| CONTRACT NO: | 11-2T0204 |
| ROUTE / KP | 11-SD-52-13.8/16.4 |
| LOCATION | In San Diego County In San Diego From 0.2 Km West Of Santo Road Overcrossing To 2.4 Km West Of Oak Canyon Bridge.. |
| DESCRIPTION | Widen Existing Roadway With Pcc Pavement. |
| ESTIMATE | $ 4,230,000 |
| ADVERTISE DATE | 08/14/2006 |
| BID OPENING | 09/14/2006 |
| FINAL POSTING | 09/13/06 @ 15:15 |
| 1 |
Hazard Construction Co. | $3,074,324.00 |
| 2 |
Erreca's Inc. | $3,229,801.00 |
| 3 |
Sim J. Harris Inc. | $3,455,000.00 |
| 4 |
Daley Corp | $3,530,473.00 |
| 5 |
FCI Constructors Inc. | $3,745,209.00 |
| 6 |
Highland Construction Inc. | $4,448,757.52 |
The Caltrans District
11
Office is located at 2829 Juan Street, San Diego, CA 92110. The mailing
address is P.O. Box 85406, San Diego, CA 92186-5406. The District 11
Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the
contract,
are not a part of the contract and are provided for the bidder's
convenience
only. In some instances, the question and answer may represent a
summary
of the matters discussed rather than a word-for-word recitation. The
responses
may be considered along with all other information furnished to
prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is
not
to be construed in any way as a waiver of the provisions of Section
2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements.
Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction
Department
has developed this method of answering Bidder's Inquiries to better
serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that
Contract,
but reserves the right to not answer any questions deemed
unsatisfactory
for public viewing.
The BIDDER'S
INQUIRIES
& RESPONSES will be updated continuously and all attempts will be
made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
| CROSS SECTIONS |
|
|
|
|
ADDENDUM
|
|
|
BIDDER'S INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
1 Q:08/16/06 R:08/30/06 |
Plan Sheet / Specification Reference=Plans Question=Are cross sections
available
for the project? If avialable, When
5560 Ruffin Road Suite 5 San Diego, CA 92123 (858) 541-1500 FAX (858) 278-0558 e-mail to plot@mesablueprint.com San Diego, CA 92123
|
|
2
|
Plan
Sheet / Specification Reference=Item #45, 250MM WELDED STEEL CONDUIT,
PLAN
SHTS. L-2, IR-3, IP-2, SPEC SECTION 10-1.32 AND 10-2.01
Question=THE
SCOPE OF WORK FOR THE IRRIGATION CROSSOVER AT STA. 147+20 IS
UNCLEAR.
L-2 AND IR-3 SHOW AN EXISTING CROSSOVER TO BE REMOVED. IP-2 SHOWS
A NEW CROSSOVER TO BE INSTALLED. THE SPECIALS DESCRIBE A BORING
OPERATION
WHICH WOULD BE RELATED TO A NEW CROSSOVER INSTALLATION. IP-2 ALSO
INDICATES
NEW FACILITIES TO BE CONNECTED BETWEEN THE EASTBOUND ONRAMP AND THE
EASTBOUND
NO. 1 LANE. THIS AREA OF WORK IS NOT INCLUDED IN THE LANE CLOSURE
CHART IN THE SPECIALS OR ADDRESSED IN THE TRAFFIC HANDLING PLANS.
PLEASE
CLARIFY THE SCOPE OF WORK FOR ITEM #45.
|
|
3
|
Plan
Sheet
/ Specification Reference=special provisions section 10-1.36 jointed
plain
concrete pavement
Question=the
contractor has the option of inserting tie bars in the slipformed
concrete.
on page 184 of the specials, "dowel bars shall be placed as shown on
the
plans by using dowel bar baskets". does the contractor have the option
of inserting the dowel bars instead of using the baskets?
|