Listing for all primes seeking assistance with project 06-0U09U4. 1 results found.
Contractor: A. Teichert & Son, Inc. dba Teichert Construction Contact: Nathan Rinaldi
Address: 400 Sunrise Avenue, Suite 300 Roseville, CA 95661
Phone: 559-813-3100 Fax: 559-813-3055 Email: NRinaldi@teichert.com
Services needed: Project Description: Teichert Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: all materials, labor and equipment for Construction Area Signs, Traffic Control System, Resent, Adjust Roadway Items, Plane Asphalt Concrete, Clearing & Grubbing, Erosion Control, Temporary Erosion Control, Groove & Grind Pavement, Minor Concrete Structure, Reinforcing Steel, Pipe Lining (Cement Mortar), Roadside Sign, Reinforced Concrete Pipe, Downdrain, Misc. Iron & Steel Frame, Cover & Grate, Metal Railing, Metal Beam Guard Railing, Thermoplastic Traffic Striping and Marking, Painted Traffic Striping & Marking, Pavement Marking, Petroleum, Oil, Lubricants Supplier (Bulk Item), Sand & Gravel Supplier (Bulk Item), Asphalt Supplier (Bulk Item), Concrete & Cement Supplier (Bulk Item), Pipe Supplier, Wholesale Broker of Construction Materials (No Inventory), Broker, Archeology, LEAD Compliance, SWPPP Planning, Bottom; Transfer; Super 10; End Dump Trucks, Flat Bed Trucking, Water Truck, Asphalt Oil Tankers, Street Sweeping Truck, Truck Rental, Trucker Broker and Trucker.
Requirements: Request for qualified bids from Subcontractors, Suppliers & Truckers for the following project: Project: Construction on State Highway in Fresno County in and near Shaver Lake from 0.2 mile West of Auberry Road to Kaiser Pass Road ? Contract No. 06-0U09U4 Bid Date: 5/24/18 @ 2:00 PM Docs & Plans Available from Caltrans http://www.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php Estimate: $11,300,000 Duration: 140 working days Agency Goals: 12% DBE Teichert Construction intends to work cooperatively with all qualified firms seeking work on this project, including but not limited to breaking out contract work items into economically feasible units to increase overall DBE participation. Plans and specifications are available from the municipality listed above and the Teichert?s Roseville Estimating office. For assistance obtaining or regarding the plans and specifications, please contact the listed Estimator. 100% Payment and Performance Bonds for subcontractors are required. Teichert will pay bond premium up to 2%. Insurance Waiver of subrogation also required. However, certified DBE's are encouraged to contact Teichert and request assistance if they are unable to meet Teichert's standard bonding or insurance requirements. DBE's also are encouraged to contact Teichert for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services. Subcontractor, Supplier and Trucker quotes must be valid, at minimum, for the award period stated in the contract documents. Please note that this is a prevailing wage project and Teichert Construction is Union signatory. Subcontractors will be subject to the terms and conditions of Teichert's subcontract and safety documents available at www.teichert.com/for-subcontractors.cfm. Submission of a bid to Teichert will confirm that you have reviewed and accepted Teichert's subcontract form. Conditions or exceptions in Subcontractor?s quote are expressly rejected unless accepted in writing prior to bid. Subcontractor scopes and supplier quotes are required 24 hours prior to bid. Additional information and or assistance to DBE's available from: *** All Subcontractor Quotes must have the Department of Industrial Relations # to be ACCEPTED ***
Date posted: 04/19/2018