Quick links
Additional Links
- Strategic Growth Plan - Transportation Investments for Mobility
- Divisions
- Legislative Info
- Outside Agencies
- Inside Seven Employee Newsletter
- code survey - a project by renée green
- Early Education Center - The Center offers spacious rooms for infants, toddlers and pre-schoolers and is open to the public.
- District 7 Video Library
Contractors
Environmental Documents
I-710 Corridor Project
PUBLIC NOTICE
Public Notice Release EIS-EIR (REVISED 08/09/12) [English] [Spanish]
Errata (PDF)
Draft EIR/EIS | June 2012
All files are in PDF format. (Acrobat Reader)
- Cover Sheet - Volume 1
- Title Sheet (Signed)
- Executive Summary
- Table Of Contents
- Chapter 1.0 Proposed Project
- Chapter 2.0 Alternatives
- Chapter 3
- 3.0 Affected Environment
- 3.1 Land Use
- 3.2 Growth
- 3.3 Community Impacts
- 3.4 Utility & Emergency Services
- 3.5 Traffic
- 3.6 Visual
- 3.7 Cultural Resources
- 3.8 Hydrology and Floodplain
- 3.9 Water Quality
- 3.10 Geology
- 3.11 Paleontology
- 3.12 Hazardous Waste
- 3.13 Air Quality
- 3.14 Noise
- 3.15 Energy
- 3.16 Natural Communities
- 3.17 Wetlands
- 3.18 Plant Species
- 3.19 Animal Species
- 3.20 T&E Species
- 3.21 Invasive Species
- 3.22 RELATIONSHIP BETWEEN LOCAL SHORT-TERM-USES OF THE HUMAN ENVIRONMENT AND THE MAINTENANCE AND ENHANCEMENT OF LONG-TERM PRODUCTIVITY
- 3.23 IRREVERSIBLE AND IRRETRIEVABLE COMMITMENTS OF RESOURCES THAT WOULD BE INVOLVED IN THE PROPOSED PROJECT
- 3.24 Construction
- 3.25 Cumulative
- Chapter 4.0 CEQA
- Chapter 5.0 Comments and Coordination
- Chapter 6.0 List of Preparers
- Chapter 7.0 Distribution List
- Appendices
- Cover Sheet - Volume 2
- Appendix A - CEQA Checklist
- Appendix B - 4(f)
- Appendix C - Title VI Policy
- Appendix D - Summary of Relocation Benefits
- Appendix E - Glossary
- Appendix F - Environmental Commitments Record
- Appendix G - Acronyms
- Appendix H - List of Technical Studies
- Appendix I - FTIP_RTP
- Appendix J - Comments and Coordination
- Appendix J Comments and Coordination
- 1_NOP
- 2_NOI
- 3_NOP & NOI Responses
- 4_Scoping Meeting Materials
- 5_Example Letters from CT to Agencies requesting Part-Coop
- 6_Part and Coop Agency Response Letters
- 7_Purpose and Need Letters to Part and Coop Agencies
- 8_Part and Coop Agency Comment Letters on Purpose and Need
- I-710_JD Transmittal_Caltrans_Feb2011
- 10-14
- 16 - Species list - updated
- 17 - SHPO-Concurrence
- 18 - USACE
- 19 - SPL-2012-934_Approved-JD-letter_20120608
- 20 - 2012_03_09_AdminDEIS_710_EPA
- 20 - RTC to USEPA
- 21 - SCE-Project Description
- Appendix K - Floodplain
- Appendix L - Parcel Acquisitions
- Appendix M - References
- Appendix N - Index
- Appendix O - Concept Plans
- Appendix P - Changes in Access
- Appendix Q - On-Site Haz Waste Listings
- Appendix R - AQ_HRA Maps
- Appendix S
Technical Studies
The Technical Studies are provided in PDF format and are available in volumes as a ZIP Archive.
- Volume 1 (646mb ZIP File)
- Health Risk Assessment
- Community Impact Report
- Draft Relocation Impact Report
- Geotechnical
- Hydrology
- Initial Feasibility Analysis
- LA River Impact Report
- Alternatives Screening Analysis
- Baseline Alternative Analysis Report
- Energy Report
- Paleontology Report
- Railroad Goods Movement Study
- Traffic Noise Study Report
- Urban Design / Aesthetics Toolbox Report
- Visual Impact Analysis
- Volume 2 (604mb ZIP File)
- Traffic Operations Analysis Report
- Volume 3 (614mb ZIP File)
- Historic Property Survey Report
- Natural Environment Report
- Volume 4 (615mb ZIP File)
- Initial Site Assessment
- Right of Way Impact
- Volume 5 (494mb ZIP File)
- Traffic Impact Analysis
- Utility Impacts Report
- Volume 6 (350mb ZIP File)
- Water Quality Report
