Storm Water - Treatment BMP Design
Power Point Presentations
Separate training modules were developed for each Treatment BMP and selected related topics as LMS Training Course #100679; the information presented is based on the July 2006 PPDG Appendix B. The modules give an overview of the Treatment BMP and the engineering design criteria, and for some Treatment BMPs a design example is also given. These modules were presented as beta versions between June and September 2006.
Each presentation can be viewed printed; the accompanying text to the presentation is included.
- Introduction (Introduction)October 12, 2006
- Biofiltration Systems (Introduction) (Workshop Example) October 31, 2006
-
Infiltration Devices
- Basins (Introduction) (Workshop Example) October 31, 2006
- Trenches (Introduction) (Workshop Example)October 31, 2006
- Detention Devices (Introduction) (Workshop Example) October 31, 2006
- Traction Sand Traps (Introduction) (Workshop Example)October 31, 2006
- Dry Weather Flow Diversion (Introduction)October 17, 2006
- Gross Solids Removal Devices(Introduction)October 31, 2006
- Media Filters (Introduction) (Workshop Example)October 31, 2006
- Multi-Chamber Treatment Train (Introduction)October 31, 2006
- Wet Basins (Introduction) (Workshop Example)October 31, 2006
- Checklist T-1, Part 1 and the TDC Process (Presentation)October 16, 2006
- Checklists T-1, Parts 2 through 10 (Presentation) October 17, 2006
- Workshop Handout (Handout)October 31, 2006
Basin Sizer (to determine WQV for Infiltration Devices, Media Filters, Detention Devices, MCTTs, and Wet Basins)
[Download to Desktop and Print out as Notes pages]
This page last updated July 19, 2011