APPENDIX J

BIBLIOGRAPHY

AGS, Inc., Draft Semi-Annual Groundwater Monitoring and Sampling Report for October 1997 at Naval Station Treasure Island, San Francisco, California, November 1997.

American Association of State Highway and Transportation Officials, AASHTO Guide Specifications and Commentary for Vessel Collision Design of Highway Bridges, Volume I: Final Report, February 1991.

APEX, Report Site Investigation Oakland Bay Bridge, East Bay Span, Oakland, California, March 1994.

Association of Bay Area Governments, Bay Trail Plan, July 1989.

Association of Bay Area Governments, Macroeconomic Effects of the Loma Prieta Earthquake, 1991.

Association of Bay Area Governments, Projections Ď98, 1998.

Association of Bay Area Governments, Riding Out Future Quakes, 1998.

Bajdek, Christopher, Vehicle Noise Emissions and Pure-Tone Characteristics of Different Pavements: A Case Study, Transportation Research Board Proceedings, St. Petersburg, Florida, July 1998.

Bay Area Air Quality Management District, BAAQMD CEQA Guidelines - Assessing the Air Quality Impacts of Projects and Plans, April 1996, Revised December 1999.

California Air Resources Board, Summary of Air Quality Data for 1995, 1996, 1997, and 1998. 1996, 1997, 1998, and 1999.

California Air Resources Board, Proposed Amendments to the Area Designations for State Ambient Air Quality Standards, and Proposed Maps of the Area Designations for the State and National Ambient Air Quality Standards, October 1999.

California Department of Transportation, Energy and Transportation Systems Manual, 1983.

California Department of Transportation, Supplemental Biological Assessment for Interstate 80 Improvement Project High Occupancy Vehicle (HOV) Lanes San Francisco-Oakland Bay Bridge Toll Plaza, 1990.

California Department of Transportation, Effects of Proposed Changes to Bay Bridge HOV Operation, District 4 Highway Operations, October 19, 1994.

California Department of Transportation, Archaeological Survey Report. San Francisco-Oakland Bay Bridge Seismic Retrofit 04-SF-80-P.M. 4.80/8.85, 04-ALA-80-P.M. 0.0/1.15, 1995.

California Department of Transportation, Biological Assessment for San Francisco-Oakland Bay Bridge Seismic Retrofit, 1996.

California Department of Transportation, Historic Property Survey Report and Finding of Adverse Effect, April 1996.

California Department of Transportation, Memorandum to Darnall Reynolds (Caltrans, Office of Environmental Planning, North) from Rodney Oto (Caltrans, Office of Highway Operations), re "SFOBB Seismic Retrofit Project," August 8, 1996.

California Department of Transportation; prepared by Clayton Environmental Consultants, Sediment Sampling and Analysis, San Francisco-Oakland Bay Bridge East Span, Seismic Retrofit Project, November 1996.

California Department of Transportation; prepared by Clayton Environmental Consultants, Phase I Environmental Site Assessment, San Francisco-Oakland Bay Bridge, YBI, Parcel Acquisition Project, December 1996.

California Department of Transportation; prepared by Clayton Environmental Consultants, Subsurface Soil Investigation San Francisco-Oakland Bay Bridge/YBI, December 1996.

California Department of Transportation, Findings of Adverse Effect for Seismic Retrofit Work on the West Spans and West Approach and Interim Seismic Retrofit Work on the East Spans of the San Francisco-Oakland Bay Bridge, 1997.

California Department of Transportation, Transportation Economics Planning Program, Retrofit vs. New Bridge, An Economic Analysis for the East Span of the San Francisco-Oakland Bay Bridge, April 1997.

California Department of Transportation, Geologic Issues for the Proposed New East Span of the San Francisco-Oakland Bay Bridge, August 1997.

California Department of Transportation, MTC SFOBB Traffic Survey Memorandum from Rod Oto to Mike Davis of Parsons Brinckerhoff, September 4, 1997.

California Department of Transportation; prepared by Parsons Brinckerhoff, SFOBB East Span Retrofit Project Profile Grade Analysis Technical Memorandum, October 29, 1997.

California Department of Transportation; prepared by Fugro West, Inc., SFOBB East Span Replacement N3 Alignment, Project Memorandum. Preliminary Pre-Drilling Program Status Synopsis ≠ Extrapolated Subsurface Profile, February 18, 1998.

California Department of Transportation, Air Quality Study Memorandum, March 26, 1998.

California Department of Transportation; prepared by Parsons Brinckerhoff, Project Alignment Alternatives, May 1998.

California Department of Transportation, SFOBB East Span Seismic Safety Project 30% Type Selection Report, May 1998.

California Department of Transportation; prepared by Woodward-Clyde Consultants, Positive Archaeological Survey Report in the Counties of San Francisco and Alameda, California, with an extended Phase I Report for Investigations at CA-SFR-04, Yerba Buena Island, June 1998.

California Department of Transportation; prepared by Fugro-Earth Mechanics, Preliminary Marine Geotechnical Site Characterization Report, June 1998.

California Department of Transportation; prepared by Fugro-Earth Mechanics, Preliminary Oakland Shore Approach Geotechnical Site Characterization Report, June 1998.

California Department of Transportation; prepared by Fugro-Earth Mechanics, Preliminary Yerba Buena Island Geotechnical Site Characterization Report, June 1998.

California Department of Transportation, Classification Counts at SFOBB Toll Plaza Memorandum from Rod Oto to Helise Cohn of Parsons Brinckerhoff, June 3, 1998.

California Department of Transportation; prepared by Woodward-Clyde Consultants,

Finding of Effect for Archaeological Resources Located in the City and County of

San Francisco and the City of Oakland, Alameda County, California, July 1998.

California Department of Transportation; prepared by Parsons Brinckerhoff, Bicycle and Pedestrian Study, September 1998.

California Department of Transportation; prepared by Public Affairs Management, Inc.

and Gabriel Roche, Inc., Community Impact Assessment, September 1998.

California Department of Transportation, Draft Relocation Impact Report, September 1998.

California Department of Transportation, Finding of Adverse Effect: Building and Structures, September 1998.

California Department of Transportation; prepared by Parsons Brinckerhoff, Hazardous Wastes Assessment, September 1998.

California Department of Transportation, Historic Architecture Survey Report and Finding of Adverse Effect Addendum, September 1998.

California Department of Transportation; prepared by Parsons Brinckerhoff, Location Hydraulic Study, September 1998.

California Department of Transportation; prepared by Woodward-Clyde Consultants, Natural Environment Study, September 1998.

California Department of Transportation; prepared by Woodward-Clyde Consultants, Noise and Vibration Study, September 1998.

California Department of Transportation; prepared by Parsons Brinckerhoff, Traffic Circulation, Access and Parking Assessment, September 1998.

California Department of Transportation; prepared by Public Affairs Management, Inc., Visual Impact Assessment, September 1998.

California Department of Transportation; prepared by Woodward-Clyde Consultants, Biological Assessment, June 1999.

California Department of Transportation; prepared by Woodward-Clyde Consultants, Dredged Material Management Plan, June 1999.

California Department of Transportation; prepared by T.Y. Lin International and Moffett & Nichol Engineers, Hydraulic Modeling and Scour Analysis, June 1999.

California Department of Transportation, Supplemental Section 4(f) Evaluation, June 1999.

California Department of Transportation, Consideration of Proposed Mitigation for Project Effects on Historic Buildings and Structures, September 1999.

California Department of Transportation, Addendum Finding of Adverse Effect, October 1999.

California Department of Transportation, CCSF S-1 Modified Alignment and the Impacts to the EBMUD Sewer Outfall, November 1999.

California Department of Transportation, Land Use Issues Associated with the SFOBB East Span Seismic Safety Project and the Naval Station Treasure Island Draft Reuse Plan, January 2000.

California Department of Transportation; prepared by Merkel & Associates, Inc., Eelgrass Habitat Survey and Assessment, February 2000.

California Department of Transportation; prepared by William Self Associates, Phase I Archaeological Survey Report - Maritime Archaeology, February 2000.

California Department of Transportation; prepared by William Self Associates, Addendum Archaeological Survey Report ≠ Maritime Archaeology, March 2000.

California Department of Transportation, 1998 Traffic Volumes on the California State Highway System, April 2000.

California Department of Transportation, Replacement vs. Retrofit, April 2000.

California Department of Transportation, Sediment Sampling and Analysis Report, June 2000.

California Department of Transportation, San Francisco ≠ Oakland Bay Bridge Treatment BMP Feasibility Study, December 2000.

California Department of Transportation, Final Relocation Impact Report, April 2001.

California Office of Emergency Services, Loma Prieta Earthquake: Homes/Businesses Damaged/Destroyed, December 1989.

Chavez et al. Wetlands and Water Quality Change Detection in San Francisco Bay Ecosystem Using Remotely Sensed Images, April 1995.

City of Oakland, West Oakland Army Base Conditions and Trends Summary Report.

City of Oakland, Envision Oakland (Draft for Public Hearings), October 1997, adopted March 24, 1998.

City of Oakland, City of Oakland General Plan, March 1998.

City and County of San Francisco, Treasure Island Reuse Plan, Physical Characteristics, Building and Infrastructure Conditions, June 1995.

City and County of San Francisco, Office of Military Base Conversion, Planning Department and the San Francisco Redevelopment Agency, Draft Naval Station Treasure Island Reuse Plan, July 1996.

City and County of San Francisco, Treasure Island Reuse Plan, Existing Conditions Report, Land Use and Recreational Resources, July 1996.

Demoro, Harre W., The Key Route: Transbay Commuting by Train and Ferry, 1985.

Department of the Army ≠ Oakland Army Base Transition Office, Biological Assessment for USFWS, Disposal and reuse of Oakland Army Base, August 3, 2000.

East Bay Regional Park District, Master Plan, December 17, 1996.

Economic Development Advisory Board of the County of Alameda, West Oakland 2000 Transportation and Economic Development Study, 1997.

Federal Highway Administration, Noise Barrier Cost Reduction Procedure, STAMINA 2.0/OPTIMA Users Manual, Report No. FHWA-DP-58-1, April 1982.

Federal Highway Administration/Federal Transit Administration, Order 6640.23: FHWA Actions to Address Environmental Justice in Minority Populations and Low-income Populations, December 2, 1998

Foster Wheeler, Inc., Basewide Environmental Baseline Survey for Oakland Army Base-Final, Oakland, California, September 1996.

Foster Wheeler, Inc., Basewide Preliminary Assessment/Site Inspection (PA/SI) Oakland Army Base, Oakland, California, February 1998.

Gordon, R.B., Movements of Dredged Material, Dredged Material Research Notes. U.S. Army Engineers Waterways Experiment Station, Vicksburg, Mississippi, 1977.

Hamusek-McGann, B., M. Maniaery, and C. Baker. Archaeological Inventory and Assessment of Naval Station Treasure Island Disposal and Reuse Project, San Francisco, California, PAR Environmental Services, Inc. 1997.

Herbich, J.B., Handbook of Dredging Engineering, Environmental Effects of Dredging, 1992.

Hice, E., and D. Schierling. Historical Study of Yerba Buena Island, Treasure Island, and their Buildings., Mare Island Naval Shipyard, Base Realignment and Closure, Environmental Technical Division, 1996.

Holland Ph.D., Robert F., Preliminary Descriptions of the Terrestrial Natural

Communities of California. Prepared for the State of California Department of Fish and Game, Vegetation Ecologist Nongame-Heritage Program, 1986.

Josselyn, M., The Ecology of San Francisco Bay Tidal Marshes: A Community Profile, U.S. Fish and Wildlife Service, Division of Biological Services, 1983.

JRP Historical Consultants, Historic Context for Evaluation Building and Structures at Treasure Island and Yerba Buena Island, Naval Station, Treasure Island, California. On file, Environmental Department, Naval Station, Treasure Island, San Francisco, CA, 1997.

Kleinfelder, Inc., Basewide Preliminary Assessment/Site Inspection (PA/SI), Oakland Army Base, Oakland, California, Restoration Advisory Board Summary, February 1998.

Long-Term Management Strategy (LTMS) Multi-Agency Writing Team, Draft Long-Term Management Strategy (LTMS) for the Placement of Dredge Material in the San Francisco Bay Region. Vol. I and II. (Report prepared for the LTMS Management Protection Agency, Region 9, ACOE, San Francisco District; San Francisco Bay Conservation and Development Commission; San Francisco Bay Regional Water Quality Control Board; and California State Water Resources Control Board), April 1996.

Metropolitan Transportation Commission, 1994, 1996, and 1998 Regional Transportation Plans, 1994, 1996, and 1998.

Metropolitan Transportation Commission, Working Paper 2A.2: Initial Definition and Description for Bay Bridge Rail Options, July 28, 1999.

Metropolitan Transportation Commission, Working Paper 2A.3: Structural Assessment of Rail on the Bay Bridge, October 22, 1999.

Metropolitan Transportation Commission, Structural Assessment of Rail on the Bay Bridge: Summary Report, October 22, 1999.

Metropolitan Transportation Commission, Working Paper 3A.1: Operational Description of Bay Bridge Rail Alignment Options, November 1999.

Metropolitan Transportation Commission, Bridge Rail Feasibility Study Final Report, June 2000.

Noise Control Engineering Journal, Institute of Noise Control Engineering of the USA, Sound Propagation at Tunnel Openings, September-October 1992.

Olivia Chen Consultants, EBMUD Sodium Bisulfite Facilities for Main WWTP Geotechnical Findings and Foundation Recommendations, September 1995.

PRC Environmental Management, Groundwater Status Report: Summary of Groundwater Monitoring from November 1995 to September 1996, May 1997.

San Francisco Bay Conservation and Development Commission, The San Francisco Bay Plan, adopted 1969, amended 1987.

San Francisco Bay Conservation and Development Commission, Sea Level Rise: Predictions and Implications for San Francisco Bay, October 1988, revised.

San Francisco Bay Conservation and Development Commission, BCDC Permit No. 11-93 issued on June 8, 1994 (with amendments made October 19, 1994 and April 14, 1995).

San Francisco Estuary Institute, Executive Summary ≠ Regional Monitoring Program, 1996 Annual Report, 1997.

Skinner, M. and B. Pavlik, Manual of California Vegetation, California Native Plant Society, 1994.

Tetra Tech EM, Inc., USCG YBI Facility, San Francisco, Underground Storage Tank Closure Report, 1996.

University of California, Davis Institute of Transportation Studies, Transportation Project-Level Carbon Monoxide Protocol, December 1997.

U.S. Army Corps of Engineers, San Francisco Bay, Tidal Stage vs. Frequency Study, October 1984.

U.S. Army Corps of Engineers, Corps of Engineers Wetlands Delineation Manual, Technical Report Y-87-1, U.S. Army Engineer Waterways Experiments Station, 1987.

U.S. Army Corps of Engineers, Testing Guidelines for Dredged Material Disposal at San Francisco Bay Sites, Public Notice 93-2, February 1993.

U.S. Army Corps of Engineers, Oakland Harbor Navigation Improvement (-50 foot) Project Environmental Impact Statement/Environmental Impact Report, Volume II, 1998.

U.S. Army Corps of Engineers, Assessment of the San Francisco-Oakland Bay Bridge Seismic Replacement Projectís Impact on the EBMUD Sewer Outfall, January 6, 2000.

U.S. Army Corps of Engineers, Evaluation & Assessment of Proposed Alternatives to Retrofit/Replace the East Span of the San Francisco-Oakland Bay Bridge, October 27, 2000.

U.S. Coast Guard, Bridge Permit Application Guide, 1986 as amended.

U.S. Department of Commerce, Bureau of the Census, 1990 Census.

U.S. Environmental Protection Agency, Noise from Construction Equipment and Operations, Building Equipment and Home Appliances, 1971.

U.S. Geological Survey, Probabilities of Large Earthquakes in the San Francisco Bay Region, California, U.S. Geological Survey Circular 1053, 1990.

U.S. Geological Survey, Major Quake Likely to Strike Between 2000 and 2030, U.S. Geological Survey Fact Sheet, 152-99, 1999.

Wayson, Roger, NCHRP Synthesis, Transportation Research Board Proceedings, St. Petersburg, Florida, July 1998.

Woods, Michael, Final Species Status Plant Survey and Habitat Assessment for Naval Station Treasure Island/Yerba Buena Island, CA, 1996.