Listing for all primes seeking assistance with project 04-4G8104. 2 results found.
Contractor: Golden State Bridge, Inc. Contact: David Riccitiello
Address: 3701 Mallard Drive Benicia, CA 94510
Phone: 925-372-8000 Fax: 925-372-8001 Email: dave@gsbridge.com
Services needed: Lead Compliance Plan, Develop Water Supply, Construction Area Signs, Traffic Control System, Temp. Traffic Stripe (Paint), Channelizer (Surface Mounted), P.C.M.S., Temp. Railing (Type K), Temp. Crash Cushion Module, Prepare SWPPP, Rain Event Action Plan, Storm Water Sampling and Analysis Day, Storm Water Annual Report, Temp. Cover, Temp. Drainage Inlet Protection, Temp. Fiber Roll, Temp. Construction Entrance, Street Sweeping, Temp. Concrete Washout, Health and Safety Plan, Treated Wood Waste, Clearing and Grubbing, Structure Backfill (Bridge), Lean Concrete Backfill, Wood Mulch, Move-In/Move-Out (Erosion Control), Imported Topsoil, Rolled Erosion Control Product (Netting), Hydromulch, Fiber Rolls, Hydroseeding, Compost, Incorporate Materials, Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type C and Type F), Place Hot Mix Asphalt (Misc. Area), Remove Asphalt Concrete Dike, Temp. Support, Structural Concrete; Bridge, Structural Concrete, Approach Slab (Type R), Structural Concrete; Drainage Inlet, Minor Concrete (Backfill), Drill and Bond Dowel, Clean Expansion Joint, Joint Seal, Bar Reinforcing Steel, Structural Steel, Repair Spalled Surface Area, Core Concrete, Bridge Removal (Portion), Replace Bearing Pad, 12 in. Corrugated Steel Pipe, 18? Slotted Corrugated Steel Pipe, Anchor Assembly, Remove Pipe, Minor Concrete (Gutter Depression), Misc. Iron and Steel, Temp. Fence (Type CL-6), Chain Link Fence, Steel Access Gate, 16 ft. Chain Link Gate (Type CL-6), Remove Fence, Reconstruct Fence, Remove Pavement Marker, Guard Railing Delineator, Pavement Marker (Retroreflective), Object Marker (Type P), Midwest Guardrail System (Steel Post), Vegetation Control (Minor Concrete), Concrete Barrier (Type 27S Mod.), Transition Railing (Type WB-31), End Cap (Type A), Concrete Barrier Marker, Concrete Barrier, Remove Guardrail, Salvage Metal Bridge Railing, 2 in. Two - Component Paint Traffic Stripe, 6 in. Two-Component Paint Traffic Stripe, 6 in. Thermoplastic Traffic Stripe, Remove Painted Traffic Stripe, Remove Thermoplastic Traffic Stripe.
Requirements: Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000 or dave@gsbridge.com. Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $300 and covers the fiscal year (July 1 to June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html.
Date posted: 01/08/2018
Contractor: American Civil Constructors West Coast LLC Contact: Estimating
Address: 2990 Bay Vista Court Benicia CA 94510
Phone: 707-746-8028 Fax: 707-747-0593 Email: estimatingwc@accbuilt.com
Services needed: ACC West Coast would like to encourage all DBE companies whom are classified to perform any of the scopes of work relevant to this project to submit quotes. We are currently requesting quotes for all scopes of work and bid items related to this project. Please see the list of bid items associated with this project for more information. Other items of work in which quotes are greatly desired: Construction Rentals, Misc. Construction Supplies, Flat-Bed and End Dump Hourly Trucking Rates. We will also consider subcontracting other scopes of work offered by interested companies.
Requirements: ACC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Please call to discuss how ACC West Coast can assist you in your bonding, credit and/or insurance needs. Assistance may include, but is not limited to: Contacting bonding and/or insurance companies on your behalf, arranging with sureties incremental or phased bonding, obtaining necessary equipment, supplies and/or materials. Subcontractors may be required to provide a bond and must have a valid contractor?s license and current insurance coverage that meets ACC and project requirements. Selected subcontractors will be required to sign our standard subcontractor agreement. Please fax quotes no later than 10:00am on bid day. If you have any questions, please contact the project estimator. Plans and Specifications may be viewed at our Benicia office. Quotes must include inclusions and exclusions, and must be valid for a minimum of 60 days following the bid date. ACC is an equal opportunity employer.
Date posted: 01/12/2018