BIDDER'S INQUIRIES & RESPONSES
DISTRICT 11 CONSTRUCTION

 
CONTRACT NO: 11-271204
ROUTE / KP 11-SD-5,94,125,805-VAR
LOCATION In In San Diego County Near Pala At Pala Creek Bridge.
DESCRIPTION Upgrade Median Barrier.
ESTIMATE $ 1,580,000
ADVERTISE DATE 01/16/2007
BID OPENING 02/15/2007
03/01/2007
FINAL POSTING 02/28/07   @   17:50

BID RESULTS

1
PETERSON-CHASE GENERAL ENG. CONST. $1,298,605.00
2
HAZARD CONSTRUCTION CO. $1,399,838.00
3
DALEY CORP. $1,402,371.00
4
SIM J. HARRIS INC.
$1,464,897.00

The Caltrans District 11 Office is located at 2829 Juan Street, San Diego, CA 92110. The mailing address is P.O. Box 85406, San Diego, CA 92186-5406. The District 11 Duty Senior telephone number is (619) 688-6635. Please submit all inquiries in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to bidder' inquiries, unless incorporated into a formal addenda to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The responses may be considered along with all other information furnished to prospective bidders for the purpose of bidding on the project. The availability or use of information provided in the responses to bidder' inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.
Caltrans District 11 Construction Department has developed this method of answering Bidder's Inquiries to better serve the needs of the Contractors who bid on our Projects. Caltrans District 11 Construction Department will post all of the questions submitted by any of the contractors that are registered Planholders for that Contract, but reserves the right to not answer any questions deemed unsatisfactory for public viewing.
The BIDDER'S INQUIRIES & RESPONSES will be updated continuously and all attempts will be made to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION AVAILABLE
 
CROSS SECTIONS
BID ITEMS
 SPECIALS
PLANS
 PLANHOLDERS
 




ADDENDUM


 
 
 
 

BIDDER'S INQUIRY SUBMITTAL FORM


Inquiry No.
Inquiry
    1 

   Q:02/08/07
   R:02/09/07
   R:02/12/07
  R:02/21/07

Plan Sheet / Specification Reference=1.Specials, page 12, section
7-1.12B(4)(b)Insurance

Question= 1. Is there an addendum pending changing the insurance requirements
for subs?

  • An addendum addressing the certified Small Business subcontractors Liability Insurance limits is pending. Should the addendum not be issued prior to the bid opening, It will be addressed in accordance with Section 4-1.03 "CHANGES" of the Standard Specifications, post award and approval of the above-mentioned contract.

2. The referenced section states that there is Type Z-2 material on Route
125, the quantity sheets list Type Z-2 material on Route 5 and Route 94
only.  If there is Type Z-2 material on Route 125, how much is anticipated
to be there?

  • Please bid per the current contract documents.

3. The typical sections on Sheet X-2 do not adequately represent the work to
be done at location 2, are there more detailed cross-sections available for
that location?

  • Cross sections are available as of 02/21/07 and can be downloaded for printing from the link above at any local printing firm or on your own printing equipment: 
     MESA BLUEPRINT 
     5560 Ruffin Road Suite 5 
     San Diego, CA 92123 
     (858) 541-1500    FAX (858) 278-0558 
     e-mail to  plot@mesablueprint.com San Diego, CA 92123

 




   
      2    
 Q:02/09/07
R:02/21/07
Plan Sheet / Specification Reference=Plan sheets 24,27,28, traffic handling
plans: The planned location of the temporary K-rail very effectively
prevents access to the work behind the K-rail closure.  The offset from the
ETW allows less than 6' of horizontal clearance between the inside of the
K-rail and the existing bridge rail.  There are no construction vehicles
suitable for the planned work that can fit between these two obstacles.

Question=What divergence from the planned layout is permissible in order to
gain access to the work area?
  • None.
OTHER LINKS OF INTEREST