Listing for all primes seeking assistance with project 07-312404. 4 results found.
Contractor: HighLand Construction, Inc. Contact: Erin Richardson
Address: 133 N. Pixley St., Orange, CA 92868
Phone: 714-538-5156 Fax: 714-538-5157 Email: highlandinc@att.net
Services needed: HighLand Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE/SBE/DVBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Jobsite Management, Prepare Water Pollution Control Program, CPM Schedule, Temporary Traffic Stripe (Paint), Temporary Railing (Type K), Temporary Crash Cushion Module, Temporary Cover, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Street Sweeping, Temporary Concrete Washout, Remove Traffic Strip (HW), Treated Wood Waste, Clearing & Grubbing, Roadway Excavation, Roadway Excavation (ADL Type-Z-2), Ditch Excavation, Roadside Clearing, Slow-release Fertilizer, Plants (Group A,B,H, & U), Plant Establishment Work, Wood Mulch, C & T Existing Irrigation Facilities, Operate Existing Irrigation Facilities, Remove Irrigation Facility, Sprinkler Assembly, Plastic Pipe Supply Lines, Hydro mulch, Hydro seed, Compost, Incorporate Materials, Class 3 Aggregate Base, Lean Concrete Base, Hot Mix Asphalt, HMA Dike (Types A,C,D ), Tack Coat, Structural Concrete Drainage & Headwall, Minor Concrete, RCP, Sand Backfill, Rock Slope Protection (#1 Method B), Rock Slope Protection Fabric, (Class 8), Misc. Metal, Delineator (Class 1), Pavement Markers, Midwest Guardrail System, Vegetation Control (MC), Remove Guardrail, Striping, Modifying Existing Electrical System.
Requirements: We can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact our office. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Owners? requirements and will be required to sign HighLand Construction?s Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 133 North Pixley Street, Orange, CA 92868, between 8:00 AM and 3:00 PM Monday through Friday by appointment. Please call Erin Richardson at 714-538-5156. HighLand Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. HighLand Construction intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 10/31/2017
Contractor: GRANITE CONSTRUCTION COMPANY Contact: DIANNE CARLISLE
Address: 5335 DEBBIE LANE SANTA BARBARA CA 93111
Phone: 805 964 9951 Fax: 805 967 1431 Email: DIANNE.CARLISLE@GCINC.COM
Services needed: GRANITE CONSTRUCTION COMPANY An Equal Opportunity Employer requests subquotes from all qualified subcontractors and suppliers including certified DBE firms performing commercially useful function for the following items of work, including but not limited to: LEAD COMPLIANCE PLAN PROGRESS SCHEDULE (CRITICAL PATH METHOD) CONSTRUCTION AREA SIGNS TRAFFIC CONTROL SYSTEM TEMPORARY TRAFFIC STRIPE (PAINT) TEMPORARY RAILING (TYPE K) TEMPORARY CRASH CUSHION MODULE JOB SITE MANAGEMENT PREPARE WATER POLLUTION CONTROL PROGRAM TEMPORARY COVER TEMPORARY DRAINAGE INLET PROTECTION TEMPORARY FIBER ROLL STREET SWEEPING TEMPORARY CONCRETE WASHOUT REMOVE YELLOW PAINTED TRAFFIC STRIPE (HAZARDOUS WASTE) REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE) TREATED WOOD WASTE CLEARING AND GRUBBING (LS) ROADWAY EXCAVATION ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) DITCH EXCAVATION ROADSIDE CLEARING SLOW-RELEASE FERTILIZER PLANT (GROUP H) PLANT (GROUP A) PLANT (GROUP B) PLANT (GROUP U) PLANT ESTABLISHMENT WORK WOOD MULCH CHECK AND TEST EXISTING IRRIGATION FACILITIES OPERATE EXISTING IRRIGATION FACILITIES REMOVE IRRIGATION FACILITY 1 1/2" REMOTE CONTROL VALVE RISER SPRINKLER ASSEMBLY (GEAR DRIVEN) POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN) RISER SPRINKLER ASSEMBLY POP-UP SPRINKLER ASSEMBLY TEMPORARY IRRIGATION SYSTEM 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) BALL VALVE HYDROMULCH HYDROSEED COMPOST (CY) INCORPORATE MATERIALS CLASS 3 AGGREGATE BASE (CY) LEAN CONCRETE BASE HOT MIX ASPHALT (TYPE A) PLACE HOT MIX ASPHALT DIKE (TYPE A) PLACE HOT MIX ASPHALT DIKE (TYPE C) PLACE HOT MIX ASPHALT DIKE (TYPE D) PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) TACK COAT STRUCTURAL CONCRETE, HEADWALL STRUCTURAL CONCRETE, DRAINAGE INLET MINOR CONCRETE (BACKFILL) 8" PLASTIC PIPE 18" REINFORCED CONCRETE PIPE 24" REINFORCED CONCRETE PIPE 18" CONCRETE FLARED END SECTION 24" CONCRETE FLARED END SECTION MAINTENANCE DRAIN VALVE ABANDON PIPELINE REMOVE PIPE (LF) REMOVE INLET REMOVE ASPHALT CONCRETE OVERSIDE DRAIN REMOVE FLARED END SECTION (EA) SAND BACKFILL ROCK SLOPE PROTECTION (NO. 1, METHOD B) (CY) ROCK SLOPE PROTECTION FABRIC (CLASS 8) MISCELLANEOUS METAL 6' CHAIN LINK GATE (TYPE CL-6) REMOVE CHAIN LINK FENCE REMOVE PAVEMENT MARKER DELINEATOR (CLASS 1) PAVEMENT MARKER (RETROREFLECTIVE) MIDWEST GUARDRAIL SYSTEM VEGETATION CONTROL (MINOR CONCRETE) END ANCHOR ASSEMBLY (TYPE SFT) ALTERNATIVE IN-LINE TERMINAL SYSTEM REMOVE GUARDRAIL 6" THERMOPLASTIC TRAFFIC STRIPE 8" THERMOPLASTIC TRAFFIC STRIPE 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 36-12) REMOVE PAINTED TRAFFIC STRIPE REMOVE THERMOPLASTIC TRAFFIC STRIPE MODIFYING EXISTING ELECTRICAL SYSTEM MOBILIZATION including items of work normally performed by Granite. Quotations will be broken down into comparable packages as reasonably necessary. Granite will work with interested DBE subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: Granite Construction Company (Granite) is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds required for the full amount of subcontract price. Bonding assistance is available. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. For any bid proposal submitted on or after March 1, 2015 and any contract for public work entered into on or after April 1, 2015, the following registration requirements apply: Every Subcontractor is required to be registered to perform public work pursuant to Section 1725.5 of the Public Contract Code (?Section 1725.5?). No Contractor or Subcontractor shall be qualified to bid on, be listed in a bid proposal pursuant to Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered to perform public work pursuant to Section 1725.5. No bid shall be accepted nor any subcontract entered into without proof of the Subcontractor?s current registration to perform public work pursuant to Section 1725.5. *PLEASE PROVIDE DIR # WITH QUOTE* Plans and specifications are available for viewing at our office located at: 5335 DEBBIE LANE SANTA BARBARA CA 93111 Please call if you need any bidding assistance including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies. Granite intends to work cooperatively with all qualified DBE firms seeking work on this project. Granite Construction Company 5335 DEBBIE LANE SANTA BARBARA CA 93111 CONTACT ESTIMATOR : Randy Wagner randy.wagner@gcinc.com BID DAY IF EMAILING PLEASE ALSO SEND TO DIANNE.CARLISLE@GCINC.COM
Date posted: 10/31/2017
Contractor: Future DB International Inc. Contact: Hasan Boura
Address: 8707 Research Dr Irvine, CA 92618
Phone: 949-390-2110 Fax: 949-732-4355 Email: estimating@futuredbi.com
Services needed: Future DB is requesting bids from qualified subcontractors and suppliers including DBE?s for the following items of work, including but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL,STRIPING, TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, SWPPP, TEMPORARY COVER, DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TREATED WOOD WASTE, ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), DITCH EXCAVATION, IRRIGATION, WOOD MULCH, LANDSCAPING, CLASS 3 AGGREGATE BASE (CY), LEAN CONCRETE BASE, HMA, HMA DIKE, TACK COAT, STRUCTURAL CONCRETE, REINFORCED CONCRETE PIPE, CONCRETE FLARED END SECTION,DRAINAGE,DEMO, ROCK SLOPE PROTECTION, MISCELLANEOUS METAL, 6' CHAIN LINK GATE (TYPE CL-6), FENCING, MIDWEST GUARDRAIL SYSTEM, MINOR CONCRETE, END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE IN-LINE TERMINAL SYSTEM, MODIFYING EXISTING ELECTRICAL SYSTEM.
Requirements: We are an equal opportunity employer. Subcontractors must possess a current contractor?s license, insurance and Worker?s Compensation Insurance coverage meeting the requirements and will be required to sign a subcontract agreement. 100% Payment and Performance Bonds may be required. Future DB will provide assistance in Bonding, Insurance, Equipment, Supplies and Material if necessary.
Date posted: 11/14/2017
Contractor: Union Engineering Company, Inc. Contact: Carly Ford
Address: 1399 Arundell Avenue Ventura, CA 93003
Phone: 805-644-3373 Fax: 805-644-3380 Email: unioneng@att.net
Services needed: Union Engineering Company, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified UDBE/DBE/SBE/DVBE firms for the following items of work, including but not limited to: CPM SCHEDULE, SWPPP, LEAD COMPLIANCE, ELECTRICAL, TRAFFIC CONTROL, CONSTRUCTION AREA SIGNS, STREET SWEEPING, PAVEMENT MARKING, GUARDRAIL SYSTEM, TEMP K RAIL, LANDSCAPING, IRRIGATION, HYDROSEED, HYDROMULCH, WOODMULCH, HOT MIX ASPHALT, REINFORCED CONCRETE PIPE, MISC. METAL, ROADWAY EXCAVATION (ADL TYPE Z-2), CONCRETE WASH OUT.
Requirements: UNION ENGINEERING COMPANY, INC. IS SIGNATORY TO CARPENTERS, CEMENT MASONS, LABORERS AND OPERATING ENGINEERS UNIONS. 100% PERFORMANCE & PAYMENT BONDS MAY BE REQUIRED FOR THE FULL AMOUNT OF THE SUBCONTRACT PRICE. ASSISTANCE IS AVAILABLE UPON REQUEST. SUBCONTRACTORS MUST BE REGISTERED WITH THE DIR AND POSSESS A CURRENT CONTRACTOR'S LICENSE. LIABILITY, AUTO AND WORKER'S COMPENSATION INSURANCE COVERAGE MEETING THE PROJECTS REQUIREMENTS IS ALSO REQUIRED. SUBCONTRACTORS WILL BE REQUIRED TO SIGN THE STANDARD AGC SUBCONTRACT AGREEMENT. PLANS AND SPECS ARE AVAILABLE FOR VIEWING AT OUR OFFICE LOCATED AT: 1399 ARUNDELL AVENUE, VENTURA, CA 93003. UNION ENGINEERING COMPANY, INC. IS AN EQUAL OPPORTUNITY EMPLOYER AND INTENDS TO WORK COOPERATIVELY WITH ALL QUALIFIED COMPANIES SEEKING WORK ON THIS PROJECT.
Date posted: 11/15/2017