Listing for all primes seeking assistance with project 07-318004. 8 results found.
Contractor: HighLand Construction, Inc. Contact: Erin Richardson
Address: 133 N. Pixley St., Orange, CA 92868
Phone: 714-538-5156 Fax: 714-538-5157 Email: highlandinc@att.net
Services needed: HighLand Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE/SBE/DVBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Temporary Pavement Marking, Temporary Traffic Stripe, Channelizer, Temporary Pavement Marker, Temporary Railing, Temporary Crash Cushion Module, Job Site Management, Prepare Water Pollution Control Program, Temporary Concrete Washout, Remove Striping, Hot Mix Asphalt, Tack Coat, Temporary Support, Structural Concrete Bridge, , Structural Concrete Approach Slab, Paving Notch Extension, Drill and Bond Dowel, Clean Expansion Joint, Bonded Joint Seal, Joint Seal, Bar Reinforcing Steel, Public Safety Plan, Rapid Setting Concrete, Rapid Spalled Surface, Remove Concrete Deck Surface, Remove Unsound Concrete, Prepare Concrete Bridge Deck Surface, Refinish Concrete Surface, Treat Bridge Deck, Furnish Bridge Deck Treatment Material, Bridge Removal, Replace Bearing Pad, Remove Pavement Marker, Pavement Marker, Replace Glare Screen, Striping, Thermoplastic Pavement Marking, Maintaining Existing Traffic Management System Elements During Construction, Mobilization.
Requirements: We can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact our office. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Owners? requirements and will be required to sign HighLand Construction?s Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 133 North Pixley Street, Orange, CA 92868, between 8:00 AM and 3:00 PM Monday through Friday by appointment. Please call Erin Richardson at 714-538-5156. HighLand Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. HighLand Construction intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 09/26/2017
Contractor: Myers and Sons Construction, LP Contact: Joe Goehring
Address: 4600 Northgate Blvd., Suite 100 Sacramento, CA 95834
Phone: 916-283-9950 Fax: 916-614-9520 Email: jgoehring@myers-sons.com
Services needed: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY PAVEMENT MARKING (PAINT), TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), TEMPORARY PAVEMENT MARKER, TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, SWPPP, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), HMA, TACK COAT, FURNISH READY MIX, PAVING NOTCH EXTENSION, DRILL AND BOND DOWEL (CHEMICAL ADHESIVE), CLEAN EXPANSION JOINT, JOINT SEAL, REBAR, RAPID SETTING CONCRETE, REMOVALS, PREP CONCRETE BRIDGE DECK SURFACE, REFINISH CONCRETE SURFACE, TREAT BRIDGE DECK, FURNISH BRIDGE DECK TREATMENT MATERIAL, BRIDGE REMOVAL, REPLACE BEARING PAD, REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), REPLACE GLARE SCREEN, THERMOPLASTIC STRIPING & MARKING, PAINT TRAFFIC STRIPE, REMOVE PAINTED STRIPE, REMOVE THERMOPLASTIC STRIPING & MARKING, MAINTAIN EXISTING TRAFFIC MANAGEMENT SYSTEM, ETC.
Requirements: 100% performance and payment bonds may be required for the full amount of the subcontract price. Subcontractors must possess a valid contractor's license, DIR registration number, current insurance meeting Myers and Sons Construction's requirements. Subcontractors will be required to sign the standard Myers and Sons Construction, LP Subcontract Agreement. Quotations must be valid for one hundred and twenty (120) days after the specified Contract Award Date by the Owner. Plans and Specifications are available for viewing at our Sacramento office, please contact (916) 283-9950 or estimating@myers-sons.com. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies or visit our website at www.myers-sons.com for more information. Myers and Sons Construction, LP will work cooperatively with all qualified firms seeking work on this project. Myers and Sons Construction is signatory to the Laborers, Carpenters, Cement Masons and Operating Engineers. Myers and Sons Construction, LP is an equal opportunity employer.
Date posted: 09/28/2017
Contractor: Future DB International Inc. Contact: Estimating
Address: 8707 Research Dr Irvine, CA 92618
Phone: 949-390-2110 Fax: 949-732-4355 Email: estimating@futuredbi.com
Services needed: Future DB is requesting bids from qualified subcontractors and suppliers including DBE?s for the following items of work, including but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, STRIPING, K-RAIL, CRASH CUSHION, SWPPP, HMA, TACK COAT, STRUCTURAL CONCRETE, REBAR, PAVING NOTCH, DRILL AND BOND, EXPANSION JOINT CLEANING, JOINT SEAL, RAPID SETTING CONCRETE, CONCRETE REMOVAL, BRIDGE DECK TREATMENT MATERIAL, BEARING PAD, GLARE SCREEN, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS.
Requirements: We are an equal opportunity employer. Subcontractors must possess a current contractor?s license, insurance and Worker?s Compensation Insurance coverage meeting the requirements and will be required to sign a subcontract agreement. 100% Payment and Performance Bonds may be required. Future DB will provide assistance in Bonding, Insurance, Equipment, Supplies and Material if necessary.
Date posted: 09/29/2017
Contractor: J. McLoughlin Engineering Co., Inc. Contact: Joe McLoughlin
Address: 10641 Fulton Ct. Rancho Cucamonga, CA 91730
Phone: 909-944-1037 Fax: 909-944-3112 Email: Berenice@jmeci.com
Services needed: J. McLoughlin Engineering Co., Inc. (JMECI) is requesting quotes from all qualified subcontractors and suppliers especially certified DBE?s (This project has a 15% DBE Requirement) firms for the following items of work, including but not limited to: Trucking, Street Sweeping, Equipment Rental, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Temp Pavement Marking (Paint), Temp Traffic Stripe (Paint), Channelizer (Surface Mounted), Temp Pavement Marker, Temp Railing (Type K), Temp Crash Cushion Module, Job Site Management, Prepare Water Pollution Control Program, Temp Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Hot Mix Asphalt (Bride), Tack Coat, Temp Support, Structural Concrete, Bridge (RSC), Structural Concrete, Approach Slab (Type R), Paving Notch Extension, Drill and Bond Dowel (Chemical Adhesive)(LF), Clean Expansion Joint, Bonded Joint Seal(MR 1 ??), Joint Seal (MR ??, Joint Seal Type AL, Bar Reinforcing Steel (Bridge), Public Safety Plan, Rapid Setting Concrete (Patch), Repair Spalled Surface Area, Remove Concrete Deck Surface, Remove Unsound Concrete, Prepare Concrete Bridge Deck Surface, Refinish Concrete Surface, Treat Bridge Deck, Furnish Bridge Deck Treatment Material, Bridge Removal (Portion) Location A, B, C, D, E, F, G, H, and I, Replace Bearing Pad, Remove Pavement Marker, Pavement Marker (Retroreflective), Replace Glare Screen, 6? Thermoplastic Traffic Stripe, 8? Thermoplastic Traffic Stripe, 8? Thermoplastic Traffic Stripe (Broken 12-3), Thermoplastic Pavement Marking, 6? Thermoplastic Traffic Stripe (Broken 36-12), 6? Thermoplastic Traffic Stripe (Broken 17-7), 8? Thermoplastic Traffic Stripe (Broken 36-12), Paint Traffic Stripe (2-Coat), Remove Painted Traffic Stripe, Remove Thermoplastic Traffic Pavement Marking, and Maintaining Existing Traffic Management System Elements During Construction. Quotations will be broken down into comparable packages as reasonably necessary. JMECI will work with interested subcontractors/vendors/suppliers to identify opportunities to break down items into economically feasible packages. PLEASE DO NOT E-MAIL QUOTES.
Requirements: Subcontractors must possess a current contractor?s license, and provide General Liability, Auto and Worker?s Compensation Insurance meeting the minimum requirements required by JMECI and will be required to sign a Subcontract Agreement and / or Purchase Order if necessary. 100% performance and payment bonds may be required for the full amount of subcontract price. JMECI will provide assistance in Bonding, Line of Credit, Insurance, Equipment, Supplies, and Materials if necessary to all qualified subcontractors. Plans and Specifications are available for viewing by appointment only at our office located at 10641 Fulton Ct., Rancho Cucamonga, CA 91730. J. McLoughlin Engineering Co., Inc. intends to work cooperatively with all qualified firms seeking work on this project. JMECI is an Equal Opportunity Employer. PLEASE DO NOT E-MAIL QUOTES.
Date posted: 10/02/2017
Contractor: Powell Constructors, Inc. Contact: Sherri Evans
Address: 8555 Banana Avenue Fontana, CA 92335
Phone: 909-356-8880 Fax: 909-356-1299 Email: sherri@powellconstructors.com
Services needed: Powell Constructors, Inc. is seeking quotes from all qualified subcontractors and suppliers including certified DBE firms. ALL BID ITEMS ARE OPEN FOR BID, including items of work normally performed by Powell Constructors, Inc. LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PAVEMENT MARKING & STRIPING, JOB SITE MANAGEMENT, PREPARE WPCP, TEMPORARY CONCRETE WASHOUT, ASPHALT CONCRETE PAVEMENT, TEMPORARY SUPPORT, STRUCTURAL CONCRETE, PAVING NOTCH EXTENSION, DRILL AND BOND DOWEL (CHEMICAL ADHESIVE), CLEAN EXPANSION JOINT, JOINT SEAL, BAR REINFORCING STEEL, PUBLIC SAFETY PLAN, REPAIR AND PATCH SPALLED SURFACE AREA, REMOVE CONCRETE DECK SURFACE, REMOVE UNSOUND CONCRETE, PREPARE CONCRETE BRIDGE DECK SURFACE, REFINISH CONCRETE SURFACE, TREAT BRIDGE DECK, FURNISH BRIDGE DECK TREATMENT MATERIAL, BRIDGE REMOVAL, REPLACE BEARING PAD, REPLACE GLARE SCREEN, AND MAINTAIN EXISTING TMS ELEMENTS. Quotations will be broken down into comparable packages as reasonably necessary. Powell Constructors, Inc. will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: Union Signatory, 100% Payment and Performance Bonds from an accepted surety may be required. Powell Constructors, Inc. will reimburse subcontractor for bond premium up to 2%. Assistance in bonding, insurance, lines of credit or obtaining equipment, supplies, materials, or related assistance or services is available upon request. Subcontractors must possess a current contractor's license and provide General Liability, Auto and Worker's Compensation Insurance meeting the minimum requirements per the specifications. Subcontractors must also be registered with the Department of Industrial Relations (DIR) pursuant to the Labor Code section 1725.5. Powell Constructors, Inc. is an Equal Opportunity Employer and encourage DBE participation.
Date posted: 10/02/2017
Contractor: USS Cal Builders, Inc. Contact: Estimating
Address: 8051 Main Street Stanton, CA 90680
Phone: 714-828-4882 Fax: 714-503-6805 Email: bidding@usscalbuilders.com
Services needed: USS Cal Builders is seeking qualified DBE subcontractors, suppliers and firms to meet or exceed the 15% goal of this project. The Work includes, but is not limited to: construction on state highway in Los Angeles County at various locations from Fremont Avenue undercrossing to Rio Hondo62. Lead Compliance Plan, Construction Area Signs, Traffic Control System, Temporary Pavement Marking (Paint), Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Temporary Pavement Marker, Temporary Railing (Type K), Temporary Crash Cushion Module, Job Site Management, Prepare Water Pollution Control Program, Temporary Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Hot Mix Asphalt (Bridge), Tack Coat, Temporary Support, Structural Concrete, Bridge (Rsc), Structural Concrete, Approach Slab (Type R), Paving Notch Extension, Drill And Bond Dowel (Chemical Adhesive)(Lf), Clean Expansion Joint, Bonded Joint Seal (Mr 1 1/2"), Joint Seal (Mr 1/2"), Joint Seal (Type Al), Bar Reinforcing Steel (Bridge), Public Safety Plan, Rapid Setting Concrete (Patch), Repair Spalled Surface Area, Remove Concrete Deck Surface, Remove Unsound Concrete, Prepare Concrete Bridge Deck Surface, Refinish Concrete Surface, Treat Bridge Deck, Furnish Bridge Deck Treatment Material, Bridge Removal (Portion), Location A, Bridge Removal (Portion), Location B, Bridge Removal (Portion), Location C, Bridge Removal (Portion), Location D, Bridge Removal (Portion), Location E, Bridge Removal (Portion), Location F, Bridge Removal (Portion), Location G, Bridge Removal (Portion), Location H, Bridge Removal (Portion), Location I, Replace Bearing Pad, Remove Pavement Marker, Pavement Marker (Retroreflective), Replace Glare Screen, 6" Thermoplastic Traffic Stripe, 8" Thermoplastic Traffic Stripe, 8" Thermoplastic Traffic Stripe (Broken 12-3), Thermoplastic Pavement Marking, 6" Thermoplastic Traffic Stripe (Broken 36-12), 6" Thermoplastic Traffic Stripe (Broken 17-7), 8" Thermoplastic Traffic Stripe (Broken 36-12), Paint Traffic Stripe (2-Coat), Remove Painted Traffic Stripe, Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, Maintaining Existing Traffic Management System Elements During Construction. For detailed line items, please go to: http://usscal.syncedtool.com/shares/file/fc333963a728ca/.
Requirements: If requested, USS Cal Builders can assist subs in obtaining bonds, lines of credit and insurance in the preparation of this project. USS Cal can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. USS Cal is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. USS Cal's listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications. Each listed subcontractor must execute USS Cal's standard subcontract agreement if USS Cal is awarded the project; the standard subcontract is available for review on USS Cal's website (www.usscalbuilders.com ) and at USS Cal's office. At the discretion of USS Cal, any listed subcontractor that withdraws its bid after USS Cal submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor. This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement. USS Cal Builders, Inc. is signatory to the Carpenter's Union. Any subcontractor performing carpentry work must be signatory to the Carpenter's Union. An Equal Opportunity Employer.
Date posted: 10/09/2017
Contractor: Beador Construction Company, Inc. Contact: Roxana Quezada
Address: 26320 Lester Circle Corona, CA 92883
Phone: 951-674-7352 Fax: 951-674-7495 Email: roxana.quezada@beador.com
Services needed: Beador Construction, Inc. is requesting quotes on all items to complete the project, including but not limited to the following:Lead Compliance Plan, Construction Area Signs, Traffic Control System, Temporary Pavement Marking, Temporary Traffic Stripe, Channelizer, Temporary Pavement Marker, Temporary Railing, Temporary Crash Cushion Module, Job Site Management, Prepare Water Pollution Control Program, Temporary Concrete Washout, Remove Striping, Hot Mix Asphalt, Tack Coat, Temporary Support, Structural Concrete Bridge, , Structural Concrete Approach Slab, Paving Notch Extension, Drill and Bond Dowel, Clean Expansion Joint, Bonded Joint Seal, Joint Seal, Bar Reinforcing Steel, Public Safety Plan, Rapid Setting Concrete, Rapid Spalled Surface, Remove Concrete Deck Surface, Remove Unsound Concrete, Prepare Concrete Bridge Deck Surface, Refinish Concrete Surface, Treat Bridge Deck, Furnish Bridge Deck Treatment Material, Bridge Removal, Replace Bearing Pad, Remove Pavement Marker, Pavement Marker, Replace Glare Screen, Striping, Thermoplastic Pavement Marking, Maintaining Existing Traffic Management System Elements During Construction
Requirements: Union Signatory, Subcontractors may be required to provide 100% Payment and Performance Bonds from a surety acceptable to Beador Construction, Beador will reimburse for bond premium not to exceed 1% of subcontract. Subcontractors will be required to meet Beador?s insurance requirements. Per current state regulations, please provide a current DIR number and expiration date with your quote. Plans and specifications are available from the Caltrans website or you may contact Beador for a copy to be emailed. Subcontractor scope (including any conditions or exceptions) is required via fax 24 hours prior to bid deadline to allow proper evaluation. Quotes are required to be in accordance with the plans and specifications and good for the contract duration as specified in the bid documents. Beador encourages all minorities including but not limited to DBE/UDBE/SBE/DVBE participation and intends to work cooperatively with all qualified companies seeking work on this project. Beador is an Equal Opportunity Employer. ** Please do not e-mail quotes, fax them to 951-674-7495.** Beador Construction intends to work cooperatively with all qualified firms seeking work on this project, do not hesitate to call our office with any questions. DO NOT EMAIL QUOTES, PLEASE FAX TO 951-674-7495 QUOTES MUST BE FAXED 1 HOUR BEFORE BID DUE TIME.
Date posted: 10/16/2017
Contractor: NBG CONSTRUCTION SERVICES Contact: GLENN CAMPBELL
Address: 22772 CENTRE DR, STE 120 Lake Forest, CA 92630
Phone: 949-434-9297 Fax: 949-589-6897 Email: anichols@nbgcs.com
Services needed:
Requirements:
Date posted: 10/18/2017