B. Develop Initial Alternatives (150.10) - Develop Concept Alternatives (WBS 150.10.15)

P50. Request Traffic Management Plan

The project engineer may request a signal and lighting cost estimate along with or separately from a request for signal warrants. Normally, the costs of a new traffic signal or the modification of a signal or signal system are to be shared with a local agency. The level of participation is dependent upon factors discussed under the Traffic Manual, Chapter 9.02-5 Design Cost, and Chapter 9.02-6 Construction Cost. When a local agency participates in the various project costs, a Cooperative Agreement is required. Each agreement shall include a statement of ownership, maintenance and operation.

The project engineer should request a preliminary Electrical Design review and cost estimate for all projects that have any electrical involved. This would include but not limited to the following improvements:

  • Street Lighting
  • On- or off-ramp lighting
  • New or reconstructed signals
  • Fiber optics
  • Electrical service for landscaping equipment
  • Electrical service for pumping plants
  • Electrical service for temporary signals
  • Electrical service for any Traffic Operation Systems

Return to Table of Contents