Listing for all primes seeking assistance with project 05-1C9904. 2 results found.
Contractor: GRANITE ROCK COMPANY Contact: Randy Bonino
Address: 5225 Hellyer Avenue, Suite 220 San Jose, CA 95138
Phone: 408-574-1400 Fax: 408-365-9548 Email: estimating@graniterock.com
Services needed: Certified DBE firms are encouraged to provide a quote to Graniterock for all items of work listed on the bid list, particularly these: Lead Compliance Plan, Construction Area Signs, Traffic Control, Channelizer, PCMS, K-Rail, Temporary Crash Cushion Module, Prepare Storm Water Pollution Prevention Plan, Treated Wood Waste, Clearing and Grubbing, Hazardous Waste Removal, Erosion Control, Treated Lumber and Timber, Adjust Utilities, Minor Concrete, Fencing, Object Marker, MBGR, Alternative Crash Cushion, Striping & Markers, Modify Existing Electrical System, & Trucking.
Requirements: Granite Rock Company 'Graniterock' is signatory to Operating Engineers, Laborers, Teamsters, Carpenters and Cement Masons unions. 100% performance and payment bonds will be required from a qualified surety company for the full amount of the subcontract price. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Plans and specifications can be downloaded on-line with Caltrans, or at our offices, but please contact our estimating office for assistance. Subcontractors must possess a current contractor's license, DIR number, insurance and worker's compensation coverage. Subcontractors will be required to enter into our standard contract. DBE Subcontractors must be listed by the CUCP for the work category code(s) that apply to the scope of work they are quoting. Items of work can be broken down to facilitate DBE participation. Graniterock intends to work cooperatively with all qualified firms seeking work on this project. Granite Rock Company is an equal opportunity employer
Date posted: 02/16/2018
Contractor: A. Teichert & Son, Inc. dba Teichert Construction Contact: Tim Corvello
Address: 400 Sunrise Avenue, Suite 300 Roseville
Phone: 2099832300 Fax: 2099832375 Email: TCorvello@teichert.com
Services needed: Request for qualified bids from Subcontractors, Suppliers & Truckers for the following project: Project: Construction on State Highway in Monterey County near Monterey at Various Locations form Carmel Valley Road to 0.3 mile North of Fremont Boulevard and on Route 66 at 0.1 mile East of Route 1 Bid Date: 3/8/18 @ 2:00 PM Docs & Plans Available from Caltrans Estimate: $2,600,000 Duration: 100 Working Days Agency Goals: 15% DBE Project Description: Teichert Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: all materials, labor and equipment for Construction Area Signs, Traffic Control System, Clearing & Grubbing, Concrete Supplier, Concrete Subcontractor, QC/QA, Hydroseeding, Temporary Erosion Control, Fencing, Metal Beam Guard Railing, Thermoplastic Traffic Striping & Marking, Painted Traffic Striping & Marking, Pavement Marker, Signal & Lighting, Message Signs, Lighting & Sign Illumination, LEAD Compliance, SWPPP Planning, Bottom; Transfer; Super Dump Trucks, Water Truck, Street Sweeping Truck and Hazardous Waste Trucking. Teichert Construction intends to work cooperatively with all qualified firms seeking work on this project, including but not limited to breaking out contract work items into economically feasible units to increase overall DBE participation. Plans and specifications are available from the municipality listed above and the Teichert?s Roseville Estimating office. For assistance obtaining or regarding the plans and specifications, please contact the listed Estimator. 100% Payment and Performance Bonds for subcontractors are required. Teichert will pay bond premium up to 2%. Insurance Waiver of subrogation also required. However, certified DBE's are encouraged to contact Teichert and request assistance if they are unable to meet Teichert's standard bonding or insurance requirements. DBE's also are encouraged to contact Teichert for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services. Subcontractor, Supplier and Trucker quotes must be valid, at minimum, for the award period stated in the contract documents. Please note that this is a prevailing wage project and Teichert Construction is Union signatory. Subcontractors will be subject to the terms and conditions of Teichert's subcontract and safety documents available at www.teichert.com/for-subcontractors.cfm. Submission of a bid to Teichert will confirm that you have reviewed and accepted Teichert's subcontract form. Conditions or exceptions in Subcontractor?s quote are expressly rejected unless accepted in writing prior to bid. Subcontractor scopes and supplier quotes are required 24 hours prior to bid. Additional information and or assistance to DBE's available from: *** All Quotes must have the Department of Industrial Relations # to be ACCEPTED ***
Requirements:
Date posted: 02/16/2018