Install Sign Support System.
Advertise
Date 02/26/01
Bids
Open 04/05/01
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the contract,
are not a part of the contract and are provided for the bidder's convenience
only. In some instances, the question and answer may represent a summary
of the matters discussed rather than a word-for-word recitation. The responses
may be considered along with all other information furnished to prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is not
to be construed in any way as a waiver of the provisions of Section 2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements. Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction Department
has developed this method of answering Bidder's Inquiries to better serve
the needs of the Contractors who bid on our Projects. Only when stated
in the Special Provisions will contracts have posted INQUIRIES AND RESPONSES.
The BIDDER'S INQUIRIES
& RESPONSES will be updated continuously with the last posting no later
than 15:00 on Wednesday prior to the bid opening.
Caltrans District 11 Construction Department
will post all of the questions submitted by any of the contractors that
are registered Planholders for that Contract, but reserves the right to
not answer any questions deemed unsatisfactory for public viewing.
|
03/22/01 |
03/26/01 |
|
|
|
Inquiry |
|
|
Plan Sheet / Specification Reference=
Does the contractor drill holes for new concrete footing?
|
|
|
Plan Sheet / Specification Reference=
How deep is the hole or how much of the footing stays above ground?
|
|
|
Plan Sheet / Specification Reference=
Who welds the existing sign to the new support?
|
|
|
Plan Sheet / Specification Reference=#4,
Sign Post Support System, Sheet S1 & S2 Sheet C2 & C3
We need the difference in the Sign sizes, between G84, G84A, W58, and SPCL. So you can price the post lengths.
|
|
|
Plan Sheet / Specification Reference=Section
10-1.15 page 48
"Sign posts wedges shall be strong
and impervious to weather."
|
|
|
Plan Sheet / Specification Reference=Contract
Working Days
The term of 40 days is too short. It will take 40 days just to manufacture the concrete cylinders. The contract working days should be increased to 90 days to accommodate submittal, inspection, manufacturing, and installation.
|
|
|
Plan Sheet / Specification Reference=
Are the K-1 markers considered part of the State supplied sign panel materials noted on page 25 of the Special Provisions?
|
|
|
Plan Sheet / Specification Reference=Item
3: RESET ROADSIDE SIGN
When I purchase the plastic blocks for the wedge, am I able to use them as supplied by the distributor listed?
|
|
|
Plan Sheet / Specification Reference=ADDENDUM
# 2
The addenda states that sign posts shall be reset in the dirt area. Will this be the location for all sign post support systems?
|
|
|
Plan Sheet / Specification Reference=ADDENDUM
# 2
What is the method of payment for backfill and asphalt patching where existing sign posts are removed?
|
|
|
Plan Sheet / Specification Reference=ADDENDUM
# 2
Is concrete painted with lamp black an acceptable method for patching?
|
|
|
Plan Sheet / Specification Reference=Sheet
C-1 CONSTRUCTION DETAIL
The Plan Details appear to size the
post cavity for 4"x4" wood post.
|
|
|
Plan Sheet / Specification Reference=
Addendum #2, Revised Special Provisions Section 10-1.15 and
Plan Sheet 3. The New 5th Paragraph, Part 1, defines
the vinyl composite block as being "150MM x 675MM block. "The Plan Details
shown on Sheet 3 call for a set of detailed, tapered wedges. Is it
the intent of your
|
|
|
Plan Sheet / Specification Reference=
Reference Revised Plan Sheet 2.
What is the purpose of "ferrule loop inserts?" Please provide detail for welding to rebar hoops?
|
|
|
Plan Sheet / Specification Reference=
Revised Plan Sheets 4, 5, 6 and Special Provisions Section 10-1.14.
Your intent per Sect. 10-1.15 appears to call for a welded steel cavity form. No welding requirements are shown on plans.
|
|
|
Plan Sheet / Specification Reference=
Revised Plan Sheets 4, 5, 6 and Special Provisions Section 10-1.14.
Please confirm that a welded cavity form is required at each of the 221 Sign Support Structures of Bid Item 4.
|
|
|
Plan Sheet / Specification Reference=
Revised Plan Sheets 4, 5, 6 and Special Provisions Section 10-1.14.
Please confirm that all 221 welded steel cavity forms are to be galvanized after fabrication per Section 75-1.02.
|
|
|
Plan Sheet / Specification Reference=
Special Provisions Section 10-1.15, Paragraphs re: gravel bag fabric and
Revised Plan Sheet 2.
Clarify, as plans only call for "gravel fill."
|
|
|
Plan Sheet / Specification Reference=
Special Provisions Section 10-1.15, 1st Paragraph.
At Contractors option, can the sign post support be cast-in-place?
|
|
|
Plan Sheet / Specification Reference=
Special Provisions Section 10-1.01 and Section 4.
The 40 work day project completion appears too short to allow for preparation, submittal, review, approval and implementation of the Lead Compliance Plan required by Section 10-1.01. Request that working days be increased to reasonable time to comply with Section 10-1.01.
|
|
|
Plan Sheet / Specification Reference=
Revised Plan Sheet 2.
No Special Provisions have been provided for definition of reinforcing steel shown on Plan Sheet 2.
|
|
|
Plan Sheet / Specification Reference=
Revised Plan Sheet 2.
Addendum #2 defined unit price compensation to include most of the support system components, but does not define reinforcing steel. Please clarify.
|
|
|
Plan Sheet / Specification Reference=Revised
Section 10-1.15, Addendum #2.
The pricing table of unit prices is unclear if these are for an individual wedge or set of wedges or the "raw" 150MM x 675MM block. Your designated vendor has not yet clarified this. Please clarify.
|