ESTIMATE $ 54,500,000
WORKING DAYS

1000

ADVERTISE DATE 04/28/2008
BID OPENING 06/19/2008
FINAL POSTING
06/19/08   @   1045

BID RESULTS

The Caltrans District 11 Office is located at 4050 Taylor Street, San Diego, CA 92110. The District 11 Duty Senior telephone number is (619) 688-6635. Please submit all inquiries in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to bidder' inquiries, unless incorporated into a formal addenda to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The responses may be considered along with all other information furnished to prospective bidders for the purpose of bidding on the project. The availability or use of information provided in the responses to bidder' inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.
Caltrans District 11 Construction Department has developed this method of answering Bidder's Inquiries to better serve the needs of the Contractors who bid on our Projects. Caltrans District 11 Construction Department will post all of the questions submitted by any of the contractors that are registered Planholders for that Contract, but reserves the right to not answer any questions deemed unsatisfactory for public viewing.
The BIDDER'S INQUIRIES & RESPONSES will be updated continuously and all attempts will be made to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION AVAILABLE

X-SECTIONS
05/15/08
BID ITEMS
 SPECIALS
PLANS
 PLANHOLDERS
INFORMATION HANDOUT
06/03/08




ADDENDUM


 
 

BIDDER'S INQUIRY SUBMITTAL FORM


Inquiry No.
Inquiry
    1 

   Q:05/02/08
   R:05/15/08

Plan Sheet / Specification Reference= Special Provisions Project Information

Question= When will the electronic cross sections be available for this project?

  • Cross sections are available as of 05/15/08 and can be downloaded for printing from the link above at any local printing firm or on your own printing equipment:

     MESA REPROGRAPHICS 
     5560 Ruffin Road Suite 5 
     San Diego, CA 92123 
     (858) 541-1500    FAX (858) 278-0558 
     e-mail to  plot@mesareprographics.com San Diego, CA 92123


    2 

   Q:05/05/08
   R:05/23/08

Plan Sheet / Specification Reference= Bid Item 74, Plan Sheet 372

Question= Bid Item 74F qty is 962 m3, does it include the 89 m3 for wall 507R1?

  • Item 74F should include 89m3 for RW "507R1" and should be 1051m3.

   Q:05/12/08
  R:06/16/08

Plan Sheet / Specification Reference=Managed Lanes, Segment 2 North Hale Avenue (DAR) Retaining Walls

Question= Please provide additional information for top and bottom of concrete walls 507R & 507L. The information requested here is similar to that provided under Contract 11-2T0924 (Wall 246L), Managed Lanes, Segment 2 South.

  • In addition to Plan sheets 734 thru 772, use Typical Cross Section sheet 5, Profile and Superelevation sheets 28, 35, 41 & 43 to obtain top & bottom elevations of Walls 507R & 507L for bidding purposes.

    During Construction, Survey will be performed to field verify exact elevations.

   Q:05/15/08
   R:06/16/08

Plan Sheet / Specification Reference= Plan Sheet 541, Left Bridge, Abutment 3

Question= Should all the existing bridge joints be replaced? Legend #6 shows one location where replacement of type B joint seal is required at the existing approach slab. The qtys allowed for bid items 149 & 150 appear to be for only the N & R approach slabs. Does the left bridge and right west bridge require 40mm and the right east require 15mm? How is splicing to existing joints paid?

  • The entire bridge joints will be replaced with Joint Seal (MR 40 MM) at abutments 1 & 3.  Please see the quantity revisions per Addendum #2 dated June 12, 2008.

   Q:05/16/08
  R:06/09/08

Plan Sheet / Specification Reference= Item #111 Concrete Pavement (RSC)
Special Provisions Sec 10-1.54 The last sentence on this page states, Attention is directed to "Order of Work" of these special provisions reagarding the sequential order of grinding concrete pavement and replacing concrete pavement.

Question= Is there an "order of work" required for these items, replace concrete (RSC) and Grinding?

  • There is no order of work for this Item. The second paragraph is deleted. Please refer to Addendum No. 1.

   Q:05/19/08
  R:06/16/08

Plan Sheet / Specification Reference= Bid Items 57 > 64; Demolition; Contract Plan sheets 542, 606, 638, 664, 689, 714, 734; Special Provisions Section 10-1.34, Bridge Removal, page 271.

Question= There appears to be some mislabels in the quantity tables: 606: should the first one be location C?; 638: should location be E?; 664: should location be D?; 689: should location be F?; 715: should location be G?; 734: should location be H?

  • The Bridge Removal descriptions of Special Provisions listed in Section 10-1.34, Bridge Removal,  on page 271 have been revised.  Please see Addendum #2 dated June 12, 2008 for revisions.

   Q:05/21/08
  R:05/23/08

Plan Sheet / Specification Reference= BI 137 Minor Concrete (Minor Structure). Concract Plan Sheet # 334.

Question= Found on sheet number 334 (in the summery of quantities) there is an additional 21.84 M3 of concrete for Bid Item 137 Minor Concrete(Minor Structure). The chart gives nothing more than locations, lengths, and volumes. Is there a detail showing what is to be built at these locations?

  • The Minor Concrete Minor Structure quantity on Q-5 (sheet 334) is for Metal Beam Guard Rail Connection to Concrete Barrier on top of Abutment and Retaining Wall and it is associated with the detail shown on C-13 (sheet 60).

   Q:05/22/08
  R:06/09/08

Plan Sheet / Specification Reference= Item #182:  Flap Gate  G-6/DP-19

Question= Drain System #28b denotes a 'Flap Gate" on 900 mm RCP.  Please provide a detail and spec for the flap gate.

  • Please refer to Addendum No. 1 for Automatic Drainage Gate specification. Details and installation will be done per manufacture's recommendation.
     

   Q:05/22/08
  R:06/16/08

Plan Sheet / Specification Reference= 77 - Drilled Hole (750 MM),79 - Drilled Hole (900 MM),80 - Steel Soldier Pile (W310x39),81 - Steel Soldier Pile (W460x235),82 - Steel Soldier Pile (W460x97),133 - Class 3 Concrete (Backfill),177 - Timber Lagging
Plan Sheets 734-772

Question= Please provide the top of wall and finish grade elevations for the Hale Ave. (DAR) Retaining Walls.

  • In addition to Plan sheets 734 thru 772, use Typical Cross Section sheet 5, Profile and Superelevation sheets 28, 35, 41 & 43 to obtain top & bottom elevations of Walls 507R & 507L for bidding purposes.
          During Construction, Survey will be performed to field verify exact elevations.

There were some quantity errors regarding the piling quantities that were corrected in Addendum #2 dated June 12, 2008.
      
10

   Q:05/23/08
  R:06/10/08

Plan Sheet / Specification Reference=Within the Special Provisions page 188 – 7th paragraph “The work shall be performed in conformance with the stages of construction shown on the plans. The contractor may submit a proposal to proceed with work in subsequent stages if the work does not conflict with work in preceding stages. This proposal must include: 1) Revised staging plans 2) Revised schedule, including revised staging showing satisfactory progress is maintained in preceding stages 3) Statement of cost savings. ”

Question=Which of the below interpretations is correct? 1) Will it take written permission from the Engineer to deviate from the depicted staging? 2) a. Requested “proposal” is for information only…any costs or time savings are to be retained by the contractor and be reflected in the bid price. b. A change order/crip will be required for the purpose of revised staging plans. As such the State will seek a credit for the associated savings in time & costs.

  • Approval from the Engineer is required to deviate from the project staging shown on the plans.  A crip is not needed.

11

   Q:05/23/08
  R:06/09/08

Plan Sheet / Specification Reference= Special Provisions page 136... Beginging of work....4th paragraph

You may start work at the job site before the 15th day after contract approval if:

1) You obtain required approval of each submittal before the 55th day
2) The engineer authorizes it in writing

Question=This is confusing which duration governs?....the 15th day or the 55th day....

Can not have both?

  • The 1st working day is the 55th day after contract approval. Please refer to Addendum No.1.

12

   Q:05/27/08
  R:06/19/08

Plan Sheet / Specification Reference= SPECIAL PROVISIONS SECTION 5-1.15 PROJECT INFORMATION

Question=The Information Handout CD does not contain items T. through X. as stated on page 159.
Please provide this information, especially the Temp. Water Pollution Control Exhibit.

  • Please refer to Addendum No. 1.
13

   Q:06/02/08
  R:06/03/08

Plan Sheet / Specification Reference=

Question= Can you make the soils report available on PDF or provide information where one can obtain it?

  • The Information Handout is now posted.
14

   Q:06/04/08
   R:06/16/08

Plan Sheet / Specification Reference= BI 80 - Steel Soldier Pile (W310X39) Plan Sheet 753/772

Question= Based on the elevations available on sheets 735 & 737, the quantity for BI-80 under runs by almost 22%.  Please review the Bottom of pile Elevations shown on Sheet 753/772.  Please revise either the Bottom of Pile elevations or the Bid Item quantity.

  • The pile quantities have been corrected.  Please see the quantity revisions provided in Addendum #2 dated June 12, 2008.
15

   Q:06/04/08
  R:06/11/08

Plan Sheet / Specification Reference= OH electric line and poles shown on contract plan sheet 544.

Question= Note 3: What is kV and height above ground?
Note 6: When and where to be relocated?
Note 7: How often can this line be de-energized?

  • This is existing overhead electric transmission line 69kV (kilovolts) which is located 8.3m (27') over the freeway I-15.
    The line will remain in place. Electrical pole on the west side of the freeway will be relocated before start of construction from SDGE. (see plan sheet # 162)
 
16

   Q:06/06/08
  R:06/09/08

Plan Sheet / Specification Reference= 189, Welded Steel Pipe Casing (Bridge), 606/772

Question= Where is the 70 meters of welded steel pipe casing on the bridge?

  • The welded steel pipe casing is under the approach slabs for the future uility opening.  See Detail U-8 on Standard Plan B7-10.
17

   Q:06/06/08
  R:06/16/08

Plan Sheet / Specification Reference= 10-1.23: Maintaining Traffic, Falsework openings

Question= Will the pedestrian opening qty and size be determined at least 7 days before the bid?

  • The bike path will be closed for pedestrians and bikes during construction and openings on the falsework are not required.

18

   Q:06/09/08
   R:06/18/08

Plan Sheet / Specification Reference= BI 126, Falsework, Plan sheets 185, 222, 225, 227, 229, Spec Prov Sec 10-1.23

Question= Why do the plans and specs show different falsework opening sizes for Hale Ave, Valley Pkwy and West Mission and different sizes and qtys for W Washington Ave?

  • The traffic needs of each street required opening configurations which are unique for each location.  This created the need for different falsework openings.
    
19

   Q:06/10/08
  R:06/10/08
  R:06/11/08

Plan Sheet / Specification Reference= Bid Item 115 Repair spalled joints

Question= Please quantify locations

  • The spalled joints will be marked on the field by RE 
  • The spalled joints will be marked in the field by RE
      
20

   Q:06/10/08
  R:06/10/08

Plan Sheet / Specification Reference= Section 5-1.15, "Project Information" as revised per addendum no.1.

Question= Please post new project information items B - F on the Bidder's Inquiry web site.

  • The added Project Information is now posted.
21

   Q:06/11/08
  R:06/13/08

Plan Sheet / Specification Reference= 221(F)- Concrete Barrier Type 60C Modified

Question= 1-This "Final Pay" Item is ambiguous at best. Request that you review the information shown on plans including Roadway sheets 18,21,57,332 and 734,735 of the Structure plans. When your representative(s) look at the information now shown it may be recognized, that Item 221(F), Special Provision Section 10-1.106 and the notes and quantities on the referenced plans are incomplete, contradictory and ambiguous. Will this be corrected before bid date by an addendum to all plan holders or will this portion of the "Complete" Phase I design sequencing information be eliminated and replaced with a real complete design,and alternate compensation, by contract change order?

  • "Concrete Barrier Type 60C Modified" should read "Concrete Barrier Type 60 Mod1" on all applicable plan sheets.
    Post award and approval of the contract a CCO will be issued to change contract item 221 from "Concrete Barrier Type 60C Modified" to "Concrete Barrier Type 60 Mod1"

          
22

   Q:06/12/08
  R:06/12/08

Plan Sheet / Specification Reference= 220- Concrete Barrier Type 60C

Question= 1-This  Item is ambiguous at best. Request that you review the information shown on plans including Roadway sheets 3,5,14,15,18,19 and 332 and "Design Study Only" x-sections available on line. When your representative(s) look at the information now shown, it may be recognized, that Item 220, Special Provision Section 10-1.106 and the notes and quantities on the referenced plans are incomplete, contradictory and ambiguous. Will this be corrected before bid date by an addendum to all plan holders or will this portion of the "Complete" Phase I design sequencing information be eliminated and replaced with a real, complete design, and alternate compensation, by contract change order?

  • For typical sections (sheets 3, and 5) please refer to the legend on sheet 2.

23

   Q:06/12/08
   R:06/13/08

Plan Sheet / Specification Reference= 10-1.60 , P. 368, Difficult drilling anticipated due to the presence of surface materials..., highly to moderately decomposed granitic rock.

Question= Please inform if there are any rock cores available for viewing and what arrangements are needed if any for viewing the cores.

  • Please refer to sections 5-1.15 PROJECT INFORMATION, Page 159 and 10-1.59 PLING, on page 354 of the Special Provisions.
24

   Q:06/13/08
   R:06/16/08

Plan Sheet / Specification Reference= Item #116 Grind Existing PCCP.

Question= This area was ground full width back 2000. Is it the intent to regind this area or to just grind the 3 foot wide edge grind that the new pccp is to match?

  • Grinding needs to be done on the full width of PCC pavement within the limits of the project.

25

   Q:06/16/08
  R:06/19/08

Plan Sheet / Specification Reference= Plan Sheet No. 744-747 of 772. Special Provisions 10-1.60 , P. 369, Difficult drilling anticipated due to the presence of surface materials..., highly to moderately decomposed granitic rock.

Question= Please confirm if tieback anchorage caps are required for this job. If required, it should be noted that there may not be enough clearance for 300 mm structural concrete facing to completely encapsulate or cover the anchorage caps.

  • There are no tieback anchor caps required for the tiebacks.  There is adequate concrete coverage over a standard anchorhead wedge plate for the anchor size we expect the contractor to use.

26

   Q:06/16/08
  R:06/17/08
  R:06/18/08

Plan Sheet / Specification Reference= 126, abutment concrete, 716

Question= Should the abut bof elevations be 201.9 & 202.6?

  • The bottom of new footing elevations are shown correctly as elevation 201.900 at abutment 1 and 202.600 at abutment 4.  The CIDH piles should be 75 mm above the bottom of footing as shown on sheet 717.  The bottom of the existing abutment footings are elevation 203.25 plus or minus at abutment 1 and elevation  203.93 plus or minus at abutment 2. abutment 4.

27

   Q:06/16/08
  R:06/17/08

Plan Sheet / Specification Reference= Question #24

Question= If this area is to be re-ground, will the State require the joints in this area to be re-sealed?

  • Please bid per the current contract documents.
28

   Q:06/16/08
  R:06/17/08

Plan Sheet / Specification Reference= Bid Item 224  - TYPE 736A MODIFIED BARRIER sht 332 & 372

Question= It appears that the barrier rail quantities for the retaining walls (sht 372) have been counted twice - see sht 732.
Please advise

  • Please bid per the current contract documents.
29

   Q:06/16/08
  R:06/18/08

Plan Sheet / Specification Reference= Plan Sheet No. 746-747 of 772. Special Provisions 10-1.59 , P. 367, Difficult drilling anticipated due to the presence of surface materials..., highly to moderately decomposed granitic rock. 

Question= Section LL thorough OO shows double beams welded/strapped together with 25 mm plates @ 600 mm on center. Please clarify vertical extent of the 25 mm metal strapping welde to the beams. Cut height only? Entire beam length?

  • The straps shown in the details mentioned are required only above and below each tieback anchor.  They are not necessary for the entire length of the soldier pile.  The Contractor is responsible for ensuring that the piles are correctly spaced and aligned in the drilled hole prior to encasing the piles with concrete.

30

   Q:06/16/08
  R:06/17/08

Plan Sheet / Specification Reference= 27(S)Portable Changeable Message Sign # 11-2T0824

Question= How do I get access to the spec's for item above?

  • Please see Section 10-1.28, "Portable Changeable Message Sign" from Notice to Contractors and Special Provisions.

31

   Q:06/16/08
  R:06/18/08

Plan Sheet / Specification Reference= Bid Item #120 (S)...2.4M CIDH Piling. Bent Details No.1, sheet 697 of 772.

Question= This is a typical Type 2 Column Design.  Therefore, otptions to construction.

1. Is an optional C.J. possible at bottom of column cage elevation?

2. Is permanent casing allowed for use of optional C.J.?

3. Which type of casing CMP of smooth wall casings be accaptable?

  • Please bid per the current plans specifications and details.
The use of an optional construction joint may require further analysis and design changes.  There is currently not enough time to investigate and provide these design changes to the project prior to bid opening.
 
32

   Q:06/17/08
  R:06/18/08

Plan Sheet / Specification Reference=

Question= THE CONCRETE BLOCK SLOPE PAVERS CALL OUT FOR A FIVE SCORE, COLOR TO MATCH REFEREE SAMPLE. I UNDERSTAND THAT THERE IS NO REFEREE SAMPLE.

WILL THESE SLOPE PAVERS NEED TO BE COLORED OR ARE THEY NATURAL GREY??

  • The Slope paving concrete pavers shall be tan in color and shall match the referee sample available at the District 11 Office of Landscape Architecture, California Department of Transportation, 4050 Taylor Street, San Diego, California.
       
33

   Q:06/17/08
  R:06/18/08

Plan Sheet / Specification Reference= B.I. #120, 2.4M CIDH Concrete Piling.  Bent 2. Permanent steel casing.

Question= 1. Can permanent steel pipe at Bent 2, for RR shoring, be oversized (108" or 102")?

2. If CMP is utilized, can it be installed in an oversized drilled hole (typically 2'-0" larger in diameter) if annulus is backfilled with 2-sack sand slurry by tremie placement method?

3. If smooth wall pipe is utilized, can it be vibrated in?

4. Can permanent pipe, @ Bent 2, be installed to a deeper elevation than 189.00 shown on contract plans, at contractors option?

Please bid per the current plans and details.  

1.  The increase in casing size will have to be evaluated by the Design and Geotechnical Engineers for structural capacity.  There is not currently enough time prior to bid opening to analyze this proposed modification.  

2.  Corrugated Metal Pipe is not currently an option for pile casings.

3.  Vibration of permanent steel casing is allowed at the locations listed in the table following the sixth paragraph of section 10-1.59 Piling of the special provisions.

4.  Optional construction joints are not currently allowed on this project.  The contractor may propose the use of an optional construction joint, but it will have to be analyzed by the Design and Geotechnical Project Engineers.

34

   Q:06/18/08
  R:06/19/08

Plan Sheet / Specification Reference= Bid Items 67, 83

Question=

  • Please bid per the current contract documents.
35

   Q:06/XX/08
   R:06/XX/08

Plan Sheet / Specification Reference=

Question=


OTHER LINKS OF INTEREST

DISTRICT 11 CONSTRUCTION BIDDER'S INQUIRIES & RESPONSES
DISTRICT 11 HOMEPAGE
CALTRANS OFFICE ENGINEER: Contract Advertisement, Special Provisions, Plan Holders, Contract Awards, etc.
DEPARTMENT OF TRANSPORTATION