| Subject: | Processing English Unit Projects | |
There are still a limited number of projects that have received metric exceptions and have not been constructed. This memorandum outlines the plan and specification requirements associated with delivering a project in English units.
Project Plans:
Project Specifications:
Current projects that have been granted an exception to use English units are listed in the attachment. Any projects that are being designed in English units that are not on the list will require processing a metric exception. You should anticipate that no new projects will be given an exception without complete justification.
Toll Seismic Retrofit projects currently in design phase, are provided a blanket metric exception. These projects are identified with an asterisk on the attached list. All of the plan/specification requirements outlined in this memo shall apply.
The effort required to deliver an English project should be discussed with the District Office Engineer, ESC Structure Design Office Engineer, and ESC Division of Office Engineer. Based on these discussions you may determine that it is more time and cost effective to deliver the project in metric units.
Encroachment permit projects (up to $1,000,000 in State right of way) may be delivered in dual units as indicated in the memorandum dated October 22, 1999, signed by Robert L. Buckley.
If you have any questions, please contact Terry Abbott, Metric
Coordinator, at (916) 653-0253.
Original Signed By
BRENT FELKER
Deputy Director
Project Development
Attachment
Return to Metric Home Page
| Dist | EA | Description |
|
|
|
PM |
|
| 01 | 3206U1 | Storm Damage Repair on Rte 1 0.5 mi N. of Juan Creek Bridge |
|
|
|
ASHLEY |
|
| 03 | 368401 | Yol-80 Mace Blvd OC Reconstruction |
|
|
|
DREHER,KL |
|
| 03 | 434200 | N-A |
|
|
|
BALOG,SJ |
|
| 03 | OM59U1 | Replace headers on bridge in Yolo Co. on I-5 |
|
|
|
- | - |
| 04 | 002821 | San Mateo Bridge Paint Storage Facility |
|
|
|
HISSEN, R. |
|
| 04 | 004941 | Remodel women's restrooms @ SFOBB Maintenance Bldg. |
|
|
|
HISSEN, R. |
|
| 04 | 012091* |
SFOBB Demolition East Spans |
|
|
|
MARONEY, B. |
|
| 04 | 013091* | Carquinez Demolition (1927) span |
|
- |
|
CHANG, S. | - |
| 04 | 021921 | San Diego-Coronado Abut. 1, Tower & Foundation, Pier 2-23 |
|
- | - | - | - |
| 04 | 04340K* (2-10C) | SFOBB East Bay Retrofit Design to P&Q |
|
- |
|
TERPSTRA, K. |
|
| 04 | 0434LK* (20) | SFOBB YBI Tunnel |
|
- |
|
TERPSTRA, K. |
|
| 04 | 04356K* (17) | SFOBB WB Suspension Towers |
|
- |
|
TERPSTRA, K. |
|
| 04 | 0435A1* | SFOBB West Approach Seismic Retrofit |
|
- |
|
TERPSTRA, K. |
|
| 04 | 0435C1* | SFOBB TTT Loops, 4th St. onramp, Viaduct Retrofit |
|
- |
|
TERPSTRA, K. |
|
| 04 | 043821* | Richmond-San Rafael Main Span Foundations & Towers |
|
- |
|
TERPSTRA, K. |
|
| 04 | 043841* | Richmond-San Rafael Main Super, Approaches & W Trestle |
|
- |
|
TERPSTRA, K. |
|
| 04 | 043921* | Carquinez WB Facility--RM-1 |
|
- |
|
CHANG, S. |
|
| 04 | 0E0261 | Farmers Lane Interchange |
|
|
|
FAKHARZADEH, S |
|
| 04 | 128991 | Pose Webster Radio System (Original Exception for 44010K) |
|
|
|
HISSEN, R. |
|
| 04 | 133331* (12) | SFOBB WB Approach; Main Line |
|
- |
|
TERPSTRA, K. |
|
| 04 | 133331* (13) | SFOBB WB Approach; Upper Off Ramps |
|
- |
|
TERPSTRA, K. |
|
| 04 | 133331* (14) | SFOBB WB Approach; TBTB & Harrison |
|
- |
|
TERPSTRA, K. |
|
| 04 | 135861 | SCR-1 PM 18.2/19.7 |
|
|
|
NG, S. D. |
|
| 04 | 141831 | LA-134; Arroyo Seco Br No. 53-0166 | - | - | - | - | - |
| 04 | 143511 | Seismic Ph 2 - Distribution Structure Br No 33-0061L |
|
- |
|
WELSH, M. E. |
|
| 04 | 14670K | Seismic Ph2 - Alameda Creek Br No 33-0039 |
|
- |
|
NG, S. D. |
|
| 04 | 148721 (121771 & 148711) | Seismic Ph 2 - Walnut Creek OC Br No 28-0258 |
|
- |
|
HISSEN, R. |
|
| 04 | 163221 | LA-710; Hobart Yard OH Br. No 53-0840 |
|
- | - | - | - |
| 04 | 171211 | LA-002; La Canada Br No. 53-0061; Slide Canyon Br No. 53-0063; Woodwordia Br No. 53-0086 | - | - | - | - | - |
| 04 | 174201 | Roadway rehab and left-turn channelization on Rte 29 from Mee Lane to Sulphur Creek |
|
|
|
FAKHARZADEH, S |
|
| 04 | (18) | SFOBB WB Suspension Superstructure |
|
- | - | - | - |
| 04 | 233971 | Construct Soundwall on Hwy 24 |
|
|
|
PANG, P. K. |
|
| 04 | 440111 | Pose Webster Stg 1 Seismic (Original Exception for 44010K) |
|
|
|
GEE, S. |
|
| 04 | 440131 | Pose Webster Stg 2 Seismic (Original Exception for 44010K & 440121), Demonstration |
|
- |
|
GEE, S. |
|
| 04 | 440141 | Pose Webster Stg 2 Seismic (Original Exception for 44010K & 440121 |
|
- |
|
GEE, S. | - |
| 05 | 019021 | Hatton Canyon |
|
|
|
J.R. PONCE |
|
| 05 | 444461 | Seismic Ph 2 - Huasna River Br No 49-0178 |
|
- |
|
W.D.O'HALLORAN |
|
| 06 | 019021 | 05-Mon-1 PM 72.0/75.1 |
|
|
- | - | - |
| 06 | 389301 | Tul-63 PM 4.6 Construct Bus Turnout |
|
|
|
S.A. SHAVER |
|
| 07 | 0N9801 | Construct Drainage System Santa Monica Fwy @ 20th/Hoover St. WB On-ramp |
|
|
- | - | - |
| 07 | 106951 | Construct one HOV lane in each dir. on Rte 10 from Baldwin Ave. to Rte 605 |
|
- |
|
HUANG, D |
|
| 07 | 107201 | Borchard Road Interchange Mod., VEN-101 PM 6.6/7.4 |
|
- |
|
VELASQUEZ, T |
|
| 07 | 117361 | West end approach span travellers on Rte 47 @ Vincent Thomas Bridge |
|
Exp |
|
ALAMEDDINE, E |
|
| 07 | 1194A1 | LA-105 PM R9.6/R10.0 Imperial Hwy at Willmington; Construct Hwy Grade Sep. (Phase2) |
|
- |
|
ALY, E |
|
| 07 | 119851 | HOV Lane ea. dir. LA-405 PM 21.3/26.0 |
|
|
|
NOVOTNY, S |
|
| 07 | 122401 | Construct HOV lane in each dir. on Rte 10 from Rte 57 to San Bernardino Co. Li ne |
|
|
|
PALAHA, J |
|
| 07 | 128400 | Henry Ford Avenue RR Grade Separation | - | - |
|
KOPPARAM, V |
|
| 07 | 131011 | TCM Building | 12/31/00 | - |
|
BUHA, D |
|
| 07 | 138201 | Seismic Ph 2 - Schuyler Heim Br No 56-2618 | 12/31/00 | - |
|
NOVOTNY, S |
|
| 07 | 139901 | LA-101 PM 10.3/11.0 |
|
|
|
WONG, R |
|
| 07 | 1N0801 | Repair/Landscape City street island @ 23rd & Figueroa |
|
|
|
SHETH, O |
|
| 08 | 268311 | SBd-138 PM T16.3/19.7 |
|
|
|
MORHIG, G. |
|
| 08 | 322001 | SBD-10 PM 8.5/9.6 |
|
|
|
RAZA, S. |
|
| 08 | 340801 | SBd-10 PM 15.3/17.0 |
|
- |
|
RAZA, S. |
|
| 08 | 354301 | RIV-215 PM R18.3/R18.7; O/C widening and ramp modificiation at Newport Rd. |
|
- |
|
SHIEH, C. |
|
| 08 | 371301 | Seismic Ph 2 - Colton I/C Br No 54-0471, 54-1064F and 54-0823G |
|
- |
|
RAZA, S. |
|
| 09 | 251201 | Iny-395 PM 41.4/45.6 |
|
|
|
C.L. HAACK |
|
| 09 | 262301 | Construct diversion channel E. of Rte 395 1.1 mi N. of Sage Flat Rd. |
|
|
|
D.GRAH |
|
| 09 | 346911 | Add passing lanes in both directions on Rte 395 from Princess Pat Mine Rd. to Proper Dr. |
|
|
- | - | - |
| 10 | 438441 | Planting for environmental mitigation on Route 37 near Napa River Bridge |
|
|
- | - | - |
| 10 | 495401 | Repair Bridge near Los Banos @ Rte 5/152 separation |
|
|
|
C. ADAMS |
|
| 11 | 010101 | Planting on Rte 52 from Rte 15 to 3.0 mi E. of Santo Rd. |
|
|
|
HAM, TOM |
|
| 11 | 010731 | SD-125 19.8/21.3 Sales Tax |
|
- |
|
HULL, JOE |
|
| 11 | 021931* | SD-Coronado Tower & Foundation, Pier 24-32 |
|
- |
|
ORSO-DELGADO |
|
| 11 | 021941* | San Diego-Coronado East Approach Ramps |
|
|
|
ORSO-DELGADO |
|
| 11 | 030171 | Construct NB Aux lanes, direct connector, widen, and grade for ultimate on Rte 5 & Rte 805 |
|
|
|
ALLISON, TIM |
|
| 11 | 030191 | Construct NB and SB HOV lanes on Rte 5 from Rte 805 to 0.3 mi N. of Del Mar Heights Rd. | - | - |
|
ALLISON, TIM |
|
| 12 | 071801 | Establish existing planting on Rte 5 from Alton Pkwy to Redhill Ave. |
|
|
- | - | - |
Return to Top