| DAY CLOSURES | TUESDAY 02/07/2012 [29 Closures Found] | ||||
| Rte | Dir | Lanes Closed |
Total Lanes |
Begin - End Location/ Type of Work |
Closure Period |
| 1 | SB | #2 | 2 | CATALINA AVE RT - CROWN VALLEY PARKWAY | 02/07 09:01 |
| Utility Work | 02/07 15:01 | ||||
| 5 | NB | #1, #2, #3 | 3 | NB OFF TO JAMBOREE ROAD - NB OFF TO JAMBOREE ROAD | 02/07 09:01 |
| Concrete Pour | 02/07 15:01 | ||||
| 5 | NB | #1 | 3 | NB OFF TO SAND CYN AVE - NB OFF TO SAND CYN AVE | 02/07 09:01 |
| Roadway Excavation | 02/07 15:01 | ||||
| 5 | NB/SB | #1 | 3 | NB OFF TO EB LA PALMA AV - SB OFF TO BROOKHURST ST | 02/07 09:01 |
| Pavement Work | 02/07 15:01 | ||||
| 5 | NB/SB | #1, #2, #3 | 3 | JAMBOREE ROAD UC 55-656 - JAMBOREE ROAD UC 55-656 | 02/07 09:01 |
| Electrical Work | 02/07 15:01 | ||||
| 5 | SB | #1 | 2 | SEG SB OFF TO MANCHESTER - SEG SB OFF TO MANCHESTER | 02/07 05:01 |
| Bridge Work | 02/07 22:01 | ||||
| 5 | SB | #1, #2, #3 | 3 | SB OFF TO JAMBOREE ROAD - SB OFF TO JAMBOREE ROAD | 02/07 09:01 |
| Concrete Pour | 02/07 15:01 | ||||
| 39 | EB/WB | #2 | 2 | WHITTIER BLV @ HACIENDA - IDAHO ST | 02/07 09:01 |
| Roadway Excavation | 02/07 15:30 | ||||
| 39 | SB | #3 | 3 | LINCOLN AVE - ARTESIA BLVD | 02/07 09:01 |
| Electrical Work | 02/07 15:01 | ||||
| 55 | EB | #3 | 3 | NB OFF TO MACARTHUR BL - NB OFF TO MACARTHUR BL | 02/07 09:01 |
| Traffic Signal Work | 02/07 15:01 | ||||
| 55 | NB | Left Shoulder, Left HOV | 5 | 19TH ST - NB ON EB MACARTUR BLVD | 02/07 09:45 |
| Sweeping Operation | 02/07 12:01 | ||||
| 55 | SB | #3 | 3 | SB ON EB MACARTUR BLVD - SB ON EB MACARTUR BLVD | 02/07 09:01 |
| Traffic Signal Work | 02/07 15:01 | ||||
| 55 | SB | Left Shoulder, Left HOV | 5 | SB ON EB MACARTUR BLVD - 19TH ST | 02/07 09:45 |
| Sweeping Operation | 02/07 12:01 | ||||
| 91 | EB | #1 | 2 | EB CONNECTOR TO SB 241 - EB CONNECTOR TO SB 241 | 02/07 09:01 |
| Guardrail Work | 02/07 15:01 | ||||
| 91 | SB | #1 | 2 | Weir Cyn at rte 91 - Weir Cyn at rte 91 | 02/07 09:01 |
| Bridge Work | 02/07 15:01 | ||||
| 91 | WB | #1 | 2 | WB CONNECTOR TO SB 241 - WB CONNECTOR TO SB 241 | 02/07 09:01 |
| Guardrail Work | 02/07 15:01 | ||||
| 91 | WB | Left Shoulder, Left HOV | 5 | WB ON RAMP FR ST COLLEGE BL - CARMENITA RD POC 55-473 | 02/07 09:30 |
| Sweeping Operation | 02/07 14:01 | ||||
| 133 | NB | #1 | 2 | LAGUNA CANYON FR RD-RT - 73/133 (LAGUNA)UC55-745 | 02/07 09:01 |
| Electrical Work | 02/07 15:01 | ||||
| 241 | NB | #3, Right Shoulder | 3 | JCT RTE 261 UC 55-806G - JCT RTE 91 | 02/07 07:01 |
| Guardrail Work | 02/07 16:01 | ||||
| 241 | NB | #1 | 2 | N241 / W91 CONN OC 55-7690G - N241 / W91 CONN OC 55-7690G | 02/07 07:01 |
| Guardrail Work | 02/07 14:01 | ||||
| 241 | NB | #1 | 2 | NB OFF TO EB RTE 91 - NB OFF TO EB RTE 91 | 02/07 07:01 |
| Guardrail Work | 02/07 14:01 | ||||
| 241 | SB | #2, Right Shoulder | 2 | LAKE FOREST DR UC 55-706 - BEGIN RTE Oso Pkwy | 02/07 07:01 |
| Guardrail Work | 02/07 16:01 | ||||
| 241 | SB | #3, Right Shoulder | 3 | JCT RTE 91 - JCT RTE 261 UC 55-806G | 02/07 09:01 |
| Guardrail Work | 02/07 16:01 | ||||
| 405 | NB | Left HOV | 5 | NB OFF TO BRISTOL ST - BEAR ST OC 55-433 | 02/07 09:01 |
| Drainage Cleaning | 02/07 14:01 | ||||
| 405 | SB | Left HOV | 5 | BEAR ST OC 55-433 - DELHI DRN TRI 13X15 RCB | 02/07 09:01 |
| Drainage Cleaning | 02/07 14:01 | ||||
| NIGHT CLOSURES | TUESDAY 02/07/2012 [48 Closures Found] | ||||
| Rte | Dir | Lanes Closed |
Total Lanes |
Begin - End Location/ Type of Work |
Closure Period |
| 1 | NB | #2 | 2 | SEABLUFF LT / 2ND AVE RT - CATALINA AVE RT | 02/07 23:01 |
| Core Drilling | 02/08 00:01 | ||||
| 1 | NB | #1 | 4 | AVACADO AVE LT - NEWPORT CENTER DR RT | 02/08 00:01 |
| Core Drilling | 02/08 01:01 | ||||
| 1 | NB | #2 | 2 | 0.109 MILES NORTH OF GOLDENWEST ST RT OID - 0.309 MILES NORTH OF GOLDENWEST ST RT OID | 02/08 02:01 |
| Core Drilling | 02/08 03:01 | ||||
| 1 | NB | #3 | 3 | 0.329 MILES NORTH OF IRVINE TERRACE - 0.529 MILES NORTH OF IRVINE TERRACE | 02/08 01:01 |
| Core Drilling | 02/08 02:01 | ||||
| 1 | SB | #2 | 2 | 0.32 MILES OF 10TH AVE RT OID - 0.52 MILES OF 10TH AVE RT OID | 02/07 22:01 |
| Core Drilling | 02/07 23:01 | ||||
| 1 | SB | #2 | 2 | 19TH ST RT - 16TH ST RT | 02/08 03:01 |
| Core Drilling | 02/08 04:01 | ||||
| 5 | NB | #1 | 5 | SB ON HOV FR GENE A. WAY - SB ON HOV FR GENE A. WAY | 02/07 22:01 |
| Electrical Work | 02/08 05:01 | ||||
| 5 | NB | #1, #2 | 5 | NB ON HOV FR GENE A WAY - NB ON HOV FR GENE A WAY | 02/07 22:01 |
| Electrical Work | 02/08 05:01 | ||||
| 5 | NB/SB | #1, Left Shoulder | 5 | NB ON FR LAS RAMBLAS / RTE 1 - AVE PALIZADA UC 55-205 | 02/07 22:01 |
| Survey Work | 02/08 05:01 | ||||
| 5 | SB | #1, #2 | 5 | SB OFF HOV TO GENE A WAY - SB OFF HOV TO GENE A WAY | 02/07 22:01 |
| Bridge Work | 02/08 05:01 | ||||
| 5 | SB | #1 | 5 | KATELLA AVE OC 55-172 - STATE COLL.BL UC 55-592 | 02/07 22:01 |
| Bridge Work | 02/08 05:01 | ||||
| 5 | SB | AUX | 6 | LAKE FOREST OC 55-548 - SB OFF CARLOTA / VALENCIA | 02/07 22:01 |
| Paving Operation | 02/08 05:01 | ||||
| 5 | SB | Left HOV | 5 | KATELLA AVE OC 55-172 - STATE COLL.BL UC 55-592 | 02/07 22:01 |
| Bridge Work | 02/08 05:01 | ||||
| 5 | SB | #3, #4 | 5 | JCT 74 / 5 SEP 55-229 - VALLE RD CONNS | 02/07 22:01 |
| Falsework Installation | 02/08 05:01 | ||||
| 5 | SB | #1, #2 | 2 | SB CAMINO CAPISTRANO ON RAMP - SB CAMINO CAPISTRANO ON RAMP | 02/07 22:01 |
| Falsework Installation | 02/08 05:01 | ||||
| 22 | EB | #1 | 1 | EB OFF GARDEN GR BLVD - EB OFF GARDEN GR BLVD | 02/07 22:01 |
| Falsework Installation | 02/08 05:01 | ||||
| 22 | WB | #1 | 1 | SEG WB ON NB VALLEY VIEW - SEG WB ON NB VALLEY VIEW | 02/07 22:01 |
| Falsework Installation | 02/08 05:01 | ||||
| 22 | WB | #1 | 2 | E JCT 405 22 / 405 SEP - E JCT 405 22 / 405 SEP | 02/07 22:01 |
| Falsework Installation | 02/08 05:01 | ||||
| 22 | WB | #1, #2 | 2 | E JCT 405 22 / 405 SEP - E JCT 405 22 / 405 SEP | 02/08 00:01 |
| Falsework Installation | 02/08 05:01 | ||||
| 22 | WB | #1 | 1 | SEG WB ON SB VALLEY VIEW - SEG WB ON SB VALLEY VIEW | 02/07 22:01 |
| Falsework Installation | 02/08 05:01 | ||||
| 39 | EB/WB | #1, #2 | 2 | WHITTIER BLV @ HACIENDA - IDAHO ST | 02/07 22:01 |
| Roadway Excavation | 02/08 05:01 | ||||
| 39 | NB | #3 | 3 | ORA / LA CO LINE - JCT 90 E UNC 90 W | 02/07 22:01 |
| Sewer Work | 02/08 05:01 | ||||
| 39 | SB | #3 | 3 | JCT 90 E UNC 90 W - ORA / LA CO LINE | 02/07 22:01 |
| Sewer Work | 02/08 05:01 | ||||
| 55 | SB | #1, #2, #3 | 3 | DYER RD UC 55-409 RT LN Grand to NB 55 Off/R - DYER RD UC 55-409 RT LN Grand to NB 55 Off/R | 02/07 23:59 |
| Bridge Work | 02/08 05:01 | ||||
| 57 | EB | #1 | 1 | SB ON FR EB RTE 91 - SB ON FR EB RTE 91 | 02/07 22:30 |
| Bridge Work | 02/08 05:01 | ||||
| 57 | NB | #1, #2 | 2 | NB OFF TO EB RTE 91 - NB OFF TO EB RTE 91 | 02/07 22:30 |
| Bridge Work | 02/08 05:01 | ||||
| 57 | SB | #4 | 4 | TONNER CANYON 55-504 - LA JOLLA ST OC 55-458 | 02/07 23:01 |
| Slab Replacement | 02/08 05:01 | ||||
| 57 | SB | #3, #4 | 4 | TONNER CANYON 55-504 - LA JOLLA ST OC 55-458 | 02/07 23:59 |
| Slab Replacement | 02/08 04:01 | ||||
| 57 | SB | #2, #3, #4 | 4 | TONNER CANYON 55-504 - LA JOLLA ST OC 55-458 | 02/08 01:01 |
| Slab Replacement | 02/08 03:01 | ||||
| 91 | EB | #2, #3, AUX | 3 | STATE COLLEGE BLVD UC - LA PALMA AVE OC 55-418 | 02/07 22:30 |
| Bridge Work | 02/08 05:01 | ||||
| 91 | EB | #2, #3, Right Shoulder | 3 | STATE COLLEGE BLVD UC - LA PALMA AVE OC 55-418 | 02/07 22:30 |
| Bridge Work | 02/08 05:01 | ||||
| 91 | EB | #2, #3, AUX | 3 | STATE COLLEGE BLVD UC - LA PALMA AVE OC 55-418 | 02/07 22:30 |
| Bridge Work | 02/08 05:01 | ||||
| 91 | NB | #1 | 2 | Weir Cyn at rte 91 - Imperial Hwy at rte 91 | 02/07 23:59 |
| Bridge Work | 02/08 04:01 | ||||
| 405 | NB | #1, #2, Left HOV | 5 | SEAL BEACH BL OC 55-365 - JCT RT LN 605 N SEP BR | 02/07 22:01 |
| Paving Operation | 02/08 05:01 | ||||
| 405 | NB | #1, #2 | 2 | SEG CONN TO RTE 22 WB ON - SEG CONN TO RTE 22 WB ON | 02/08 00:01 |
| Striping Operation | 02/08 05:01 | ||||
| 405 | SB | #1, #2, Left HOV | 5 | JCT RT LN 605 N SEP BR - SEAL BEACH BL OC 55-365 | 02/07 22:01 |
| Paving Operation | 02/08 05:01 | ||||
| 405 | SB | #1 | 2 | JCT 22 E, 22/405 SEP - JCT 22 E, 22/405 SEP | 02/07 22:01 |
| Falsework Installation | 02/08 05:01 | ||||
| 405 | SB | #1, #2 | 2 | JCT 22 E, 22/405 SEP - JCT 22 E, 22/405 SEP | 02/08 00:01 |
| Falsework Installation | 02/08 05:01 | ||||
| 605 | SB | #1, #2 | 2 | SB OFF TO SB RTE 405 - SB OFF TO SB RTE 405 | 02/07 23:01 |
| Paving Operation | 02/08 05:01 | ||||
| DAY CLOSURES | WEDNESDAY 02/08/2012 [37 Closures Found] | ||||
| Rte | Dir | Lanes Closed |
Total Lanes |
Begin - End Location/ Type of Work |
Closure Period |
| 1 | SB | #2 | 2 | CATALINA AVE RT - CROWN VALLEY PARKWAY | 02/08 09:01 |
| Utility Work | 02/08 15:01 | ||||
| 5 | NB | #1, #2, #3 | 3 | NB OFF TO JAMBOREE ROAD - NB OFF TO JAMBOREE ROAD | 02/08 09:01 |
| Concrete Pour | 02/08 15:01 | ||||
| 5 | NB | #1 | 3 | NB OFF TO SAND CYN AVE - NB OFF TO SAND CYN AVE | 02/08 09:01 |
| Roadway Excavation | 02/08 15:01 | ||||
| 5 | NB/SB | #1 | 3 | NB OFF TO EB LA PALMA AV - SB OFF TO BROOKHURST ST | 02/08 09:01 |
| Pavement Work | 02/08 15:01 | ||||
| 5 | NB/SB | #1, #2, #3 | 3 | JAMBOREE ROAD UC 55-656 - JAMBOREE ROAD UC 55-656 | 02/08 09:01 |
| Electrical Work | 02/08 15:01 | ||||
| 5 | SB | #1 | 2 | SEG SB OFF TO MANCHESTER - SEG SB OFF TO MANCHESTER | 02/08 05:01 |
| Bridge Work | 02/08 22:01 | ||||
| 5 | SB | #1, #2, #3 | 3 | SB OFF AVERY PKWY - SB OFF AVERY PKWY | 02/08 09:30 |
| Pavement Repair | 02/08 14:01 | ||||
| 5 | SB | #1, #2, #3 | 3 | SB OFF TO JAMBOREE ROAD - SB OFF TO JAMBOREE ROAD | 02/08 09:01 |
| Concrete Pour | 02/08 15:01 | ||||
| 22 | EB | #3 | 3 | EB OFF GARDEN GR BLVD - EB ON FR GARDEN GR BLVD | 02/08 04:01 |
| Core Drilling | 02/08 05:01 | ||||
| 22 | EB | #4 | 4 | 0.195 MILES EAST OF SPRINGDALE ST OC 55-398 - 0.395 MILES EAST OF SPRINGDALE ST OC 55-398 | 02/08 05:01 |
| Core Drilling | 02/08 06:01 | ||||
| 22 | EB | Left HOV | 8 | BOLSA CHICA RD OC 55-332 - SANTA ANA RIVER 55-342 | 02/08 09:01 |
| Sweeping Operation | 02/08 14:01 | ||||
| 22 | WB | Left HOV | 8 | BOLSA CHICA RD OC 55-332 - SANTA ANA RIVER 55-342 | 02/08 09:01 |
| Sweeping Operation | 02/08 14:01 | ||||
| 39 | EB/WB | #2 | 2 | WHITTIER BLV @ HACIENDA - IDAHO ST | 02/08 09:01 |
| Roadway Excavation | 02/08 15:30 | ||||
| 39 | NB | #3 | 3 | LAMBERT RD - GX-DES MOINS RR XING | 02/08 09:01 |
| Electrical Work | 02/08 15:01 | ||||
| 39 | SB | #3 | 3 | LINCOLN AVE - ARTESIA BLVD | 02/08 09:01 |
| Electrical Work | 02/08 15:01 | ||||
| 55 | EB | #3 | 3 | NB OFF TO MACARTHUR BL - NB OFF TO MACARTHUR BL | 02/08 09:01 |
| Traffic Signal Work | 02/08 15:01 | ||||
| 55 | SB | #3 | 3 | SB ON EB MACARTUR BLVD - SB ON EB MACARTUR BLVD | 02/08 09:01 |
| Traffic Signal Work | 02/08 15:01 | ||||
| 74 | EB | #1 | 2 | CAPER REGIONAL PARK LT - LUCAS CYN QUARRY RT PRIV | 02/08 16:01 |
| Core Drilling | 02/08 17:01 | ||||
| 91 | EB | #1 | 2 | EB CONNECTOR TO SB 241 - EB CONNECTOR TO SB 241 | 02/08 09:01 |
| Guardrail Work | 02/08 15:01 | ||||
| 91 | SB | #1 | 2 | Weir Cyn at rte 91 - Weir Cyn at rte 91 | 02/08 09:01 |
| Bridge Work | 02/08 15:01 | ||||
| 91 | WB | #3 | 3 | WB OFF RAMP TO WEIR CANYON RD - WB OFF RAMP TO WEIR CANYON RD | 02/08 09:01 |
| Sign Work | 02/08 17:01 | ||||
| 91 | WB | #1 | 2 | WB CONNECTOR TO SB 241 - WB CONNECTOR TO SB 241 | 02/08 09:01 |
| Guardrail Work | 02/08 15:01 | ||||
| 133 | NB | #1 | 2 | LAGUNA CANYON FR RD-RT - 73/133 (LAGUNA)UC55-745 | 02/08 09:01 |
| Electrical Work | 02/08 15:01 | ||||
| 241 | NB | #3, Right Shoulder | 3 | JCT RTE 261 UC 55-806G - JCT RTE 91 | 02/08 07:01 |
| Guardrail Work | 02/08 16:01 | ||||
| 241 | NB | #1 | 2 | NB OFF TO EB RTE 91 - NB OFF TO EB RTE 91 | 02/08 07:01 |
| Guardrail Work | 02/08 14:01 | ||||
| 241 | NB | #1 | 2 | N241 / W91 CONN OC 55-7690G - N241 / W91 CONN OC 55-7690G | 02/08 07:01 |
| Guardrail Work | 02/08 14:01 | ||||
| 241 | SB | #2, Right Shoulder | 2 | LAKE FOREST DR UC 55-706 - BEGIN RTE Oso Pkwy | 02/08 07:01 |
| Guardrail Work | 02/08 16:01 | ||||
| 241 | SB | #3, Right Shoulder | 3 | JCT RTE 91 - JCT RTE 261 UC 55-806G | 02/08 09:01 |
| Guardrail Work | 02/08 16:01 | ||||
| 405 | SB | #1 | 1 | SB ON FR EB WARNER AV - SB ON FR EB WARNER AV | 02/08 09:15 |
| Landscape Work | 02/08 14:15 | ||||
| NIGHT CLOSURES | WEDNESDAY 02/08/2012 [50 Closures Found] | ||||
| Rte | Dir | Lanes Closed |
Total Lanes |
Begin - End Location/ Type of Work |
Closure Period |
| 5 | NB | #1 | 5 | SB ON HOV FR GENE A. WAY - SB ON HOV FR GENE A. WAY | 02/08 22:01 |
| Electrical Work | 02/09 05:01 | ||||
| 5 | NB | #1, #2 | 5 | NB ON HOV FR GENE A WAY - NB ON HOV FR GENE A WAY | 02/08 22:01 |
| Electrical Work | 02/09 05:01 | ||||
| 5 | NB/SB | #1, Left Shoulder | 5 | NB ON FR LAS RAMBLAS / RTE 1 - AVE PALIZADA UC 55-205 | 02/08 22:01 |
| Survey Work | 02/09 05:01 | ||||
| 5 | SB | #1, #2 | 5 | SB OFF HOV TO GENE A WAY - SB OFF HOV TO GENE A WAY | 02/08 22:01 |
| Bridge Work | 02/09 05:01 | ||||
| 5 | SB | #3, #4 | 5 | JCT 74 / 5 SEP 55-229 - VALLE RD CONNS | 02/08 22:01 |
| Falsework Installation | 02/09 05:01 | ||||
| 5 | SB | Left HOV | 5 | KATELLA AVE OC 55-172 - STATE COLL.BL UC 55-592 | 02/08 22:01 |
| Bridge Work | 02/09 05:01 | ||||
| 5 | SB | #1 | 5 | KATELLA AVE OC 55-172 - STATE COLL.BL UC 55-592 | 02/08 22:01 |
| Bridge Work | 02/09 05:01 | ||||
| 5 | SB | AUX | 6 | LAKE FOREST OC 55-548 - SB OFF CARLOTA / VALENCIA | 02/08 22:01 |
| Paving Operation | 02/09 05:01 | ||||
| 5 | SB | #1, #2 | 2 | SB CAMINO CAPISTRANO ON RAMP - SB CAMINO CAPISTRANO ON RAMP | 02/08 22:01 |
| Falsework Installation | 02/09 05:01 | ||||
| 22 | EB | #1 | 1 | EB OFF GARDEN GR BLVD - EB OFF GARDEN GR BLVD | 02/08 22:01 |
| Falsework Installation | 02/09 05:01 | ||||
| 22 | WB | #1 | 1 | SEG WB ON NB VALLEY VIEW - SEG WB ON NB VALLEY VIEW | 02/08 22:01 |
| Falsework Installation | 02/09 05:01 | ||||
| 22 | WB | #1, #2 | 2 | E JCT 405 22 / 405 SEP - E JCT 405 22 / 405 SEP | 02/09 00:01 |
| Falsework Installation | 02/09 05:01 | ||||
| 22 | WB | #1 | 2 | E JCT 405 22 / 405 SEP - E JCT 405 22 / 405 SEP | 02/08 22:01 |
| Falsework Installation | 02/09 05:01 | ||||
| 22 | WB | #1 | 1 | SEG WB ON SB VALLEY VIEW - SEG WB ON SB VALLEY VIEW | 02/08 22:01 |
| Falsework Installation | 02/09 05:01 | ||||
| 39 | EB/WB | #1, #2 | 2 | WHITTIER BLV @ HACIENDA - IDAHO ST | 02/08 22:01 |
| Roadway Excavation | 02/09 05:01 | ||||
| 39 | NB | #3 | 3 | ORA / LA CO LINE - JCT 90 E UNC 90 W | 02/08 22:01 |
| Sewer Work | 02/09 05:01 | ||||
| 39 | SB | #3 | 3 | JCT 90 E UNC 90 W - ORA / LA CO LINE | 02/08 22:01 |
| Sewer Work | 02/09 05:01 | ||||
| 55 | SB | #1, #2, #3 | 3 | DYER RD UC 55-409 RT LN Grand to NB 55 Off/R - DYER RD UC 55-409 RT LN Grand to NB 55 Off/R | 02/08 23:59 |
| Bridge Work | 02/09 05:01 | ||||
| 57 | EB | #1 | 1 | SB ON FR EB RTE 91 - SB ON FR EB RTE 91 | 02/08 22:30 |
| Bridge Work | 02/09 05:01 | ||||
| 57 | EB/WB | #1, #2 | 2 | NB OFF CHAPMAN AVE - NB OFF CHAPMAN AVE | 02/08 22:01 |
| Falsework Removal | 02/09 05:01 | ||||
| 57 | EB/WB | #1, #2 | 2 | CHAPMAN AVE UC 55-456 - CHAPMAN AVE UC 55-456 | 02/08 23:01 |
| Falsework Removal | 02/09 06:01 | ||||
| 57 | NB | #1, #2 | 2 | NB OFF TO EB RTE 91 - NB OFF TO EB RTE 91 | 02/08 22:30 |
| Bridge Work | 02/09 05:01 | ||||
| 57 | SB | #4 | 4 | TONNER CANYON 55-504 - LA JOLLA ST OC 55-458 | 02/08 23:01 |
| Slab Replacement | 02/09 05:01 | ||||
| 57 | SB | #2, #3, #4 | 4 | TONNER CANYON 55-504 - LA JOLLA ST OC 55-458 | 02/09 01:01 |
| Slab Replacement | 02/09 03:01 | ||||
| 57 | SB | #3, #4 | 4 | TONNER CANYON 55-504 - LA JOLLA ST OC 55-458 | 02/08 23:59 |
| Slab Replacement | 02/09 04:01 | ||||
| 73 | NB | #1 | 4 | SB ON FR ALISO CR RD - NB ON FR ALISO CR RD | 02/08 22:01 |
| Core Drilling | 02/08 23:01 | ||||
| 73 | NB | #1, #2 | 2 | NB ON MACARTHUR BL. - NB ON MACARTHUR BL. | 02/08 23:01 |
| Concrete Pour | 02/09 04:59 | ||||
| 73 | NB | #1 | 4 | 0.616 MILES NORTH OF SB OFF FORD/BONITA CNYN - 0.816 MILES NORTH OF SB OFF FORD/BONITA CNYN | 02/09 02:01 |
| Core Drilling | 02/09 03:01 | ||||
| 73 | NB | #1, #2, #3, #4 | 4 | BISON AVE OC 55-761 - JAMBOREE RD OC 55-531 | 02/09 01:01 |
| Concrete Pour | 02/09 04:59 | ||||
| 73 | NB | #4 | 4 | SB OFF TO SB NEWPRT COAST - 0.2 MILES NORTH OF SB OFF TO SB NEWPORT COAST | 02/09 01:01 |
| Core Drilling | 02/09 02:01 | ||||
| 73 | NB | #3, #4 | 4 | BISON AVE OC 55-761 - JAMBOREE RD OC 55-531 | 02/09 00:01 |
| Concrete Pour | 02/09 04:59 | ||||
| 73 | NB | #3, #4, #5 | 5 | END BR 55-861 L/R - NB OFF TO TOLL PLAZA | 02/09 00:01 |
| Core Drilling | 02/09 01:01 | ||||
| 73 | NB | #1, #2 | 2 | NB ON FR EB JABMOREE RD - NB ON FR EB JABMOREE RD | 02/08 23:01 |
| Concrete Pour | 02/09 04:59 | ||||
| 73 | SB | #1 | 3 | 0.07 MILES SOUTH OF GLENWOOD DR OC 55-757 - 0.27 MILES SOUTH OF GLENWOOD DR OC 55-757 | 02/08 23:01 |
| Core Drilling | 02/09 00:01 | ||||
| 73 | SB | #3 | 3 | BIRCH ST OC 55-636 - SB OFF TO BRISTOL / JAMBOR | 02/09 03:01 |
| Core Drilling | 02/09 04:01 | ||||
| 73 | SB | #1, #2, #3, #4 | 4 | RED HILL AV OC 55-535 - JAMBOREE RD OC 55-531 | 02/09 01:01 |
| Concrete Pour | 02/09 04:59 | ||||
| 91 | EB | #2, #3, Right Shoulder | 3 | STATE COLLEGE BLVD UC - LA PALMA AVE OC 55-418 | 02/08 22:30 |
| Bridge Work | 02/09 05:01 | ||||
| 91 | EB | #2, #3, AUX | 3 | STATE COLLEGE BLVD UC - LA PALMA AVE OC 55-418 | 02/08 22:30 |
| Bridge Work | 02/09 05:01 | ||||
| 91 | SB | #1 | 2 | Weir Cyn at rte 91 - Imperial Hwy at rte 91 | 02/08 23:59 |
| Bridge Work | 02/09 04:01 | ||||
| 405 | NB | #1, #2, Left HOV | 5 | SEAL BEACH BL OC 55-365 - JCT RT LN 605 N SEP BR | 02/08 22:01 |
| Paving Operation | 02/09 05:01 | ||||
| 405 | NB | #1, #2 | 2 | SEG CONN TO RTE 22 WB ON - SEG CONN TO RTE 22 WB ON | 02/09 00:01 |
| Striping Operation | 02/09 05:01 | ||||
| 405 | SB | #1, #2, Left HOV | 5 | JCT RT LN 605 N SEP BR - SEAL BEACH BL OC 55-365 | 02/08 22:01 |
| Paving Operation | 02/09 05:01 | ||||
| 405 | SB | #1 | 2 | JCT 22 E, 22/405 SEP - JCT 22 E, 22/405 SEP | 02/08 22:01 |
| Falsework Installation | 02/09 05:01 | ||||
| 405 | SB | #1, #2 | 2 | JCT 22 E, 22/405 SEP - JCT 22 E, 22/405 SEP | 02/09 00:01 |
| Falsework Installation | 02/09 05:01 | ||||
| 605 | SB | #1, #2 | 2 | SB OFF TO SB RTE 405 - SB OFF TO SB RTE 405 | 02/08 23:01 |
| Paving Operation | 02/09 05:01 | ||||
| DAY CLOSURES | THURSDAY 02/09/2012 [32 Closures Found] | ||||
| Rte | Dir | Lanes Closed |
Total Lanes |
Begin - End Location/ Type of Work |
Closure Period |
| 1 | SB | #2 | 2 | CATALINA AVE RT - CROWN VALLEY PARKWAY | 02/09 09:01 |
| Utility Work | 02/09 15:01 | ||||
| 5 | NB | #1, #2, #3 | 3 | NB OFF TO JAMBOREE ROAD - NB OFF TO JAMBOREE ROAD | 02/09 09:01 |
| Concrete Pour | 02/09 15:01 | ||||
| 5 | NB | #1 | 3 | NB OFF TO SAND CYN AVE - NB OFF TO SAND CYN AVE | 02/09 09:01 |
| Roadway Excavation | 02/09 15:01 | ||||
| 5 | NB/SB | #1 | 3 | NB OFF TO EB LA PALMA AV - SB OFF TO BROOKHURST ST | 02/09 09:01 |
| Pavement Work | 02/09 15:01 | ||||
| 5 | NB/SB | #1, #2, #3 | 3 | JAMBOREE ROAD UC 55-656 - JAMBOREE ROAD UC 55-656 | 02/09 09:01 |
| Electrical Work | 02/09 15:01 | ||||
| 5 | SB | #1 | 2 | SEG SB OFF TO MANCHESTER - SEG SB OFF TO MANCHESTER | 02/09 05:01 |
| Bridge Work | 02/09 22:01 | ||||
| 5 | SB | #1, #2, #3 | 3 | SB OFF TO JAMBOREE ROAD - SB OFF TO JAMBOREE ROAD | 02/09 09:01 |
| Concrete Pour | 02/09 15:01 | ||||
| 39 | EB/WB | #2 | 2 | WHITTIER BLV @ HACIENDA - IDAHO ST | 02/09 09:01 |
| Roadway Excavation | 02/09 15:30 | ||||
| 39 | SB | #3 | 3 | LINCOLN AVE - ARTESIA BLVD | 02/09 09:01 |
| Electrical Work | 02/09 15:01 | ||||
| 55 | EB | #3 | 3 | NB OFF TO MACARTHUR BL - NB OFF TO MACARTHUR BL | 02/09 09:01 |
| Traffic Signal Work | 02/09 15:01 | ||||
| 55 | SB | #3 | 3 | SB ON EB MACARTUR BLVD - SB ON EB MACARTUR BLVD | 02/09 09:01 |
| Traffic Signal Work | 02/09 15:01 | ||||
| 74 | EB/WB | #1 | 2 | CON ROCK SAN JUAN PLANT - VERDUGO WASH | 02/09 09:30 |
| Pavement Repair | 02/09 14:01 | ||||
| 91 | EB | #1 | 2 | EB CONNECTOR TO SB 241 - EB CONNECTOR TO SB 241 | 02/09 09:01 |
| Guardrail Work | 02/09 15:01 | ||||
| 91 | SB | #1 | 2 | Weir Cyn at rte 91 - Weir Cyn at rte 91 | 02/09 09:01 |
| Bridge Work | 02/09 15:01 | ||||
| 91 | WB | #3 | 3 | WB OFF RAMP TO WEIR CANYON RD - WB OFF RAMP TO WEIR CANYON RD | 02/09 09:01 |
| Sign Work | 02/09 17:01 | ||||
| 91 | WB | #1 | 2 | WB CONNECTOR TO SB 241 - WB CONNECTOR TO SB 241 | 02/09 09:01 |
| Guardrail Work | 02/09 15:01 | ||||
| 241 | NB | #3, Right Shoulder | 3 | JCT RTE 261 UC 55-806G - JCT RTE 91 | 02/09 07:01 |
| Guardrail Work | 02/09 16:01 | ||||
| 241 | NB | #1 | 2 | NB OFF TO EB RTE 91 - NB OFF TO EB RTE 91 | 02/09 07:01 |
| Guardrail Work | 02/09 14:01 | ||||
| 241 | NB | #1 | 2 | N241 / W91 CONN OC 55-7690G - N241 / W91 CONN OC 55-7690G | 02/09 07:01 |
| Guardrail Work | 02/09 14:01 | ||||
| 241 | SB | #2, Right Shoulder | 2 | LAKE FOREST DR UC 55-706 - BEGIN RTE Oso Pkwy | 02/09 07:01 |
| Guardrail Work | 02/09 16:01 | ||||
| 241 | SB | #3, Right Shoulder | 3 | JCT RTE 91 - JCT RTE 261 UC 55-806G | 02/09 09:01 |
| Guardrail Work | 02/09 16:01 | ||||
| 405 | SB | #1, #2, #3 | 3 | TALBERT AVE OC 55-260 - NB OFF TO BROOKHURST ST | 02/09 09:01 |
| Fence Work | 02/09 13:01 | ||||
| 605 | NB/SB | Left Shoulder, Left HOV | 4 | BEG UNC 605, JCT 1 - COYOTE CR BR 55-406 | 02/09 09:01 |
| Sweeping Operation | 02/09 14:01 | ||||
| NIGHT CLOSURES | THURSDAY 02/09/2012 [54 Closures Found] | ||||
| Rte | Dir | Lanes Closed |
Total Lanes |
Begin - End Location/ Type of Work |
Closure Period |
| 5 | NB | #1 | 5 | SB ON HOV FR GENE A. WAY - SB ON HOV FR GENE A. WAY | 02/09 22:01 |
| Electrical Work | 02/10 05:01 | ||||
| 5 | NB | #1, #2 | 5 | NB ON HOV FR GENE A WAY - NB ON HOV FR GENE A WAY | 02/09 22:01 |
| Electrical Work | 02/10 05:01 | ||||
| 5 | NB/SB | #1, #2, #3, #4, Left HOV | 5 | SB OFF CROWN VALLEY - SB ON CROWN VALLEY | 02/09 23:59 |
| Falsework Removal | 02/10 04:01 | ||||
| 5 | SB | #1, #2 | 5 | SB OFF HOV TO GENE A WAY - SB OFF HOV TO GENE A WAY | 02/09 22:01 |
| Bridge Work | 02/10 05:01 | ||||
| 5 | SB | #3, #4 | 5 | JCT 74 / 5 SEP 55-229 - VALLE RD CONNS | 02/09 22:01 |
| Falsework Installation | 02/10 05:01 | ||||
| 5 | SB | Left HOV | 5 | KATELLA AVE OC 55-172 - STATE COLL.BL UC 55-592 | 02/09 22:01 |
| Bridge Work | 02/10 05:01 | ||||
| 5 | SB | #1, #2 | 2 | SB CAMINO CAPISTRANO ON RAMP - SB CAMINO CAPISTRANO ON RAMP | 02/09 22:01 |
| Falsework Installation | 02/10 05:01 | ||||
| 5 | SB | AUX | 6 | LAKE FOREST OC 55-548 - SB OFF CARLOTA / VALENCIA | 02/09 22:01 |
| Paving Operation | 02/10 05:01 | ||||
| 5 | SB | #1 | 5 | KATELLA AVE OC 55-172 - STATE COLL.BL UC 55-592 | 02/09 22:01 |
| Bridge Work | 02/10 05:01 | ||||
| 22 | EB | #1 | 1 | EB OFF GARDEN GR BLVD - EB OFF GARDEN GR BLVD | 02/09 22:01 |
| Falsework Installation | 02/10 05:01 | ||||
| 22 | WB | #1 | 1 | SEG WB ON NB VALLEY VIEW - SEG WB ON NB VALLEY VIEW | 02/09 22:01 |
| Falsework Installation | 02/10 05:01 | ||||
| 22 | WB | #1, #2 | 2 | E JCT 405 22 / 405 SEP - E JCT 405 22 / 405 SEP | 02/10 00:01 |
| Falsework Installation | 02/10 05:01 | ||||
| 22 | WB | #1 | 1 | SEG WB ON SB VALLEY VIEW - SEG WB ON SB VALLEY VIEW | 02/09 22:01 |
| Falsework Installation | 02/10 05:01 | ||||
| 22 | WB | #1 | 2 | E JCT 405 22 / 405 SEP - E JCT 405 22 / 405 SEP | 02/09 22:01 |
| Falsework Installation | 02/10 05:01 | ||||
| 39 | EB/WB | #1, #2 | 2 | WHITTIER BLV @ HACIENDA - IDAHO ST | 02/09 22:01 |
| Roadway Excavation | 02/10 05:01 | ||||
| 39 | NB | #3 | 3 | ORA / LA CO LINE - JCT 90 E UNC 90 W | 02/09 22:01 |
| Sewer Work | 02/10 05:01 | ||||
| 39 | SB | #3 | 3 | JCT 90 E UNC 90 W - ORA / LA CO LINE | 02/09 22:01 |
| Sewer Work | 02/10 05:01 | ||||
| 55 | SB | #1, #2, #3 | 3 | DYER RD UC 55-409 RT LN Grand to NB 55 Off/R - DYER RD UC 55-409 RT LN Grand to NB 55 Off/R | 02/09 23:01 |
| Bridge Work | 02/10 05:01 | ||||
| 57 | EB/WB | #1, #2 | 2 | NB OFF CHAPMAN AVE - NB OFF CHAPMAN AVE | 02/09 22:01 |
| Falsework Removal | 02/10 05:01 | ||||
| 57 | EB/WB | #1, #2 | 2 | CHAPMAN AVE UC 55-456 - CHAPMAN AVE UC 55-456 | 02/09 23:01 |
| Falsework Removal | 02/10 06:01 | ||||
| 57 | NB | #3, #4 | 5 | NBOFF TO KATELLA AVE - JCT ST 91 | 02/09 22:01 |
| K-rail Installation | 02/10 06:01 | ||||
| 57 | SB | #4 | 4 | TONNER CANYON 55-504 - LA JOLLA ST OC 55-458 | 02/09 23:01 |
| Slab Replacement | 02/10 05:01 | ||||
| 57 | SB | #3, #4 | 4 | TONNER CANYON 55-504 - LA JOLLA ST OC 55-458 | 02/09 23:59 |
| Slab Replacement | 02/10 04:01 | ||||
| 57 | SB | #2, #3, #4 | 4 | TONNER CANYON 55-504 - LA JOLLA ST OC 55-458 | 02/10 01:01 |
| Slab Replacement | 02/10 03:01 | ||||
| 73 | NB | #3, #4 | 4 | BISON AVE OC 55-761 - JAMBOREE RD OC 55-531 | 02/10 00:01 |
| Concrete Pour | 02/10 04:59 | ||||
| 73 | SB | #1, #2, #3, #4 | 4 | RED HILL AV OC 55-535 - JAMBOREE RD OC 55-531 | 02/10 01:01 |
| Concrete Pour | 02/10 04:59 | ||||
| 91 | SB | #1 | 2 | Weir Cyn at rte 91 - Imperial Hwy at rte 91 | 02/09 23:59 |
| Bridge Work | 02/10 04:01 | ||||
| 91 | WB | #1 | 1 | WB OFF RAMP TO COAL CANYON RD - WB OFF RAMP TO COAL CANYON RD | 02/09 22:01 |
| AC Paving | 02/10 04:01 | ||||
| 91 | WB | #4, #5, Right Shoulder | 5 | WB OFF RAMP TO COAL CANYON RD - WB ON RAMP FR COAL CANYON RD | 02/09 22:01 |
| AC Paving | 02/10 04:01 | ||||
| 91 | WB | #1 | 1 | WB ON RAMP FR COAL CANYON RD - WB ON RAMP FR COAL CANYON RD | 02/09 22:01 |
| AC Paving | 02/10 04:01 | ||||
| 133 | NB | #2 | 2 | 0.58 MILES NORHT OF END PASSING LANE RT - 0.78 MILES NORHT OF END PASSING LANE RT | 02/09 22:01 |
| Core Drilling | 02/09 23:01 | ||||
| 133 | NB | #2 | 2 | SW CONN OC 55-0782G - NB TOLL PLAZA | 02/10 00:01 |
| Core Drilling | 02/10 01:01 | ||||
| 133 | NB | #3 | 3 | 0.254 MILES NORTH OF TRABUCO RD OC 55-0777 - 0.454 MILES NORTH OF TRABUCO RD OC 55-0777 | 02/09 23:01 |
| Core Drilling | 02/10 00:01 | ||||
| 133 | SB | #2 | 2 | SEG NB OFF TO SB RTE 405 - NB OFF TO RTE 405 | 02/10 02:01 |
| Core Drilling | 02/10 03:01 | ||||
| 133 | SB | #2 | 2 | 0.761 MILES SOUTH OF LAGUNA CYN RD - 0.961 MILES SOUTH OF LAGUNA CYN RD | 02/10 03:01 |
| Core Drilling | 02/10 04:01 | ||||
| 241 | SB | #2 | 2 | 0.17 MILES SOUTH OF HAUL ROAD UC 55-0895 - 0.37 MILES SOUTH OF HAUL ROAD UC 55-0895 | 02/10 01:01 |
| Core Drilling | 02/10 02:01 | ||||
| 405 | NB | #1, #2, Left HOV | 5 | SEAL BEACH BL OC 55-365 - JCT RT LN 605 N SEP BR | 02/09 22:01 |
| Paving Operation | 02/10 05:01 | ||||
| 405 | NB | #1, #2 | 2 | SEG CONN TO RTE 22 WB ON - SEG CONN TO RTE 22 WB ON | 02/10 00:01 |
| Striping Operation | 02/10 05:01 | ||||
| 405 | SB | #1, #2, Left HOV | 5 | JCT RT LN 605 N SEP BR - SEAL BEACH BL OC 55-365 | 02/09 22:01 |
| Paving Operation | 02/10 05:01 | ||||
| 405 | SB | #1 | 2 | JCT 22 E, 22/405 SEP - JCT 22 E, 22/405 SEP | 02/09 22:01 |
| Falsework Installation | 02/10 05:01 | ||||
| 405 | SB | #1, #2 | 2 | JCT 22 E, 22/405 SEP - JCT 22 E, 22/405 SEP | 02/10 00:01 |
| Falsework Installation | 02/10 05:01 | ||||
| 605 | SB | #1, #2 | 2 | SB OFF TO SB RTE 405 - SB OFF TO SB RTE 405 | 02/09 23:01 |
| Paving Operation | 02/10 05:01 | ||||
| DAY CLOSURES | FRIDAY 02/10/2012 [26 Closures Found] | ||||
| Rte | Dir | Lanes Closed |
Total Lanes |
Begin - End Location/ Type of Work |
Closure Period |
| 1 | SB | #2 | 2 | CATALINA AVE RT - CROWN VALLEY PARKWAY | 02/10 09:01 |
| Utility Work | 02/10 15:01 | ||||
| 5 | NB | #1, #2, #3 | 3 | NB OFF TO JAMBOREE ROAD - NB OFF TO JAMBOREE ROAD | 02/10 09:01 |
| Concrete Pour | 02/10 15:01 | ||||
| 5 | NB | #1 | 3 | NB OFF TO SAND CYN AVE - NB OFF TO SAND CYN AVE | 02/10 09:01 |
| Roadway Excavation | 02/10 15:01 | ||||
| 5 | NB/SB | #1 | 3 | NB OFF TO EB LA PALMA AV - SB OFF TO BROOKHURST ST | 02/10 09:01 |
| Pavement Work | 02/10 15:01 | ||||
| 5 | NB/SB | #1, #2, #3 | 3 | JAMBOREE ROAD UC 55-656 - JAMBOREE ROAD UC 55-656 | 02/10 09:01 |
| Electrical Work | 02/10 15:01 | ||||
| 5 | SB | #1 | 2 | SEG SB OFF TO MANCHESTER - SEG SB OFF TO MANCHESTER | 02/10 05:01 |
| Bridge Work | 02/10 22:01 | ||||
| 5 | SB | #1, #2, #3 | 3 | SB OFF TO JAMBOREE ROAD - SB OFF TO JAMBOREE ROAD | 02/10 09:01 |
| Concrete Pour | 02/10 15:01 | ||||
| 39 | EB/WB | #2 | 2 | WHITTIER BLV @ HACIENDA - IDAHO ST | 02/10 09:01 |
| Roadway Excavation | 02/10 15:30 | ||||
| 39 | SB | #3 | 3 | LINCOLN AVE - ARTESIA BLVD | 02/10 09:01 |
| Electrical Work | 02/10 15:01 | ||||
| 39 | SB | #2 | 2 | ARTESIA BLVD - ARTESIA BLVD | 02/10 09:01 |
| Survey Work | 02/10 15:01 | ||||
| 55 | EB | #3 | 3 | NB OFF TO MACARTHUR BL - NB OFF TO MACARTHUR BL | 02/10 09:01 |
| Traffic Signal Work | 02/10 15:01 | ||||
| 55 | SB | #3 | 3 | SB ON EB MACARTUR BLVD - SB ON EB MACARTUR BLVD | 02/10 09:01 |
| Traffic Signal Work | 02/10 15:01 | ||||
| 73 | NB | #3 | 3 | C.L. LAGUNA HILLS / ORA CO - PAC PK DR UC 55-751 L/R | 02/10 09:01 |
| Bridge Work | 02/10 14:01 | ||||
| 91 | EB | #1 | 2 | EB CONNECTOR TO SB 241 - EB CONNECTOR TO SB 241 | 02/10 09:01 |
| Guardrail Work | 02/10 15:01 | ||||
| 91 | SB | #1 | 2 | Weir Cyn at rte 91 - Weir Cyn at rte 91 | 02/10 09:01 |
| Bridge Work | 02/10 15:01 | ||||
| 91 | WB | #3 | 3 | WB OFF RAMP TO WEIR CANYON RD - WB OFF RAMP TO WEIR CANYON RD | 02/10 09:01 |
| Sign Work | 02/10 17:01 | ||||
| 91 | WB | #1 | 2 | WB CONNECTOR TO SB 241 - WB CONNECTOR TO SB 241 | 02/10 09:01 |
| Guardrail Work | 02/10 15:01 | ||||
| 241 | NB | #3, Right Shoulder | 3 | JCT RTE 261 UC 55-806G - JCT RTE 91 | 02/10 07:01 |
| Guardrail Work | 02/10 16:01 | ||||
| 241 | NB | #1 | 2 | N241 / W91 CONN OC 55-7690G - N241 / W91 CONN OC 55-7690G | 02/10 07:01 |
| Guardrail Work | 02/10 14:01 | ||||
| 241 | NB | #1 | 2 | NB OFF TO EB RTE 91 - NB OFF TO EB RTE 91 | 02/10 07:01 |
| Guardrail Work | 02/10 14:01 | ||||
| 241 | SB | #2, Right Shoulder | 2 | LAKE FOREST DR UC 55-706 - BEGIN RTE Oso Pkwy | 02/10 07:01 |
| Guardrail Work | 02/10 16:01 | ||||
| 241 | SB | #3, Right Shoulder | 3 | JCT RTE 91 - JCT RTE 261 UC 55-806G | 02/10 09:01 |
| Guardrail Work | 02/10 16:01 | ||||
| NIGHT CLOSURES | FRIDAY 02/10/2012 [36 Closures Found] | ||||
| Rte | Dir | Lanes Closed |
Total Lanes |
Begin - End Location/ Type of Work |
Closure Period |
| 5 | NB | #1, #2, #3, #4, Left HOV | 5 | NB OFF CROWN VALLEY PKW - NB ON FR EB CROWN VAL PK | 02/10 23:59 |
| Falsework Removal | 02/11 04:01 | ||||
| 5 | NB | #1, #2 | 2 | NB ON FR EB CROWN VAL PK - NB ON FR WB CROWN VAL PK | 02/10 23:59 |
| Falsework Removal | 02/11 04:01 | ||||
| 5 | SB | #3, #4 | 5 | JCT 74 / 5 SEP 55-229 - VALLE RD CONNS | 02/10 22:01 |
| Falsework Installation | 02/11 05:01 | ||||
| 5 | SB | #1, #2 | 2 | SB CAMINO CAPISTRANO ON RAMP - SB CAMINO CAPISTRANO ON RAMP | 02/10 22:01 |
| Falsework Installation | 02/11 05:01 | ||||
| 5 | SB | AUX | 6 | LAKE FOREST OC 55-548 - SB OFF CARLOTA / VALENCIA | 02/10 22:01 |
| Paving Operation | 02/11 05:01 | ||||
| 22 | EB | #1 | 1 | EB OFF GARDEN GR BLVD - EB OFF GARDEN GR BLVD | 02/10 22:01 |
| Falsework Installation | 02/11 05:01 | ||||
| 22 | WB | #1 | 1 | SEG WB ON NB VALLEY VIEW - SEG WB ON NB VALLEY VIEW | 02/10 22:01 |
| Falsework Installation | 02/11 05:01 | ||||
| 22 | WB | #1 | 1 | SEG WB ON SB VALLEY VIEW - SEG WB ON SB VALLEY VIEW | 02/10 22:01 |
| Falsework Installation | 02/11 05:01 | ||||
| 22 | WB | #1, #2 | 2 | E JCT 405 22 / 405 SEP - E JCT 405 22 / 405 SEP | 02/11 00:01 |
| Falsework Installation | 02/11 05:01 | ||||
| 22 | WB | #1 | 2 | E JCT 405 22 / 405 SEP - E JCT 405 22 / 405 SEP | 02/10 22:01 |
| Falsework Installation | 02/11 05:01 | ||||
| 39 | EB/WB | #1, #2 | 2 | WHITTIER BLV @ HACIENDA - IDAHO ST | 02/10 22:01 |
| Roadway Excavation | 02/11 05:01 | ||||
| 39 | NB | #3 | 3 | ORA / LA CO LINE - JCT 90 E UNC 90 W | 02/10 22:01 |
| Sewer Work | 02/11 05:01 | ||||
| 39 | SB | #3 | 3 | JCT 90 E UNC 90 W - ORA / LA CO LINE | 02/10 22:01 |
| Sewer Work | 02/11 05:01 | ||||
| 57 | EB/WB | #1, #2 | 2 | NB OFF CHAPMAN AVE - NB OFF CHAPMAN AVE | 02/10 22:01 |
| Falsework Removal | 02/11 05:01 | ||||
| 57 | EB/WB | #1, #2 | 2 | CHAPMAN AVE UC 55-456 - CHAPMAN AVE UC 55-456 | 02/10 23:01 |
| Falsework Removal | 02/11 06:01 | ||||
| 57 | NB | #3, #4 | 5 | NBOFF TO KATELLA AVE - JCT ST 91 | 02/10 22:01 |
| K-rail Installation | 02/11 06:01 | ||||
| 57 | SB | #1, #2 | 2 | SB ON WB LINCOLN AVE - SB ON WB LINCOLN AVE | 02/10 19:01 |
| Paving Operation | 02/11 07:01 | ||||
| 57 | SB | #1, #2 | 2 | SB ON EB LINCOLN AVE - SB ON EB LINCOLN AVE | 02/10 21:01 |
| Paving Operation | 02/11 07:01 | ||||
| 57 | SB | #4 | 4 | SB OFF TO LINCOLN AVE - SOUTH ST OC 55-516 | 02/10 21:01 |
| Paving Operation | 02/11 07:01 | ||||
| 57 | SB | #2, #3, #4 | 4 | TONNER CANYON 55-504 - LA JOLLA ST OC 55-458 | 02/11 01:01 |
| Slab Replacement | 02/11 05:01 | ||||
| 57 | SB | #1, #2 | 2 | SB ON WB LINCOLN AVE - SB ON WB LINCOLN AVE | 02/10 21:01 |
| Paving Operation | 02/11 07:01 | ||||
| 57 | SB | #4 | 4 | TONNER CANYON 55-504 - LA JOLLA ST OC 55-458 | 02/10 23:01 |
| Slab Replacement | 02/11 08:01 | ||||
| 57 | SB | #3, #4 | 4 | TONNER CANYON 55-504 - LA JOLLA ST OC 55-458 | 02/10 23:59 |
| Slab Replacement | 02/11 06:01 | ||||
| 91 | EB | #1, #2 | 4 | EB OFF RAMP TO WEIR CANYON RD - EB OFF RAMP TO WEIR CANYON RD | 02/10 22:59 |
| Grinding and Paving | 02/11 04:01 | ||||
| 91 | SB | #1 | 2 | Weir Cyn at rte 91 - Imperial Hwy at rte 91 | 02/10 23:59 |
| Bridge Work | 02/11 04:01 | ||||
| 405 | NB | #1, #2, Left HOV | 5 | SEAL BEACH BL OC 55-365 - JCT RT LN 605 N SEP BR | 02/10 22:01 |
| Paving Operation | 02/11 05:01 | ||||
| 405 | NB | #1, #2 | 2 | SEG CONN TO RTE 22 WB ON - SEG CONN TO RTE 22 WB ON | 02/11 00:01 |
| Striping Operation | 02/11 05:01 | ||||
| 405 | SB | #1, #2, Left HOV | 5 | JCT RT LN 605 N SEP BR - SEAL BEACH BL OC 55-365 | 02/10 22:01 |
| Paving Operation | 02/11 05:01 | ||||
| 405 | SB | #1, #2 | 2 | JCT 22 E, 22/405 SEP - JCT 22 E, 22/405 SEP | 02/11 00:01 |
| Falsework Installation | 02/11 05:01 | ||||
| 405 | SB | #1 | 2 | JCT 22 E, 22/405 SEP - JCT 22 E, 22/405 SEP | 02/10 22:01 |
| Falsework Installation | 02/11 05:01 | ||||
| 605 | SB | #1, #2 | 2 | SB OFF TO SB RTE 405 - SB OFF TO SB RTE 405 | 02/10 23:01 |
| Paving Operation | 02/11 05:01 | ||||
| DAY CLOSURES | SATURDAY 02/11/2012 [11 Closures Found] | ||||
| Rte | Dir | Lanes Closed |
Total Lanes |
Begin - End Location/ Type of Work |
Closure Period |
| 1 | SB | #2 | 2 | CATALINA AVE RT - CROWN VALLEY PARKWAY | 02/11 09:01 |
| Utility Work | 02/11 15:01 | ||||
| 5 | NB/SB | #1 | 3 | NB OFF TO EB LA PALMA AV - SB OFF TO BROOKHURST ST | 02/11 09:01 |
| Pavement Work | 02/11 15:01 | ||||
| 39 | EB/WB | #2 | 2 | WHITTIER BLV @ HACIENDA - IDAHO ST | 02/11 09:01 |
| Roadway Excavation | 02/11 15:30 | ||||
| 91 | EB | #1, #2 | 2 | EB CONNECTOR TO RTE 57 - EB CONNECTOR TO RTE 57 | 02/11 05:01 |
| Bridge Work | 02/11 12:01 | ||||
| 91 | EB | #1, #2 | 2 | EB CONNECTOR TO RTE 57 - EB CONNECTOR TO RTE 57 | 02/11 05:01 |
| Bridge Work | 02/11 13:01 | ||||
| 91 | WB | #3 | 3 | WB OFF RAMP TO WEIR CANYON RD - WB OFF RAMP TO WEIR CANYON RD | 02/11 09:01 |
| Sign Work | 02/11 17:01 | ||||
| 405 | SB | #1, Left Shoulder, Left HOV | 5 | EDINGER AVE OC 55-266 - MCFADDEN OC BR 55-268 | 02/11 05:01 |
| K-rail Removal | 02/11 11:01 | ||||
| 405 | SB | #1 | 1 | SB OFF TO RTE 133 - SB OFF TO RTE 133 | 02/11 06:01 |
| Electrical Work | 02/11 07:30 | ||||
| NIGHT CLOSURES | SATURDAY 02/11/2012 [17 Closures Found] | ||||
| Rte | Dir | Lanes Closed |
Total Lanes |
Begin - End Location/ Type of Work |
Closure Period |
| 5 | SB | AUX | 6 | LAKE FOREST OC 55-548 - SB OFF CARLOTA / VALENCIA | 02/11 22:01 |
| Paving Operation | 02/12 05:01 | ||||
| 22 | EB | #1 | 1 | EB OFF GARDEN GR BLVD - EB OFF GARDEN GR BLVD | 02/11 22:01 |
| Falsework Installation | 02/12 05:01 | ||||
| 22 | WB | #1 | 1 | SEG WB ON NB VALLEY VIEW - SEG WB ON NB VALLEY VIEW | 02/11 22:01 |
| Falsework Installation | 02/12 05:01 | ||||
| 22 | WB | #1 | 1 | SEG WB ON SB VALLEY VIEW - SEG WB ON SB VALLEY VIEW | 02/11 22:01 |
| Falsework Installation | 02/12 05:01 | ||||
| 22 | WB | #1 | 2 | E JCT 405 22 / 405 SEP - E JCT 405 22 / 405 SEP | 02/11 22:01 |
| Falsework Installation | 02/12 05:01 | ||||
| 39 | EB/WB | #1, #2 | 2 | WHITTIER BLV @ HACIENDA - IDAHO ST | 02/11 22:01 |
| Roadway Excavation | 02/12 05:01 | ||||
| 91 | EB | #1, #2 | 4 | EB OFF RAMP TO WEIR CANYON RD - EB OFF RAMP TO WEIR CANYON RD | 02/11 22:59 |
| Grinding and Paving | 02/12 04:01 | ||||
| 91 | EB | Median, Left Shoulder, Left HOV | 4 | ST 91/55 SEP 55-493R Full Clsr 91 Express lns - END OF COUNTY Full Clsr 91 Express lns | 02/11 23:01 |
| Bridge Inspection | 02/12 06:01 | ||||
| 91 | EB | #1, #2, Left HOV | 4 | ST 91/90 SEP 55-474 - END OF COUNTY | 02/11 23:01 |
| Bridge Work | 02/12 06:01 | ||||
| 405 | NB | #1, #2, Left HOV | 5 | SEAL BEACH BL OC 55-365 - JCT RT LN 605 N SEP BR | 02/11 22:01 |
| Paving Operation | 02/12 05:01 | ||||
| 405 | SB | #1, #2, Left HOV | 5 | JCT RT LN 605 N SEP BR - SEAL BEACH BL OC 55-365 | 02/11 22:01 |
| Paving Operation | 02/12 05:01 | ||||
| 405 | SB | #1 | 2 | JCT 22 E, 22/405 SEP - JCT 22 E, 22/405 SEP | 02/11 22:01 |
| Falsework Installation | 02/12 05:01 | ||||
| 605 | SB | #1, #2 | 2 | SB OFF TO SB RTE 405 - SB OFF TO SB RTE 405 | 02/11 23:01 |
| Paving Operation | 02/12 05:01 | ||||
| DAY CLOSURES | SUNDAY 02/12/2012 [6 Closures Found] | ||||
| Rte | Dir | Lanes Closed |
Total Lanes |
Begin - End Location/ Type of Work |
Closure Period |
| NIGHT CLOSURES | SUNDAY 02/12/2012 [4 Closures Found] | ||||
| Rte | Dir | Lanes Closed |
Total Lanes |
Begin - End Location/ Type of Work |
Closure Period |
| DAY CLOSURES | MONDAY 02/13/2012 [10 Closures Found] | ||||
| Rte | Dir | Lanes Closed |
Total Lanes |
Begin - End Location/ Type of Work |
Closure Period |
| NIGHT CLOSURES | MONDAY 02/13/2012 [22 Closures Found] | ||||
| Rte | Dir | Lanes Closed |
Total Lanes |
Begin - End Location/ Type of Work |
Closure Period |
| Continuous Closures | [ 4 Closures Found] | ||||
| Rte | Dir | Lanes Closed |
Total Lanes |
Begin - End Location/ Type of Work |
Closure Period |
| 405 | NB | #1, #2 | 2 | SEG CONN TO RTE 22 WB ON - SEG CONN TO RTE 22 WB ON | 03/07 05:01 |
| Striping Operation | 04/30 05:01 | ||||
| 405 | NB | #1, #2 | 2 | SEG CONN TO RTE 22 WB ON - SEG CONN TO RTE 22 WB ON | 04/18 23:01 |
| Bridge Construction | 04/18 05:01 | ||||
| 1 | NB | #3 | 3 | SUPERIOR RT / BALBOA LT - PROSPECT ST RT | 10/18 00:01 |
| Sewer Repair | 02/29 23:01 | ||||
| 91 | WB | #3 | 3 | WB OFF RAMP TO WEIR CANYON RD - WB OFF RAMP TO WEIR CANYON RD | 01/23 09:01 |
| Sign Work | 02/29 17:01 | ||||