The OSFP Information and Procedures Guide contains the general policies and procedures of the Office of Special Funded Projects.

Manual Sections
Editable Attachments

MANUAL SECTIONS
   
All files are Adobe pdf unless otherwise shown.  
   
  Last
Document
Update

OSFP Information and Procedures Guide - Complete
   
Binder Cover Sheets
Jul 2007
Title Sheet
Jul 2007
Mar 2004
Mar 2004
 
1 General Information
     
Introduction
Jun 2002
Roles and Responsibilities
Jun 2002
Project Liaison and Oversight
Jun 2002
Published Design and Procedural documents
Jun 2002
Statement of Work for Structures
Mar 2004
Quality Control Plan
Jun 2002
Deliverables
Mar 2004
Updating Projects for Advertisement
Jun 2002
Project Records
Jun 2002
 
2 Typical Project Information
     
Bridge Names and Numbers
Jun 2002
Plans
Jun 2002
Foundation Report
Jun 2002
Hydraulics Report
Jun 2002
Field Assessments
Jun 2002
Miscellaneous Structures
Mar 2004
 
3 Project Initiation and Preliminary Engineering
     
Project Initiation
Jun 2002
Advance Planning Studies
Jun 2002
Value Analysis Studies
Jun 2002
3-4
PSRs & PSR/PDSs
Future
 
4 Design and Award
     
Preliminary Data
Oct. 2002
Structure Type Selection
Jun 2002
Unchecked Details Submittal
Jun 2002
PS&E Deliverables, Review, & Approval
Mar 2004
Structure Calculations
Mar 2004
Contract Special Provisions
Mar 2004
PS&E Estimates
Mar 2004
Road Plans and Special Provisions
Mar 2004
Resident Engineer's Pending File
Jun 2002
Pumping Plants
Sep 2003
4-11
Buildings
Future
Contract documents
Jun 2002
Addenda
Mar 2004
Bidder's Inquiries
Jun 2002
 
5 Construction
     
Roles and Responsibilities
Sep 2003
Contract Change Orders
Mar 2004
Cost Reduction Incentive Proposals
Mar 2004
Working Drawings and Submittals
Sep 2006
Structure As-Built Plans
Oct 2003
5-6
Final Report
Future
     
     
 
EDITABLE ATTACHMENTS
   
All files are Microsoft WORD unless otherwise shown.  
   
  Last
Document
Update

Statement of Work for Structures
Mar 2004
Quality Control Plan Checklist
Jun 2002
3-2.1 Consultant Prepared APS Checklist Jun 2004
4-1.1 Bridge Site Data Submittal (Preliminary Investigations) Mar 2003
4-1.2 Bridge or Structure Field Site Investigation Checklist Jun 2002
4-1.3 Railroad Separation Field Site Investigation Checklist Jun 2002
4-1.4 Bridge or Structure Hydraulic Site Survey Checklist Jun 2002
4-1.5 Foundation Plan Preparation Checklist Jun 2002
4-6.1 Memo To Specifications Engineer/Estimator Jan 2011
     
Forms referenced in Section 4-7 "PS&E Estimates":
     
Quantity Summaries & Cost Estimates (Structure Office Engineer)(EXCEL)
Working Days Schedule
     
     
 

Information for Persons with Sensory Disabilities