Construct Median Barrier.
Advertise
Date 12/11/00
Bids
Open 01/11/01
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the contract,
are not a part of the contract and are provided for the bidder's convenience
only. In some instances, the question and answer may represent a summary
of the matters discussed rather than a word-for-word recitation. The responses
may be considered along with all other information furnished to prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is not
to be construed in any way as a waiver of the provisions of Section 2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements. Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction Department
has developed this method of answering Bidder's Inquiries to better serve
the needs of the Contractors who bid on our Projects. Only when stated
in the Special Provisions will contracts have posted INQUIRIES AND RESPONSES.
The BIDDER'S INQUIRIES
& RESPONSES will be updated continuously with the last posting no later
than 15:00 on Wednesday prior to the bid opening.
Caltrans District 11 Construction Department
will post all of the questions submitted by any of the contractors that
are registered Planholders for that Contract, but reserves the right to
not answer any questions deemed unsatisfactory for public viewing.
|
12/28/00 |
|
|
|
|
Inquiry |
|
|
Plan Sheet / Specification Reference=Item
20: SOIL STABILIZATION, Special Provisions: Section 10-1.24 SOIL STABILIZATION
(100 MM DEPTH).
Per the typical cross sections there is soil stabilization shown under the DTBB and TBB, how can the soil stabilization be completed under the the rail?
|
|
|
Plan Sheet / Specification Reference=Sheet
C-1, Detail showing location 2 "TBB AROUND DI".
The detail on Plan Sheet C-1 shows the
requirement for (2) Type SRT Terminal Anchor Assemblies. The Bid Quantity
references (1) total. Please clarify.
|
|
|
Plan Sheet / Specification Reference=Special
Provisions 10-1.34 CONCRETE BARRIER (TYPE K).
Will "Steam Cure" be an allowable process
during the manufacture of the concrete barrier?
|
|
|
Plan Sheet / Specification Reference=Special
Provisions 10-1.34 CONCRETE BARRIER (TYPE K).
Please clarify the requirement of the
1 x 1 meter test panel:
|
|
|
Plan Sheet / Specification Reference=Special
Provisions 5-1.13 PAYMENTS.
Can a partial payment for the CONCRETE BARRIER (TYPE K) be made upon the completion of manufacture?
|
|
|
Plan Sheet / Specification Reference=Special
Provisions 10-1.05 TEMPORARY CONSTRUCTION ENTRANCE
What are the requirements for the steel wash rack?
|
|
|
|