Resolution
Status
Date Passed
Title/Description

PA-02-01

Amending PA -00-14

Jan. 23, 2002 Item 2.1d.

County of Nevada - Project approval amendment to modify the scope of the County of Nevada bus purchase project. The County of Nevada had planned to purchase four, (CNG) El Dorado / Cummins MST transit buses featured on the Department of General Services (DGS) purchasing list, but a road test of the El Dorado MST showed it lacked acceleration capability needed to allow for safe usage in a foothill environment. Recently, the Ford El Dorado Aerotech transit bus was added to the DGS purchasing list, which is CNG-powered and adequate for use in their service area. With the addition of local funds, the County was able to purchase seven new Conga-powered transit buses, which will add seven more seats (for a total of 119) to the fleet without additional expenditure of Proposition 116 Non-Urban Program funds. (2.1d.) (Concurrent Allocation Amendment under 2.6c.(1).)

PA-02-02

Original

Feb. 28,2002 Item 2.1e.(1)

Project Approval to the Department of Transportation for 150,000 in Proposition 116 Rail Bond funds (PUC Section 99622[c]) for construction of the Oakland Coliseum Intercity Rail Station. (Concurrent Allocation under 2.6d.)

PA-02-03

Amending PA-99-22

July 18, 2002 Ref. No. 2.9c.

Project Approval Amendment to the Department of Transportation for $18,000,000 in Proposition 116 Rail Bond funds (PUC Section 99624[a]) for construction of the Alameda Corridor-Pacific Coast Highway Grade Separation Project.

PA-02-04

Amending PA-00-05

Apr. 3, 2002 Item 2.1d.(1)

County of Sutter - Project Approval Amendment to modify the scope of the Sutter Commuter Bikeway project. The County completed a bike path segment and one of two approved bike lane segments, but was unable to complete the second bike lane segment with the Proposition 116 funds programmed for the project. The County is requesting deletion of the unconstructed bike lane segment from the project scope. The Commission has allocated $1,246,566 for this project. Reimbursements to the County for the project total $1,207,822. (Concurrent Allocation Amendment under Item 2.6c.(2).)

PA-02-05

Amending PA-00-15

Apr. 3, 2002 Item 2.1d.(2)

Nevada County - Project Approval Amendment to PA-00-15 to amend two projects as follows: -- Transit Vehicle Turn Pocket project - reduce the amount programmed from $34,500 to $29,578. This project was completed with cost savings of $4,922. -- Bus Shelters - increase the amount of Proposition 116 funds on this project from $31,500 to $36,422 and include $1,492 in local funds. This amendment will also reduce the number of bus shelters to be constructed from 14 to 8. The increased cost and reduced number of shelters is due to the County's selection of a shelter type that is larger and better suited to the changing environment in Nevada County. (Concurrent De-Allocation Amendment under 2.6c.(1)) and Allocation under 2.6b.(3).)

PA-02-06

Amending PA-98-02

Apr. 3, 2002 Item 2.1e.(1)

Project Approval Amendment to the Peninsula Corridor Joint Powers Board for $853,525 in Proposition 116 Rail Bond funds (PUC Section 99636) for Passenger Railcar Purchase. (Concurrent De-Allocation Amendment under 2.6c.(3).)

PA-02-07

Amending PA-96-32

Apr. 3, 2002 Item 2.1e.(2)

Project Approval Amendment to the Peninsula Corridor Joint Powers Board for $853,525 in Proposition 116 Rail Bond funds (PUC Section 99636) for the CalTrain Capital Improvements Project to increase the amount of Proposition 116 fund on the Passenger Railcar Rehabilitation element to allow for rehabilitation of ten additional railcars. (Concurrent Allocation under 2.6b.(2).)

PA-02-08

Amending PA-99-18

Apr. 3, 2002 Item 2.1e.(3)

Project Approval Amendment to City of South Lake Tahoe for $6,650,000 in Proposition 116 Rail Bond funds (PUC Section 99647) for the Park Avenue Intermodal Transit Facility. (Concurrent Allocation under 2.6b.(1).)

PA-02-09

Original

May 9, 2002 Item 2.1e.

Project Approval to the Department of Transportation for $7,486,800 in Proposition 116 Rail Bond funds (PUC Section 99622[a]) for the Escalon to Stockton Second Mainline Track Project. (Related item under 2.1c.(1))

PA-02-10

Amending Resolution
PA-02-03

Aug. 22, 2002
2.1e.(1)

Project Approval Amendment – Amending PA-02-03 for the Department of Transportation, $900,000 and the Alameda Corridor Transportation Authority, $17,100,000 in Proposition 116 Bond funds for the Alameda Corridor Pacific Coast Highway Grade Separation Project.
PA-02-03 authorized $18,000,000 to ACTA. This amendment would approve $900,000 in Proposition 116 Bond funds be authorized to the Department for previously expended funds on the PS&E portion of the project and authorize $17,100,000 to ACTA for the construction component on the PCH project. This amendment would also provide for consistency with the Proposition 116 funding plan and other funding plans on the project.

PA-02-11

Amending Resolution
PA-99-06n

Aug. 22, 2002 2.1e.(2)

Project Approval Amendment – Amending PA-99-06 for the City of Irvine. This amendment will reduce the amount of Proposition 116 Bond funds authorized for the City of Irvine’s Fixed Guideway Demonstration project from $2,400,000 in PS&E to $1,701,222 in PS&E.