Listing for all primes seeking assistance with project 04-4G8404. 4 results found.
Contractor: Golden State Bridge, Inc. Contact: David Riccitiello
Address: 3701 Mallard Drive Benicia, CA 94510
Phone: 925-372-8000 Fax: 925-372-8001 Email: dave@gsbridge.com
Services needed: LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), TEMPORARY SIGNAL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (LS), TEMPORARY RAILING (TYPE K), TEMPORARY ALTERNATIVE CRASH CUSHION, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMPORARY COVER, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY REINFORCED SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, TEMPORARY CONSTRUCTION ROADWAY, STREET SWEEPING, TEMPORARY ACTIVE TREATMENT SYSTEM, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, TEMPORARY CREEK DIVERSION SYSTEMS, ASBESTOS COMPLIANCE PLAN, HEALTH AND SAFETY PLAN, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), WORK AREA MONITORING (BRIDGE), TREATED WOOD WASTE, DUST CONTROL PLAN (NATURALLY OCCURRING ASBESTOS), TEMPORARY HIGH-VISIBILITY FENCE, TEMPORARY TIMBER CONSTRUCTION MAT, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, ROADWAY EXCAVATION (TYPE COM), ROADWAY EXCAVATION (TYPE H), ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), STRUCTURE EXCAVATION (BRIDGE), STRUCTURE EXCAVATION (TYPE D), STRUCTURE BACKFILL (BRIDGE), DITCH EXCAVATION, SUBGRADE ENHANCEMENT GEOGRID, ROADSIDE CLEARING, SOIL AMENDMENT, PACKET FERTILIZER, PLANT (GROUP I), PLANT (GROUP M), PLANT (GROUP A), PLANT ESTABLISHMENT WORK, WOOD MULCH, FOLIAGE PROTECTOR, 2" WYE STRAINER ASSEMBLY, RISER SPRINKLER ASSEMBLY, CAM COUPLER ASSEMBLY, 1 1/2" GATE VALVE, 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 3" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), MOVE-IN/MOVE-OUT (EROSION CONTROL), IMPORTED TOPSOIL (CY), ROLLED EROSION CONTROL PRODUCT (NETTING), HYDROMULCH, FIBER ROLLS, HYDROSEED, COMPOST (CY), INCORPORATE MATERIALS, CLASS 2 AGGREGATE SUBBASE, HOT MIX ASPHALT (TYPE A), HOT MIX ASPHALT (LEVELING), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE F), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, REMOVE BASE AND SURFACING, GROUND ANCHOR (SUBHORIZONTAL), TEMPORARY BRIDGE, 144" PERMANENT STEEL CASING, 144" CAST-IN-DRILLED-HOLE CONCRETE PILING, 132" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), STRUCTURAL CONCRETE, BRIDGE FOOTING, STRUCTURAL CONCRETE, BRIDGE, STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER), STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N), STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED), STRUCTURAL CONCRETE, DRAINAGE INLET, FURNISH PRECAST PRESTRESSED CONCRETE GIRDER (60'-70'), FURNISH PRECAST PRESTRESSED CONCRETE GIRDER (90'-100'), ERECT PRECAST PRESTRESSED CONCRETE GIRDER, PTFE SPHERICAL BEARING, JOINT SEAL (MR 1"), STEEL PLATE JOINT, BAR REINFORCING STEEL (BRIDGE), BRIDGE REMOVAL, CONCRETE BACKFILL (PIPE TRENCH) (RAPID STRENGTH CONCRETE), 18" CORRUGATED STEEL PIPE (.109" THICK), 8" PERFORATED PLASTIC PIPE UNDERDRAIN, FURNISH AND INSTALL DRAIN PIPE (HORIZONTAL DRAIN), DRILL HOLE (HORIZONTAL DRAIN), 18" ANCHOR ASSEMBLY, 18" STEEL FLARED END SECTION, REMOVE CULVERT (LF), REMOVE INLET, REMOVE FLARED END SECTION (EA), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), ROCK SLOPE PROTECTION FABRIC (CLASS 8), MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION), MISCELLANEOUS IRON AND STEEL, 186" ISOLATION CASING, DESTROY WELL, PREPARE AND STAIN CONCRETE, STAIN GALVANIZED SURFACES (LF), RELOCATE MAILBOX, TEMPORARY FENCE (TYPE CL-6), 4' CHAIN LINK GATE (TYPE CL-6), REMOVE GATE, REMOVE PAVEMENT MARKER, GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), REMOVE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINIUM SIGN (0.063" UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINIUM SIGN (0.080" UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), RETROREFLECTIVE SHEETING TYPE XI, ROADSIDE SIGN - ONE POST, MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), TRANSITION RAILING (TYPE WB-31), ALTERNATIVE IN-LINE TERMINAL SYSTEM, ALTERNATIVE CRASH CUSHION, CALIFORNIA ST-70 BRIDGE RAIL (MODIFIED), REMOVE GUARDRAIL, 6" THERMOPLASTIC TRAFFIC STRIPE, PAINT PAVEMENT MARKING (2-COAT), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE PAINTED PAVEMENT MARKING, REMOVE THERMOPLASTIC TRAFFIC STRIPE.
Requirements: Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000 or dave@gsbridge.com. Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $400 and covers the fiscal year (July 1 to June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html.
Date posted: 11/08/2018
Contractor: Ghilotti Construction Company, Inc. Contact: Jim Petnic
Address: 246 Ghilotti Avenue Santa Rosa, CA 95407
Phone: 707-585-1221 Fax: 707-585-1601 Email: jimp@ghilotti.com
Services needed: Ghilotti Construction Company, Inc. is seeking certified DBE subcontractors, suppliers & truckers for quotes including, but not limited to, the following scopes of work: FABRIC & OILS, CAS, TRAFFIC CONTROL, RESET-ADJUST ROADWAY ITEMS, COLD PLANE, CLEAR & GRUB, LANDSCAPE / HIGHWAY PLANTING, IRRIGATION, EROSION CONTROL, ASPHALT PAVING, AC DIKE, CIDH PILES, STRUCTURAL CONCRETE, MINOR CONCRETE STRUCTURE, PRECAST CONCRETE GIRDERS, JOINT SEAL, REINFORCING STEEL, ROADSIDE SIGNS, TEMPORARY FENCING-ESA, SILT, MBGR, METAL RAILING, THERMOPLASTIC TRAFFIC STRIPING & PAVEMENT MARKINGS, SIGNAL, STORM DRAIN (UNDERGROUND), STREET SWEEPING, MATERIAL SUPPLIER & TRUCKING. Submit quotes by Noon on bid date. Contact our estimator for more information. GCC is available to discuss breaking out any portion of work to encourage minority participation.
Requirements: Mr. Jim Petnic (707/585-1221 or jimp@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: GCC may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. GCC will pay bond premiums up to 1 1/2% of contract cost. GCC is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.) Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC's written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on our website (www.ghilotti.com/subcontractors/documents) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void. As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form 'CG-2010-1185' or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.
Date posted: 11/20/2018
Contractor: California Engineering Contractors, Inc Contact: Jeff Hollfelder-Estimator
Address: 20 Happy Valley Road Pleasanton
Phone: 9254611500 Fax: 925-461-0510 Email: estimator@cecmain.com
Services needed: Request Qualified DBE Subcontractors, Consultants and Suppliers Quotes For:but not limited to: Clearing/Tree Removal, Construction Area Signs, Temporary Signals, Traffic Striping, Landscaping/Erosion Control, Rebar, Active Treatment System, Metal Beam Guard Rail, Bridge Demolition, Paving and Grading, Furnish and Erect Precast Girders, Isolation Casing, Temporary Bridge, PTFE Bearings, Drainage, Concrete, Furnish & Install Miscellaneous Metal, Fencing, Furnish & Install Bridge Rail, CIDH/Tiebacks, Trucking, Materials & Supplies. CEC is willing to breakout any portion of work to encourage DBE participation. Plans and specs are available for viewing at our Pleasanton office. They may also be viewed and downloaded from the Caltrans Website: http://www.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php
Requirements: 100 % Payment & Performance Bonds will be required from a single, treasury-listed surety subject to our approval. CEC will pay bond premiums up to 1.5%. Subcontractors awarded on any project will be on CEC's standard form for subcontract without any modifications. Please call for assistance in bonding, insurance, lines of credit, technical info, equipment and supplies or if any other assistance is needed. AN EQUAL OPPORTUNITY EMPLOYER
Date posted: 12/11/2018
Contractor: Disney Construction Inc. Contact: Amir Mutwakil
Address: 533 Airport Blvd Suite 120 Burlingame
Phone: 650-259-9545 Fax: 650-259-9651 Email: estimating@disneyconstruction.com
Services needed: Disney Construction Inc. is seeking certified DBE subcontractors, suppliers & truckers for quotes including, but not limited to: Construction Area Signs, Roadside Signs, Reset/Adjust Roadway Items, Traffic Control System, Temp. K-Railing, Temp. Creek Diversion & Temp Active Treatment System, Water Quality Sampling, Analysis & Report, Lead/Asbestos Compliance Plan, Dust Control Plan (NOA), Bridge Removal, Inlet Removal, Destroy Well, Clearing and Grubbing, Storm Water Pollution Prevention, WPC BMPs, Drainage Inlet and Storm Drain System, Corrugated Steel Pipe & FES, Earthwork and Grading, Landscape Planting & Irrigation & Maintenance, Erosion Control & Hydroseeding, RSP/Rip Rap, RSP Fabric, HMA Type A, AC Dike, Cold Plane Asphalt, Subbase Aggregate CL2, Ready-mix Concrete, Striping & Marking. Bridge Railing, CL Fencing, Midwest Guardrail & Transition Railing, Alternative In-Line Terminal System, Concrete Barrier, Structural Concrete Bridge and CIDH foundations, Temporary Bridge, Perm. Steel Casing, Isolation Casing, Approach Slab, Drainage Inlet, Rebar, Ground Anchor, Conc. Approach Slabs, Furnish & Erect Precast Concrete Girders, Minor Conc. Misc. Const., PTFE Spherical Bearing, Joint Seal, Misc. Metals, Prepare & Stain Concrete, Stain Galvanized Surface,
Requirements: Disney Construction Inc. is an Equal Opportunity Employer and is requesting quotes from all qualified subcontractors and suppliers. Disney Construction Inc. is willing to breakout portions of work to encourage DBE participation. Please contact us if you need assistance with the following: (a) Contacting bonding and/or insurance companies, (b) Arranging with sureties incremental or phased bonding for DBEs, (c) Paying for the cost of the bond insurance, (d) Waving bonding or insurance requirements, (e) Referrals to Business Development Centers for obtaining bonding, insurance, or lines of credit. 100% performance and payment bonds with a surety company subject to approval of Disney Construction, Inc. are required of subcontractors for this project. Disney Construction, Inc. will pay bond premium up to 1.5%. Subcontractor must possess a valid contractor?s license, current insurance, worker?s compensation meeting Disney Construction?s requirement and be registered under Public Works Contractors Registration Law [SB 854]. Subcontractors will be required to abide by terms and conditions of the AGC Master Labor Agreements and to execute an agreement utilizing the latest DCI Subcontract incorporating prime contract terms and conditions, including payment provisions. Disney Construction is signatory to the Laborers & Cement Masons, Carpenters & Pile Drivers, and Operating Engineers. Disney Construction, Inc.?s listing of a subcontractor is not to be construed as an acceptance of all the subcontractor?s conditions or exceptions included with the subcontractor?s price quote. Please send in you scope letters 2 days prior to bid day and your quote 24 hours prior to bid. Please contact Amir Mutwakil at (650) 259-9545 with any questions, or email estimating@disneyconstruction.com. Please note that all Contractors and Subcontractors must register with The DIR (Department of Industrial Relations) in order to bid on public works projects. Include CSLB License Number and DIR Number on All Quotes Submitted. For Plans & Specifications https://disneyconstruction.egnyte.com/fl/KHqffudG6A. Plans and specifications can be reviewed at our main office located at 533 Airport Blvd Suite #120 in Burlingame CA. Please call to setup an appointment for review.
Date posted: 12/12/2018