Welcome to California Department of Transportation

Development of a a Self-Restoring Impact Attenuator

Develop a low-maintenance vehicle impact attenuator to shield barrier ends or other fixed objects, with the following features:

  • Reusable
  • Self-restoring
  • Minimal Vehicle Rebound
  • Non Proprietary Standard Plan
  • Lower Cost than Comparable Products

End treatment concept F with foam modules

Foam Energy Absorbing Modules

Click on the following two clips to see LS-DYNA finite element simulations of NCHRP tests 3-30 on the configuration employing the foam energy absorbing modules.  Results of the simulations indicate that this material is feasible.

Animated Crash with Foam Modules#1     Animated Crash with Foam Modules #2

 

Dynamic testing using a variable mass pendulum

  • Maximum impact speed 42 km/h (26 mph) 63.2 kJ energy absorbed, 78% compression

End Treatment Picture #1 End Treatment Picture #2

End treatment concept H with elastomeric marine fenders

  • Below are simulations of an alternative concept using marine fenders constrained by cables.

The first simulation shows a pickup truck test impacting end-on at 70 km/h.  Although the end treatment will be designed for NCHRP test level 3, this simulation was done at test level 2 to save time on processing.  Extending to test level 3 is a matter of building a longer model with more fenders or cylinders.  The simulation results were acceptable, indicating that the fenders are feasible for this type of impact.

The second simulation shows the pickup truck impacting laterally at 100 km/h.  The simulation failed prematurely, but the initial results indicate that these fenders are too flexible to handle the impact and redirect the vehicle.  The restraining cables are not adequate, and additional elements will have to be added to the end treatment in order to redirect impacting vehicles.

Animated Crash with Elastomeric Marine Fenders #1 Animated Crash with Elastomeric Marine Fenders #2

Quarterly Reports

  FY 06 1st Quarter FY 06 2nd Quarter FY 06 3rd Quarter FY 06 4th Quarter
  FY 05 1st Quarter FY 05 2nd Quarter FY 05 3rd Quarter FY 05 4th Quarter
  FY 04 All 4 Quarters      
  FY 03 1st Quarter FY 03 2nd Quarter FY 03 3rd Quarter FY 03 4th Quarter
  FY 02 1st Quarter FY 02 2nd Quarter FY 02 3rd Quarter FY 02 4th Quarter
             

Expenditures

  Project Expenditures