ea: 1992U4
Route:
039
County:
LA
Work:
| Mile Post Beg./End: | 40.0/44.4 |
| Location: | IN LA COUNTY NEAR GLENDORA |
| Detailed Project Scope: | REHAB DRAIN, CONSTRUCT RETAINING WALL, RECON ROAD |
| Estimate Cost Range (x $million) | 20 - 40 |
| Working Days Range: | 490 |
| Proposed Advertisement Date: | 2014-07-01 |
| Comments: | |
| Types Of Work |
| Asphalt Concrete Surfacing |
| Repair Slope |
| Repair Storm Damage |
| Retaining Wall |
| Quantity Of Major Highway Items |
| Asphalt Condrete (Tons) | 19400 |
| PCC (cy) | 0 |
| Aggregate Base (cy) | 2400 |
| Imported Borrow (cy) | 0 |
| Roadway Excavation (cy) | 8000 |
| Major Structure Items |
| Steel (lbs): | 0 |
| PCC (cy): | 0 |