33.3 37.8 04/30/13 05/01/13 10:01 PM 7:01 AM SB Begin:  Temescal Canyon Rd
End:  El Cerrito Rd
Restriction: #3, #2 of 3 lanes, right shoulder
Reason: Grinding and Paving
 
C15FE 13 15 Riv 33.3 38.7 05/01/13 05/02/13 9:01 PM 5:01 AM NB Begin:  Temescal Canyon Rd
End:  Ontario Ave
Restriction: #1, #2 of 3 lanes, left shoulder
Reason: Bridge Work
 
C15FE 9 15 Riv 33.3 37.8 05/01/13 05/02/13 10:01 PM 7:01 AM SB Begin:  Temescal Canyon Rd
End:  El Cerrito Rd
Restriction: #3, #2 of 3 lanes, right shoulder
Reason: Grinding and Paving
 
C15FE 14 15 Riv 33.3 38.7 05/02/13 05/03/13 9:01 PM 5:01 AM NB Begin:  Temescal Canyon Rd
End:  Ontario Ave
Restriction: #1, #2 of 3 lanes, left shoulder
Reason: Bridge Work
 
C15FE 10 15 Riv 33.3 37.8 05/02/13 05/03/13 10:01 PM 7:01 AM SB Begin:  Temescal Canyon Rd
End:  El Cerrito Rd
Restriction: #2, #3 of 3 lanes, right shoulder
Reason: Grinding and Paving
 
C15FE 2 15 Riv 33.3 38.7 05/03/13 05/04/13 9:01 PM 5:01 AM NB Begin:  Temescal Canyon Rd
End:  Ontario Ave
Restriction: #1, #2 of 3 lanes, left shoulder
Reason: Bridge Work
 
C15FE 1 15 Riv 33.3 37.8 05/03/13 05/04/13 10:01 PM 7:01 AM SB Begin:  Temescal Canyon Rd
End:  El Cerrito Rd
Restriction: #3, #2 of 3 lanes, right shoulder
Reason: Grinding and Paving
 
C15FE 6 15 Riv 37.8 38.7 04/27/13 04/28/13 11:01 PM 7:01 AM SB Begin:  El Cerrito Rd
End:  Ontario Ave
Restriction: #2, #3 of 3 lanes, right shoulder
Reason: Drainage Work
 
M15AA 1 15 Riv 39.4 40.4 05/01/13 05/01/13 9:01 AM 1:01 PM NB Begin:  Old Temescal Rd
End:  Magnolia Ave
Restriction: Intermittent #4 of 4 lanes
Reason: Guardrail Repair
 
M15AA 2 15 Riv 40.4 41 05/01/13 05/01/13 9:01 AM 1:01 PM NB Begin:  Magnolia Ave
End:  6th St
Restriction: Intermittent #4 of 4 lanes
Reason: Guardrail Repair
 
M15AA 3 15 Riv 40.4 40.4 05/01/13 05/01/13 9:01 AM 2:01 PM NB Begin: WB Magnolia Ave
End: NB Route 15
Restriction: Intermittent full on ramp closure
Reason: Guardrail Repair
 
C60LB 2 60 Riv 18.4 20.4 04/24/13 04/26/13 9:01 PM 5:01 AM EB Begin:  Nason St
End:  Redlands Blvd
Restriction: #3, #2, #1 of 3 lanes
Reason: Pavement Work
 
C60LB 5 60 Riv 19.1 19.1 04/24/13 04/25/13 9:01 PM 5:01 AM EB Begin: EB Moreno Beach Dr
End: EB Route 60
Restriction: Intermittent full on ramp closure
Reason: Pavement Work
 
C60LB 8 60 Riv 19.1 19.1 04/24/13 04/25/13 9:01 PM 5:01 AM EB Begin: EB Route 60
End: EB Moreno Beach Dr
Restriction: Full off ramp closure
Reason: Paving Operation
 
C60LB 6 60 Riv 19.1 19.1 04/25/13 04/26/13 9:01 PM 5:01 AM EB Begin: EB Moreno Beach Dr
End: EB Route 60
Restriction: Intermittent full on ramp closure
Reason: Pavement Work
 
C60LB 9 60 Riv 19.1 19.1 04/25/13 04/26/13 9:01 PM 5:01 AM EB Begin: EB Route 60
End: EB Moreno Beach Dr
Restriction: Full off ramp closure
Reason: Paving Operation
 
P62KA 1 62 Riv 0.8 1.9 04/29/13 05/03/13 8:01 AM 4:01 PM SB Begin:  Dillon Rd
End:  Old Morongo Road
Restriction: Intermittent #2 of 2 lanes
Reason: Utility Work
 
C62MA 2 62 Riv
SBd
9.2 0.8 04/25/13 04/26/13 8:01 AM 4:01 PM EB Begin:  SBD/RIV County Line
End:  Hess Blvd
Restriction: #2, #1 of 2 lanes
Reason: Emergency Work
 
C74FA 2 74 Riv 27.8 27.5 04/25/13 05/06/13 7:01 AM 4:01 PM WB Begin:  Trumble Rd
End:  Route 215
Restriction: #2 of 2 lanes
Reason: Fence Work
 
C74HA 4 74 Riv 29.8 29.8 04/25/13 05/06/13 6:01 AM 6:01 PM EB/WB Begin:  1500' E/W of Menifee Rd
End:  1500' E/W of Menifee Rd
Restriction: #2, #1 of 2 lanes
Reason: Highway Construction
 
M74FA 1 74 Riv 31.8 32 05/02/13 05/02/13 9:01 AM 2:01 PM EB Begin:  Leon Rd
End:  Juniper Flats Rd
Restriction: Intermittent #2 of 2 lanes
Reason: Guardrail Repair
 
C74EA 6 74 Riv 46.9 71.7 04/25/13 05/06/13 6:01 AM 6:01 PM EB/WB Begin:  Marshall Ave
End:  Route 371
Restriction: One-way traffic control
Reason: Grinding and Paving
 
M74FA 2 74 Riv 48.1 48.8 05/02/13 05/02/13 9:01 AM 2:01 PM EB/WB Begin:  Blackburn Rd
End:  Rouse Hill Truck trail
Restriction: Intermittent one-way traffic control
Reason: Guardrail Repair
 
C79PA 1 79 Riv 8.4 15.2 04/25/13 05/01/13 8:01 AM 4:01 PM NB/SB Begin:  Thompson Rd/Leon Rd
End:  Newport Rd
Restriction: #1 of 2 lanes
Reason: K-rail Installation
 
M91DA 1 91 Riv 7.5 7.5 04/25/13 04/25/13 9:01 AM 2:01 PM EB Begin: EB Route 91
End: SB Route 15
Restriction: #1, #2 of 2 lanes
Reason: Guardrail Repair
 
M91CA 1 91 Riv 11.1 12 04/27/13 04/27/13 6:01 AM 12:01 PM EB Begin:  Magnolia Ave
End:  La Sierra Ave
Restriction: Auxiliary lane
Reason: Crack Seal Operation
 
M91CA 2 91 Riv 12 12 04/27/13 04/27/13 6:01 AM 12:01 PM EB Begin: EB Route 91
End:  La Sierra Ave
Restriction: Full off ramp closure
Reason: Crack Seal Operation
 
M91CA 3 91 Riv 12 12 04/27/13 04/27/13 6:01 AM 12:01 PM EB Begin: EB La Sierra Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: Crack Seal Operation
 
C91HA 59 91 Riv 13.9 13.9 04/24/13 04/26/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Indiana Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 8 91 Riv 13.9 13.9 04/26/13 04/27/13 11:01 PM 6:59 AM EB Begin: EB Route 91
End: EB Indiana Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 55 91 Riv 13.9 13.9 04/28/13 05/03/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Indiana Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 7 91 Riv 13.9 13.9 05/03/13 05/04/13 11:01 PM 6:59 AM EB Begin: EB Route 91
End: EB Indiana Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 29 91 Riv 15.6 20.5 04/24/13 04/26/13 10:01 PM 5:59 AM EB Begin:  Adams St
End:  Seventh St
Restriction: #2, #3 of 3 lanes, median, right shoulder, left shoulder
Reason: K-rail Installation
 
C91HA 1 91 Riv 15.6 20.5 04/26/13 04/27/13 11:01 PM 6:59 AM EB Begin:  Adams St
End:  Seventh St
Restriction: #2, #3 of 3 lanes, right shoulder, left shoulder, median
Reason: K-rail Installation
 
C91HA 25 91 Riv 15.6 20.5 04/28/13 05/03/13 10:01 PM 5:59 AM EB Begin:  Adams St
End:  Seventh St
Restriction: #2, #3 of 3 lanes, right shoulder, left shoulder, median
Reason: K-rail Installation
 
C91HA 1 91 Riv 15.6 20.5 05/03/13 05/04/13 11:01 PM 6:59 AM EB Begin:  Adams St
End:  Seventh St
Restriction: #2, #3 of 3 lanes, left shoulder, median, right shoulder
Reason: K-rail Installation
 
C91HA 119 91 Riv 16.7 16.7 04/24/13 04/25/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Madison St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 124 91 Riv 16.7 16.7 04/24/13 04/25/13 9:01 PM 4:59 AM WB Begin: WB Madison St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 64 91 Riv 16.7 16.7 04/24/13 04/25/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Madison St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 69 91 Riv 16.7 16.7 04/24/13 04/25/13 10:01 PM 5:59 AM EB Begin: EB Madison St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 120 91 Riv 16.7 16.7 04/25/13 04/26/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Madison St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 125 91 Riv 16.7 16.7 04/25/13 04/26/13 9:01 PM 4:59 AM WB Begin: WB Madison St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 65 91 Riv 16.7 16.7 04/25/13 04/26/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Madison St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 70 91 Riv 16.7 16.7 04/25/13 04/26/13 10:01 PM 5:59 AM EB Begin: EB Madison St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 9 91 Riv 16.7 16.7 04/26/13 04/27/13 11:01 PM 6:59 AM EB Begin: EB Route 91
End: EB Madison St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 10 91 Riv 16.7 16.7 04/26/13 04/27/13 11:01 PM 6:59 AM EB Begin: EB Madison St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 20 91 Riv 16.7 16.7 04/26/13 04/27/13 11:01 PM 6:59 AM WB Begin: WB Route 91
End: WB Madison St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 21 91 Riv 16.7 16.7 04/26/13 04/27/13 11:01 PM 6:59 AM WB Begin: WB Madison St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 60 91 Riv 16.7 16.7 04/28/13 04/29/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Madison St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 65 91 Riv 16.7 16.7 04/28/13 04/29/13 10:01 PM 5:59 AM EB Begin: EB Madison St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 115 91 Riv 16.7 16.7 04/28/13 04/29/13 10:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Madison St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 120 91 Riv 16.7 16.7 04/28/13 04/29/13 10:01 PM 4:59 AM WB Begin: WB Madison St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 116 91 Riv 16.7 16.7 04/29/13 04/30/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Madison St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 121 91 Riv 16.7 16.7 04/29/13 04/30/13 9:01 PM 4:59 AM WB Begin: WB Madison St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 61 91 Riv 16.7 16.7 04/29/13 04/30/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Madison St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 66 91 Riv 16.7 16.7 04/29/13 04/30/13 10:01 PM 5:59 AM EB Begin: EB Madison St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 117 91 Riv 16.7 16.7 04/30/13 05/01/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Madison St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 122 91 Riv 16.7 16.7 04/30/13 05/01/13 9:01 PM 4:59 AM WB Begin: WB Madison St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 62 91 Riv 16.7 16.7 04/30/13 05/01/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Madison St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 67 91 Riv 16.7 16.7 04/30/13 05/01/13 10:01 PM 5:59 AM EB Begin: EB Madison St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 118 91 Riv 16.7 16.7 05/01/13 05/02/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Madison St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 123 91 Riv 16.7 16.7 05/01/13 05/02/13 9:01 PM 4:59 AM WB Begin: WB Madison St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 63 91 Riv 16.7 16.7 05/01/13 05/02/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Madison St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 68 91 Riv 16.7 16.7 05/01/13 05/02/13 10:01 PM 5:59 AM EB Begin: EB Madison St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 119 91 Riv 16.7 16.7 05/02/13 05/03/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Madison St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 124 91 Riv 16.7 16.7 05/02/13 05/03/13 9:01 PM 4:59 AM WB Begin: WB Madison St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 64 91 Riv 16.7 16.7 05/02/13 05/03/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Madison St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 69 91 Riv 16.7 16.7 05/02/13 05/03/13 10:01 PM 5:59 AM EB Begin: EB Madison St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 8 91 Riv 16.7 16.7 05/03/13 05/04/13 11:01 PM 6:59 AM EB Begin: EB Route 91
End: EB Madison St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 9 91 Riv 16.7 16.7 05/03/13 05/04/13 11:01 PM 6:59 AM EB Begin: EB Madison St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 19 91 Riv 16.7 16.7 05/03/13 05/04/13 11:01 PM 6:59 AM WB Begin: WB Route 91
End: WB Madison St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 20 91 Riv 16.7 16.7 05/03/13 05/04/13 11:01 PM 6:59 AM WB Begin: WB Madison St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 134 91 Riv 17.6 17.6 04/24/13 04/26/13 10:01 PM 6:01 AM EB Begin: EB EB91 Arlington offramp
End:  Indiana Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C91HA 23 91 Riv 17.6 17.6 04/26/13 04/27/13 11:01 PM 7:01 AM EB Begin: EB EB91 Arlington offramp
End:  Indiana Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C91HA 130 91 Riv 17.6 17.6 04/28/13 05/03/13 10:01 PM 6:01 AM EB Begin: EB EB91 Arlington offramp
End:  Indiana Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C91HA 22 91 Riv 17.6 17.6 05/03/13 05/04/13 11:01 PM 7:01 AM EB Begin: EB EB91 Arlington offramp
End:  Indiana Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C91HA 104 91 Riv 17.8 17.8 04/24/13 04/25/13 9:01 PM 4:59 AM WB Begin: WB Arlington Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 44 91 Riv 17.8 17.8 04/24/13 04/25/13 10:01 PM 5:59 AM EB Begin: EB Arlington Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 105 91 Riv 17.8 17.8 04/25/13 04/26/13 9:01 PM 4:59 AM WB Begin: WB Arlington Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 45 91 Riv 17.8 17.8 04/25/13 04/26/13 10:01 PM 5:59 AM EB Begin: EB Arlington Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 5 91 Riv 17.8 17.8 04/26/13 04/27/13 11:01 PM 6:59 AM EB Begin: EB Arlington Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 40 91 Riv 17.8 17.8 04/28/13 04/29/13 10:01 PM 5:59 AM EB Begin: EB Arlington Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 101 91 Riv 17.8 17.8 04/29/13 04/30/13 9:01 PM 4:59 AM WB Begin: WB Arlington Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 41 91 Riv 17.8 17.8 04/29/13 04/30/13 10:01 PM 5:59 AM EB Begin: EB Arlington Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 102 91 Riv 17.8 17.8 04/30/13 05/01/13 9:01 PM 4:59 AM WB Begin: WB Arlington Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 42 91 Riv 17.8 17.8 04/30/13 05/01/13 10:01 PM 5:59 AM EB Begin: EB Arlington Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 103 91 Riv 17.8 17.8 05/01/13 05/02/13 9:01 PM 4:59 AM WB Begin: WB Arlington Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 43 91 Riv 17.8 17.8 05/01/13 05/02/13 10:01 PM 5:59 AM EB Begin: EB Arlington Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 104 91 Riv 17.8 17.8 05/02/13 05/03/13 9:01 PM 4:59 AM WB Begin: WB Arlington Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 44 91 Riv 17.8 17.8 05/02/13 05/03/13 10:01 PM 5:59 AM EB Begin: EB Arlington Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 4 91 Riv 17.8 17.8 05/03/13 05/04/13 11:01 PM 6:59 AM EB Begin: EB Arlington Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 129 91 Riv 18 18 04/24/13 04/26/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Riverside Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 22 91 Riv 18 18 04/26/13 04/27/13 11:01 PM 6:59 AM WB Begin: WB Route 91
End: WB Riverside Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 125 91 Riv 18 18 04/28/13 04/29/13 10:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Riverside Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 126 91 Riv 18 18 04/29/13 05/03/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Riverside Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 21 91 Riv 18 18 05/03/13 05/04/13 11:01 PM 6:59 AM WB Begin: WB Route 91
End: WB Riverside Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 109 91 Riv 18.4 18.4 04/24/13 04/25/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 114 91 Riv 18.4 18.4 04/24/13 04/25/13 9:01 PM 4:59 AM WB Begin: WB Central Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 49 91 Riv 18.4 18.4 04/24/13 04/25/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 54 91 Riv 18.4 18.4 04/24/13 04/25/13 10:01 PM 5:59 AM EB Begin: EB Central Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 110 91 Riv 18.4 18.4 04/25/13 04/26/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 115 91 Riv 18.4 18.4 04/25/13 04/26/13 9:01 PM 4:59 AM WB Begin: WB Central Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 50 91 Riv 18.4 18.4 04/25/13 04/26/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 55 91 Riv 18.4 18.4 04/25/13 04/26/13 10:01 PM 5:59 AM EB Begin: EB Central Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 6 91 Riv 18.4 18.4 04/26/13 04/27/13 11:01 PM 6:59 AM EB Begin: EB Route 91
End: EB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 7 91 Riv 18.4 18.4 04/26/13 04/27/13 11:01 PM 6:59 AM EB Begin: EB Central Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 18 91 Riv 18.4 18.4 04/26/13 04/27/13 11:01 PM 6:59 AM WB Begin: WB Route 91
End: WB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 19 91 Riv 18.4 18.4 04/26/13 04/27/13 11:01 PM 6:59 AM WB Begin: WB Central Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 45 91 Riv 18.4 18.4 04/28/13 04/29/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 50 91 Riv 18.4 18.4 04/28/13 04/29/13 10:01 PM 5:59 AM EB Begin: EB Central Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 105 91 Riv 18.4 18.4 04/28/13 04/29/13 10:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 110 91 Riv 18.4 18.4 04/28/13 04/29/13 10:01 PM 4:59 AM WB Begin: WB Central Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 106 91 Riv 18.4 18.4 04/29/13 04/30/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 111 91 Riv 18.4 18.4 04/29/13 04/30/13 9:01 PM 4:59 AM WB Begin: WB Central Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 46 91 Riv 18.4 18.4 04/29/13 04/30/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 51 91 Riv 18.4 18.4 04/29/13 04/30/13 10:01 PM 5:59 AM EB Begin: EB Central Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 107 91 Riv 18.4 18.4 04/30/13 05/01/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 112 91 Riv 18.4 18.4 04/30/13 05/01/13 9:01 PM 4:59 AM WB Begin: WB Central Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 47 91 Riv 18.4 18.4 04/30/13 05/01/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 52 91 Riv 18.4 18.4 04/30/13 05/01/13 10:01 PM 5:59 AM EB Begin: EB Central Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 108 91 Riv 18.4 18.4 05/01/13 05/02/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 113 91 Riv 18.4 18.4 05/01/13 05/02/13 9:01 PM 4:59 AM WB Begin: WB Central Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 48 91 Riv 18.4 18.4 05/01/13 05/02/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 53 91 Riv 18.4 18.4 05/01/13 05/02/13 10:01 PM 5:59 AM EB Begin: EB Central Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 109 91 Riv 18.4 18.4 05/02/13 05/03/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 114 91 Riv 18.4 18.4 05/02/13 05/03/13 9:01 PM 4:59 AM WB Begin: WB Central Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 49 91 Riv 18.4 18.4 05/02/13 05/03/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 54 91 Riv 18.4 18.4 05/02/13 05/03/13 10:01 PM 5:59 AM EB Begin: EB Central Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 5 91 Riv 18.4 18.4 05/03/13 05/04/13 11:01 PM 6:59 AM EB Begin: EB Route 91
End: EB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 6 91 Riv 18.4 18.4 05/03/13 05/04/13 11:01 PM 6:59 AM EB Begin: EB Central Ave
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 17 91 Riv 18.4 18.4 05/03/13 05/04/13 11:01 PM 6:59 AM WB Begin: WB Route 91
End: WB Central Ave
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 18 91 Riv 18.4 18.4 05/03/13 05/04/13 11:01 PM 6:59 AM WB Begin: WB Central Ave
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 84 91 Riv 20 20 04/24/13 04/25/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 89 91 Riv 20 20 04/24/13 04/25/13 9:01 PM 4:59 AM WB Begin: WB 14th St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 34 91 Riv 20 20 04/24/13 04/25/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 39 91 Riv 20 20 04/24/13 04/25/13 10:01 PM 5:59 AM EB Begin: EB 14th St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 85 91 Riv 20 20 04/25/13 04/26/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 90 91 Riv 20 20 04/25/13 04/26/13 9:01 PM 4:59 AM WB Begin: WB 14th St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 35 91 Riv 20 20 04/25/13 04/26/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 40 91 Riv 20 20 04/25/13 04/26/13 10:01 PM 5:59 AM EB Begin: EB 14th St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 2 91 Riv 20 20 04/26/13 04/27/13 11:01 PM 6:59 AM EB Begin: EB Route 91
End: EB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 3 91 Riv 20 20 04/26/13 04/27/13 11:01 PM 6:59 AM EB Begin: EB 14th St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 13 91 Riv 20 20 04/26/13 04/27/13 11:01 PM 6:59 AM WB Begin: WB Route 91
End: WB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 14 91 Riv 20 20 04/26/13 04/27/13 11:01 PM 6:59 AM WB Begin: WB 14th St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 30 91 Riv 20 20 04/28/13 04/29/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 35 91 Riv 20 20 04/28/13 04/29/13 10:01 PM 5:59 AM EB Begin: EB 14th St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 80 91 Riv 20 20 04/28/13 04/29/13 10:01 PM 4:59 AM WB Begin: WB Route 91
End: WB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 85 91 Riv 20 20 04/28/13 04/29/13 10:01 PM 4:59 AM WB Begin: WB 14th St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 81 91 Riv 20 20 04/29/13 04/30/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 86 91 Riv 20 20 04/29/13 04/30/13 9:01 PM 4:59 AM WB Begin: WB 14th St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 31 91 Riv 20 20 04/29/13 04/30/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 36 91 Riv 20 20 04/29/13 04/30/13 10:01 PM 5:59 AM EB Begin: EB 14th St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 82 91 Riv 20 20 04/30/13 05/01/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 87 91 Riv 20 20 04/30/13 05/01/13 9:01 PM 4:59 AM WB Begin: WB 14th St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 32 91 Riv 20 20 04/30/13 05/01/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 37 91 Riv 20 20 04/30/13 05/01/13 10:01 PM 5:59 AM EB Begin: EB 14th St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 83 91 Riv 20 20 05/01/13 05/02/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 88 91 Riv 20 20 05/01/13 05/02/13 9:01 PM 4:59 AM WB Begin: WB 14th St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 33 91 Riv 20 20 05/01/13 05/02/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 38 91 Riv 20 20 05/01/13 05/02/13 10:01 PM 5:59 AM EB Begin: EB 14th St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 84 91 Riv 20 20 05/02/13 05/03/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 89 91 Riv 20 20 05/02/13 05/03/13 9:01 PM 4:59 AM WB Begin: WB 14th St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 34 91 Riv 20 20 05/02/13 05/03/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 39 91 Riv 20 20 05/02/13 05/03/13 10:01 PM 5:59 AM EB Begin: EB 14th St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 2 91 Riv 20 20 05/03/13 05/04/13 11:01 PM 6:59 AM EB Begin: EB Route 91
End: EB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 3 91 Riv 20 20 05/03/13 05/04/13 11:01 PM 6:59 AM EB Begin: EB 14th St
End: EB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 12 91 Riv 20 20 05/03/13 05/04/13 11:01 PM 6:59 AM WB Begin: WB Route 91
End: WB 14th St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 13 91 Riv 20 20 05/03/13 05/04/13 11:01 PM 6:59 AM WB Begin: WB 14th St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 99 91 Riv 20.3 20.3 04/24/13 04/26/13 9:01 PM 4:59 AM WB Begin: WB Ninth St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 16 91 Riv 20.3 20.3 04/26/13 04/27/13 11:01 PM 6:59 AM WB Begin: WB Ninth St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 95 91 Riv 20.3 20.3 04/28/13 04/29/13 10:01 PM 4:59 AM WB Begin: WB Ninth St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 96 91 Riv 20.3 20.3 04/29/13 05/03/13 9:01 PM 4:59 AM WB Begin: WB Ninth St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 15 91 Riv 20.3 20.3 05/03/13 05/04/13 11:01 PM 6:59 AM WB Begin: WB Ninth St
End: WB Route 91
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C91HA 139 91 Riv 20.5 20.5 04/24/13 04/26/13 10:01 PM 6:01 AM EB Begin: EB EB91 University offramp
End:  Eighth St
Restriction: Full off ramp closure
Reason: Bridge Work
 
C91HA 24 91 Riv 20.5 20.5 04/26/13 04/27/13 11:01 PM 7:01 AM EB Begin: EB EB91 University offramp
End:  Eighth St
Restriction: Full off ramp closure
Reason: Bridge Work
 
C91HA 135 91 Riv 20.5 20.5 04/28/13 05/03/13 10:01 PM 6:01 AM EB Begin: EB EB91 University offramp
End:  Eighth St
Restriction: Full off ramp closure
Reason: Bridge Work
 
C91HA 23 91 Riv 20.5 20.5 05/03/13 05/04/13 11:01 PM 7:01 AM EB Begin: EB EB91 University offramp
End:  Eighth St
Restriction: Full off ramp closure
Reason: Bridge Work
 
C91HA 79 91 Riv 20.5 15.6 04/24/13 04/25/13 9:01 PM 4:59 AM WB Begin:  Seventh St
End:  Adams St
Restriction: #3, #2 of 3 lanes, right shoulder, left shoulder, median
Reason: K-rail Installation
 
C91HA 94 91 Riv 20.5 20.5 04/24/13 04/25/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Seventh St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 80 91 Riv 20.5 15.6 04/25/13 04/26/13 9:01 PM 4:59 AM WB Begin:  Seventh St
End:  Adams St
Restriction: #3, #2 of 3 lanes, right shoulder, left shoulder, median
Reason: K-rail Installation
 
C91HA 95 91 Riv 20.5 20.5 04/25/13 04/26/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Seventh St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 12 91 Riv 20.5 15.6 04/26/13 04/27/13 11:01 PM 6:59 AM WB Begin:  Seventh St
End:  Adams St
Restriction: #3, #2 of 3 lanes, left shoulder, median, right shoulder
Reason: K-rail Installation
 
C91HA 15 91 Riv 20.5 20.5 04/26/13 04/27/13 11:01 PM 6:59 AM WB Begin: WB Route 91
End: WB Seventh St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 75 91 Riv 20.5 15.6 04/28/13 04/29/13 10:01 PM 4:59 AM WB Begin:  Seventh St
End:  Adams St
Restriction: #3, #2 of 3 lanes, right shoulder, left shoulder, median
Reason: K-rail Installation
 
C91HA 90 91 Riv 20.5 20.5 04/28/13 04/29/13 10:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Seventh St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 76 91 Riv 20.5 15.6 04/29/13 04/30/13 9:01 PM 4:59 AM WB Begin:  Seventh St
End:  Adams St
Restriction: #3, #2 of 3 lanes, median, right shoulder, left shoulder
Reason: K-rail Installation
 
C91HA 91 91 Riv 20.5 20.5 04/29/13 04/30/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Seventh St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 77 91 Riv 20.5 15.6 04/30/13 05/01/13 9:01 PM 4:59 AM WB Begin:  Seventh St
End:  Adams St
Restriction: #2, #3 of 3 lanes, median, left shoulder, right shoulder
Reason: K-rail Installation
 
C91HA 92 91 Riv 20.5 20.5 04/30/13 05/01/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Seventh St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 78 91 Riv 20.5 15.6 05/01/13 05/02/13 9:01 PM 4:59 AM WB Begin:  Seventh St
End:  Adams St
Restriction: #2, #3 of 3 lanes, median, left shoulder, right shoulder
Reason: K-rail Installation
 
C91HA 93 91 Riv 20.5 20.5 05/01/13 05/02/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Seventh St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 79 91 Riv 20.5 15.6 05/02/13 05/03/13 9:01 PM 4:59 AM WB Begin:  Seventh St
End:  Adams St
Restriction: #2, #3 of 3 lanes, right shoulder, median, left shoulder
Reason: K-rail Installation
 
C91HA 94 91 Riv 20.5 20.5 05/02/13 05/03/13 9:01 PM 4:59 AM WB Begin: WB Route 91
End: WB Seventh St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 11 91 Riv 20.5 15.6 05/03/13 05/04/13 11:01 PM 6:59 AM WB Begin:  Seventh St
End:  Adams St
Restriction: #2, #3 of 3 lanes, left shoulder, right shoulder, median
Reason: K-rail Installation
 
C91HA 14 91 Riv 20.5 20.5 05/03/13 05/04/13 11:01 PM 6:59 AM WB Begin: WB Route 91
End: WB Seventh St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 74 91 Riv 21 21 04/24/13 04/26/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB  Mulberry St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 11 91 Riv 21 21 04/26/13 04/27/13 11:01 PM 6:59 AM EB Begin: EB Route 91
End: EB  Mulberry St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 70 91 Riv 21 21 04/28/13 05/03/13 10:01 PM 5:59 AM EB Begin: EB Route 91
End: EB  Mulberry St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C91HA 10 91 Riv 21 21 05/03/13 05/04/13 11:01 PM 6:59 AM EB Begin: EB Route 91
End: EB  Mulberry St
Restriction: Full off ramp closure
Reason: K-rail Installation
 
P111CA 9 111 Riv 62.5 62.9 04/25/13 04/27/13 8:01 AM 4:01 PM EB Begin:  Snow Creek Rd
End:  W Palm Spring Oh
Restriction: Median (on local cross-street)
Reason: Utility Work
 
P111CA 11 111 Riv 62.5 62.9 04/27/13 04/27/13 9:01 AM 3:01 PM EB Begin:  Snow Creek Rd
End:  W Palm Spring Oh
Restriction: Median (on local cross-street)
Reason: Utility Work
 
P111CA 6 111 Riv 62.5 62.9 04/28/13 04/29/13 8:01 AM 4:01 PM EB Begin:  Snow Creek Rd
End:  W Palm Spring Oh
Restriction: Median (on local cross-street)
Reason: Utility Work
 
P111CA 2 111 Riv 62.5 62.9 04/30/13 04/30/13 8:01 AM 3:01 PM EB Begin:  Snow Creek Rd
End:  W Palm Spring Oh
Restriction: Median (on local cross-street)
Reason: Utility Work
 
P111CA 8 111 Riv 62.5 62.9 04/30/13 04/30/13 8:01 AM 4:01 PM EB Begin:  Snow Creek Rd
End:  W Palm Spring Oh
Restriction: Median (on local cross-street)
Reason: Utility Work
 
P111CA 3 111 Riv 62.5 62.9 05/01/13 05/01/13 8:01 AM 3:01 PM EB Begin:  Snow Creek Rd
End:  W Palm Spring Oh
Restriction: Median (on local cross-street)
Reason: Utility Work
 
P111CA 10 111 Riv 62.5 62.9 05/01/13 05/01/13 8:01 AM 4:01 PM EB Begin:  Snow Creek Rd
End:  W Palm Spring Oh
Restriction: Median (on local cross-street)
Reason: Utility Work
 
P111CA 4 111 Riv 62.5 62.9 05/02/13 05/02/13 8:01 AM 3:01 PM EB Begin:  Snow Creek Rd
End:  W Palm Spring Oh
Restriction: Median (on local cross-street)
Reason: Utility Work
 
C215ZC 1 215 Riv 15.5 23.5 04/29/13 04/30/13 9:01 PM 4:01 AM NB Begin:  Scott Rd
End:  Route 74
Restriction: #2, #1 of 2 lanes
Reason: Highway Construction
 
C215ZC 9 215 Riv 15.5 15.5 04/29/13 04/30/13 10:01 PM 5:01 AM NB Begin: NB Scott Rd
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 57 215 Riv 15.5 15.5 04/29/13 04/30/13 10:01 PM 4:01 AM SB Begin: SB Route 215
End:  Scott Rd
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 2 215 Riv 15.5 23.5 04/30/13 05/01/13 9:01 PM 4:01 AM NB Begin:  Scott Rd
End:  Route 74
Restriction: #2, #1 of 2 lanes
Reason: Highway Construction
 
C215ZC 10 215 Riv 15.5 15.5 04/30/13 05/01/13 10:01 PM 5:01 AM NB Begin: NB Scott Rd
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 58 215 Riv 15.5 15.5 04/30/13 05/01/13 10:01 PM 4:01 AM SB Begin: SB Route 215
End:  Scott Rd
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 3 215 Riv 15.5 23.5 05/01/13 05/02/13 9:01 PM 4:01 AM NB Begin:  Scott Rd
End:  Route 74
Restriction: #2, #1 of 2 lanes
Reason: Highway Construction
 
C215ZC 11 215 Riv 15.5 15.5 05/01/13 05/02/13 10:01 PM 5:01 AM NB Begin: NB Scott Rd
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 59 215 Riv 15.5 15.5 05/01/13 05/02/13 10:01 PM 4:01 AM SB Begin: SB Route 215
End:  Scott Rd
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 4 215 Riv 15.5 23.5 05/02/13 05/03/13 9:01 PM 4:01 AM NB Begin:  Scott Rd
End:  Route 74
Restriction: #1, #2 of 2 lanes
Reason: Highway Construction
 
C215ZC 12 215 Riv 15.5 15.5 05/02/13 05/03/13 10:01 PM 5:01 AM NB Begin: NB Scott Rd
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 60 215 Riv 15.5 15.5 05/02/13 05/03/13 10:01 PM 4:01 AM SB Begin: SB Route 215
End:  Scott Rd
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 1 215 Riv 15.5 23.5 05/03/13 05/04/13 10:01 PM 6:01 AM NB Begin:  Scott Rd
End:  Route 74
Restriction: #2, #1 of 2 lanes
Reason: Highway Construction
 
C215ZC 3 215 Riv 15.5 15.5 05/03/13 05/04/13 10:01 PM 5:01 AM NB Begin: NB Scott Rd
End: NB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 6 215 Riv 15.5 15.5 05/03/13 05/04/13 10:01 PM 6:01 AM NB Begin: NB Route 215
End: NB Scott Rd
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 9 215 Riv 15.5 15.5 05/03/13 05/04/13 10:01 PM 5:01 AM SB Begin: SB Route 215
End:  Scott Rd
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 12 215 Riv 15.5 15.5 05/03/13 05/04/13 10:01 PM 5:01 AM SB Begin: SB Scott Rd
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 13 215 Riv 18.5 18.5 04/29/13 04/30/13 10:01 PM 5:01 AM NB Begin: NB Newport Rd
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 17 215 Riv 18.5 18.5 04/29/13 04/30/13 10:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Newport Rd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215ZC 61 215 Riv 18.5 18.5 04/29/13 04/30/13 10:01 PM 4:01 AM SB Begin: SB Route 215
End:  Newport Rd
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 73 215 Riv 18.5 18.5 04/29/13 04/30/13 10:01 PM 4:01 AM SB Begin: SB Newport Rd
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 14 215 Riv 18.5 18.5 04/30/13 05/01/13 10:01 PM 5:01 AM NB Begin: NB Newport Rd
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 18 215 Riv 18.5 18.5 04/30/13 05/01/13 10:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Newport Rd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215ZC 62 215 Riv 18.5 18.5 04/30/13 05/01/13 10:01 PM 4:01 AM SB Begin: SB Route 215
End:  Newport Rd
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 74 215 Riv 18.5 18.5 04/30/13 05/01/13 10:01 PM 4:01 AM SB Begin: SB Newport Rd
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 15 215 Riv 18.5 18.5 05/01/13 05/02/13 10:01 PM 5:01 AM NB Begin: NB Newport Rd
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 19 215 Riv 18.5 18.5 05/01/13 05/02/13 10:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Newport Rd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215ZC 63 215 Riv 18.5 18.5 05/01/13 05/02/13 10:01 PM 4:01 AM SB Begin: SB Route 215
End:  Newport Rd
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 75 215 Riv 18.5 18.5 05/01/13 05/02/13 10:01 PM 4:01 AM SB Begin: SB Newport Rd
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 16 215 Riv 18.5 18.5 05/02/13 05/03/13 10:01 PM 5:01 AM NB Begin: NB Newport Rd
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 20 215 Riv 18.5 18.5 05/02/13 05/03/13 10:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Newport Rd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215ZC 64 215 Riv 18.5 18.5 05/02/13 05/03/13 10:01 PM 4:01 AM SB Begin: SB Route 215
End:  Newport Rd
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 76 215 Riv 18.5 18.5 05/02/13 05/03/13 10:01 PM 4:01 AM SB Begin: SB Newport Rd
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 4 215 Riv 18.5 18.5 05/03/13 05/04/13 10:01 PM 5:01 AM NB Begin: NB Newport Rd
End: NB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 7 215 Riv 18.5 18.5 05/03/13 05/04/13 10:01 PM 6:01 AM NB Begin: NB Route 215
End: NB Newport Rd
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 13 215 Riv 18.5 18.5 05/03/13 05/04/13 10:01 PM 5:01 AM SB Begin: SB Newport Rd
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 21 215 Riv 20.8 20.8 04/29/13 04/30/13 10:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Mc Call Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215ZC 25 215 Riv 20.8 20.8 04/29/13 04/30/13 10:01 PM 5:01 AM NB Begin: NB Mc Call Blvd
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 65 215 Riv 20.8 20.8 04/29/13 04/30/13 10:01 PM 4:01 AM SB Begin: SB Route 215
End:  Mc Call Blvd
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 77 215 Riv 20.8 20.8 04/29/13 04/30/13 10:01 PM 4:01 AM SB Begin: SB Mc Call Blvd
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 22 215 Riv 20.8 20.8 04/30/13 05/01/13 10:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Mc Call Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215ZC 26 215 Riv 20.8 20.8 04/30/13 05/01/13 10:01 PM 5:01 AM NB Begin: NB Mc Call Blvd
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 66 215 Riv 20.8 20.8 04/30/13 05/01/13 10:01 PM 4:01 AM SB Begin: SB Route 215
End:  Mc Call Blvd
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 78 215 Riv 20.8 20.8 04/30/13 05/01/13 10:01 PM 4:01 AM SB Begin: SB Mc Call Blvd
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 23 215 Riv 20.8 20.8 05/01/13 05/02/13 10:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Mc Call Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215ZC 27 215 Riv 20.8 20.8 05/01/13 05/02/13 10:01 PM 5:01 AM NB Begin: NB Mc Call Blvd
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 67 215 Riv 20.8 20.8 05/01/13 05/02/13 10:01 PM 4:01 AM SB Begin: SB Route 215
End:  Mc Call Blvd
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 79 215 Riv 20.8 20.8 05/01/13 05/02/13 10:01 PM 4:01 AM SB Begin: SB Mc Call Blvd
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 24 215 Riv 20.8 20.8 05/02/13 05/03/13 10:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Mc Call Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215ZC 28 215 Riv 20.8 20.8 05/02/13 05/03/13 10:01 PM 5:01 AM NB Begin: NB Mc Call Blvd
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 68 215 Riv 20.8 20.8 05/02/13 05/03/13 10:01 PM 4:01 AM SB Begin: SB Route 215
End:  Mc Call Blvd
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 80 215 Riv 20.8 20.8 05/02/13 05/03/13 10:01 PM 4:01 AM SB Begin: SB Mc Call Blvd
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 14 215 Riv 20.8 20.8 05/03/13 05/04/13 10:01 PM 5:01 AM SB Begin: SB Mc Call Blvd
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 29 215 Riv 23.5 23.5 04/29/13 04/30/13 10:01 PM 5:01 AM NB Begin: NB Ethanac Road
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 41 215 Riv 23.5 23.5 04/29/13 04/30/13 10:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Ethanac Road
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215ZC 53 215 Riv 23.5 23.5 04/29/13 04/30/13 10:01 PM 5:01 AM NB Begin: NB Ethanac Road
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 69 215 Riv 23.5 23.5 04/29/13 04/30/13 10:01 PM 4:01 AM SB Begin: SB Route 215
End:  Ethanac Road
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 81 215 Riv 23.5 23.5 04/29/13 04/30/13 10:01 PM 4:01 AM SB Begin: SB Ethanac Road
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 30 215 Riv 23.5 23.5 04/30/13 05/01/13 10:01 PM 5:01 AM NB Begin: NB Ethanac Road
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 42 215 Riv 23.5 23.5 04/30/13 05/01/13 10:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Ethanac Road
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215ZC 54 215 Riv 23.5 23.5 04/30/13 05/01/13 10:01 PM 5:01 AM NB Begin: NB Ethanac Road
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 70 215 Riv 23.5 23.5 04/30/13 05/01/13 10:01 PM 4:01 AM SB Begin: SB Route 215
End:  Ethanac Road
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 82 215 Riv 23.5 23.5 04/30/13 05/01/13 10:01 PM 4:01 AM SB Begin: SB Ethanac Road
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 31 215 Riv 23.5 23.5 05/01/13 05/02/13 10:01 PM 5:01 AM NB Begin: NB Ethanac Road
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 43 215 Riv 23.5 23.5 05/01/13 05/02/13 10:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Ethanac Road
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215ZC 55 215 Riv 23.5 23.5 05/01/13 05/02/13 10:01 PM 5:01 AM NB Begin: NB Ethanac Road
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 71 215 Riv 23.5 23.5 05/01/13 05/02/13 10:01 PM 4:01 AM SB Begin: SB Route 215
End:  Ethanac Road
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 83 215 Riv 23.5 23.5 05/01/13 05/02/13 10:01 PM 4:01 AM SB Begin: SB Ethanac Road
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 32 215 Riv 23.5 23.5 05/02/13 05/03/13 10:01 PM 5:01 AM NB Begin: NB Ethanac Road
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 44 215 Riv 23.5 23.5 05/02/13 05/03/13 10:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Ethanac Road
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215ZC 56 215 Riv 23.5 23.5 05/02/13 05/03/13 10:01 PM 5:01 AM NB Begin: NB Ethanac Road
End: NB Route 215
Restriction: Full on ramp closure
Reason: Highway Construction
 
C215ZC 72 215 Riv 23.5 23.5 05/02/13 05/03/13 10:01 PM 4:01 AM SB Begin: SB Route 215
End:  Ethanac Road
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 84 215 Riv 23.5 23.5 05/02/13 05/03/13 10:01 PM 4:01 AM SB Begin: SB Ethanac Road
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 15 215 Riv 23.5 23.5 05/03/13 05/04/13 10:01 PM 5:01 AM SB Begin: SB Ethanac Road
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 5 215 Riv 23.5 15.5 04/29/13 04/30/13 9:01 PM 4:01 AM SB Begin:  Route 74
End:  Scott Rd
Restriction: #2, #1 of 2 lanes
Reason: Highway Construction
 
C215ZC 49 215 Riv 23.5 23.5 04/29/13 04/30/13 10:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Route 74
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215ZC 85 215 Riv 23.5 23.5 04/29/13 04/30/13 10:01 PM 4:01 AM SB Begin: SB Route 74
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 6 215 Riv 23.5 15.5 04/30/13 05/01/13 9:01 PM 4:01 AM SB Begin:  Route 74
End:  Scott Rd
Restriction: #2, #1 of 2 lanes
Reason: Highway Construction
 
C215ZC 50 215 Riv 23.5 23.5 04/30/13 05/01/13 10:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Route 74
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215ZC 86 215 Riv 23.5 23.5 04/30/13 05/01/13 10:01 PM 4:01 AM SB Begin: SB Route 74
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 7 215 Riv 23.5 15.5 05/01/13 05/02/13 9:01 PM 4:01 AM SB Begin:  Route 74
End:  Scott Rd
Restriction: #2, #1 of 2 lanes
Reason: Highway Construction
 
C215ZC 51 215 Riv 23.5 23.5 05/01/13 05/02/13 10:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Route 74
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215ZC 87 215 Riv 23.5 23.5 05/01/13 05/02/13 10:01 PM 4:01 AM SB Begin: SB Route 74
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 8 215 Riv 23.5 15.5 05/02/13 05/03/13 9:01 PM 4:01 AM SB Begin:  Route 74
End:  Scott Rd
Restriction: #2, #1 of 2 lanes
Reason: Highway Construction
 
C215ZC 52 215 Riv 23.5 23.5 05/02/13 05/03/13 10:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Route 74
Restriction: Full off ramp closure
Reason: Highway Construction
 
C215ZC 88 215 Riv 23.5 23.5 05/02/13 05/03/13 10:01 PM 4:01 AM SB Begin: SB Route 74
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 2 215 Riv 23.5 15.5 05/03/13 05/04/13 10:01 PM 5:01 AM SB Begin:  Route 74
End:  Scott Rd
Restriction: #2, #1 of 2 lanes
Reason: Highway Construction
 
C215ZC 5 215 Riv 23.5 23.5 05/03/13 05/04/13 10:01 PM 5:01 AM NB Begin: NB Ethanac Road
End: NB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 11 215 Riv 23.5 23.5 05/03/13 05/04/13 10:01 PM 5:01 AM SB Begin: SB Route 215
End:  Route 74
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 16 215 Riv 23.5 23.5 05/03/13 05/04/13 10:01 PM 5:01 AM SB Begin: SB Route 74
End: SB Route 215
Restriction: Full on ramp closure
Reason: K-rail Installation
 
C215ZC 17 215 Riv 23.5 23.5 05/03/13 05/04/13 10:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Route 74
Restriction: Full off ramp closure
Reason: K-rail Installation
 
C215ZC 3 215 Riv 26.5 27.9 04/24/13 04/25/13 9:01 PM 4:01 AM NB Begin:  Route 74/4th St
End:  Nuevo Rd
Restriction: #1, #2 of 2 lanes
Reason: Roadway Excavation
 
C215ZC 29 215 Riv 26.5 27.9 04/24/13 04/25/13 10:01 PM 5:01 AM NB Begin:  Route 74/4th St
End:  Nuevo Rd
Restriction: Full highway closure
Reason: Roadway Excavation
 
C215ZC 4 215 Riv 26.5 27.9 04/25/13 04/26/13 9:01 PM 4:01 AM NB Begin:  Route 74/4th St
End:  Nuevo Rd
Restriction: #2, #1 of 2 lanes
Reason: Roadway Excavation
 
C215ZC 30 215 Riv 26.5 27.9 04/25/13 04/26/13 10:01 PM 5:01 AM NB Begin:  Route 74/4th St
End:  Nuevo Rd
Restriction: Full highway closure
Reason: Roadway Excavation
 
C215ZC 24 215 Riv 27 27 04/24/13 04/26/13 8:01 PM 4:01 AM NB/SB Begin: NB/SB Jarvis St
End: NB/SB San Jacinto Ave
Restriction: Full closure (on local cross-street)
Reason: Roadway Excavation
 
C215ZC 31 215 Riv 27.2 27.2 04/24/13 04/25/13 10:01 PM 4:01 AM SB Begin: SB Route 215
End:  D St
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215ZC 8 215 Riv 27.9 26.5 04/24/13 04/26/13 9:01 PM 4:01 AM SB Begin:  Nuevo Rd
End:  Route 74/4th St
Restriction: #2, #1 of 2 lanes
Reason: Roadway Excavation
 
C215MC 7 215 Riv 32.3 35.8 04/24/13 05/03/13 9:01 PM 4:01 AM NB Begin:  Harley Knox Road
End:  Cactus Ave
Restriction: #1, #2, #3 of 3 lanes
Reason: Bridge Work
 
C215MC 1 215 Riv 32.3 35.8 05/03/13 05/04/13 10:01 PM 5:01 AM NB Begin:  Harley Knox Road
End:  Cactus Ave
Restriction: #1, #3, #2 of 3 lanes
Reason: AC Paving
 
C215MC 2 215 Riv 32.3 35.8 05/06/13 05/07/13 9:01 PM 4:01 AM NB Begin:  Harley Knox Road
End:  Cactus Ave
Restriction: #2, #3, #1 of 3 lanes
Reason: Falsework Installation
 
M215MA 3 215 Riv 34.2 36.4 04/25/13 04/25/13 9:01 AM 2:01 PM NB Begin:  Van Buren Blvd
End:  Alessandro Blvd
Restriction: #1 of 3 lanes
Reason: Guardrail Repair
 
C215MC 10 215 Riv 35.8 32.3 04/24/13 04/26/13 9:01 PM 4:01 AM SB Begin:  Cactus Ave
End:  Harley Knox Road
Restriction: #3, #2, #1 of 3 lanes
Reason: Bridge Work
 
C215MC 2 215 Riv 35.8 32.3 04/26/13 04/27/13 10:01 PM 5:01 AM SB Begin:  Cactus Ave
End:  Harley Knox Road
Restriction: #1, #2, #3 of 3 lanes
Reason: Bridge Work
 
C215MC 7 215 Riv 35.8 32.3 04/29/13 05/07/13 9:01 PM 4:01 AM SB Begin:  Cactus Ave
End:  Harley Knox Road
Restriction: #3, #1, #2 of 3 lanes
Reason: AC Paving
 
C215AD 66 215 Riv 41.9 41.9 04/28/13 04/29/13 9:01 PM 5:01 AM SB Begin: SB Iowa Ave
End: SB Route 215
Restriction: Full on ramp closure
Reason: Miscellaneous Work
 
C215AD 71 215 Riv 41.9 41.9 04/28/13 04/29/13 9:01 PM 5:01 AM SB Begin: SB Route 215
End: SB Iowa Ave
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 80 215 Riv 41.9 41.9 04/28/13 04/29/13 10:01 PM 6:01 AM NB Begin: NB Route 215
End: NB Iowa Ave
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 81 215 Riv 41.9 41.9 04/28/13 04/29/13 10:01 PM 6:01 AM NB Begin: NB Iowa Ave
End: NB Route 215
Restriction: Full on ramp closure
Reason: Miscellaneous Work
 
C215AD 67 215 Riv 41.9 41.9 04/29/13 04/30/13 9:01 PM 5:01 AM SB Begin: SB Iowa Ave
End: SB Route 215
Restriction: Full on ramp closure
Reason: Miscellaneous Work
 
C215AD 72 215 Riv 41.9 41.9 04/29/13 04/30/13 9:01 PM 5:01 AM SB Begin: SB Route 215
End: SB Iowa Ave
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 76 215 Riv 41.9 41.9 04/29/13 04/30/13 9:01 PM 6:01 AM NB Begin: NB Route 215
End: NB Iowa Ave
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 82 215 Riv 41.9 41.9 04/29/13 04/30/13 9:01 PM 6:01 AM NB Begin: NB Iowa Ave
End: NB Route 215
Restriction: Full on ramp closure
Reason: Miscellaneous Work
 
C215AD 68 215 Riv 41.9 41.9 04/30/13 05/01/13 9:01 PM 5:01 AM SB Begin: SB Iowa Ave
End: SB Route 215
Restriction: Full on ramp closure
Reason: Miscellaneous Work
 
C215AD 73 215 Riv 41.9 41.9 04/30/13 05/01/13 9:01 PM 5:01 AM SB Begin: SB Route 215
End: SB Iowa Ave
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 77 215 Riv 41.9 41.9 04/30/13 05/01/13 9:01 PM 6:01 AM NB Begin: NB Route 215
End: NB Iowa Ave
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 83 215 Riv 41.9 41.9 04/30/13 05/01/13 9:01 PM 6:01 AM NB Begin: NB Iowa Ave
End: NB Route 215
Restriction: Full on ramp closure
Reason: Miscellaneous Work
 
C215AD 69 215 Riv 41.9 41.9 05/01/13 05/02/13 9:01 PM 5:01 AM SB Begin: SB Iowa Ave
End: SB Route 215
Restriction: Full on ramp closure
Reason: Miscellaneous Work
 
C215AD 74 215 Riv 41.9 41.9 05/01/13 05/02/13 9:01 PM 5:01 AM SB Begin: SB Route 215
End: SB Iowa Ave
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 78 215 Riv 41.9 41.9 05/01/13 05/02/13 9:01 PM 6:01 AM NB Begin: NB Route 215
End: NB Iowa Ave
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 84 215 Riv 41.9 41.9 05/01/13 05/02/13 9:01 PM 6:01 AM NB Begin: NB Iowa Ave
End: NB Route 215
Restriction: Full on ramp closure
Reason: Miscellaneous Work
 
C215AD 70 215 Riv 41.9 41.9 05/02/13 05/03/13 9:01 PM 5:01 AM SB Begin: SB Iowa Ave
End: SB Route 215
Restriction: Full on ramp closure
Reason: Miscellaneous Work
 
C215AD 75 215 Riv 41.9 41.9 05/02/13 05/03/13 9:01 PM 5:01 AM SB Begin: SB Route 215
End: SB Iowa Ave
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 79 215 Riv 41.9 41.9 05/02/13 05/03/13 9:01 PM 6:01 AM NB Begin: NB Route 215
End: NB Iowa Ave
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 85 215 Riv 41.9 41.9 05/02/13 05/03/13 9:01 PM 6:01 AM NB Begin: NB Iowa Ave
End: NB Route 215
Restriction: Full on ramp closure
Reason: Miscellaneous Work
 
C215PC 34 215 Riv 42.2 42.3 04/25/13 04/26/13 9:01 AM 2:01 PM NB Begin:  Blaine St/3rd St
End:  Blaine St/3rd St
Restriction: Right shoulder
Reason: Landscape Work
 
C215AD 14 215 Riv 43.3 45.3 04/24/13 04/25/13 9:01 PM 5:01 AM SB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #1, #3 of 3 lanes
Reason: Roadway Excavation
 
C215AD 9 215 Riv 43.3 45.3 04/24/13 04/25/13 10:01 PM 5:01 AM NB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #1 of 3 lanes
Reason: Slope Clearing
 
C215AD 15 215 Riv 43.3 45.3 04/25/13 04/26/13 9:01 PM 5:01 AM SB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #1, #3 of 3 lanes
Reason: Roadway Excavation
 
C215AD 10 215 Riv 43.3 45.3 04/25/13 04/26/13 10:01 PM 5:01 AM NB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #1 of 3 lanes
Reason: Slope Clearing
 
C215AD 1 215 Riv 43.3 45.3 04/26/13 04/27/13 10:01 PM 7:01 AM NB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #1 of 3 lanes
Reason: Slope Clearing
 
C215AD 2 215 Riv 43.3 45.3 04/26/13 04/27/13 11:01 PM 7:01 AM SB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #3, #1 of 3 lanes
Reason: Roadway Excavation
 
C215AD 40 215 Riv 43.3 45.3 04/28/13 04/29/13 9:01 PM 5:01 AM SB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #1, #2 of 3 lanes
Reason: Roadway Excavation
 
C215AD 5 215 Riv 43.3 45.3 04/28/13 04/29/13 10:01 PM 5:01 AM NB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #3, #2, #1 of 3 lanes
Reason: Roadway Excavation
 
C215AD 41 215 Riv 43.3 45.3 04/29/13 04/30/13 9:01 PM 5:01 AM SB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #2, #1 of 3 lanes
Reason: Roadway Excavation
 
C215AD 6 215 Riv 43.3 45.3 04/29/13 04/30/13 10:01 PM 5:01 AM NB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #3, #2, #1 of 3 lanes
Reason: Roadway Excavation
 
C215AD 42 215 Riv 43.3 45.3 04/30/13 05/01/13 9:01 PM 5:01 AM SB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #1, #2 of 3 lanes
Reason: Roadway Excavation
 
C215AD 7 215 Riv 43.3 45.3 04/30/13 05/01/13 10:01 PM 5:01 AM NB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #2, #1, #3 of 3 lanes
Reason: Roadway Excavation
 
C215AD 43 215 Riv 43.3 45.3 05/01/13 05/02/13 9:01 PM 5:01 AM SB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #1, #2 of 3 lanes
Reason: Roadway Excavation
 
C215AD 8 215 Riv 43.3 45.3 05/01/13 05/02/13 10:01 PM 5:01 AM NB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #1, #3, #2 of 3 lanes
Reason: Roadway Excavation
 
C215AD 44 215 Riv 43.3 45.3 05/02/13 05/03/13 9:01 PM 5:01 AM SB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #2, #1 of 3 lanes
Reason: Roadway Excavation
 
C215AD 9 215 Riv 43.3 45.3 05/02/13 05/03/13 10:01 PM 5:01 AM NB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #1, #3, #2 of 3 lanes
Reason: Roadway Excavation
 
C215AD 1 215 Riv 43.3 45.3 05/03/13 05/04/13 10:01 PM 7:01 AM NB Begin:  Route 60
End:  Riv/SBD County line
Restriction: #3, #1, #2 of 3 lanes
Reason: Roadway Excavation
 
C215AD 25 215 Riv 45 45 04/28/13 04/29/13 9:01 PM 5:01 AM SB Begin: SB Route 215
End: SB Center Street
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 30 215 Riv 45 45 04/28/13 04/29/13 9:01 PM 5:01 AM SB Begin: SB Center Street
End: SB Route 215
Restriction: Full on ramp closure
Reason: Miscellaneous Work
 
C215AD 35 215 Riv 45 45 04/28/13 04/29/13 10:01 PM 6:01 AM NB Begin: NB Route 215
End: NB Center Street
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 45 215 Riv 45 45 04/28/13 04/29/13 10:01 PM 5:01 AM NB Begin: NB Route 215
End: SB Center Street
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 26 215 Riv 45 45 04/29/13 04/30/13 9:01 PM 5:01 AM SB Begin: SB Route 215
End: SB Center Street
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 31 215 Riv 45 45 04/29/13 04/30/13 9:01 PM 5:01 AM SB Begin: SB Center Street
End: SB Route 215
Restriction: Full on ramp closure
Reason: Miscellaneous Work
 
C215AD 36 215 Riv 45 45 04/29/13 04/30/13 9:01 PM 6:01 AM NB Begin: NB Route 215
End: NB Center Street
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 47 215 Riv 45 45 04/29/13 05/01/13 9:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Center Street
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 32 215 Riv 45 45 04/30/13 05/01/13 9:01 PM 5:01 AM SB Begin: SB Center Street
End: SB Route 215
Restriction: Full on ramp closure
Reason: Miscellaneous Work
 
C215AD 37 215 Riv 45 45 04/30/13 05/01/13 9:01 PM 6:01 AM NB Begin: NB Route 215
End: NB Center Street
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 48 215 Riv 45 45 04/30/13 05/02/13 9:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Center Street
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 33 215 Riv 45 45 05/01/13 05/02/13 9:01 PM 5:01 AM SB Begin: SB Center Street
End: SB Route 215
Restriction: Full on ramp closure
Reason: Miscellaneous Work
 
C215AD 38 215 Riv 45 45 05/01/13 05/02/13 9:01 PM 6:01 AM NB Begin: NB Route 215
End: NB Center Street
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 49 215 Riv 45 45 05/01/13 05/03/13 9:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Center Street
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 34 215 Riv 45 45 05/02/13 05/03/13 9:01 PM 5:01 AM SB Begin: SB Center Street
End: SB Route 215
Restriction: Full on ramp closure
Reason: Miscellaneous Work
 
C215AD 39 215 Riv 45 45 05/02/13 05/03/13 9:01 PM 6:01 AM NB Begin: NB Route 215
End: NB Center Street
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 50 215 Riv 45 45 05/02/13 05/03/13 9:01 PM 5:01 AM NB Begin: NB Route 215
End: NB Center Street
Restriction: Full off ramp closure
Reason: Miscellaneous Work
 
C215AD 51 215 Riv 45.3 45.3 04/28/13 05/03/13 9:01 PM 5:01 AM SB Begin: NB La Cadena Dr
End: SB Route 215
Restriction: Full on ramp closure
Reason: Miscellaneous Work
 
C10HG 35 10 SBd 11.5 15.2 04/24/13 04/25/13 10:01 PM 4:01 AM WB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #4, #3, #2, #1 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 29 10 SBd 11.5 15.2 04/24/13 04/25/13 11:01 PM 5:01 AM EB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #4, #3, #1, #2 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 36 10 SBd 11.5 15.2 04/25/13 04/25/13 12:01 AM 3:01 AM WB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #3, #4, #2, #1 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 30 10 SBd 11.5 15.2 04/25/13 04/25/13 1:01 AM 5:01 AM EB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #3, #4, #2, #1 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 47 10 SBd 11.5 15.2 04/25/13 04/26/13 10:01 PM 4:01 AM WB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #3, #4, #1, #2 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 41 10 SBd 11.5 15.2 04/25/13 04/26/13 11:01 PM 5:01 AM EB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #3, #4, #2, #1 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 48 10 SBd 11.5 15.2 04/26/13 04/26/13 12:01 AM 3:01 AM WB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #2, #4, #3, #1 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 42 10 SBd 11.5 15.2 04/26/13 04/26/13 1:01 AM 4:01 AM EB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #2, #3, #4, #1 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 7 10 SBd 11.5 15.2 04/26/13 04/27/13 11:01 PM 6:01 AM WB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #3, #4, #2, #1 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 1 10 SBd 11.5 15.2 04/27/13 04/27/13 12:01 AM 7:01 AM EB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #3, #4, #2, #1 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 8 10 SBd 11.5 15.2 04/27/13 04/27/13 1:01 AM 4:01 AM WB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #3, #4, #2, #1 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10HG 2 10 SBd 11.5 15.2 04/27/13 04/27/13 3:01 AM 5:01 AM EB Begin:  Valley Blvd
End:  Citrus Ave
Restriction: #4, #2, #3, #1 of 5 lanes, auxiliary lane
Reason: Highway Construction
 
C10SA 7 10 SBd 13.2 16.2 04/24/13 04/25/13 10:01 PM 3:59 AM EB Begin:  Cherry Ave
End:  Sierra Ave
Restriction: #3, #4 of 4 lanes
Reason: Bridge Work
 
C10HG 39 10 SBd 13.2 13.2 04/24/13 04/25/13 10:01 PM 4:01 AM WB Begin: WB Route 10
End:  Cherry Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C10HG 40 10 SBd 13.2 13.2 04/24/13 04/25/13 10:01 PM 4:01 AM WB Begin: EB Cherry Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10HG 33 10 SBd 13.2 13.2 04/24/13 04/25/13 11:01 PM 5:01 AM EB Begin: EB Route 10
End:  Cherry Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C10HG 34 10 SBd 13.2 13.2 04/24/13 04/25/13 11:01 PM 5:01 AM EB Begin: EB Cherry Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10SA 8 10 SBd 13.2 16.2 04/25/13 04/26/13 10:01 PM 3:59 AM EB Begin:  Cherry Ave
End:  Sierra Ave
Restriction: #3, #4 of 4 lanes
Reason: Bridge Work
 
C10HG 51 10 SBd 13.2 13.2 04/25/13 04/26/13 10:01 PM 4:01 AM WB Begin: WB Route 10
End:  Cherry Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C10HG 52 10 SBd 13.2 13.2 04/25/13 04/26/13 10:01 PM 4:01 AM WB Begin: EB Cherry Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10HG 45 10 SBd 13.2 13.2 04/25/13 04/26/13 11:01 PM 5:01 AM EB Begin: EB Route 10
End:  Cherry Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C10HG 46 10 SBd 13.2 13.2 04/25/13 04/26/13 11:01 PM 5:01 AM EB Begin: EB Cherry Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10SA 1 10 SBd 13.2 16.2 04/26/13 04/27/13 11:01 PM 5:59 AM EB Begin:  Cherry Ave
End:  Sierra Ave
Restriction: #3, #4 of 4 lanes
Reason: Bridge Work
 
C10HG 11 10 SBd 13.2 13.2 04/26/13 04/27/13 11:01 PM 6:01 AM WB Begin: WB Route 10
End:  Cherry Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C10HG 12 10 SBd 13.2 13.2 04/26/13 04/27/13 11:01 PM 6:01 AM WB Begin: EB Cherry Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10HG 5 10 SBd 13.2 13.2 04/27/13 04/27/13 12:01 AM 7:01 AM EB Begin: EB Route 10
End:  Cherry Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C10HG 6 10 SBd 13.2 13.2 04/27/13 04/27/13 12:01 AM 7:01 AM EB Begin: EB Cherry Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Highway Construction
 
C10SA 7 10 SBd 13.2 16.2 04/29/13 05/03/13 10:01 PM 3:59 AM EB Begin:  Cherry Ave
End:  Sierra Ave
Restriction: #4, #3 of 4 lanes
Reason: Bridge Work
 
C10SA 1 10 SBd 13.2 16.2 05/03/13 05/04/13 11:01 PM 5:59 AM EB Begin:  Cherry Ave
End:  Sierra Ave
Restriction: #3, #4 of 4 lanes
Reason: Bridge Work
 
C10SA 10 10 SBd 15.2 15.2 04/24/13 04/25/13 10:01 PM 3:59 AM EB Begin: EB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10SA 13 10 SBd 15.2 15.2 04/24/13 04/25/13 10:01 PM 3:59 AM EB Begin: EB Citrus Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10SA 19 10 SBd 15.2 15.2 04/24/13 04/25/13 11:01 PM 5:59 AM WB Begin: WB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10SA 22 10 SBd 15.2 15.2 04/24/13 04/25/13 11:01 PM 5:59 AM WB Begin: WB Citrus Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10SA 11 10 SBd 15.2 15.2 04/25/13 04/26/13 9:30 PM 4:59 AM EB Begin: EB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10SA 14 10 SBd 15.2 15.2 04/25/13 04/26/13 9:30 PM 4:59 AM EB Begin: EB Citrus Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10SA 20 10 SBd 15.2 15.2 04/25/13 04/26/13 11:01 PM 5:59 AM WB Begin: WB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10SA 23 10 SBd 15.2 15.2 04/25/13 04/26/13 11:01 PM 5:59 AM WB Begin: WB Citrus Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10SA 2 10 SBd 15.2 15.2 04/26/13 04/27/13 9:30 PM 5:59 AM EB Begin: EB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10SA 3 10 SBd 15.2 15.2 04/26/13 04/27/13 9:30 PM 5:59 AM EB Begin: EB Citrus Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10SA 5 10 SBd 15.2 15.2 04/27/13 04/27/13 12:01 AM 6:59 AM WB Begin: WB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10SA 6 10 SBd 15.2 15.2 04/27/13 04/27/13 12:01 AM 6:59 AM WB Begin: WB Citrus Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10SA 11 10 SBd 15.2 15.2 04/29/13 04/30/13 10:01 PM 3:59 AM EB Begin: EB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10SA 15 10 SBd 15.2 15.2 04/29/13 04/30/13 10:01 PM 3:59 AM EB Begin: EB Citrus Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10SA 23 10 SBd 15.2 15.2 04/29/13 04/30/13 11:01 PM 5:59 AM WB Begin: WB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10SA 27 10 SBd 15.2 15.2 04/29/13 04/30/13 11:01 PM 5:59 AM WB Begin: WB Citrus Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10SA 12 10 SBd 15.2 15.2 04/30/13 05/01/13 10:01 PM 3:59 AM EB Begin: EB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10SA 16 10 SBd 15.2 15.2 04/30/13 05/01/13 10:01 PM 3:59 AM EB Begin: EB Citrus Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10SA 24 10 SBd 15.2 15.2 04/30/13 05/01/13 11:01 PM 5:59 AM WB Begin: WB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10SA 28 10 SBd 15.2 15.2 04/30/13 05/01/13 11:01 PM 5:59 AM WB Begin: WB Citrus Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10SA 13 10 SBd 15.2 15.2 05/01/13 05/02/13 10:01 PM 3:59 AM EB Begin: EB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10SA 17 10 SBd 15.2 15.2 05/01/13 05/02/13 10:01 PM 3:59 AM EB Begin: EB Citrus Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10SA 25 10 SBd 15.2 15.2 05/01/13 05/02/13 11:01 PM 5:59 AM WB Begin: WB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10SA 29 10 SBd 15.2 15.2 05/01/13 05/02/13 11:01 PM 5:59 AM WB Begin: WB Citrus Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10SA 14 10 SBd 15.2 15.2 05/02/13 05/03/13 10:01 PM 3:59 AM EB Begin: EB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10SA 18 10 SBd 15.2 15.2 05/02/13 05/03/13 10:01 PM 3:59 AM EB Begin: EB Citrus Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10SA 26 10 SBd 15.2 15.2 05/02/13 05/03/13 11:01 PM 5:59 AM WB Begin: WB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10SA 30 10 SBd 15.2 15.2 05/02/13 05/03/13 11:01 PM 5:59 AM WB Begin: WB Citrus Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10SA 2 10 SBd 15.2 15.2 05/03/13 05/04/13 11:01 PM 5:59 AM EB Begin: EB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10SA 3 10 SBd 15.2 15.2 05/03/13 05/04/13 11:01 PM 5:59 AM EB Begin: EB Citrus Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10SA 5 10 SBd 15.2 15.2 05/04/13 05/04/13 12:01 AM 6:59 AM WB Begin: WB Route 10
End:  Citrus Ave
Restriction: Full off ramp closure
Reason: Bridge Work
 
C10SA 6 10 SBd 15.2 15.2 05/04/13 05/04/13 12:01 AM 6:59 AM WB Begin: WB Citrus Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10VB 17 10 SBd 16.2 20 04/24/13 04/25/13 10:01 PM 6:01 AM EB Begin:  Sierra Ave
End:  Riverside Ave
Restriction: #4 of 4 lanes
Reason: Grinding and Paving
 
C10SA 16 10 SBd 16.2 13.2 04/24/13 04/25/13 11:01 PM 5:59 AM WB Begin:  Sierra Ave
End:  Cherry Ave
Restriction: #3, #4 of 4 lanes
Reason: Bridge Work
 
C10VB 18 10 SBd 16.2 20 04/25/13 04/26/13 10:01 PM 6:01 AM EB Begin:  Sierra Ave
End:  Riverside Ave
Restriction: #4 of 4 lanes
Reason: Grinding and Paving
 
C10SA 17 10 SBd 16.2 13.2 04/25/13 04/26/13 11:01 PM 5:59 AM WB Begin:  Sierra Ave
End:  Cherry Ave
Restriction: #4, #3 of 4 lanes
Reason: Bridge Work
 
C10SA 4 10 SBd 16.2 13.2 04/27/13 04/27/13 12:01 AM 6:59 AM WB Begin:  Sierra Ave
End:  Cherry Ave
Restriction: #3, #4 of 4 lanes
Reason: Bridge Work
 
C10SA 19 10 SBd 16.2 13.2 04/29/13 05/03/13 11:01 PM 5:59 AM WB Begin:  Sierra Ave
End:  Cherry Ave
Restriction: #4, #3 of 4 lanes
Reason: Bridge Work
 
C10SA 4 10 SBd 16.2 13.2 05/04/13 05/04/13 12:01 AM 6:59 AM WB Begin:  Sierra Ave
End:  Cherry Ave
Restriction: #4, #3 of 4 lanes
Reason: Bridge Work
 
C10VB 33 10 SBd 18.5 18.5 04/24/13 04/25/13 8:01 PM 4:01 AM WB Begin: WB Cedar Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 25 10 SBd 18.5 18.5 04/24/13 04/25/13 10:01 PM 6:01 AM EB Begin: EB Cedar Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 34 10 SBd 18.5 18.5 04/25/13 04/26/13 8:01 PM 4:01 AM WB Begin: WB Cedar Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 26 10 SBd 18.5 18.5 04/25/13 04/27/13 10:01 PM 6:01 AM EB Begin: EB Cedar Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 2 10 SBd 18.5 18.5 04/26/13 04/27/13 11:01 PM 7:01 AM EB Begin: EB Cedar Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 14 10 SBd 18.5 18.5 04/29/13 04/30/13 8:01 PM 4:01 AM WB Begin: WB Cedar Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 66 10 SBd 18.5 23.2 04/29/13 04/30/13 8:01 PM 4:01 AM WB Begin:  Cedar Ave
End:  Mt Vernon Ave
Restriction: #4 of 4 lanes
Reason: Grinding and Paving
 
C10VB 58 10 SBd 18.5 18.5 04/29/13 04/30/13 10:01 PM 6:01 AM EB Begin: EB Cedar Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 15 10 SBd 18.5 18.5 04/30/13 05/01/13 8:01 PM 4:01 AM WB Begin: WB Cedar Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 67 10 SBd 18.5 23.2 04/30/13 05/01/13 8:01 PM 4:01 AM WB Begin:  Cedar Ave
End:  Mt Vernon Ave
Restriction: #4 of 4 lanes
Reason: Grinding and Paving
 
C10VB 59 10 SBd 18.5 18.5 04/30/13 05/01/13 10:01 PM 6:01 AM EB Begin: EB Cedar Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 16 10 SBd 18.5 18.5 05/01/13 05/02/13 8:01 PM 4:01 AM WB Begin: WB Cedar Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 68 10 SBd 18.5 23.2 05/01/13 05/02/13 8:01 PM 4:01 AM WB Begin:  Cedar Ave
End:  Mt Vernon Ave
Restriction: #4 of 4 lanes
Reason: Grinding and Paving
 
C10VB 60 10 SBd 18.5 18.5 05/01/13 05/02/13 10:01 PM 6:01 AM EB Begin: EB Cedar Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 17 10 SBd 18.5 18.5 05/02/13 05/03/13 8:01 PM 4:01 AM WB Begin: WB Cedar Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 69 10 SBd 18.5 23.2 05/02/13 05/03/13 8:01 PM 4:01 AM WB Begin:  Cedar Ave
End:  Mt Vernon Ave
Restriction: #4 of 4 lanes
Reason: Grinding and Paving
 
C10VB 61 10 SBd 18.5 18.5 05/02/13 05/04/13 10:01 PM 6:01 AM EB Begin: EB Cedar Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 14 10 SBd 18.5 23.2 05/03/13 05/04/13 10:01 PM 6:01 AM WB Begin:  Cedar Ave
End:  Mt Vernon Ave
Restriction: #4 of 4 lanes
Reason: Grinding and Paving
 
C10VB 12 10 SBd 18.5 18.5 05/03/13 05/04/13 11:01 PM 7:01 AM EB Begin: EB Cedar Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 29 10 SBd 20 16.2 04/24/13 04/26/13 8:01 PM 4:01 AM WB Begin:  Riverside Ave
End:  Sierra Ave
Restriction: #4 of 4 lanes
Reason: Grinding and Paving
 
C10VB 3 10 SBd 20 16.2 04/26/13 04/27/13 10:01 PM 6:01 AM WB Begin:  Riverside Ave
End:  Sierra Ave
Restriction: #4 of 4 lanes, right shoulder
Reason: Grinding and Paving
 
C10VB 57 10 SBd 21 21 04/24/13 04/25/13 8:01 PM 4:01 AM WB Begin: WB Pepper Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 37 10 SBd 21 21 04/24/13 04/25/13 10:01 PM 6:01 AM EB Begin: EB Pepper Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 58 10 SBd 21 21 04/25/13 04/26/13 8:01 PM 4:01 AM WB Begin: WB Pepper Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 38 10 SBd 21 21 04/25/13 04/27/13 10:01 PM 6:01 AM EB Begin: EB Pepper Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 5 10 SBd 21 21 04/26/13 04/27/13 11:01 PM 7:01 AM EB Begin: EB Pepper Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 71 10 SBd 21 22.6 04/26/13 04/27/13 11:01 PM 7:01 AM EB Begin:  Pepper Ave
End:  La Cadena Dr
Restriction: #4 of 4 lanes, right shoulder
Reason: Landscape Work
 
C10VB 34 10 SBd 21 21 04/29/13 04/30/13 8:01 PM 4:01 AM WB Begin: WB Pepper Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 54 10 SBd 21 21 04/29/13 04/30/13 10:01 PM 6:01 AM EB Begin: EB Pepper Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 35 10 SBd 21 21 04/30/13 05/01/13 8:01 PM 4:01 AM WB Begin: WB Pepper Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 55 10 SBd 21 21 04/30/13 05/01/13 10:01 PM 6:01 AM EB Begin: EB Pepper Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 36 10 SBd 21 21 05/01/13 05/02/13 8:01 PM 4:01 AM WB Begin: WB Pepper Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 56 10 SBd 21 21 05/01/13 05/02/13 10:01 PM 6:01 AM EB Begin: EB Pepper Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 37 10 SBd 21 21 05/02/13 05/03/13 8:01 PM 4:01 AM WB Begin: WB Pepper Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 57 10 SBd 21 21 05/02/13 05/04/13 10:01 PM 6:01 AM EB Begin: EB Pepper Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 11 10 SBd 21 21 05/03/13 05/04/13 11:01 PM 7:01 AM EB Begin: EB Pepper Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 41 10 SBd 22 22 04/24/13 04/25/13 10:01 PM 6:01 AM EB Begin: EB Rancho Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10LG 1 10 SBd 22 22 04/25/13 04/26/13 8:01 PM 6:01 AM EB Begin: EB Rancho Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Bridge Work
 
C10VB 42 10 SBd 22 22 04/25/13 04/26/13 10:01 PM 6:01 AM EB Begin: EB Rancho Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 6 10 SBd 22 22 04/26/13 04/27/13 11:01 PM 7:01 AM EB Begin: EB Rancho Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 30 10 SBd 22 22 04/29/13 04/30/13 8:01 PM 4:01 AM WB Begin: WB Rancho Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 50 10 SBd 22 22 04/29/13 04/30/13 10:01 PM 6:01 AM EB Begin: EB Rancho Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 31 10 SBd 22 22 04/30/13 05/01/13 8:01 PM 4:01 AM WB Begin: WB Rancho Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 51 10 SBd 22 22 04/30/13 05/01/13 10:01 PM 6:01 AM EB Begin: EB Rancho Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 32 10 SBd 22 22 05/01/13 05/02/13 8:01 PM 4:01 AM WB Begin: WB Rancho Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 52 10 SBd 22 22 05/01/13 05/02/13 10:01 PM 6:01 AM EB Begin: EB Rancho Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10LG 1 10 SBd 22 22 05/01/13 05/02/13 10:01 PM 6:01 AM EB Begin: EB Rancho Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: K-rail Removal
 
C10VB 33 10 SBd 22 22 05/02/13 05/03/13 8:01 PM 4:01 AM WB Begin: WB Rancho Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 53 10 SBd 22 22 05/02/13 05/04/13 10:01 PM 6:01 AM EB Begin: EB Rancho Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 10 10 SBd 22 22 05/03/13 05/04/13 11:01 PM 7:01 AM EB Begin: EB Rancho Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 61 10 SBd 22.6 22.6 04/24/13 04/25/13 8:01 PM 4:01 AM WB Begin: WB La Cadena Dr
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 45 10 SBd 22.6 22.6 04/24/13 04/25/13 10:01 PM 6:01 AM EB Begin: EB La Cadena Dr
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 62 10 SBd 22.6 22.6 04/25/13 04/26/13 8:01 PM 4:01 AM WB Begin: WB La Cadena Dr
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 46 10 SBd 22.6 22.6 04/25/13 04/27/13 10:01 PM 6:01 AM EB Begin: EB La Cadena Dr
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 7 10 SBd 22.6 22.6 04/26/13 04/27/13 11:01 PM 7:01 AM EB Begin: EB La Cadena Dr
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 26 10 SBd 22.6 22.6 04/29/13 04/30/13 8:01 PM 4:01 AM WB Begin: WB La Cadena Dr
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 46 10 SBd 22.6 22.6 04/29/13 04/30/13 10:01 PM 6:01 AM EB Begin: EB La Cadena Dr
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 27 10 SBd 22.6 22.6 04/30/13 05/01/13 8:01 PM 4:01 AM WB Begin: WB La Cadena Dr
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 47 10 SBd 22.6 22.6 04/30/13 05/01/13 10:01 PM 6:01 AM EB Begin: EB La Cadena Dr
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 28 10 SBd 22.6 22.6 05/01/13 05/02/13 8:01 PM 4:01 AM WB Begin: WB La Cadena Dr
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 48 10 SBd 22.6 22.6 05/01/13 05/02/13 10:01 PM 6:01 AM EB Begin: EB La Cadena Dr
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 29 10 SBd 22.6 22.6 05/02/13 05/03/13 8:01 PM 4:01 AM WB Begin: WB La Cadena Dr
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 49 10 SBd 22.6 22.6 05/02/13 05/04/13 10:01 PM 6:01 AM EB Begin: EB La Cadena Dr
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 9 10 SBd 22.6 22.6 05/03/13 05/04/13 11:01 PM 7:01 AM EB Begin: EB La Cadena Dr
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 65 10 SBd 22.7 22.7 04/24/13 04/25/13 8:01 PM 4:01 AM WB Begin: WB Ninth St
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 49 10 SBd 22.7 22.7 04/24/13 04/25/13 10:01 PM 6:01 AM EB Begin: EB Ninth St
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 66 10 SBd 22.7 22.7 04/25/13 04/26/13 8:01 PM 4:01 AM WB Begin: WB Ninth St
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 50 10 SBd 22.7 22.7 04/25/13 04/27/13 10:01 PM 6:01 AM EB Begin: EB Ninth St
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 8 10 SBd 22.7 22.7 04/26/13 04/27/13 11:01 PM 7:01 AM EB Begin: EB Ninth St
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 22 10 SBd 22.7 22.7 04/29/13 04/30/13 8:01 PM 4:01 AM WB Begin: WB Ninth St
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 42 10 SBd 22.7 22.7 04/29/13 04/30/13 10:01 PM 6:01 AM EB Begin: EB Ninth St
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 23 10 SBd 22.7 22.7 04/30/13 05/01/13 8:01 PM 4:01 AM WB Begin: WB Ninth St
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 43 10 SBd 22.7 22.7 04/30/13 05/01/13 10:01 PM 6:01 AM EB Begin: EB Ninth St
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 24 10 SBd 22.7 22.7 05/01/13 05/02/13 8:01 PM 4:01 AM WB Begin: WB Ninth St
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 44 10 SBd 22.7 22.7 05/01/13 05/02/13 10:01 PM 6:01 AM EB Begin: EB Ninth St
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 25 10 SBd 22.7 22.7 05/02/13 05/03/13 8:01 PM 4:01 AM WB Begin: WB Ninth St
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 45 10 SBd 22.7 22.7 05/02/13 05/04/13 10:01 PM 6:01 AM EB Begin: EB Ninth St
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 8 10 SBd 22.7 22.7 05/03/13 05/04/13 11:01 PM 7:01 AM EB Begin: EB Ninth St
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 69 10 SBd 23.2 23.2 04/24/13 04/25/13 8:01 PM 4:01 AM WB Begin: WB Mt Vernon Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 21 10 SBd 23.2 23.2 04/24/13 04/25/13 10:01 PM 6:01 AM EB Begin: EB Route 10
End: EB Mt Vernon Ave
Restriction: Full off ramp closure
Reason: Roadway Excavation
 
C10VB 53 10 SBd 23.2 23.2 04/24/13 04/25/13 10:01 PM 6:01 AM EB Begin: EB Mt Vernon Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 70 10 SBd 23.2 23.2 04/25/13 04/26/13 8:01 PM 4:01 AM WB Begin: WB Mt Vernon Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 22 10 SBd 23.2 23.2 04/25/13 04/26/13 10:01 PM 6:01 AM EB Begin: EB Route 10
End: EB Mt Vernon Ave
Restriction: Full off ramp closure
Reason: Roadway Excavation
 
C10VB 54 10 SBd 23.2 23.2 04/25/13 04/27/13 10:01 PM 6:01 AM EB Begin: EB Mt Vernon Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 1 10 SBd 23.2 23.2 04/26/13 04/27/13 11:01 PM 7:01 AM EB Begin: EB Route 10
End: EB Mt Vernon Ave
Restriction: Full off ramp closure
Reason: Roadway Excavation
 
C10VB 9 10 SBd 23.2 23.2 04/26/13 04/27/13 11:01 PM 7:01 AM EB Begin: EB Mt Vernon Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 18 10 SBd 23.2 23.2 04/29/13 04/30/13 8:01 PM 4:01 AM WB Begin: WB Mt Vernon Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 38 10 SBd 23.2 23.2 04/29/13 04/30/13 10:01 PM 6:01 AM EB Begin: EB Mt Vernon Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 62 10 SBd 23.2 18.5 04/29/13 04/30/13 10:01 PM 6:01 AM EB Begin:  Mt Vernon Ave
End:  Cedar Ave
Restriction: #4 of 4 lanes
Reason: Grinding and Paving
 
C10VB 19 10 SBd 23.2 23.2 04/30/13 05/01/13 8:01 PM 4:01 AM WB Begin: WB Mt Vernon Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 39 10 SBd 23.2 23.2 04/30/13 05/01/13 10:01 PM 6:01 AM EB Begin: EB Mt Vernon Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 63 10 SBd 23.2 18.5 04/30/13 05/01/13 10:01 PM 6:01 AM EB Begin:  Mt Vernon Ave
End:  Cedar Ave
Restriction: #4 of 4 lanes
Reason: Grinding and Paving
 
C10VB 20 10 SBd 23.2 23.2 05/01/13 05/02/13 8:01 PM 4:01 AM WB Begin: WB Mt Vernon Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 40 10 SBd 23.2 23.2 05/01/13 05/02/13 10:01 PM 6:01 AM EB Begin: EB Mt Vernon Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 64 10 SBd 23.2 18.5 05/01/13 05/02/13 10:01 PM 6:01 AM EB Begin:  Mt Vernon Ave
End:  Cedar Ave
Restriction: #4 of 4 lanes
Reason: Grinding and Paving
 
C10VB 21 10 SBd 23.2 23.2 05/02/13 05/03/13 8:01 PM 4:01 AM WB Begin: WB Mt Vernon Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 41 10 SBd 23.2 23.2 05/02/13 05/03/13 10:01 PM 6:01 AM EB Begin: EB Mt Vernon Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 65 10 SBd 23.2 18.5 05/02/13 05/03/13 10:01 PM 6:01 AM EB Begin:  Mt Vernon Ave
End:  Cedar Ave
Restriction: #4 of 4 lanes
Reason: Grinding and Paving
 
C10VB 2 10 SBd 23.2 23.2 05/03/13 05/04/13 10:01 PM 6:01 AM WB Begin: WB Mt Vernon Ave
End: WB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 7 10 SBd 23.2 23.2 05/03/13 05/04/13 11:01 PM 7:01 AM EB Begin: EB Mt Vernon Ave
End: EB Route 10
Restriction: Full on ramp closure
Reason: Roadway Excavation
 
C10VB 13 10 SBd 23.2 18.5 05/03/13 05/04/13 11:01 PM 7:01 AM EB Begin:  Mt Vernon Ave
End:  Cedar Ave
Restriction: #4 of 4 lanes
Reason: Grinding and Paving
 
C10KG 1 10 SBd 24.8 23.6 04/28/13 04/29/13 9:01 PM 6:01 AM EB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #1, #4 of 4 lanes
Reason: K-rail Installation
 
C10KG 6 10 SBd 24.8 23.6 04/28/13 04/29/13 9:01 PM 5:01 AM WB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #4, #1 of 4 lanes
Reason: K-rail Installation
 
C10KG 11 10 SBd 24.8 23.6 04/28/13 04/29/13 9:01 PM 6:01 AM EB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #4, #1 of 4 lanes
Reason: Bridge Work
 
C10KG 16 10 SBd 24.8 23.6 04/28/13 04/29/13 9:01 PM 5:01 AM WB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #1, #4 of 4 lanes
Reason: Bridge Work
 
C10KG 2 10 SBd 24.8 23.6 04/29/13 04/30/13 9:01 PM 6:01 AM EB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #4, #1 of 4 lanes
Reason: K-rail Installation
 
C10KG 7 10 SBd 24.8 23.6 04/29/13 04/30/13 9:01 PM 5:01 AM WB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #4, #1 of 4 lanes
Reason: K-rail Installation
 
C10KG 12 10 SBd 24.8 23.6 04/29/13 04/30/13 9:01 PM 6:01 AM EB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #1, #4 of 4 lanes
Reason: Bridge Work
 
C10KG 17 10 SBd 24.8 23.6 04/29/13 04/30/13 9:01 PM 5:01 AM WB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #1, #4 of 4 lanes
Reason: Bridge Work
 
C10KG 3 10 SBd 24.8 23.6 04/30/13 05/01/13 9:01 PM 6:01 AM EB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #4, #1 of 4 lanes
Reason: K-rail Installation
 
C10KG 8 10 SBd 24.8 23.6 04/30/13 05/01/13 9:01 PM 5:01 AM WB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #1, #4 of 4 lanes
Reason: K-rail Installation
 
C10KG 13 10 SBd 24.8 23.6 04/30/13 05/01/13 9:01 PM 6:01 AM EB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #4, #1 of 4 lanes
Reason: Bridge Work
 
C10KG 18 10 SBd 24.8 23.6 04/30/13 05/01/13 9:01 PM 5:01 AM WB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #4, #1 of 4 lanes
Reason: Bridge Work
 
C10KG 4 10 SBd 24.8 23.6 05/01/13 05/02/13 9:01 PM 6:01 AM EB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #4, #1 of 4 lanes
Reason: K-rail Installation
 
C10KG 9 10 SBd 24.8 23.6 05/01/13 05/02/13 9:01 PM 5:01 AM WB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #4, #1 of 4 lanes
Reason: K-rail Installation
 
C10KG 14 10 SBd 24.8 23.6 05/01/13 05/02/13 9:01 PM 6:01 AM EB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #1, #4 of 4 lanes
Reason: Bridge Work
 
C10KG 19 10 SBd 24.8 23.6 05/01/13 05/02/13 9:01 PM 5:01 AM WB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #4, #1 of 4 lanes
Reason: Bridge Work
 
C10KG 5 10 SBd 24.8 23.6 05/02/13 05/03/13 9:01 PM 6:01 AM EB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #4, #1 of 4 lanes
Reason: K-rail Installation
 
C10KG 10 10 SBd 24.8 23.6 05/02/13 05/03/13 9:01 PM 5:01 AM WB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #1, #4 of 4 lanes
Reason: K-rail Installation
 
C10KG 15 10 SBd 24.8 23.6 05/02/13 05/03/13 9:01 PM 6:01 AM EB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #4, #1 of 4 lanes
Reason: Bridge Work
 
C10KG 20 10 SBd 24.8 23.6 05/02/13 05/03/13 9:01 PM 5:01 AM WB Begin:  Hunts Lane
End:  Sperry Dr
Restriction: #1, #4 of 4 lanes
Reason: Bridge Work
 
C15EC 60 15 SBd 3.8 12.8 04/24/13 04/25/13 10:01 AM 7:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #4, #2, #1, #3 of 4 lanes
Reason: Highway Construction
 
C15EC 65 15 SBd 3.8 12.8 04/25/13 04/25/13 12:01 AM 5:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #2, #3 of 4 lanes
Reason: Highway Construction
 
C15EC 61 15 SBd 3.8 12.8 04/25/13 04/26/13 10:01 AM 7:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #4, #2, #1, #3 of 4 lanes
Reason: Highway Construction
 
C15EC 66 15 SBd 3.8 12.8 04/26/13 04/26/13 12:01 AM 5:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #2, #3 of 4 lanes
Reason: Highway Construction
 
C15EC 1 15 SBd 3.8 12.8 04/27/13 04/27/13 12:01 AM 7:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #1, #2, #3, #4 of 4 lanes
Reason: Highway Construction
 
C15EC 3 15 SBd 3.8 12.8 04/27/13 04/27/13 1:01 AM 6:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #3, #2 of 4 lanes
Reason: Highway Construction
 
C15EC 4 15 SBd 3.8 12.8 04/27/13 04/27/13 1:01 AM 7:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #2, #3 of 4 lanes
Reason: Highway Construction
 
C15EC 2 15 SBd 3.8 12.8 04/27/13 04/28/13 11:01 PM 7:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #2, #4, #1, #3 of 4 lanes
Reason: Highway Construction
 
C15EC 5 15 SBd 3.8 12.8 04/28/13 04/28/13 1:01 AM 7:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #2, #3 of 4 lanes
Reason: Highway Construction
 
C15EC 60 15 SBd 3.8 12.8 04/28/13 04/30/13 10:01 PM 7:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #4, #3, #1, #2 of 4 lanes
Reason: Highway Construction
 
C15EC 70 15 SBd 3.8 12.8 04/30/13 04/30/13 12:01 AM 5:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #3, #2 of 4 lanes
Reason: Highway Construction
 
C15EC 74 15 SBd 3.8 12.8 04/30/13 04/30/13 1:01 AM 6:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #2, #3 of 4 lanes
Reason: Highway Construction
 
C15EC 62 15 SBd 3.8 12.8 04/30/13 05/01/13 10:01 PM 7:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #2, #1, #4, #3 of 4 lanes
Reason: Highway Construction
 
C15EC 71 15 SBd 3.8 12.8 05/01/13 05/01/13 12:01 AM 5:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #3, #2 of 4 lanes
Reason: Highway Construction
 
C15EC 75 15 SBd 3.8 12.8 05/01/13 05/01/13 1:01 AM 6:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #2, #3 of 4 lanes
Reason: Highway Construction
 
C15EC 63 15 SBd 3.8 12.8 05/01/13 05/02/13 10:01 PM 7:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #3, #2, #4, #1 of 4 lanes
Reason: Highway Construction
 
C15EC 72 15 SBd 3.8 12.8 05/02/13 05/02/13 12:01 AM 5:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #2, #3 of 4 lanes
Reason: Highway Construction
 
C15EC 76 15 SBd 3.8 12.8 05/02/13 05/02/13 1:01 AM 6:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #2, #3 of 4 lanes
Reason: Highway Construction
 
C15EC 64 15 SBd 3.8 12.8 05/02/13 05/03/13 10:01 PM 7:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #1, #3, #4, #2 of 4 lanes
Reason: Highway Construction
 
C15EC 73 15 SBd 3.8 12.8 05/03/13 05/03/13 12:01 AM 5:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #2, #3 of 4 lanes
Reason: Highway Construction
 
C15EC 77 15 SBd 3.8 12.8 05/03/13 05/03/13 1:01 AM 6:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #3, #2 of 4 lanes
Reason: Highway Construction
 
C15EC 1 15 SBd 3.8 12.8 05/04/13 05/04/13 12:01 AM 7:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #4, #3, #2, #1 of 4 lanes
Reason: Highway Construction
 
C15EC 3 15 SBd 3.8 12.8 05/04/13 05/04/13 1:01 AM 6:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #2, #3 of 4 lanes
Reason: Highway Construction
 
C15EC 5 15 SBd 3.8 12.8 05/04/13 05/04/13 1:01 AM 7:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #3, #2 of 4 lanes
Reason: Highway Construction
 
C15EC 2 15 SBd 3.8 12.8 05/04/13 05/05/13 11:01 PM 7:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #3, #2, #4, #1 of 4 lanes
Reason: Highway Construction
 
C15EC 6 15 SBd 3.8 12.8 05/05/13 05/05/13 1:01 AM 7:01 AM NB Begin:  Seventh St
End:  Sierra Ave
Restriction: #2, #3 of 4 lanes
Reason: Highway Construction
 
C15EC 165 15 SBd 5.3 5.3 04/24/13 04/25/13 8:01 PM 5:01 AM SB Begin: SB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 171 15 SBd 5.3 5.3 04/24/13 04/25/13 8:01 PM 5:01 AM SB Begin: EB Route 66/Foothill Blvd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 100 15 SBd 5.3 5.3 04/24/13 04/25/13 10:01 PM 7:01 AM NB Begin: NB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 105 15 SBd 5.3 5.3 04/24/13 04/25/13 10:01 PM 7:01 AM NB Begin: WB Route 66/Foothill Blvd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 166 15 SBd 5.3 5.3 04/25/13 04/26/13 8:01 PM 5:01 AM SB Begin: SB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 172 15 SBd 5.3 5.3 04/25/13 04/26/13 8:01 PM 5:01 AM SB Begin: EB Route 66/Foothill Blvd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 101 15 SBd 5.3 5.3 04/25/13 04/26/13 10:01 PM 7:01 AM NB Begin: NB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 106 15 SBd 5.3 5.3 04/25/13 04/26/13 10:01 PM 7:01 AM NB Begin: WB Route 66/Foothill Blvd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 37 15 SBd 5.3 5.3 04/26/13 04/27/13 9:01 PM 7:01 AM SB Begin: SB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 39 15 SBd 5.3 5.3 04/26/13 04/27/13 9:01 PM 7:01 AM SB Begin: EB Route 66/Foothill Blvd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 14 15 SBd 5.3 5.3 04/27/13 04/27/13 12:01 AM 7:01 AM NB Begin: NB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 16 15 SBd 5.3 5.3 04/27/13 04/27/13 12:01 AM 7:01 AM NB Begin: WB Route 66/Foothill Blvd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 15 15 SBd 5.3 5.3 04/27/13 04/28/13 11:01 PM 7:01 AM NB Begin: NB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 17 15 SBd 5.3 5.3 04/27/13 04/28/13 11:01 PM 7:01 AM NB Begin: WB Route 66/Foothill Blvd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 34 15 SBd 5.3 5.3 04/27/13 04/28/13 11:01 PM 7:01 AM SB Begin: SB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 36 15 SBd 5.3 5.3 04/27/13 04/28/13 11:01 PM 7:01 AM SB Begin: EB Route 66/Foothill Blvd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 107 15 SBd 5.3 5.3 04/28/13 04/29/13 10:01 PM 7:01 AM NB Begin: EB Route 66/Foothill Blvd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 117 15 SBd 5.3 5.3 04/28/13 04/29/13 10:01 PM 7:01 AM NB Begin: NB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 148 15 SBd 5.3 5.3 04/29/13 04/29/13 12:01 AM 5:01 AM SB Begin: EB Route 66/Foothill Blvd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 158 15 SBd 5.3 5.3 04/29/13 04/29/13 12:01 AM 5:01 AM SB Begin: SB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 149 15 SBd 5.3 5.3 04/29/13 04/30/13 8:01 PM 5:01 AM SB Begin: EB Route 66/Foothill Blvd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 159 15 SBd 5.3 5.3 04/29/13 04/30/13 8:01 PM 5:01 AM SB Begin: SB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 108 15 SBd 5.3 5.3 04/29/13 04/30/13 10:01 PM 7:01 AM NB Begin: EB Route 66/Foothill Blvd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 118 15 SBd 5.3 5.3 04/29/13 04/30/13 10:01 PM 7:01 AM NB Begin: NB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 150 15 SBd 5.3 5.3 04/30/13 05/01/13 8:01 PM 5:01 AM SB Begin: EB Route 66/Foothill Blvd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 160 15 SBd 5.3 5.3 04/30/13 05/01/13 8:01 PM 5:01 AM SB Begin: SB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 109 15 SBd 5.3 5.3 04/30/13 05/01/13 10:01 PM 7:01 AM NB Begin: EB Route 66/Foothill Blvd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 119 15 SBd 5.3 5.3 04/30/13 05/01/13 10:01 PM 7:01 AM NB Begin: NB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 151 15 SBd 5.3 5.3 05/01/13 05/02/13 8:01 PM 5:01 AM SB Begin: EB Route 66/Foothill Blvd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 161 15 SBd 5.3 5.3 05/01/13 05/02/13 8:01 PM 5:01 AM SB Begin: SB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 110 15 SBd 5.3 5.3 05/01/13 05/02/13 10:01 PM 7:01 AM NB Begin: EB Route 66/Foothill Blvd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 120 15 SBd 5.3 5.3 05/01/13 05/02/13 10:01 PM 7:01 AM NB Begin: NB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 152 15 SBd 5.3 5.3 05/02/13 05/03/13 8:01 PM 5:01 AM SB Begin: EB Route 66/Foothill Blvd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 162 15 SBd 5.3 5.3 05/02/13 05/03/13 8:01 PM 5:01 AM SB Begin: SB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 111 15 SBd 5.3 5.3 05/02/13 05/03/13 10:01 PM 7:01 AM NB Begin: EB Route 66/Foothill Blvd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 121 15 SBd 5.3 5.3 05/02/13 05/03/13 10:01 PM 7:01 AM NB Begin: NB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 35 15 SBd 5.3 5.3 05/03/13 05/04/13 9:01 PM 7:01 AM SB Begin: EB Route 66/Foothill Blvd
End: SB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 37 15 SBd 5.3 5.3 05/03/13 05/04/13 9:01 PM 7:01 AM SB Begin: SB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 15 15 SBd 5.3 5.3 05/04/13 05/04/13 12:01 AM 7:01 AM NB Begin: EB Route 66/Foothill Blvd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 19 15 SBd 5.3 5.3 05/04/13 05/04/13 12:01 AM 7:01 AM NB Begin: NB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 16 15 SBd 5.3 5.3 05/04/13 05/05/13 11:01 PM 7:01 AM NB Begin: EB Route 66/Foothill Blvd
End: NB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 20 15 SBd 5.3 5.3 05/04/13 05/05/13 11:01 PM 7:01 AM NB Begin: NB Route 15
End:  Route 66/Foothill Blvd
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 181 15 SBd 6.7 6.7 04/24/13 04/25/13 8:01 PM 5:01 AM SB Begin: SB Route 15
End:  Baseline Rd/East Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 186 15 SBd 6.7 6.7 04/24/13 04/25/13 8:01 PM 5:01 AM SB Begin:  Baseline Rd/East Ave
End: SB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 115 15 SBd 6.7 6.7 04/24/13 04/25/13 10:01 PM 7:01 AM NB Begin: NB Route 15
End:  Baseline Rd/East Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 120 15 SBd 6.7 6.7 04/24/13 04/25/13 10:01 PM 7:01 AM NB Begin: EB/WB Baseline Rd/East Ave
End: NB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 182 15 SBd 6.7 6.7 04/25/13 04/26/13 8:01 PM 5:01 AM SB Begin: SB Route 15
End:  Baseline Rd/East Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 187 15 SBd 6.7 6.7 04/25/13 04/26/13 8:01 PM 5:01 AM SB Begin:  Baseline Rd/East Ave
End: SB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 116 15 SBd 6.7 6.7 04/25/13 04/26/13 10:01 PM 7:01 AM NB Begin: NB Route 15
End:  Baseline Rd/East Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 121 15 SBd 6.7 6.7 04/25/13 04/26/13 10:01 PM 7:01 AM NB Begin: EB/WB Baseline Rd/East Ave
End: NB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 41 15 SBd 6.7 6.7 04/26/13 04/27/13 9:01 PM 7:01 AM SB Begin: SB Route 15
End:  Baseline Rd/East Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 42 15 SBd 6.7 6.7 04/26/13 04/27/13 9:01 PM 7:01 AM SB Begin:  Baseline Rd/East Ave
End: SB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 21 15 SBd 6.7 6.7 04/27/13 04/27/13 12:01 AM 7:01 AM NB Begin: NB Route 15
End:  Baseline Rd/East Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 23 15 SBd 6.7 6.7 04/27/13 04/27/13 12:01 AM 7:01 AM NB Begin: EB/WB Baseline Rd/East Ave
End: NB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 22 15 SBd 6.7 6.7 04/27/13 04/28/13 11:01 PM 7:01 AM NB Begin: NB Route 15
End:  Baseline Rd/East Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 24 15 SBd 6.7 6.7 04/27/13 04/28/13 11:01 PM 7:01 AM NB Begin: EB/WB Baseline Rd/East Ave
End: NB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 122 15 SBd 6.7 6.7 04/28/13 04/29/13 10:01 PM 7:01 AM NB Begin: EB/WB Baseline Rd/East Ave
End: NB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 163 15 SBd 6.7 6.7 04/29/13 04/29/13 12:01 AM 5:01 AM SB Begin: SB Route 15
End:  Baseline Rd/East Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 168 15 SBd 6.7 6.7 04/29/13 04/29/13 12:01 AM 5:01 AM SB Begin:  Baseline Rd/East Ave
End: SB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 164 15 SBd 6.7 6.7 04/29/13 04/30/13 8:01 PM 5:01 AM SB Begin: SB Route 15
End:  Baseline Rd/East Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 169 15 SBd 6.7 6.7 04/29/13 04/30/13 8:01 PM 5:01 AM SB Begin:  Baseline Rd/East Ave
End: SB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 123 15 SBd 6.7 6.7 04/29/13 04/30/13 10:01 PM 7:01 AM NB Begin: EB/WB Baseline Rd/East Ave
End: NB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 165 15 SBd 6.7 6.7 04/30/13 05/01/13 8:01 PM 5:01 AM SB Begin: SB Route 15
End:  Baseline Rd/East Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 170 15 SBd 6.7 6.7 04/30/13 05/01/13 8:01 PM 5:01 AM SB Begin:  Baseline Rd/East Ave
End: SB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 124 15 SBd 6.7 6.7 04/30/13 05/01/13 10:01 PM 7:01 AM NB Begin: EB/WB Baseline Rd/East Ave
End: NB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 166 15 SBd 6.7 6.7 05/01/13 05/02/13 8:01 PM 5:01 AM SB Begin: SB Route 15
End:  Baseline Rd/East Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 171 15 SBd 6.7 6.7 05/01/13 05/02/13 8:01 PM 5:01 AM SB Begin:  Baseline Rd/East Ave
End: SB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 125 15 SBd 6.7 6.7 05/01/13 05/02/13 10:01 PM 7:01 AM NB Begin: EB/WB Baseline Rd/East Ave
End: NB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 167 15 SBd 6.7 6.7 05/02/13 05/03/13 8:01 PM 5:01 AM SB Begin: SB Route 15
End:  Baseline Rd/East Ave
Restriction: Full off ramp closure
Reason: Highway Construction
 
C15EC 172 15 SBd 6.7 6.7 05/02/13 05/03/13 8:01 PM 5:01 AM SB Begin:  Baseline Rd/East Ave
End: SB Route 15
Restriction: Full on ramp closure
Reason: Highway Construction
 
C15EC 126 15 SBd 6.7 6.7 05/02/13 05/03/13 10:01 PM 7:01 AM NB Begin: E