California Department of Transportation
 

Current US Highway101 Conditions

Before driving, check with the Caltrans Highway Information Network (CHIN) 800.427.7623


US 101
    [IN THE SOUTHERN CALIFORNIA AREA]
    THE NORTHBOUND CONNECTOR TO SOUTHBOUND I 405 /IN SHERMAN OAKS/
(LOS ANGELES CO) IS CLOSED FROM 2200 HRS EACH NIGHT TO 0600 HRS EACH MORNING
MONDAY THRU SATURDAY THRU 1/27/18 - DUE TO CONSTRUCTION - A DETOUR IS AVAILABLE

    IS CLOSED TO NORTHBOUND TRAFFIC FROM THE VENTURA/SANTA BARBARA CO LINE TO 
SOUTH MILPAS ST /IN SANTA BARBARA/ (SANTA BARBARA CO) - DUE TO MUDSLIDES - 
MOTORISTS ARE ADVISED TO USE AN ALTERNATE ROUTE 

    [IN THE CENTRAL CALIFORNIA AREA]
    IS CLOSED TO NORTHBOUND TRAFFIC FROM THE VENTURA/SANTA BARBARA CO LINE TO 
SOUTH MILPAS ST /IN SANTA BARBARA/ (SANTA BARBARA CO) - DUE TO MUDSLIDES - 
MOTORISTS ARE ADVISED TO USE AN ALTERNATE ROUTE 

    IS CLOSED TO SOUTHBOUND TRAFFIC FROM SOUTH MILPAS ST /IN SANTA BARBARA/
TO 3.4 MI SOUTH OF SANTA BARBARA /AT PADARO LANE/ (SANTA BARBARA CO) 
- DUE TO MUDSLIDES - MOTORISTS ARE ADVISED TO USE AN ALTERNATE ROUTE

    [IN THE NORTHERN CALIFORNIA AREA]
    1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 3.4 MI NORTH OF CALPELLA
/AT UVA DR/ TO 10.7 MI NORTH OF CALPELLA (MENDOCINO CO) FROM 0700 HRS TO 
1700 HRS MONDAY THRU FRIDAY THRU 1/26/18 - DUE TO MAINTENANCE

    1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE JCT OF SR 1 
/IN LEGGETT/ TO 15 MI SOUTH OF GARBERVILLE (MENDOCINO CO) - DUE TO A ROCK SLIDE

    1-WAY CONTROLLED TRAFFIC FROM 6.2 MI NORTH TO 6.6 MI NORTH OF TRINIDAD
(HUMBOLDT CO) 24 HRS A DAY 7 DAYS A WEEK THRU 1930 HRS ON 1/31/18 - DUE TO 
CONSTRUCTION

    1-WAY CONTROLLED TRAFFIC FROM 2.2 MI NORTH OF BIG LAGOON TO 2.6 MI NORTH OF
BIG LAGOON (HUMBOLDT CO) 24 HRS A DAY 7 DAYS A WEEK THRU 1930 HRS ON 1/31/18 - 
DUE TO CONSTRUCTION

    1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 13.7 MI SOUTH TO 10.5 MI
SOUTH OF CRESCENT CITY (DEL NORTE CO) 24 HRS A DAY 7 DAYS A WEEK THRU 2000 HRS 
ON 1/31/18 - DUE TO CONSTRUCTION

    1-WAY CONTROLLED TRAFFIC FROM 11 MI SOUTH TO 10.6 MI SOUTH OF CRESCENT CITY
(DEL NORTE CO) 24 HRS A DAY 7 DAYS A WEEK THRU 1700 HRS ON 6/1/18 - DUE TO 
CONSTRUCTION

    IS REDUCED TO 1 LANE IN EACH DIRECTION FROM 5.6 MI NORTH TO 6.3 MI NORTH
OF THE JCT OF SR 271 (HUMBOLDT CO) 24 HRS A DAY 7 DAYS A WEEK - DUE TO 
STORM DAMAGE REPAIR