Listing for all primes seeking assistance with project 06-0T2104. 3 results found.
Contractor: Emmett's Excavation, Inc. Contact: John Emmett
Address: 6207 E. Clinton Avenue Fresno, CA 93727
Phone: 559-347-9188 Fax: 559-348-9272 Email: emmetts@eei78.com
Services needed: Services needed: Emmett?s Excavation, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE, MBE, WBE, SBE, DVBE, and or any other certified minority or underutilized firms for the following project & items of work, including but not limited to the items listed below: Lead Compliance Plan, Prepare Water Pollution Control Program, CAS, Traffic Control System, Type III Barricade, PCMS, Temp Drainage Inlet Protection, Temp Silt Fence, High Visibility Temp Fence (Type ESA), Clearing and Grubbing, Roadway Excavation, Roadside Clearing, Boulder, Hot Mix Asphalt, Class 2 Aggregate Base, Wood Mulch, bonded Fiber matrix, Minor Hot Mix Asphalt, HMA Dike (Type A), Railings, Structural Concrete, Minor Concrete, Rebar, Furnish Single Sheet Aluminum Sign, Roadside Sign, Minor Concrete (Misc.) and (Exposed Aggregate Concrete), Electrical, Iron and Steel, Paint Traffic Stripe and Marking (2-Coat), Trucking and any and all bid items involved
Requirements: Requirements: Emmett?s Excavation, Inc. is signatory to Operating Engineers, Laborers, Cement Masons, and Carpenters Unions. 100% performance and payment bonds may be required for the full amount of the subcontract price. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation insurance coverage meeting Emmett?s Excavation, Inc?s requirements and will be required to sign the standard Emmett?s Excavation, Inc. Subcontract Agreement. A copy of the insurance requirements and agreements can be obtained by contacting Emmett?s Excavation, Inc. at (559) 347-9188. Plans and specifications are available for viewing through the following: on the Caltrans website at http://www.dot.ca.gov/hq/esc/oe/weekly_ads/all_advertised.php, or our office located at 6207 E. Clinton Avenue, Fresno, CA 93727. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies, or any other information or assistance to help you to be able to bid on this project. Emmett?s Excavation, Inc. will break out smaller portions of work to make it more feasible for smaller subcontractors and suppliers, as needed. Emmett?s Excavation, Inc. intends to work cooperatively with all qualified firms seeking work on this project. Emmett?s Excavation, Inc. is an equal opportunity employer.
Date posted: 06/25/2018
Contractor: A. Teichert & Son, Inc. dba Teichert Construction Contact: Mike Stephenson
Address: 400 Sunrise Avenue, Suite 300 Roseville, CA 95661
Phone: 209-373-8554 Fax: 559-813-3055 Email: MStephenson@teichert.com
Services needed: Teichert Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: all materials, labor and equipment for Construction Area Signs, Traffic Control System, Reset, Adjust Roadway Items, Plane Asphalt Concrete, Modify Bridge Item, Clearing & Grubbing, Roadway Excavation, Grading, Soil Amendments, Temporary Erosion Control, Finishing Roadway, Aggregate Base, Asphalt Concrete, Paving Asphalt (Asphalt Concrete), SAMI Seal, Placer Asphalt Concrete Dike & Misc., Recycle, Reclaim Asphalt Concrete, Portland Cement & Concrete Pavement, Joint Seal ? Water Stop, Roadside Sign, Filter Fabric, Rock Slope Protection, Concrete Curb & Sidewalk ? Misc., Temporary Fencing, Metal Beam Guard Railing, Thermoplastic Striping & Marking, Pavement Marking, Signal, Lighting, Message Signs, Lighting & Sign Illumination, Landscaping Contractor, Hydroseed, Construction Equipment Rental, Heavy Equipment Rental, Demolition, Safety Equipment Supplier, Sand & Gravel Supplier (Bulk Item), Asphalt Supplier (Bulk Item), Concrete & Cement Supplier (Bulk Item), Reinforcing Bar Section Supplier, Wholesale Broker of Construction Materials (No Inventory), LEAD Compliance, SWPPP Planning, Bottom, Transfer, Super 10, and End Dump Trucks, Water Truck, Asphalt Oil Tankers, Street Sweeping Truck, Truck Rental, Trucker Broker and Trucker
Requirements: Request for qualified bids from Subcontractors, Suppliers & Truckers for the following project: Project: Construction on State Highway in Madera County in and near Chowchilla from Route 152/99 Separation to Merced County Line ? Contract No. 06-0T2104 Bid Date: 7/24/18 @ 2:00 PM Docs & Plans Available from Caltrans http://www.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php Estimate: $13,800,000 Duration: 170 Working Days Agency Goals: 15% DBE Teichert Construction intends to work cooperatively with all qualified firms seeking work on this project, including but not limited to breaking out contract work items into economically feasible units to increase overall DBE participation. Plans and specifications are available from the municipality listed above and the Teichert?s Roseville Estimating office. For assistance obtaining or regarding the plans and specifications, please contact the listed Estimator. 100% Payment and Performance Bonds for subcontractors are required. Teichert will pay bond premium up to 2%. Insurance Waiver of subrogation also required. However, certified DBE's are encouraged to contact Teichert and request assistance if they are unable to meet Teichert's standard bonding or insurance requirements. DBE's also are encouraged to contact Teichert for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services. Subcontractor, Supplier and Trucker quotes must be valid, at minimum, for the award period stated in the contract documents. Please note that this is a prevailing wage project and Teichert Construction is Union signatory. Subcontractors will be subject to the terms and conditions of Teichert's subcontract and safety documents available at www.teichert.com/for-subcontractors.cfm. Submission of a bid to Teichert will confirm that you have reviewed and accepted Teichert's subcontract form. Conditions or exceptions in Subcontractor?s quote are expressly rejected unless accepted in writing prior to bid. Subcontractor scopes and supplier quotes are required 24 hours prior to bid. Additional information and or assistance to DBE's available from: *** All Subcontractor Quotes must have the Department of Industrial Relations # to be ACCEPTED ***
Date posted: 06/26/2018
Contractor: Granite Construction Company Contact: Mark Curfman
Address: 2716 Granite Court Fresno, CA 93706
Phone: 559-441-5700 Fax: 559-441-5791 Email: mark.curfman@gcinc.com
Services needed: Granite Construction Company is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Provide Lead Compliance Plan, Construction Area Signs, Roadside Signs, Traffic Control, Prepare WPCP, Provide Aggregates, Provide HMA Binder, Erosion Control, SAMI Rubber Chip Seal, HMA Dike, Provide Tack, Cold Plane Asphalt, RSC Panel Replacement, Concrete Approach Slab, Minor Concrete (Textured Paving & Curbing), Delineators & Markers, Guardrail, Vegetation Control, Striping & Marking, Rumble Strip (HMA), Install RSP, ESA Fence, and Electrical. Quotations will be broken down into comparable packages as reasonably necessary. Granite will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Portions of work can be made available upon request prior to bid date. Please call if any assistance is needed.
Requirements: Plans and specifications are available at your local Builders Exchange and/ or on the CDOT website: http://www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php. They are also available for viewing at our office located at 2716 Granite Court, Fresno CA. Requirements: Granite is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. This will be a prevailing wage job. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite will pay for bond premium up to 1.5%. Subcontractors must possess a current contractor?s license, DIR registration number, insurance and worker?s compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. Granite intends to work cooperatively with all qualified firms seeking work on this project. If you need services and or assistance in obtaining bonds, lines of credit, insurance, necessary equipment, materials and/or supplies, for this project call the Estimator, or contact your local Small Business Development Center Network (http://californiasbdc.org), Minority Business Development Center (www.mbda.gov) or contact the California Southwest Transportation Resource Center (https://www.transportation.gov/osdbu/sw-region-sbtrc). Please call or email if any assistance is needed. Granite Construction Company Is An Equal Opportunity Business Employer
Date posted: 06/28/2018