Realign Intersection, Add Two-Way Left Turn Lane, And Widen Shoulders.
Advertise
Date 08/07/00
Bids
Open
09/14/00
The responses to bidder' inquiries, unless incorporated into a formal addenda to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The responses may be considered along with all other information furnished to prospective bidders for the purpose of bidding on the project. The availability or use of information provided in the responses to bidder' inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.
Caltrans District 11 Construction Department has developed this method of answering Bidders Inquiries to better serve the needs of the Contractors who bid on our Projects.
The BIDDER'S INQUIRIES & RESPONSES will be updated continuously with the last posting no later than 15:00 on Wednesday prior to the bid opening.
Caltrans District 11 Construction Department will post all of the questions submitted by any of the registered Planholders for that Contract, but reserves the right not to answer any questions deemed unsatisfactory for public viewing.
|
09/01/00 |
|
|
Inquiry |
|
|
How do we obtain full size plan sheets?
They can be printed directly from the above
listed site or downloaded for printing at any available reprographics company.
|
|
|
Plan Sheet / Specification Reference=
Are cross sections available?
5560 Ruffin Road Suite 5 San Diego, CA 92123 (858) 541-1500 FAX (858) 278-0558 e-mail to MESA@flashnet.com |
|
|
Plan Sheet / Specification Reference=
Please verify the size and the type of pipe of the two water lines on the south side of the road. Also, relocating the fire hydrants appear to be moving to the other side of the water line. This requires wet tapping into the line and providing new valves. Same goes for the air vacs / blow-off. The plans are not clear, please verify.
|
|
|
Plan Sheet / Specification Reference=Bid
Items #47, 48, 49
The plans call out Corrugated Steel Pipe as an allowable Alternate Pipe Culvert but they do not specify a gage or coating. What gage and coating (if required) can be used on this project.
|
|
|
Plan Sheet / Specification Reference=Bid
Item # 54 600mm Bit Coated Slotted CSP
-How tall is the slot on the slotted
corrugated steel pipe ?
|
|
|
Plan Sheet / Specification Reference=Bid
Items #47, 48, 49
I can't find on the plans or in the specs where it tell me what the acceptable alternates are for the APC.
|
|
|
Plan Sheet / Specification Reference=CONTRACT
PLANS
DRAINAGE UNIT 2b, 3b ASK FOR A HEADWALL,
NO FURTHER INFO IS PROVIDED.
|