    TRI-3 WEAVERVILLE ELEMENTARY SCHOOL SIDEWALKS (02-4E600)
Description: To improve paved shoulders, bike lane/sidewalk width, curbs and gutters
Project Manager: Steve Rogers
Construction is expected to begin in spring 2015
   
    TRI-3 NORTH HAYFORK THIN BLANKET OVERLAY WITH DIGOUTS (02-4G180)
Description: To extend the service life of the road before it needs major rehabilitation
Project Manager: Lance Brown
Construction is expected to begin in June 2015
   
    TRI-3 SOUTH SCOTT MOUNTAIN ASPHALT RUBBER CHIP SEAL (02-4F180)
Description: To place chip seal on SR 3 within the existing hinge points
Project Manager: Lance Brown
Construction is complete
   
    TRI-3 BRIDGE MAINTENANCE (02-4E560)
Description: Bridge maintenance in various locations in Trinity County
Project Manager: Lance Brown
Construction in progress
   
    TRI-36 FOREST GLENN PROFILE CORRECTION (02-4F400)
Description: To remove and replace structural section to improve pavement profile
Project Manager: Steve Rogers
Construction in progress
   
    TRI-299 BIG FRENCH CREEK BRIDGE RAIL (02-37430)
Description: To replace the existing bridge rail with Type 732 rail.
Project Manager: Steve Rogers
Construction in progress
   
    TRI-299 ENCHILADA CURVE IMPROVEMENT (02-2E350)
Description: To improve roadway geometrics, superelevation transitions, widen paved shoulders to 8 ft
Project Manager: Chris Harvey
Construction in progress
   
    TRI-299 COLLINS BAR IMPROVEMENT (02-3E790)
Description: To realign four curves, widen paved shoulders, increase tangent lengths and improve the superelevation transitions
Project Manager: Steve Rogers
Construction is estimated to begin late 2014 or early 2015
   
    TRI-299 POISON POND CURVE IMPROVEMENT (02-4E310)
Description: The purpose of this project is to widen the road on State Route 299 by creating 12-15 foot lanes, 8 foot paved shoulders and installing metal beam guard railing.
Project Manager: Steve Rogers
Construction is expected to begin in May 2014
   
    TRI-299 OREGON MOUNTAIN ROADWAY REHABILITATION (02-4F930)
Description: To remove and replace asphalt concrete
Project Manager: Lance Brown
Construction is expected to begin in May 2014
   
    TRI-299 OREGON MOUNTAIN PERMANENT RESTORATION (02-4E610)
Description: To improve the stability of the slopes at .3 miles west of Glennison Gap Road and at .9 miles east of Glennison Gap Road. This area has experienced numerous slides and slip-outs due to wildfires, previous mining operations, and poor soil conditions.
Project Manager: Steve Rogers
Construction is expected to begin in April/May 2014
   
    TRI-299 DOUGLAS CITY CAPM PAVEMENT REHABILITATION (02-4E410)
Description: to overlay the pavement on SR 299 and reconstruct guardrails and guardrail end treatments to meet current standards
Project Manager: Steve Rogers
Construction is expected to begin in March 2014
   
    TRI-299 MOON LIM LEE REHABILITATION (02-4G360)
Description: To rehabilitate restroom interior, upgrade electrical lighting, install pre-fab auxillary restrooms and sidewalks
Project Manager: Kristen Kingsley
Construction is expected to begin in September 2014
   
    TRI-299 LITTLE GRASS VALLEY DRAINAGE RESTORATION (02-0E020)
Description: To construct a fish ladder
Project Manager: Mark Miller
Construction is expected to begin in August 2014
   
    TRI-299 WILDWOOD THIN BLANKET, SAMI AND DIGOUTS (02-4G120)
Description: To place an asphalt overlay, chip seal, and isolated digouts
Project Manager: Lance Brown
Construction is expected to begin in 2016