| CONTRACT NO: | 11-2T0004 |
| ROUTE / KP | 11-SD-52,67-27.4/28.5, R1.8/R4.3 |
| LOCATION | In San Diego County In And Near Santee On Route 52 From 0.7 Km West Of Magnolia Avenue Undercrossing To Route 52/67 Separation And On Route 67 From Bradley Avenue Overcrossing To Woodside Avenue Undercrossing. |
| DESCRIPTION | Construct A 4 Lane Freeway And Interchange. |
| ESTIMATE | $ 97,000,000 |
| WORKING DAYS | 615 |
| ADVERTISE DATE | 01/28/2008 |
| BID OPENING | 03/20/2008 |
| FINAL POSTING | 03/19/2008
@ 15:30 |
The Caltrans District
11
Office is located at 4050 Taylor Street, San Diego, CA 92110. The
District 11
Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the
contract,
are not a part of the contract and are provided for the bidder's
convenience
only. In some instances, the question and answer may represent a
summary
of the matters discussed rather than a word-for-word recitation. The
responses
may be considered along with all other information furnished to
prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is
not
to be construed in any way as a waiver of the provisions of Section
2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements.
Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction
Department
has developed this method of answering Bidder's Inquiries to better
serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that
Contract,
but reserves the right to not answer any questions deemed
unsatisfactory
for public viewing.
The BIDDER'S
INQUIRIES
& RESPONSES will be updated continuously and all attempts will be
made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
| X-SECTIONS |
|
|
|
|
| Information
Handout 2/05/08 |
Information
Handout 2 2/14/08 |
| ADDENDUM
#2 Posted 03/14/08 |
BIDDER'S INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
1
Q:01/30/08 |
Plan Sheet / Specification
Reference= Special Provisions section 5-1.17 Project Information
Question = Please post in
electronic copy the information available at the Distric Office, items
A through CC including the cross sections.
|
|
2
Q:02/01/08 R:03/17/08 |
Plan Sheet / Specification
Reference= Dwg. Ref.: 5-D, Special Provisions Section 10-1.38 “Soil
Nail Assembly” under the heading “Testing” (Page 275)
Question = Special Provisions Section 10-1.38 “Soil Nail Assembly” under the heading “Testing” (Page 275) provides an equation to determine the test load of the test soil nail assemblies. The Value Qd (in kN/linear meter) cannot be found in the plans. Please advise.
|
|
3
Q:02/28/08 R:03/10/08 |
Plan Sheet / Specification
Reference= Plan Sheet 301 - Summary of Quantities, Earthwork Summary
Question = In the Earthwork
Summary table on plan sheet 301, the last item is Miscellaneous Infield
Areas with 8,406 m3 embankment and 26,714 m3 excavation. The "Miscellaneous
Infield Areas" are the following:
|
|
4
Q:03/03/08 R:03/11/08 |
Plan Sheet / Specification
Reference= Column Details. Sheets 424, 468, 514, & 559.
Question = In the above
details, the use of a optional construction joint is shown. If
this construction is utilized, the possibilty of lowering personal into
the drilled shaft exist.
|
|
5
Q:03/03/08 R:03/17/08 |
Plan Sheet / Specification
Reference= Diesel Contaminated Areas, Plan Sheet 54 of 688
Question = What is the depth and quantity of the diesel contaminated material shown on plan sheet 54 of 688?
|
|
6
Q:03/04/08 R:03/10/08 |
Plan Sheet / Specification
Reference= Bid Item 60(S) Imported Topsoil
Question = In the Summary of
Quantities, the Earthwork Summary Chart on sheet 301 lists Imported
Topsoil on the ES and NW. I cannot find a plan sheet showing the
location and depth of this topsoil. What are the limits and depth of
the topsoil?
|
|
7
Q:03/04/08 R:03/13/08 |
Plan Sheet / Specification
Reference= Specials 10-1.36 Earth Retaining Structures, page 266,
second paragraph
Question = The second
paragraph on page 266 of the Specials instructs the Contractor to place
permeable material within the limits shown on the plans. On plan sheet
592, the limits of backfill do not indictate any permeable backfill.
|
|
8
Q:03/07/08 R:03/13/08 |
Plan Sheet / Specification Reference= Column Details - Bent 8, Sheet No. 514 Question = Section B-B shows CIDH Pile cage for Bent 8 of the N67-W52 Brdige, and calls for (57) vertical bars. (19) are bundled and (19) are not. My calculations show that in this section, which is for 49'-3" of the upper portion of this pile, your clear spacing between verts. is 2 1/2"!!..This does not meet your 5" X 5" window spacing design for rebar cages, per your 1992 MEMO. Please address. This will lead to restricted concrete flow and result in anomaly readings in the Gamma-Gamma test.
|
|
9
Q:03/07/08 R:03/13/08 |
Plan Sheet / Specification Reference= ALL column/pile connections. Sheets 424, 468, 514, 559, & 561. Question =Optional Constrcution Joints are shown in all your CIDH piles. Typically @ 24'-8" from cut-off. In serveral of your foundation report Memorandums, you state that if this C.J. is utilized, permanent steel casing shall be furnished and installed to a mimimum of 1'-0" below this joint. Due to ground water and possible cavey 'rock' conditons, it may be necessary to install this steel casing to a much deeper depth. What is the maximum depth the designer will allow this casing to be placed?
|
|
10 R:03/14/08 |
Plan Sheet / Specification Reference= Special Provisions Section 4, Page 136 Question = 1) States: "The Contractor may begin work at the job site before the fifty-fifth day after contract approval if …". What is the significance of 55 days?
|
|
11 |
Plan Sheet / Specification Reference= 139(S) Sanitary Sewer System Question =Please provide a specification for the Sanitary Sewer
system.
|
|
12
Q:03/12/08 R:03/17/08 |
Plan Sheet / Specification
Reference=Item 55, 56 and 57- MSE Walls Question = Special provisions section 10-1.34 requires a settlement period for these MSE structures. Will the contractor be required to place a settlement fill for the entire zone of the straps and then remove the material, or does the settlement period only relate to the construction of the concrete cap on top. There is no quantity for structure excavation for item 55 (Location A) and the QTY for items 56 and 57 does not appear to account for overbuilding the embankment and then removing the fill prior to constructing the wall.
|
|
13
Q:03/13/08 R:03/17/08 |
Plan Sheet / Specification
Reference=Item #146: Minor Concrete (Textured Paving) plan
sheet detail C-7, Special Provisions section 10-1.78 (page 359) Question = The specification denotes that the contract price paid for the Textured Paving is to include aggregate base. The detail shown on sheet C-7 denotes that the Textured Paving is on compacted subgrade. Please clarify.
|
|
14
Q:03/13/08 R:03/13/08 |
Plan Sheet / Specification Reference= CIDH Pile Rock Sockets Question = The pile data table identifies the elevation of top of estimated hard rock. Please confirm that the rock socket bid item unit price will be paid from the top of hard rock actually encountered. Also, please clarify who is responsible for determining the actual elevation at which hard rock is encountered in the field.
|
|
15
Q:03/13/08 R:03/17/08 |
Plan Sheet / Specification
Reference=Speical Provisions Section 10-1.34 Question = Is a settlement embankment required for the retaining walls adjacent to the bridges, and if required will the removal be paid as roadway excavation as surplus material?
|
|
16
Q:03/13/08 R:03/17/08 |
Plan Sheet / Specification
Reference= Item #76 Concrete Pavement and Sec.10-1.50
Jointed Plain Concrete Pavement. Question
= There is a pay item #76 for concrete pavement and no items for seal
pavement. The Measurement and Payment section states that sealing
joints will be paid by the meter.
|
|
17
Q:03/14/08 R:03/14/08 |
Plan Sheet / Specification
Reference= Layout Drawing L-3 Sheet 12 and Layout Drawing
L-4 Sheet 13 Question
= On Layout drawing L-3 NB Rt 67 at merge with NW Line (Sta. 290+92.392
to Sta. 291+92.392)and drawing L-3 & L-4 SB Rt 67 at merge with ES
Line (Sta. 89+29.316 to Sta. 90+80.873), the drawings indicate new
structural section "H", base and paving outside of K-Rail protection.
The removal and replacement of this structural section cannot be done
in one shift. Is it the intent to preform this work with mutiple lane
closures or will K-Rail be placed to protect the excavation?
|
|
18
Q:03/14/08 R:03/17/08 |
Plan Sheet / Specification
Reference= Drainage Details page 1 Question
= The dimensions on the Type F Inlet is said to be shown on the Plans.
Though at both locations, 5-V and 12-DD on the Drainage Plan, there is
nothing. Is there a different location that this information can be
found?
|
|
19
Q:03/17/08 R:03/17/08 R:03/18/08 |
Plan Sheet / Specification
Reference= Unconfined compression test (ASTM D2938) Question
= Information obtained during viewing of cores, up in Sacramento, in
your Trans Lab,shows a break test that was performed on 1/3/2006, from
the above boring breaking @ 6716.6 TSF (93,277PSI)!!
|
|
20
Q:03/17/08 R:03/17/08 |
Plan Sheet / Specification Reference= Reference Plan Sheet U-5 and U-7 Question = The El Monte Water Line runs through the job-site and under all four proposed bridge structures. Are there load requirements and/or protection requirements for falsework or equipment required to construct these structures within the water-line easement?
|
|
21
Q:03/17/08 R:03/17/08 |
Plan Sheet / Specification Reference= Addendum # 2 Question = Page 1 cover sheet of addendum 2 Sheets 5,15,98,110 120,149,154,156,167 and 168, are revised in addendum 2. The actual plan sheets included are sheets 3,15,98.110,120,149,154,156,167,and 168, Is this a typo on the cover sheet or is sheet 5 of the plans missing.
|
|
22
Q:03/18/08 03/19/08 R:03/19/08 |
Plan Sheet / Specification Reference= Bid Item #80 - Estimated 'Rock Socket' quantity; Question
= On Bridge sturcture #1121 (E52-N67 Connector) The pile data table on
sheet 450 of 688 identified a minimum of 6.1M of bedrock penetration
for Bent 6. If CIDH pile is installed to specified tip elevation
(108.4)and continous "Hard to Very Hard" rock is encountered @
Elevation 117.0M, will this portion of the CIDH Piles be paid for under
Bid Item #80 for Rock-Socket?
|
|
23
Q:03/19/08 R:03/19/08 |
Plan Sheet / Specification Reference= Pre Bid Inquiry, Contract 11-2T0004, Bid Date 3/20/08 Question
= 1-Ref Contract Item
169, Type 60 C Concrete Barrier- Per Standard Plan A76A the maximum
offset in pavement differential is to be 910mm. In reviewing the "
Design Study Only" cross sections, and current plan details there are
areas of intended Type 60 C Concrete Barrier that exceed the maximum
offset. Also, there appears to be requirements for transition details
that tie the Type 60 C Concrete Barrier to other barrier types (Typ
60D, Typ 736A and Typ 736 Mod) which are not yet detailed. Plan sheet
44 appears to define payment limits, but is not a clear representation
of the work. Plese confirm that a contract CCO will be issued, after
award, that provides for the details and changed character for apparent
"Modified Typ 60C" barrier on this project.
|