California Department of Transportation
 

Storm Water Data Report Examples

Example Number Project Type Project Phase Short Form Long Form EPA Waiver R factor Treatment BMPs T-1 Tools Risk level Calculation RUSLE II SWDR Tracking Form Multiple Location Project
1 Micro surfacing PID
PSE
PAED
X spacer spacer spacer spacer spacer spacer X spacer
2 Cold plan and overlay PID
PSE
PAED
X spacer spacer spacer spacer spacer   spacer spacer
3 Road rehabilitation and shoulder backing with over 1 acre disturbed soil area (DSA) PID
PSE
PAED
spacer X spacer spacer spacer X Xspacer X spacer
4 Road rehabilitation with shoulder backing with minimal DSA; routine maintenance PID
PSE
PAED
X spacer spacer spacer spacer spacer spacer X spacer
5 Road rehabilitation with over 1 acre DSA, but qualifies for EPA 1-5 acre waiver PID
PSE
PAED
X spacer X spacer spacer spacer spacer X spacer
6 Electric loop detectors and sign posts; less than 1 acre DSA PID
PSE
PAED
X spacer spacer spacer spacer spacer spacer X X
7 Culvert lining project, minimal DSA. No permits required PID
PSE
PAED
X spacer spacer spacer spacer spacer spacer X spacer
7A Culvert lining project, minimal DSA. Permits required PID
PSE
PAED
X spacer spacer spacer spacer spacer spacer X spacer
8 Turn pocket with 0.25 acres of net new impervious (NNI) area and 1 acre DSA; multiple location more than 1/4 apart PID
PSE
PAED
X spacer X spacer spacer spacer spacer X X
9 New bridge over a 303-d listed water body and less than 1 acre of NNI area, with 401 requirement PID
PSE
PAED
spacer X spacer X spacer X X X spacer
10 New high occupancy vehicle (HOV) lane with more than 1 acre of NNI area PID
PSE
PAED
spacer X spacer X X X X X spacer
11 Gross Solids Removal Device (GSRD) and other treatment installations within District 7 to address total maximum daily loads (TMDLs) for trash and metals PID
PSE
PAED
spacer X spacer X X X X X spacer
12 New Highway alingment of over 30 acres of NNI area PID
PSE
PAED
spacer X spacer X X X X X spacer

 

This page last updated June 9, 2011