California Department of Transportation

Office of Capital Improvement Programming (OCIP)

2016 Pre-Populated PPRs for Existing STIP Projects

Projects programmed in the STIP, TCRP, CMIA or Route 99 Bond may be amended to revise scope, cost, schedule or implementing agency upon approval by the California Transportation Commission (CTC). Projects may also be added to or deleted from these programs, although specific rules apply to each Program.

(under construction)


Click on the yellow bar above to allow ActiveX content.

Scroll through this list to locate project(s) of interest and right-click your mouse to download the PPR.

County PPNO EA Project Title Last Updated
Alameda0081J23303East-West Connector (I-880 to Mission Blvd.)04/25/14
Alameda2100 Planning, Programming and Monitoring08/31/15
Alameda2179 Planning, Programming and Monitoring03/24/14
Alameda9051A Improved Bike/Pedestrian Access to SFOBB East Span03/24/14
Alameda2090A Oakland to San Jose Double Track, (Segment 2A)07/15/15
Alpine0014 TE Reserve03/24/14
Alpine3043 Diamond Valley Road Overlay - Phase 106/26/15
Alpine3044 Diamond Valley Road Overlay - Phase 206/26/15
Alpine3115 Hot Springs Road Reconstruction09/03/15
Alpine6626 Hot Springs Creek Bridge06/26/15
AlpineA1950 Planning, Programming and Monitoring09/03/15
Amador24540G550Pine Grove Improvements03/24/14
AmadorB1950 Planning, Programming and Monitoring08/27/14
Butte0L16 Planning, Programming and Monitoring10/22/15
Butte2430 Midway Bridge Replacement across Butte Creek03/24/14
Butte3124HL2344Neal Road and Cohasset Road Bike Project08/28/14
Butte98013F280SR70 Passing Lanes (Segment 1)06/30/15
Butte9801A3F281SR70 Passing Lanes (Segment 2)03/24/14
Calaveras0016 TE Reserve03/24/14
Calaveras30670E530Wagon Trail Realignment03/24/14
CalaverasC1950 Planning, Programming and Monitoring09/03/15
Colusa0L20 Planning, Programming and Monitoring07/01/15
Colusa2852 City of Colusa Road Rehabilitation Project03/24/14
Colusa2853 Norman Road Rehabilitation03/24/14
Colusa3123C Arbuckle Rail Depot Restoration06/27/14
Contra Costa0222E I-680 Southbound HOV Lane Gap Closure12/12/14
Contra Costa0242K0A082I-80/San Pablo Dam Interchange - Phase 2 (R/W only)03/24/14
Contra Costa0298E22910I-680/SR 4 Interchange - Widen Route 4 (Phase 3)06/04/15
Contra Costa0521K4G111Freeway Performance Initiative - Phase 203/24/14
Contra Costa2010B Walnut Creek BART Transit-Oriented Development (TOD)03/24/14
Contra Costa2010C BART Station Modernization Program06/26/15
Contra Costa2010D Bike and Pedestrian Access to Downtown BART Station06/05/15
Contra Costa2011O Planning, Programming and Monitoring08/31/15
Contra Costa2025G Hercules Railroad Station Building03/24/14
Contra Costa2025H I-80/Central Avenue - Phase 2 (Local Road Realignment)03/24/14
Contra Costa2025J Kirker Pass Road - Northbound Truck Climbing Lane03/24/14
Contra Costa2103CR299TDaly City BART Station Improvements03/24/14
Contra Costa2118 Planning, Programming and Monitoring08/31/15
Contra Costa2118F TE reserve (MTC Share)07/10/14
Del Norte1032 Planning, Programming and Monitoring08/28/15
El Dorado0L14 Planning, Programming and Monitoring07/01/15
El Dorado1217A Western Placerville Interchanges Phase 203/24/14
El Dorado31220F310ED-SR-49 South Fork American River Bridge03/24/14
Fresno0091C34253Kings Canyon Expressway - Segment 312/17/14
Fresno648934235180 West Freeway Landscaping03/24/14
Fresno65820N910Coalinga SRRA Interpretive Plaza03/24/14
Fresno67050S370Excelsior Expressway03/24/14
Fresno6L01 Planning, Programming and Monitoring10/15/14
FresnoB002 TE Reserve03/24/14
Glenn1322 Sycamore Street Rehabilitation03/24/14
Glenn1323 Lassen Street Reconstruct03/24/14
Glenn1325 County Road 306 Rehabilitation03/24/14
Glenn1326 Sixth Street Pavement Preservation03/24/14
Glenn3785 Tehama Street Reconstruction03/24/14
Glenn3786 Road M 1/2 Reconstruction03/24/14
Humboldt007236600Eureka/Arcata Corridor Improvement03/24/14
Humboldt2002P Planning, Programming and Monitoring08/28/15
Humboldt2069280704Eureka Waterfront Trail Phase A ((Del Norte to Truesdale)01/28/15
Humboldt2076 Rohnerville Road Widening (Redwood - Jordan)04/03/15
Humboldt2258 Construction of Traffic Signal System at Fern Street and Walnut Drive08/12/15
Humboldt2373 Highland and Koster Rehabilitation03/24/14
Humboldt2374 Hawthorne, Felt, & 14th Street Rehabilitation03/24/14
Humboldt238936601Eureka/Arcta Restoration Project for Mitigation - 3 Parcels04/14/14
Humboldt2390 Railroad Avenue Improvements (E to G Streets)10/22/15
Humboldt2391 Humboldt Bay Trail (Eureka-to-Bracut Segment)08/27/14
Imperial052641040Reconstruct I-8 / Imperial Avenue Interchange03/24/14
Imperial054226331I-8/Dogwood Interchange Landscape Mitigation09/03/14
Imperial0549A080231Route 98 Widening (West of Route 111) Phase 105/29/15
Imperial7200212574Project Planning and Monitoring10/13/14
Inyo017021340Olancha and Cartago Expressway03/24/14
Inyo0170A21342Olancha and Cartago Archaeological Pre-Mitigation03/24/14
Inyo1010 Planning, Programming and Monitoring08/27/14
Inyo2517 TE Reserve03/24/14
Inyo256910920Seibu to School Bike Path03/24/14
Inyo258535060West Line Street Sidewalk03/24/14
Inyo2599 West Bishop Roadway Reconstruction03/24/14
Kern3386C44254Route 46 Widening - Segment 4A06/26/15
Kern341241880Wasco 4-Lane03/24/14
Kern348242550Dennison Road Interchange03/24/14
Kern3645A42471Truck Climbing Lanes from Elk Hills Road to Tupman Road03/24/14
Kern370548460Centennial Corridor03/24/14
Kern65770N860Northern and Southern Kern 99 Corridor Bridge Enhancement03/24/14
Kern6609 North Chester Avenue Pedestrian Path11/07/14
Kern6611 Diamond Street Beautification Project07/08/14
Kern66130S3304Route 46 Pedestrian Path07/08/14
Kern6L03 Planning, Programming and Monitoring06/26/15
Kern8042A45711Freeman Gulch Widening - Segment 103/24/14
Kern8042B45712Freeman Gulch Widening - Segment 203/24/14
Kern853944310Inyokern 4-Lane03/24/14
KernE012 TE Reserve03/24/14
Kings4330Y3255119th Avenue Interchange Landscaping11/13/14
Kings6L04 Planning, Programming and Monitoring06/26/15
KingsC002 TE Reserve03/24/14
Lake3002P Planning, Programming and Monitoring08/28/15
Lake3032R281714South Main Street Rehabilitation06/03/15
Lake3033R281724Soda Bay Road Rehabilitation06/03/15
Lake3088 Dam Road Extension to 18th Avenue03/24/14
Lake3089 Lakeport Boulevard and South Main Street Intersection Improvements03/24/14
Lake310029821Segment 2C of the Lake-29 Expressway Project03/24/14
Lassen2121A1A0100Skyline Road Extension (Phase 2)07/01/15
Lassen2124 Planning, Programming and Monitoring07/01/15
Lassen2356457044County Roads (B), rehabilitation03/24/14
Lassen2391 County Rehab A03/24/14
Lassen2510 City Rehabilitation FC07/10/15
Lassen2513 City Rehabilitation SC204/03/15
Lassen2514 City Rehabilitation SC304/03/15
Lassen2515 City Rehabilitation SC404/03/15
Lassen2516 City Rehabilitation SC504/03/15
Lassen2561 City Rehabilitation FD09/01/15
Lassen2562 Beaver Creek Bridge 7C-82 Replacement03/24/14
Lassen2564 County Road C (Center Road)03/24/14
Lassen2565 Main Street Johnstonville Road Connection03/24/14
Lassen34924F360South East Gateway Project02/02/15
Los Angeles0219M020090Route 10 to Route 210 - new 6 lane freeway03/24/14
Los Angeles0393F116720Palmdale- Fwy&Conventional Hwy (RW only)08/21/14
Los Angeles2215187901Rte 710 Gap Closure (North) PE & Technical Studies03/24/14
Los Angeles2741210600Rte 71 Expwy to Fwy Conversion (Rte 10 to Rte 60)03/24/14
Los Angeles2808C2159FI-5 Widening - Route 605 to Route 71003/24/14
Los Angeles2808D2159E5/710 Interchange03/24/14
Los Angeles3612249900I-710 Expansion03/24/14
Los Angeles4025R241TESystemwide Light Rail Vehicles06/26/15
Los Angeles4027A AB 3090 Reimbursement Project03/24/14
Los Angeles432628460Route 14 Corridor Master Plan08/21/14
Los Angeles432728370Interstate 5 Corridor Master Plan03/24/14
Los Angeles433628480Route 710 Corridor Master Plan03/24/14
Los Angeles435628620Route 138 Widening, Segment 606/16/15
Los Angeles435728630Route 138 Widening, Segment 1306/16/15
Los Angeles456029350Route 138 Widening, Segment 903/24/14
Los Angeles9001 Planning, Programming and Monitoring12/11/14
Los Angeles2098 Raymer to Bernson Double Track Project06/02/14
Los Angeles2106 Burbank Airport and Rail Station Pedestrian Grade Separation03/24/14
Madera533547090Madera 6 Lane03/24/14
Madera62970H220South Madera 6 Lane03/24/14
Madera66060G900Madera 41 Passing Lane06/02/15
Madera6L05 Planning, Programming and Monitoring06/02/15
Marin0342L2261H1Route 101 HOV Lane Gap Closure - MItigation Planting09/02/15
Marin2127 Planning, Programming and Monitoring08/31/15
Marin2127B TE reserve (MTC Share)07/10/14
Marin2127C Planning, Programming and Monitoring03/24/14
Marin2127S Miller Creek Class II Bycycle Lanes and Pedestrian Improvements03/24/14
Marin2128D North Civic Center Drive Improvements06/29/15
Marin2128E Parkade Area Circulation Improvement Project03/24/14
Mariposa0208 Silva Road Rehabilitation03/24/14
Mariposa0212 Triangle Road Rehabilitation03/24/14
Mariposa0214 Chowchilla Mountain Rd/Harris Cutoff Rd Rehab06/16/15
Mariposa3002 Old Toll Road Rehabilitation Phase I03/24/14
Mariposa3003 Old Toll Road Rehabilitation Phase II03/24/14
Mariposa3049 Merced Falls Road Rehabilitation, Phase I03/24/14
Mariposa3050 Ben Hur Road Reconstruction03/24/14
Mariposa3K1A Triangle Road Rehabilitation06/16/15
Mariposa4957 Planning, Programming and Monitoring06/16/15
Mendocino0125W26203Willits Bypass - Relinquishment of Bypassed Route 101 (Exisitng Route 101 Through Willits)07/01/15
Mendocino0125Y26201Willits Bypass - Ryan Creek/Coho Salmon Mitigation10/13/14
Mendocino0125Z26204Willits Bypass - Sherwood Road Geometric Upgrades.09/01/15
Mendocino4002P Planning, Programming and Monitoring08/28/15
Mendocino4073P280524East Side Potter Valley Road Recon Phase I07/01/15
Mendocino4517 Branscomb Road Bridge07/01/15
Mendocino4560 Acquisition of Six Revenues Vehicles03/24/14
Mendocino4561 Traffic Signal at Gobbi Street and Waugh Lane03/24/14
Mendocino4562 Roundabout at Low Gap Road and North Bush Street03/24/14
Mendocino4563 Ukiah Downtown Streetscape Improvement, Phase I10/22/15
Mendocino45790C720Downtown Gualala Non-Motorized Transportation and Streetscape Improvement Project03/24/14
Mendocino4590 North State Street Intersection Improvements: Phase 103/24/14
Mendocino4591 Ukiah Downtown Streetscape Improvement: Phase 203/24/14
Mendocino4593 South Main Street Bicycle and Pedestrian Access03/24/14
Merced01610Q120Livingston Widening03/24/14
Merced0161A0Q121Livingston Widening Northbound12/17/14
Merced0161B0Q122Livingston Widening Southbound12/17/14
Merced5707A41911Los Banos Bypass, Segment 103/24/14
Merced5960 Planning, Programming and Monitoring03/24/14
Modoc2051 Planning, Programming and Monitoring09/04/15
Modoc2438 CR 55 Rehabilitation03/24/14
Modoc2534 Pedestrian Improvements along Alturas Central Business District09/01/15
Modoc2535 Oak and Juniper Street Rehabilitation09/01/15
Modoc2536 County Road 87 Chipseal03/24/14
Modoc2537 County Road 111 Double Chip03/24/14
Modoc2538 East Street Rehabilitate Phase 103/24/14
Modoc2539 County Road 114 Chipseal03/24/14
Modoc2540 County Road 272 Chipseal03/24/14
Mono2003 Planning, Programming and Monitoring09/03/15
Mono2516 TE Reserve03/24/14
Mono2566T298TDTransit Vehicle Replacement06/02/15
Mono258935550Sherwin Vista Point Improvements03/24/14
Mono259035540Conway Vista Point Improvements03/24/14
Mono2595 Meridian Roundabout and Signal Relocation05/30/14
Mono2601 West Minaret Road Sidewalk & Safety Project06/16/15
Mono2602 North Main Street Sidewalk & Safety Project Phases 2A, 2B, and 306/16/15
Mono2603 Airport Road Rehabilitation Project03/24/14
Mono2604 Convict Lake Road06/02/15
Mono2605 County-wide Preventative Maintenance Program03/24/14
Monterey0057C31600Route 156 West Corridor03/12/15
Monterey0058Y0161HPrunedale Improvement Project Landscape Mitigation09/16/15
Monterey1155R131TBCaltrain Extension to Montery County06/26/14
Monterey1165 Planning, Programming and Monitoring06/26/15
Monterey1813A0H823Route 68 Safety & Operational Improvements at Corral de Tierra06/26/15
Monterey18140L570SR-1 Operational Improvements06/26/15
Monterey1971R328TACoast Daylight/Caltrain Track Improvements06/26/15
Monterey2296 Castroville Bike/Pedestrian Path03/24/14
Monterey23391A820District 5 Safety Roadside Rest Areas Shade and Shelters and Transportation Art03/24/14
Monterey2572 Imjin Road Widening02/18/15
Monterey2573 Monterey-Salinas Transit Buses03/24/14
Napa037628120KSR 12/29/221 Intersection Improvements03/24/14
Napa1003E Planning, Programming and Monitoring08/31/15
Napa2130 Planning, Programming and Monitoring08/31/15
Napa2130B TE reserve (MTC Share)07/10/14
Napa2130D Devlin Road and Vine Trail Extension03/24/14
Napa2130E Eucalyptus Complete Streets03/24/14
Napa2130F California Boulevard Roundabouts06/29/15
Napa2130M Petrified Forest Road Intersection Improvements03/24/14
Napa2130N Hopper Creek Pedestrian Path03/24/14
Napa2130P Airport Boulevard Rehabilitation03/24/14
Nevada0L83 Planning, Programming and Monitoring09/04/15
Nevada41174E170SR 49 Widening: La Bar Meadows Road to McKnight Way03/24/14
Orange2132 Planning, Programming and Monitoring06/26/15
Orange26550K021Interstate 5 Widening, Segment 1 (SR 73 to Oso Parkway)08/26/14
Orange26780L850I-5 HOV Lane Operational Improvements03/24/14
Orange2883A0C890I-5 HOV Lanes - Route 55 to Route 5706/30/15
Orange3834C1108SR-57 & Lambert Road Interchange Improvements Project03/24/14
Orange49560H0451I-405 Auxiliary Lane Southbound - University to Route 13309/02/14
Orange2107 Laguna Niguel to San Juan Capistrano Passing Siding03/24/14
Orange9657 Orange Transportation Center Parking Structure03/24/14
Placer0L11 Planning, Programming and Monitoring07/01/15
Placer1520A0C931AB 3090 Replacement10/22/15
Placer4679A0C9301AB 3090 Replacement07/01/15
Placer9879R779SASac-Roseville Track and Signal Improvements03/24/14
Plumas2057 Planning, Programming and Monitoring07/01/15
Plumas2547 North Loop (Phase 1)03/24/14
Plumas2548 Graeagle-Johnsville Road Reconstruction03/24/14
Plumas33550E240Greenville SR89 Rehabilitation07/01/15
Riverside0013H0N440Riv-10 Corridor Master Plan08/26/14
Riverside0021K43272French Valley Parkway IC - Collector/Distributor06/26/15
Riverside0046J0N69USR60 Truck Climbing/ Descending Lanes07/03/15
Riverside0071E0R010B Canyon Wildlife Crossing Corridor12/12/14
Riverside0108T0F163I-215 Southbound Connector08/26/14
Riverside0247R0N450Riv-215 Corridor Master Plan08/26/14
Riverside1019CVLNKCoachella Valley Link03/24/14
Riverside1112RIVTERTE Reserve07/10/14
Riverside9803 Planning, Programming and Monitoring06/05/15
Sacramento0L30 Planning, Programming and Monitoring07/01/15
Sacramento1666 Widen Grant Line Road - Bradshaw to Mosher Road03/24/14
Sacramento1667 ITS Master Plan-Phase 4 Implementation03/24/14
Sacramento1668 Green Valley Road Widening03/24/14
Sacramento16704F510Zinfandel Complex Improvements03/24/14
Sacramento1671 14th Avenue Extension03/24/14
Sacramento1672 Hazel Avenue Widening, Phase 303/24/14
Sacramento1673 Old Florin Town Streetscape, Phase 203/24/14
Sacramento58353C001I-5 HOV Phase 103/24/14
Sacramento5988 CNG Replacement Buses & Related Spare Parts03/24/14
Sacramento5990 Laguna Creek Trail - North Camden Spur03/24/14
Sacramento64053F750SR 51 NR Transition Lane Project and Local Roadway Improvements03/24/14
Sacramento6576 C Street/Central Galt Complete Streets03/24/14
Sacramento69130F350Ramp Meters at Various Locations03/24/14
San Benito029734490San Benito Route 156 Improvement Project03/24/14
San Benito2043 Planning, Programming and Monitoring06/26/15
San Bernardino0076F0L340Aesthetic Corridor Master Plan, Urban03/24/14
San Bernardino0134K0C250I-10 HOV Lane Extension, from Haven Avenue to Ford Street03/24/14
San Bernardino0195N0C700Route 210 Widening08/26/14
San Bernardino0215C34770Kramer Junction - Phase 110/09/15
San Bernardino0242L0M630I-215 Mount Vernon/Washington Street Interchange Improvements03/24/14
San Bernardino0243K0J070I-215/Barton Interchange Reconstruction06/09/14
San Bernardino0260B34040KRoute 395 Widening10/09/15
San Bernardino9811 Planning, Programming and Monitoring08/31/15
San Diego0615235800Route 5 Widening for HOV, Mixed flow & Aux Lanes03/24/14
San Diego0615A2T171Route 5 HOV Extension03/24/14
San Diego0615B2T170Soundwalls, Manchester Avenue to Route 7803/24/14
San Diego0615C2T172Route 5 HOV Extension - Stage 1, San Elijo Lagoon Bridge Replacement03/24/14
San Diego7402 Planning, Programming and Monitoring09/18/15
San Diego7421W Inland Rail Trail Phases - IIA, IIB, IIIA, IIIB06/30/15
San Diego2108 Del Mar Bluffs Stabilization Project 403/24/14
San Francisco0612F Chinatown Broadway Complete Streets - Phase IV06/02/14
San Francisco2007 Planning, Programming and Monitoring08/22/14
San Francisco2007S TE reserve (MTC Share)07/10/14
San Francisco2131 Planning, Programming and Monitoring08/31/15
San Joaquin30451C260Turner Road Interchange Operational Improvements07/16/14
San Joaquin3046 McKinley Avenue/State Route 120 Interchange03/24/14
San Joaquin3K59 McHenry Avenue Improvements11/07/14
San Joaquin6627 Stockton Avenue Widening06/26/15
San Joaquin6629 MacArthur Drive Widening and Reconstruction03/24/14
San Joaquin7952 Planning, Programming and Monitoring06/26/15
San Joaquin2030B Stockton to Escalon Double Track Project Segment 4 03/24/14
San Luis Obispo0226H33078Route 46 Corridor Improvements (Whitley 2B)09/30/14
San Luis Obispo0226J3307ACholame03/24/14
San Luis Obispo0226K3307CRoute 46/41 Wye04/16/14
San Luis Obispo0942 Planning, Programming and Monitoring06/26/15
San Luis Obispo1129A Bob Jones Class 1 Bike Trail, Northern Segment11/07/14
San Luis Obispo2071 Price Canyon Road Widening09/03/15
San Luis Obispo2302 Shell Beach Road Multiuse Path, Phase 107/08/14
San Luis Obispo23421A880Cuyama Archaeological Collections03/24/14
San Luis Obispo2373 Grand Avenue Streetscape, Phase 307/08/14
San Luis Obispo2374 Morro Creek Multi-Use Trail & Bridge - Phase 107/08/14
San Luis Obispo2376PERMIT"Near" Route 41 Multi-Purpose Pathway to the Park11/07/14
San Luis Obispo25281C150Route 46/Union Road Intersection Improvements06/26/15
San Luis Obispo255945131Route 101/46 West Interchange Improvement Phase 309/30/14
San Luis Obispo37000H371Route 101 Southbound Auxiliary Lane - Oak Park/Halcyon03/24/14
San Luis Obispo4856B0A370Brisco Road Interchange Improvements and Auxiliary Lanes03/24/14
San Mateo0632C25460Calera Parkway (Phase 1)06/26/15
San Mateo0648F Grand Boulevard Initiative Complete Streets Program04/14/14
San Mateo0668A SR 92/SR 82 Interchange Improvements - Phase 103/24/14
San Mateo0668D SR 92/US 101 Interchange Improvements - Phase 203/24/14
San Mateo0690A235650SR 101/Willow Road I/C Reconstruction06/26/15
San Mateo2140 Planning, Programming and Monitoring08/31/15
San Mateo2140A Planning, Programming and Monitoring08/31/15
San Mateo2140C TE reserve (MTC Share)07/10/14
San Mateo2140E Countywide ITS Improvements03/24/14
Santa Barbara04824482UCasitas Pass & Linden Ave interchanges03/24/14
Santa Barbara08200G820Las Positas Rd/Cliff Dr Intersection Improvements12/30/14
Santa Barbara1834 TE Reserve03/24/14
Santa Barbara1840A Cathedral Oaks Landscaping Enhancement07/21/15
Santa Barbara1914 Planning, Programming and Monitoring08/25/14
Santa Barbara46114611UFowler Road & Ekwill Street Extension06/26/15
Santa Barbara6400Y0C641Route 246 Planting Mitigation11/07/14
Santa Barbara71010N700South Coast 101 HOV Lanes12/17/14
Santa Barbara2087RA05CASanta Barbara County Ortega Siding Upgrade and Extension 07/15/15
Santa Clara0521C0K030I-680 Sound Walls - Capitol Expressway to Mueller08/31/15
Santa Clara2015D Adobe Creek/ Highway 101 Bicycle Pedestrian Bridge01/23/15
Santa Clara2144 Planning, Programming and Monitoring08/31/15
Santa Clara2147E BART to San Jose; Extend from Berryessa to San Jose06/03/14
Santa Clara2255 Planning, Programming and Monitoring08/31/15
Santa Clara9035L Park Avenue Multi - Modal Improvements04/07/15
Santa Clara9035M St. John Street Multi - Modal Improvements - Phase 106/05/15
Santa Cruz0073A0C73241st Avenue to Soquel Avenue Auxiliary Lanes06/26/15
Santa Cruz041344130Watsonville-Harkins Slough Rd Interchange03/24/14
Santa Cruz0921 Planning, Programming and Monitoring06/26/15
Santa Cruz09234A2174Highway 1 Freeway Service Patrol06/26/15
Santa Cruz1968 Mar Vista Bike/Pedestrian Overcrossing03/24/14
Santa Cruz2363 Park Avenue Sidewalks07/08/14
Santa Cruz2366 Airport Boulevard Improvements03/24/14
Santa Cruz2551 Monterey Bay Sanctuary Scenic Trail Network Segment 703/24/14
Santa Cruz2552 Monterey Bay Sanctuary Scenic Trail Network Segment 1809/03/15
Santa Cruz2555 Airport Boulevard Improvements03/24/14
Santa Cruz2556 Sidewalk Infill on Harkins Slough Road and Main Street03/24/14
Santa Cruz2557 Casserly Road Bridge Replacement03/24/14
Santa Cruz2558 Freedom Boulevard Cape Seal03/24/14
Santa Cruz465846580Route 1/9 Intersection Improvements06/26/15
Shasta2368 Planning, Programming and Monitoring10/13/14
Shasta2559 Browning Street Complete Streets Improvements03/24/14
Shasta2560 Sacramento River Trail to Downtown Non-Motorized Improvements03/24/14
Shasta3445A4C403Redding to Anderson Six Lane - Phase 1 "Little Easy"03/24/14
Shasta3445B4C404Redding to Anderson Six Lane - Phase 203/24/14
Sierra0L04 Planning, Programming and Monitoring09/04/15
Sierra1704 Smithneck Creek Road Rehabilitation07/01/15
Sierra17054F490SR 89 Truck Pull-outs Sierra County to Sutterville08/14/15
Sierra17064F500Smithneck Creek Bike Path07/01/15
Sierra80051F260Wildlife Undercrossings07/10/14
Siskiyou2474 Schumeyer Gulch Bridge03/24/14
Siskiyou2500 S. Oregon Street and 4H Way Rehabilitation03/24/14
Siskiyou2506 Guys Gulch03/24/14
Siskiyou2517 Mt. Shasta Blvd. Guardrail Project10/22/15
Siskiyou2518 Oregon Street Rehabilitation10/22/15
Siskiyou2521 Lincon Road, Union Ave., Angel Valley Road Rehabilitation03/24/14
Siskiyou2522 6th and Ridgeview Street Rehabilitation03/24/14
Siskiyou2541 Vista Drive Rehabilitation10/22/15
Siskiyou2544 Ream Avenue Rehabilitation10/22/15
Siskiyou2545 South 9th Street Rehabilitation03/24/14
Siskiyou2546 Overlay and Rehab Various Streets07/10/15
Siskiyou2553 Big Springs Road - Phase 103/24/14
Siskiyou2554 Dunsmuir 2019 Road Rehabilitation Project03/24/14
Siskiyou2555 California Street Rehabilitation03/24/14
Siskiyou2556 Howell Avenue Rehabilitation Project03/24/14
Siskiyou2557 Fort Jones Pedestrian Improvements03/24/14
Siskiyou2558 Mt. Shasta Boulevard Rehabiitation03/24/14
Siskiyou2568 Ager Road Rehab03/24/14
Solano2152 Planning, Programming and Monitoring08/31/15
Solano2263 Planning, Programming and Monitoring08/31/15
Solano5301T Jepson Parkway: Widen Vanden Road, Peadbody to Leisure Town06/03/14
Solano5301U Jepson Parkway: Widen Leisure Town Road, Vanden to Commerce06/03/14
Solano5301V Jepson Parkway: Widen Leisure Town Road, from Commerce to Orange06/03/14
Solano8273B0T1631Route 80 Widening Landscaping07/10/14
Sonoma0770E Planning, Programming and Monitoring08/31/15
Sonoma0789F264H6Follow Up Landscaping06/29/15
Sonoma2156 Planning, Programming and Monitoring08/31/15
Sonoma5156A TE reserve (MTC Share)07/10/14
Sonoma9038A Downtown Santa Rosa Streetscape03/24/14
Stanislaus0944M40350Route 132 Expressway, Phase 107/23/14
Stanislaus3027 Route 132 Expressway - Phase IA04/21/14
Stanislaus3047 McHenry Avenue Widening03/24/14
Stanislaus946047210Pelandale Avenue Interchange05/30/14
Stanislaus9953 Planning, Programming and Monitoring06/16/15
Sutter1675L2324Feather River Bridge at 5th Street03/24/14
Sutter1L53 Planning, Programming and Monitoring07/01/15
Tehama2063 Planning, Programming and Monitoring10/13/14
Tehama2331455824MCoy Road Low-Water Crossing03/24/14
Tehama2333455784Jewett Creek Bridge at Kirkwood Road07/01/15
Tehama2334455794Jewett Creek Bridge at Columbia Ave.07/01/15
Tehama2378454004Sacramento River Bridge (#08C-0043)08/27/14
Tehama2379453964Evergreen Rd. Bridge at South Fork Cottonwood Cr.07/01/15
Tehama2493 Bridge Deck Restoration03/24/14
Tehama2509 City of Tehama Reconstruction and Drainage Improvement04/03/15
Tehama2527 Baker Road @ Brickyard Creek Bridge06/27/14
Tehama2528 Los Molinos Phase III03/24/14
Tehama2567 99W Gap Closure: Glenn County Line to Corning City Limits03/24/14
Tehama2569 99W & Gyle Road to South Main Street & I-5 Overcrossing03/24/14
Tehama2570 Los Molinos Gap Closure Grant Street to Los Molinos HIgh School03/24/14
Trinity2066 Planning, Programming and Monitoring07/01/15
Trinity2399D456944Lewiston Road Bike/Ped Lane03/24/14
Trinity242145672Wildwood Road Reconstruction, Segment 107/10/14
Trinity2465 Lewiston Road Rehab No 20207/10/14
Trinity35284F920Trinity 3 Turnouts03/24/14
Tulare010443080Tulare Expressway03/24/14
Tulare0106Y43071Houston Avenue Landscaping06/02/15
Tulare636948950Tulare City Widening03/24/14
Tulare6400E36025Tagus 6-Lane Southbound Widening03/24/14
Tulare6400F36026Tagus 6-Lane Northbound Widening03/24/14
Tulare642347150Route 99 Betty Drive Interchange Improvements03/24/14
Tulare6565 Santa Fe Trail Connection Segment 1A07/08/14
Tulare6632 Oak Avenue Pedestrian Walkway07/08/14
Tulare66580Q860City of Woodlake Downtown Enhancement Project Phase 411/07/14
Tulare8650A43401Terra Bella Expressway - Segment 103/24/14
Tulare8650B43402Terra Bella Expressway - Segment 203/24/14
Tulare8650C43403Terra Bella Expressway - Segment 303/24/14
Tulare8650D43404Terra Bella Expressway - Segment 403/24/14
TulareD006 TE Reserve03/24/14
TulareD006A4C2204Santa Fe Bike Path06/16/15
Tuolumne023534045Mono Way Operational & Safety Improvements07/21/15
Tuolumne0452 Planning, Programming and Monitoring09/03/15
Tuolumne30480Y210Peaceful Oaks Road/SR 108 Interchange Ramps07/21/15
Various2127J0G500Cultural Resources Database Data Entry03/24/14
Various2127M1G440Geoarchaeological Study of Route 101 Corridor03/24/14
Various2127N1G490Statewide Archaeological Reburial Database03/24/14
Various2065J Capitalized Maintenance Capitol Corridor (CCJPA) 10/15/14
Various2065K Capitalized Maintenance San Joaquin Corridor08/22/14
Various2065L Capitalized Maintenance Pacific Surfliner LOSSAN Corridor08/22/14
Ventura2291A AB 3090 Reimbursement Project03/24/14
Ventura462529830Route 101 Widening (Environmental)05/30/14
Ventura4740 Santa Clara River Riparian Mitigation (Phase 1)08/21/14
Ventura474131610VEN-118 Widening (Environmental)01/21/15
Ventura90024U2564Planning, Programming and Monitoring09/18/15
Ventura2089RA04CAVentura County Seacliff Siding Upgrade and Extension 12/11/14
Yolo0301X374221NB I-5 to SB SR 113 Direct connect Ph 203/24/14
Yolo0L37 Planning, Programming and Monitoring07/01/15
Yolo1916 Pioneer Bluff Bridge Phase 2 - Village Parkway Extension03/24/14
Yolo1918 Mace Blvd. Complete Street03/24/14
Yolo8726 Third Street Improvements, CIP No. 816403/24/14
Yolo8727 East Main Street Improvements03/24/14
Yuba0L41 Planning, Programming and Monitoring07/01/15
Yuba2010 Olivehurst Avenue Roundabout Project03/24/14
Yuba201192929Powerline Road Bike/Ped Improvements Phase 203/24/14
Yuba9679 North Beale Road Complete Streets Revitalization Phase 103/24/14